section 5 concrete

Upload: theresa-denice-fernandez

Post on 13-Apr-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/26/2019 Section 5 Concrete

    1/205

  • 7/26/2019 Section 5 Concrete

    2/205

  • 7/26/2019 Section 5 Concrete

    3/205

  • 7/26/2019 Section 5 Concrete

    4/205

  • 7/26/2019 Section 5 Concrete

    5/205

  • 7/26/2019 Section 5 Concrete

    6/205

  • 7/26/2019 Section 5 Concrete

    7/205

  • 7/26/2019 Section 5 Concrete

    8/205

  • 7/26/2019 Section 5 Concrete

    9/205

  • 7/26/2019 Section 5 Concrete

    10/205

  • 7/26/2019 Section 5 Concrete

    11/205

  • 7/26/2019 Section 5 Concrete

    12/205

  • 7/26/2019 Section 5 Concrete

    13/205

  • 7/26/2019 Section 5 Concrete

    14/205

  • 7/26/2019 Section 5 Concrete

    15/205

  • 7/26/2019 Section 5 Concrete

    16/205

  • 7/26/2019 Section 5 Concrete

    17/205

  • 7/26/2019 Section 5 Concrete

    18/205

  • 7/26/2019 Section 5 Concrete

    19/205

  • 7/26/2019 Section 5 Concrete

    20/205

  • 7/26/2019 Section 5 Concrete

    21/205

  • 7/26/2019 Section 5 Concrete

    22/205

  • 7/26/2019 Section 5 Concrete

    23/205

  • 7/26/2019 Section 5 Concrete

    24/205

  • 7/26/2019 Section 5 Concrete

    25/205

  • 7/26/2019 Section 5 Concrete

    26/205

  • 7/26/2019 Section 5 Concrete

    27/205

  • 7/26/2019 Section 5 Concrete

    28/205

  • 7/26/2019 Section 5 Concrete

    29/205

  • 7/26/2019 Section 5 Concrete

    30/205

  • 7/26/2019 Section 5 Concrete

    31/205

  • 7/26/2019 Section 5 Concrete

    32/205

  • 7/26/2019 Section 5 Concrete

    33/205

  • 7/26/2019 Section 5 Concrete

    34/205

  • 7/26/2019 Section 5 Concrete

    35/205

  • 7/26/2019 Section 5 Concrete

    36/205

  • 7/26/2019 Section 5 Concrete

    37/205

  • 7/26/2019 Section 5 Concrete

    38/205

  • 7/26/2019 Section 5 Concrete

    39/205

  • 7/26/2019 Section 5 Concrete

    40/205

  • 7/26/2019 Section 5 Concrete

    41/205

  • 7/26/2019 Section 5 Concrete

    42/205

  • 7/26/2019 Section 5 Concrete

    43/205

  • 7/26/2019 Section 5 Concrete

    44/205

  • 7/26/2019 Section 5 Concrete

    45/205

  • 7/26/2019 Section 5 Concrete

    46/205

  • 7/26/2019 Section 5 Concrete

    47/205

  • 7/26/2019 Section 5 Concrete

    48/205

  • 7/26/2019 Section 5 Concrete

    49/205

  • 7/26/2019 Section 5 Concrete

    50/205

  • 7/26/2019 Section 5 Concrete

    51/205

  • 7/26/2019 Section 5 Concrete

    52/205

  • 7/26/2019 Section 5 Concrete

    53/205

  • 7/26/2019 Section 5 Concrete

    54/205

  • 7/26/2019 Section 5 Concrete

    55/205

  • 7/26/2019 Section 5 Concrete

    56/205

  • 7/26/2019 Section 5 Concrete

    57/205

  • 7/26/2019 Section 5 Concrete

    58/205

  • 7/26/2019 Section 5 Concrete

    59/205

  • 7/26/2019 Section 5 Concrete

    60/205

  • 7/26/2019 Section 5 Concrete

    61/205

  • 7/26/2019 Section 5 Concrete

    62/205

  • 7/26/2019 Section 5 Concrete

    63/205

  • 7/26/2019 Section 5 Concrete

    64/205

  • 7/26/2019 Section 5 Concrete

    65/205

  • 7/26/2019 Section 5 Concrete

    66/205

