The Idea• ANSP individual roadmap for SES policies implementation

– Network improvement– DCTs– Free Route Airspace

• History of good cooperation between the two ANSPs– Main corridors for the South‐East air traffic flows– Areas with delegated ATS– Coordination of DCTs for common interface

The Idea

Autumn 2015, Graz meeting• agreement to join forces and implement unconstrained X‐Border FRA without infringing existing safety and capacity values.First

• H24• CROSS‐BORDER• GND‐FL660 / USB • Free Route Airspace

SLOVENIANAUSTRIAN

X‐BORDERFREEROUTEAIRSPACE Live on 10 NOV 2016

INDIVIDUAL FRAINDIVIDUAL FRA

• Linked with compulsoryAoR border points

X‐BORDER DIRECT OPTIONX‐BORDER DIRECT OPTION

• Virtually seamlessoperations betweenAoR

X‐BORDER SAXFRAX‐BORDER SAXFRA

H24 SAXFRA OFFERS

MORE THAN 13.000 kg OF FUEL AND 43.000 kg OF CO2SAVED PER DAY

ATS ROUTES DELETED – NEW CONCEPT FRA FROM GROUND

ATS route environment – only via published airways

IFPS REJECTED FPL

FRA from GND – everywhere above LAL polygons

IFPS REJECTED FPL

SAXFRA– LAL polygons common AIP chart

Lowest available level represents an analogy to minimum en‐route altitude (MEA) and ensures:

‐ adequate reception of relevant navigation facilities

‐ two‐way communication with ATS

‐ complies with the airspace structure (class)

‐ provides the required obstacle clearance

FRA – balconies

Part of ATS environment are also portions of airspace withdelegated air traffic services. 

Such areas on one side allow safe and efficient traffic flowsmanagement, but can be complex to interpret within FPL systemswhen different concepts are applied (FRA<‐>ATS routes)

Basic interface principleComplex interface withmajor TMA in the viciniyof FRA

Valuable know‐how from NM• solution provided• 3 prevalidations• fine‐tuning

Alongside SAXFRA

• ARR and DEP profiles improved (ANSPs LoA)

• Operational procedures revised and simplified

• SID/STAR adapted to support FRA

• No major upgrades of ATM Systems (costs for users)

• Without regulations on implementation – no delays

• Period of adaptation with lower capacity – not needed

SAXFRA – pillars of success

• Excellent cooperation and sharing of know‐how ANSPs

• Successful brainstorming and coordination with NM 

• Common approach to FHA with NSA briefings

• Open and constant communication with Users

• Encouraging positive view amongst ATCO community

SAXFRA WELCOMES YOU H24 FROM GROUND TO UNL