Page 1: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016 SAFER, SMARTER, GREENER DNV GL © 2016

Ungraded

01 March 2016

Safeti Offshore workshop

1

Justification of blast and fire wall location for offshore structures

Page 2: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Your Presenter – Daragh Stokes

6 Years working with Phast and Safeti

– 3 years with technical Support

– 18 months with consulting

– Now back with Sales for DNV GL Software

Responsible for

– Phast – Consequence Analysis Software

– Safeti(Phast Risk) – QRA software

– Safeti Offshore – Offshore QRA

– Maros – Upstream Reliability Modelling

– Taro – Downstream Reliability Modelling

– Others

2

Page 3: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

General Structure

Introduciton

An overview of Safeti offshore

A look at fire and blast wall modelling in Safeti Offshore

Benchmarking

Analysis of Results

Determining economical blast and firewall locations based on both consequence criteria and risk criteria

3

Page 4: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Learning Objectives

To see how we can use Safeti offshore for consequence and risk based decision making

4

Page 5: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016 SAFER, SMARTER, GREENER DNV GL © 2016

Ungraded

01 March 2016

Introduction

5

The Problem with safety studies

Page 6: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

The problem with safety studies

6

Design Initial Design Design continues Additional Feedback

from Safety Study

Design continues Design Frozen

Safety Safety study carried out Safety Study Results

Sensitivities & Updates

Final Revision of

Report

Safety studies are static, changes can be challenging

They are time consuming,

Information can be out of date by the time the study is issued

But they are essential to the design process

Page 7: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

So what can we do?

DNV GL Software and others in the industry are working on approaches and methodologies to shorted this lead time.

Some approaches include

– Integrating studies

– Re using data

– Digital Twin Concept

7

Page 8: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016 SAFER, SMARTER, GREENER DNV GL © 2016

Ungraded

01 March 2016

An Overview of Safeti Offshore

8

Page 9: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

An Overview

The Software takes a typical approach to running an offshore QRA

9

Layout

Parts Count

Process Condition

Scenario Definition

Event and Frequency Generation

Population Calculation

Results Generation

Risk

Page 10: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Layout

10

Page 11: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Run Results

Now there is a deviation based on our recommended practice.

– Risk Based we can use Safeti Offshore to produce a range of risk results

– Consequence based

20

Page 12: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016 SAFER, SMARTER, GREENER DNV GL © 2016

Ungraded

01 March 2016

A look at fire and Blast Wall modelling

21

Page 13: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

To start with we set the vulnerability Levels

22

Page 14: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Set up the wall Characteristics

23

Page 15: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Then Apply the rating

24

Page 16: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016 SAFER, SMARTER, GREENER DNV GL © 2016

Ungraded

01 March 2016

Analysis of results

25

Risk Based

Page 17: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

See Demo

26

Page 18: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016 SAFER, SMARTER, GREENER DNV GL © 2016

Ungraded

01 March 2016

Analysis of results

27

Consequence based

Page 19: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

See Demo

28

Page 20: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016 SAFER, SMARTER, GREENER DNV GL © 2016

Ungraded

01 March 2016

Determining economical blast and firewall locations based on both consequence and risk criteria

29

Page 21: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Cost Benefit Analysis

As with all engineering design decisions cost benefit is a key factor.

How can we be sure that our Safety dollars are well spent?

30

Page 22: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Risk Based – Impact on Life

ALARP, F-N Curves etc.

31

Page 23: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Risk Based – Impact on the Asset

Cost Benefit analysis

– Does the cost of the blast wall equate to the cost of damage?

32

Page 24: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

Consequence based

Should this event occur can people escape?

Should this event occur what happens?

33

Page 25: Safeti Offshore workshop - DNV GL6 Years working with Phast and Safeti – 3 years with technical Support – 18 months with consulting – Now back with Sales for DNV GL Software

DNV GL © 2016

Ungraded

01 March 2016

SAFER, SMARTER, GREENER