  • 7/26/2019 Section 5 Concrete

    67/205

  • 7/26/2019 Section 5 Concrete

    68/205

  • 7/26/2019 Section 5 Concrete

    69/205

  • 7/26/2019 Section 5 Concrete

    70/205

  • 7/26/2019 Section 5 Concrete

    71/205

  • 7/26/2019 Section 5 Concrete

    72/205

  • 7/26/2019 Section 5 Concrete

    73/205

  • 7/26/2019 Section 5 Concrete

    74/205

  • 7/26/2019 Section 5 Concrete

    75/205

  • 7/26/2019 Section 5 Concrete

    76/205

  • 7/26/2019 Section 5 Concrete

    77/205

  • 7/26/2019 Section 5 Concrete

    78/205

  • 7/26/2019 Section 5 Concrete

    79/205

  • 7/26/2019 Section 5 Concrete

    80/205

  • 7/26/2019 Section 5 Concrete

    81/205

  • 7/26/2019 Section 5 Concrete

    82/205

  • 7/26/2019 Section 5 Concrete

    83/205

  • 7/26/2019 Section 5 Concrete

    84/205

  • 7/26/2019 Section 5 Concrete

    85/205

  • 7/26/2019 Section 5 Concrete

    86/205

  • 7/26/2019 Section 5 Concrete

    87/205

  • 7/26/2019 Section 5 Concrete

    88/205

  • 7/26/2019 Section 5 Concrete

    89/205

  • 7/26/2019 Section 5 Concrete

    90/205

  • 7/26/2019 Section 5 Concrete

    91/205

  • 7/26/2019 Section 5 Concrete

    92/205

  • 7/26/2019 Section 5 Concrete

    93/205

  • 7/26/2019 Section 5 Concrete

    94/205

  • 7/26/2019 Section 5 Concrete

    95/205

  • 7/26/2019 Section 5 Concrete

    96/205

  • 7/26/2019 Section 5 Concrete

    97/205

  • 7/26/2019 Section 5 Concrete

    98/205

  • 7/26/2019 Section 5 Concrete

    99/205

  • 7/26/2019 Section 5 Concrete

    100/205

  • 7/26/2019 Section 5 Concrete

    101/205

  • 7/26/2019 Section 5 Concrete

    102/205

  • 7/26/2019 Section 5 Concrete

    103/205

  • 7/26/2019 Section 5 Concrete

    104/205

  • 7/26/2019 Section 5 Concrete

    105/205

  • 7/26/2019 Section 5 Concrete

    106/205

  • 7/26/2019 Section 5 Concrete

    107/205

  • 7/26/2019 Section 5 Concrete

    108/205

  • 7/26/2019 Section 5 Concrete

    109/205

  • 7/26/2019 Section 5 Concrete

    110/205

  • 7/26/2019 Section 5 Concrete

    111/205

  • 7/26/2019 Section 5 Concrete

    112/205

  • 7/26/2019 Section 5 Concrete

    113/205

  • 7/26/2019 Section 5 Concrete

    114/205

  • 7/26/2019 Section 5 Concrete

    115/205

  • 7/26/2019 Section 5 Concrete

    116/205

  • 7/26/2019 Section 5 Concrete

    117/205

  • 7/26/2019 Section 5 Concrete

    118/205

  • 7/26/2019 Section 5 Concrete

    119/205

  • 7/26/2019 Section 5 Concrete

    120/205

  • 7/26/2019 Section 5 Concrete

    121/205

  • 7/26/2019 Section 5 Concrete

    122/205

  • 7/26/2019 Section 5 Concrete

    123/205

  • 7/26/2019 Section 5 Concrete

    124/205

  • 7/26/2019 Section 5 Concrete

    125/205

  • 7/26/2019 Section 5 Concrete

    126/205

  • 7/26/2019 Section 5 Concrete

    127/205

  • 7/26/2019 Section 5 Concrete

    128/205

  • 7/26/2019 Section 5 Concrete

    129/205

  • 7/26/2019 Section 5 Concrete

    130/205

  • 7/26/2019 Section 5 Concrete

    131/205

  • 7/26/2019 Section 5 Concrete

    132/205

  • 7/26/2019 Section 5 Concrete

    133/205

  • 7/26/2019 Section 5 Concrete

    134/205

