screencast pp
TRANSCRIPT
Construction of the current bridge began in 1982, and the completed bridge was dedicated on February 7, 1987
• regular inspection• drainage system maintenance• miscellaneous structural repairs• Aviation• Navigation• decorative lighting maintenance• debris removal• mechanical and electrical maintenance for elevators, generators, lightning suppression,motorist aid communications, and facility lighting• assistance with bridge security and emergency response.
Collapsing support beams
Inefficient Safety rails
2013: 5 suicides, 10 possible, 2 survivors, 4 saves2012: 12 suicides, 12 possible, 2 survivors, 6 saves
2011: 9 suicides, 14 possible, 1 survivor, 3 saves2010: 5 suicides, 19 possible, 5 saves
2009: 8 suicides, 15 possible, 1 survivor, 8 saves2008: 11 suicides, 10 possible, 2 survivors, 5 saves2007: 10 suicides, 7 possible, 2 survivors, 1 save2006: 5 suicides, 17 possible, 1 survivor, 1 save
2005: 10 suicides, 13 possible, 2 saves2004: 4 suicides, 2 possible, 4 saves
2003: 13 suicides, 4 saves2002: 9 suicides, 1 survivor, 1 save
2001: 5 suicides, 3 survivors, 1 save2000: 5 suicides, 1 survivor, 1 save
1999: 10 suicides, 2 survivors, 1 save1998: 12 suicides, 1 survivor
1997-1987: 36 suicides, 3 survivors1986-1977: 15 suicides, 1 forced, 7 survivors
1976-1967: 15 suicides, 4 survivors1966-1954: 20 suicides, 3 survivors
Damaged Stay-Cables