Site selection and setting out. Biogas ToT Course May 10 – 15, Kampala, Uganda. Site selection. Main considerations Easy construction works Water logging Rock Minimum construction cost Easy operation and maintenance Feeding Use of main gas valve Composing and use of slurry - PowerPoint PPT Presentation

TRANSCRIPT

Site selection and setting out

Biogas ToT Course

May 10 – 15, Kampala, Uganda

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSite selection

Main considerations

• Easy construction works– Water logging– Rock

• Minimum construction cost• Easy operation and maintenance

– Feeding– Use of main gas valve– Composing and use of slurry– Checking of gas leakage– Draining condensed water from pipeline.

• The site should guarantee plant safety

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSite requirements I

• Constant, high ambient temperature• Even and smooth surface• Slightly in elevated than the surrounding• Close to:

– dung collection point– water point– gas application point

• 2 meter away from foundations• Space for plant and compost-pit• Away from wells to avoid ground water pollution

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSite requirements II

• Sufficient distance to trees• Adequate distance from main trail or unsafe areas• Good bearing capacity of soil• Limited space: cattle shed on top of the plant after

proper backfill• Reasonably far from any machine producing

vibration on soil

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSetting out

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSetting out

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaLay-out example

Digester OutletInlet

Slurry Pit

Slurry Pit

Toilet

Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaReference line

Reference line30 – 50cm above

ground level

> 20 cm

30 cm