  • 7/26/2019 Section 5 Concrete

    135/205

  • 7/26/2019 Section 5 Concrete

    136/205

  • 7/26/2019 Section 5 Concrete

    137/205

  • 7/26/2019 Section 5 Concrete

    138/205

  • 7/26/2019 Section 5 Concrete

    139/205

  • 7/26/2019 Section 5 Concrete

    140/205

  • 7/26/2019 Section 5 Concrete

    141/205

  • 7/26/2019 Section 5 Concrete

    142/205

  • 7/26/2019 Section 5 Concrete

    143/205

  • 7/26/2019 Section 5 Concrete

    144/205

  • 7/26/2019 Section 5 Concrete

    145/205

  • 7/26/2019 Section 5 Concrete

    146/205

  • 7/26/2019 Section 5 Concrete

    147/205

  • 7/26/2019 Section 5 Concrete

    148/205

  • 7/26/2019 Section 5 Concrete

    149/205

  • 7/26/2019 Section 5 Concrete

    150/205

  • 7/26/2019 Section 5 Concrete

    151/205

  • 7/26/2019 Section 5 Concrete

    152/205

  • 7/26/2019 Section 5 Concrete

    153/205

  • 7/26/2019 Section 5 Concrete

    154/205

  • 7/26/2019 Section 5 Concrete

    155/205

  • 7/26/2019 Section 5 Concrete

    156/205

  • 7/26/2019 Section 5 Concrete

    157/205

  • 7/26/2019 Section 5 Concrete

    158/205

  • 7/26/2019 Section 5 Concrete

    159/205

  • 7/26/2019 Section 5 Concrete

    160/205

  • 7/26/2019 Section 5 Concrete

    161/205

  • 7/26/2019 Section 5 Concrete

    162/205

  • 7/26/2019 Section 5 Concrete

    163/205

  • 7/26/2019 Section 5 Concrete

    164/205

  • 7/26/2019 Section 5 Concrete

    165/205

  • 7/26/2019 Section 5 Concrete

    166/205

  • 7/26/2019 Section 5 Concrete

    167/205

  • 7/26/2019 Section 5 Concrete

    168/205

  • 7/26/2019 Section 5 Concrete

    169/205

  • 7/26/2019 Section 5 Concrete

    170/205

  • 7/26/2019 Section 5 Concrete

    171/205

  • 7/26/2019 Section 5 Concrete

    172/205

  • 7/26/2019 Section 5 Concrete

    173/205

  • 7/26/2019 Section 5 Concrete

    174/205

  • 7/26/2019 Section 5 Concrete

    175/205

  • 7/26/2019 Section 5 Concrete

    176/205

  • 7/26/2019 Section 5 Concrete

    177/205

  • 7/26/2019 Section 5 Concrete

    178/205

  • 7/26/2019 Section 5 Concrete

    179/205

  • 7/26/2019 Section 5 Concrete

    180/205

  • 7/26/2019 Section 5 Concrete

    181/205

  • 7/26/2019 Section 5 Concrete

    182/205

  • 7/26/2019 Section 5 Concrete

    183/205

  • 7/26/2019 Section 5 Concrete

    184/205

  • 7/26/2019 Section 5 Concrete

    185/205

  • 7/26/2019 Section 5 Concrete

    186/205

  • 7/26/2019 Section 5 Concrete

    187/205

  • 7/26/2019 Section 5 Concrete

    188/205

  • 7/26/2019 Section 5 Concrete

    189/205

  • 7/26/2019 Section 5 Concrete

    190/205

  • 7/26/2019 Section 5 Concrete

    191/205

  • 7/26/2019 Section 5 Concrete

    192/205

  • 7/26/2019 Section 5 Concrete

    193/205

    QCS 2014 Section 05: Concrete Page 1Part 19: Testing of Water Retaining Structures

    19 TESTING OF WATER RETAINING STRUCTURES................................................ 2

    19.1 GENERAL ............................................................................................................... 2 19.1.1 Scope 2 19.1.2 References 2 19.1.3 Submittals 2 19.1.4 General 2

    19.2 TESTING ................................................................................................................. 2 19.2.1 General 2 19.2.2 Cleaning 3

    19.3 TESTING PROCEDURE ......................................................................................... 4 19.3.1 Walls 4 19.3.2 Roofs 5 19.3.3 Disposal of Water Used for Testing 5

  • 7/26/2019 Section 5 Concrete

    194/205

    QCS 2014 Section 05: Concrete Page 2Part 19: Testing of Water Retaining Structures

    19 TESTING OF WATER RETAINING STRUCTURES

    19.1 GENERAL

    19.1.1 Scope

    1 This Part of the specification applies to the testing of structures that are designed with theintention of retaining water.

    2 Related Section and Parts are as follows:

    This SectionPart 1 ............... GeneralPart 13 ............. Inspection and Testing of Hardened ConcretePart 14 ............. Protective Treatments for Concrete

    19.1.2 References

    BS 8007 ...................... Code of Practice for Design of concrete structures for the retaining ofaqueous liquids

    19.1.3 Submittals

    1 The Contractor shall record and submit to the Engineer within 24 hours the results of thewatertightness tests carried out.

    19.1.4 General

    1 Water retaining structures shall be watertight when subjected to external groundwaterpressures or to tests as specified in this Part.

    19.2 TESTING

    19.2.1 General

    1 The Contractor shall test watertightness of water retaining structures including storagereservoirs and other miscellaneous structures that require to be watertight.

    2 All water used for testing shall be potable or irrigation water and the Contractor shall make

    arrangements for the supply and disposal of this water.

    3 Water retaining structures shall be tested for watertightness after completion, in accordancewith the following method or as directed by the Engineer:

    (a) the structure shall be filled with potable or irrigation water in stages not exceeding 1 min 24 h held at each water level for such time as the Engineer may require. Shoulddampness or leakage occur, the water shall be drawn off and the defects remedied tothe satisfaction of the Engineer

    (b) in the case of structures which are subdivided into individual tanks, each individualtank shall be tested separately. In the case of underground or partially undergroundstructures, the testing shall take place before application of water proofing membrane,liner material or perimeter drain, filter material or backfilling is placed against the walls

  • 7/26/2019 Section 5 Concrete

    195/205

    QCS 2014 Section 05: Concrete Page 3Part 19: Testing of Water Retaining Structures

    (c) in the case of hopper bottomed tanks, this shall be taken to mean that no material isplaced against the vertical external walls of the tank, the sloping walls of the hopperbottoms of the tanks being assumed built directly against the excavation apart from theblinding concrete

    (d) no placing of material against the walls shall take place until the Engineer has givenhis written approval and acceptance of the water retaining structures as watertight

    (e) filling shall not take place earlier than 28 d after the casting of the final sections of thestructure which will be stressed by the filling of the structure.

    (f) testing shall not be undertaken until the structure to be tested has been; completedstructurally including roof, if any, and has been passed by the Engineer in writing assatisfactory in all respects other than watertightness, especially in regard to the finalfinish of the work

    (g) not withstanding the satisfactory completion of the seven day test, leakage, cracks,and damp patches and sweating visible on the outside faces of the structure shall be

    rectified from the water face by an injection system to the approval of the Engineer

    (h) repair making the outer face only watertight wall not be accepted, this applies to bobbinholes also

    (i) the structure shall be retested until the watertightness is approved by the Engineer.

    (j) should the structure fail a test in the above respects, the Contractor shall immediatelytake such steps as may be necessary to:

    (i) ascertain the nature and positions of defects or leakage's

    (ii) empty the structure

    (iii) remedy the defects in a manner approved by the Engineer, employing workerswho are specialists in this class of work

    (k) when the remedial work has been completed in the manner approved by the Engineer,the testing and if necessary rectification shall be repeated until a satisfactory test isachieved.

    (l) if necessary, in extreme cases of lack of watertightness, the Engineer may reject thestructure or portions thereof.

    19.2.2 Cleaning

    1 All water retaining structures shall, on completion, be carefully cleaned of all debris, to the

    complete satisfaction of the Engineer as follows:(a) shall be brushed down on all internal faces with a stiff broom while still dry

    (b) all resulting debris removed

    (c) all associated reservoir pipe work shall be cleaned in accordance with the specifiedrequirements

    (d) the structure shall then be flooded with approximately 75 mm of clean water

    (e) whole of internal faces shall be carefully brushed down with stiff brooms using thewater continuously until all faces are clean

    (f) water shall then be drained off

    (g) walls and floors hosed and flushed with clean water until perfectly clean.

  • 7/26/2019 Section 5 Concrete

    196/205

    QCS 2014 Section 05: Concrete Page 4Part 19: Testing of Water Retaining Structures

    19.3 TESTING PROCEDURE

    19.3.1 Walls

    1 After completion and cleaning of the structure and all associated pipe work, if any, theContractor shall fill the structure up to the top water level and leave for a stabilising period of21 d in order to allow for absorption and autogenous healing to take place.

    2 Water shall be added over this period to maintain the top water level.

    3 The Contractor shall ensure that all pipes and specials are available in ample time ahead oftesting.

    4 Two sets of evaporation trays shall be provided along with two sets of rain gauges.

    5 Levels in the trays and structure shall be made and recorded by a hook gauge with vernier

    attachments.

    6 Before and during testing, flows in the structure under drainage, if any, shall be monitored,measured and recorded.

    7 Each under drain shall be numbered and observations reported by under drain number tofacilitate analysis of the data.

    8 All leaks shall be repaired within one month of their detection.

    9 On the twenty-second day, two shallow watertight evaporation trays of area 0.4 m2 shall befilled with 75 mm of water and placed to float in the structure.

    10 The water level in the structure shall be recorded and the test commenced and carried outover the next 7 d.

    11 Readings of water levels in the structure and trays shall be made and recorded every 24 hover this period.

    12 If the water level in the tank falls by more than indicated by the evaporation trays, or othersign of leakage occurs by the end of the test period then the Contractor shall search andmark all areas of defect.

    13 The structure shall then be emptied and the defects made good as specified herein.

    14 After completion of remedial measures the structure shall be refilled and the test repeated.

    15 This process shall be repeated until the structure is watertight to the satisfaction of theEngineer.

    16 The fall of water level in the structure over the test period of 7 d, minus the fall accounted forby evaporation and rainfall shall not exceed 1/500 of the average water depth of the fullstructure or 10 mm whichever is less.

  • 7/26/2019 Section 5 Concrete

    197/205

    QCS 2014 Section 05: Concrete Page 5Part 19: Testing of Water Retaining Structures

    19.3.2 Roofs

    1 The roofs of structures shall be tested for watertightness before laying of roof membrane.

    2 Roof and fittings shall be hosed down vigorously and this shall be repeated in such a way asto keep the roof wet for three successive days.

    3 Roof and fittings shall be deemed satisfactory for watertightness if no discernible leaks ordamp patches show in the soffit.

    4 Roof covering shall be completed as soon as possible after testing.

    19.3.3 Disposal of Water Used for Testing

    1 The Contractor shall provide suitable means for disposal of water used for testing, such thatno damage results to facilities, structures or property.

    2 These means shall be subject to the approval of the Engineer and local authorities.

    3 Details shall be submitted to Engineer on request.

    4 The Contractor shall be responsible for damage caused by his filling, testing, flushing andwastewater disposal operations.

    END OF PART

  • 7/26/2019 Section 5 Concrete

    198/205

    QCS 2014 Section 05: Concrete Page 1Part 20: Personnel Qualifications and Certification

    20 PERSONNEL QUALIFICATIONS AND CERTIFICATIONS ........ .......... ......... ......... . 2

    20.1 GENERAL ............................................................................................................... 2

    20.2 AUDITORS .......... ......... .......... ......... ......... ......... .......... ......... .......... ......... ......... ....... 2

    20.3 READY MIXED CONCRETE COMPANIES ............................................................. 2 20.3.1 Technical Department 2 20.3.2 Production and Operation Department 4

    20.4 TESTING LABORATORIES .................................................................................... 5 20.4.1 Concrete Laboratory Department 5

    20.5 CONTRACTORS ..................................................................................................... 6 20.5.1 Concrete Construction Department 6

    20.6 CONSULTANTS ...................................................................................................... 7 20.6.1 Site Supervision Department 7

    20.6.2 Site Supervision / Design Office Department 7

  • 7/26/2019 Section 5 Concrete

    199/205

    QCS 2014 Section 05: Concrete Page 2Part 20: Personnel Qualifications and Certification

    20 PERSONNEL QUALIFICATIONS AND CERTIFICATIONS

    20.1 GENERAL

    1 The qualification requirements given in this part are optional unless otherwise mentionedbelow. The purpose of the qualifications is to prepare the industry to cope with the requiredquality of construction. The requirements will become compulsory as and when stated byQatar Standards.

    2 Qualifications shall be approved by Qatar Standards or their representatives.

    20.2 AUDITORS

    1 Qatar Standards auditors and their approved representatives shall be qualified for inspecting

    concrete ready mix plants and testing laboratories.

    20.3 READY MIXED CONCRETE COMPANIES

    20.3.1 Technical Department

    1 Position: Technical Manager / QC Manager

    Qualifications:

    (a) Concrete specification review and concrete mixture proportioning

    (b) Concrete constituent materials, their characteristics, and effects on concrete properties

    (c) Fresh and hardened concrete properties

    (d) Durability of concrete

    (e) Production and delivery of Ready Mixed Concrete

    (f) Handling, placing and curing of concrete

    (g) Specifying and evaluation of concrete strength

    (h) Testing of concrete and its constituents

    (i) Quality control procedures and statistical analysis

    (j) Hot weather concreting(k) Troubleshooting concrete problems

    2 Position: Site Supervisor

    Qualifications:

    (a) The supervisor shall be capable of satisfactorily reading, understanding andperforming the below fresh concrete tests:

    BS EN 12350-1 .......... Testing fresh concrete - Sampling ASTM C1064/C1064M Temperature of freshly mixed hydraulic-cement concrete

  • 7/26/2019 Section 5 Concrete

    200/205

    QCS 2014 Section 05: Concrete Page 3Part 20: Personnel Qualifications and Certification

    BS EN 12350-2 .......... Testing fresh concrete Slump testBS EN 12350-6 ......... Testing fresh concrete DensityBS EN 12390-2 ......... Testing hardened concrete Making and curing specimens for

    strength tests

    ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete

    3 Position: Lab Supervisor

    Qualifications:

    (a) The supervisor shall be capable of satisfactorily reading, understanding andperforming the below fresh and hardened concrete tests:

    BS EN 12350-1 ......... Testing fresh concrete - Sampling

    ASTM C1064/C1064M Temperature of freshly mixed hydraulic-cement concrete

    BS EN 12350-2 ......... Testing fresh concrete Slump testBS EN 12350-6 ......... Testing fresh concrete DensityBS EN 12350-7 ......... Testing fresh concrete Air content (Pressure Method)BS EN 12390-2 ......... Testing hardened concrete Making and curing specimens for

    strength tests

    ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete

    BS EN 12390-3 .......... Testing hardened concrete - Compressive strength of test specimens

    BS EN 932-1 ............. Aggregates - Methods of sampling

    BS EN 932-2 ............. Aggregates Methods of reducing laboratory samples

    BS EN 933-1 ............. Aggregates Determination of particle size distribution (and dustcontent)

    BS EN 1097-6 ........... Aggregates Determination of particle density and water absorptionBS EN 1097-3 ........... Aggregates Determination of loose bulk density and voids

    ASTM C566 ............ Method of determination of moisture content

    4 Position: Site Technician (compulsory if requested by the Engineer)

    Qualifications:

    (a) The technician shall be capable of satisfactorily performing the below fresh concretetests:

    BS EN 12350-1 ......... Testing fresh concrete - Sampling

    ASTM C1064/C1064M Temperature of freshly mixed hydraulic-cement concrete

    BS EN 12350-2 ......... Testing fresh concrete Slump testBS EN 12350-6 ......... Testing fresh concrete DensityBS EN 12390-2 ......... Testing hardened concrete Making and curing specimens for

    strength tests

    ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete

  • 7/26/2019 Section 5 Concrete

    201/205

    QCS 2014 Section 05: Concrete Page 4Part 20: Personnel Qualifications and Certification

    5 Position: Lab Technician (compulsory if requested by the Engineer)

    Qualifications:

    (a) The technician shall be capable of satisfactorily performing the below fresh and

    hardened concrete tests:

    BS EN 12350-1 ......... Testing fresh concrete - Sampling

    ASTM C1064/C1064M Temperature of freshly mixed hydraulic-cement concrete

    BS EN 12350-2 ......... Testing fresh concrete Slump testBS EN 12350-6 ......... Testing fresh concrete DensityBS EN 12350-7 ......... Testing fresh concrete Air content (Pressure Method)BS EN 12390-2 ......... Testing hardened concrete Making and curing specimens for

    strength tests

    ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete

    BS EN 12390-3 ......... Testing hardened concrete - Compressive strength of test specimens

    BS EN 932-1 ............. Aggregates - Methods of sampling

    BS EN 932-2 ............. Aggregates Methods of reducing laboratory samplesBS EN 933-1 ............. Aggregates Determination of particle size distribution (and dust

    content)

    BS EN 1097-6 ........... Aggregates Determination of particle density and water absorptionBS EN 1097-3 ........... Aggregates Determination of loose bulk density and voids

    ASTM C566 ............ Method of determination of moisture content

    20.3.2 Production and Operation Department

    1 Position: Plant/Production/Operation Manager and/or Supervisor

    Qualifications:

    (a) Properties of concrete and its constituents

    (b) Materials management

    (c) Plant design, function and maintenance

    (d) Batching operations, procedures and dispatching

    (e) Materials management and inventory(f) Safety regulations and procedures

    2 Position: Plant Operator

    Qualifications:

    (a) Basic concrete properties and characteristics of its constituents

    (b) Scales, meters and batching sequence and control system

    (c) Central mixing and discharging

    (d) Tolerances, overweight/underweight controls

  • 7/26/2019 Section 5 Concrete

    202/205

    QCS 2014 Section 05: Concrete Page 5Part 20: Personnel Qualifications and Certification

    (e) Troubleshooting scales, gates and other plant components

    (f) Safety procedures

    20.4 TESTING LABORATORIES

    20.4.1 Concrete Laboratory Department

    1 Position: Laboratory Manager / QC Manager

    Qualifications:

    (a) Concrete specification review and concrete mixture proportioning

    (b) Concrete constituent materials, their characteristics, and effects on concrete properties

    (c) Fresh and hardened concrete properties

    (d) Durability of concrete

    (e) Production and delivery of Ready Mixed Concrete

    (f) Handling, placing and curing of concrete

    (g) Evaluation of concrete strength

    (h) Testing of concrete and its constituents

    (i) Quality control procedures and statistical analysis

    (j) Hot weather concreting

    (k) Troubleshooting concrete problems

    2 Position: Supervisor

    Qualifications:

    (a) The supervisor shall be capable of satisfactorily reading, understanding andperforming the below fresh and hardened concrete tests:

    BS EN 12350-1 ......... Testing fresh concrete - Sampling

    ASTM C1064/C1064M Temperature of freshly mixed hydraulic-cement concrete

    BS EN 12350-2 ......... Testing fresh concrete Slump testBS EN 12350-6 ......... Testing fresh concrete DensityBS EN 12350-7 ......... Testing fresh concrete Air content (Pressure Method)BS EN 12390-2 ......... Testing hardened concrete Making and curing specimens for

    strength tests

    ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete

    BS EN 12390-3 ......... Testing hardened concrete - Compressive strength of test specimens

    BS EN 932-1 ............. Aggregates - Methods of sampling

    BS EN 932-2 ............. Aggregates Methods of reducing laboratory samples

    BS EN 933-1 ............. Aggregates

    Determination of particle size distribution (and dustcontent)

  • 7/26/2019 Section 5 Concrete

    203/205

    QCS 2014 Section 05: Concrete Page 6Part 20: Personnel Qualifications and Certification

    BS EN 1097-6 ........... Aggregates Determination of particle density and water absorptionBS EN 1097-3 ........... Aggregates Determination of loose bulk density and voids

    ASTM C566 ............ Method of determination of moisture content

    3 Position: Technician (compulsory if requested by the Engineer)

    Qualifications:

    (a) The technician shall be capable of satisfactorily performing the below fresh andhardened concrete tests:

    BS EN 12350-1 ......... Testing fresh concrete - Sampling

    ASTM C1064/C1064M Temperature of freshly mixed hydraulic-cement concrete

    BS EN 12350-2 ......... Testing fresh concrete Slump test

    BS EN 12350-6 ......... Testing fresh concrete DensityBS EN 12350-7 ......... Testing fresh concrete Air content (Pressure Method)BS EN 12390-2 ......... Testing hardened concrete Making and curing specimens for

    strength tests

    ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete

    BS EN 12390-3 ......... Testing hardened concrete - Compressive strength of test specimens

    BS EN 932-1 ............. Aggregates - Methods of sampling

    BS EN 932-2 ............. Aggregates Methods of reducing laboratory samplesBS EN 933-1 ............. Aggregates Determination of particle size distribution (and dust

    content)

    BS EN 1097-6 ........... Aggregates Determination of particle density and water absorptionBS EN 1097-3 ........... Aggregates Determination of loose bulk density and voids

    ASTM C566 ............ Method of determination of moisture content

    20.5 CONTRACTORS

    20.5.1 Concrete Construction Department

    1 Position: Site Engineer

    Qualifications:(a) The site engineer shall be capable of satisfactorily reading, understanding and

    performing the below fresh concrete tests:

    BS EN 12350-1 ......... Testing fresh concrete - Sampling

    ASTM C1064/C1064M Temperature of freshly mixed hydraulic-cement concrete

    BS EN 12350-2 ......... Testing fresh concrete Slump testBS EN 12350-6 ......... Testing fresh concrete DensityBS EN 12350-7 ......... Testing fresh concrete Air content (Pressure Method)BS EN 12390-2 ......... Testing hardened concrete Making and curing specimens for

    strength tests

    ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete

  • 7/26/2019 Section 5 Concrete

    204/205

    QCS 2014 Section 05: Concrete Page 7Part 20: Personnel Qualifications and Certification

    2 Position: QC Manager/ QC Engineer/ Material Engineer

    Qualifications:

    (a) Concrete specification review and concrete mixture proportioning

    (b) Concrete constituent materials, their characteristics, and effects on concrete properties

    (c) Fresh and hardened concrete properties

    (d) Durability of concrete

    (e) Production and delivery of Ready Mixed Concrete

    (f) Handling, placing and curing of concrete

    (g) Specifying and evaluating of concrete strength

    (h) Testing of concrete and its constituents

    (i) Quality control procedures and statistical analysis

    (j) Hot weather concreting

    (k) Troubleshooting concrete problems

    20.6 CONSULTANTS

    20.6.1 Site Supervision Department

    1 Position: Site Inspector/ Material Inspector

    Qualifications:

    (a) The site engineer shall be capable of satisfactorily reading, understanding andperforming the below fresh concrete tests:

    BS EN 12350-1 ......... Testing fresh concrete - Sampling

    ASTM C1064/C1064M Temperature of freshly mixed hydraulic-cement concrete

    BS EN 12350-2 ......... Testing fresh concrete Slump testBS EN 12350-6 ......... Testing fresh concrete DensityBS EN 12390-2 ......... Testing hardened concrete Making and curing specimens for

    strength tests

    ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete

    20.6.2 Site Supervision / Design Office Department

    1 Position: Material Engineer

    Qualifications:

    (a) Concrete specification review and concrete mixture proportioning

    (b) Concrete constituent materials, their characteristics, and effects on concrete properties

    (c) Fresh and hardened concrete properties(d) Durability of concrete

  • 7/26/2019 Section 5 Concrete

    205/205

    QCS 2014 Section 05: Concrete Page 8Part 20: Personnel Qualifications and Certification

    (e) Production and delivery of Ready Mixed Concrete

    (f) Handling, placing and curing of concrete

    (g) Specifying and evaluating of concrete strength

    (h) Testing of concrete and its constituents(i) Quality control procedures and statistical analysis

    (j) Hot weather concreting

    (k) Troubleshooting concrete problems

    END OF PART