safe dependency board widget v3 for ibm rational team concert (rtc)

26
Speed Up SAFe Program Increment Planning with the New Rational Team Concert Dependency Board Widget Dependency Board Widget Session HDR-1406 Markus Giacomuzzi SAFe4 Program Consultant ScrumMaster Team Leader InterConnect 2017

Upload: markus-giacomuzzi

Post on 09-Apr-2017

27 views

Category:

Technology


3 download

TRANSCRIPT

Speed Up SAFe ProgramIncrement Planning with theNew Rational Team ConcertDependency Board WidgetDependency Board Widget

Session HDR-1406

Markus GiacomuzziSAFe4 Program ConsultantScrumMasterTeam Leader

InterConnect2017

S P R I N T S / I T E R A T I O N ST

EA

MS

I T E R A T I O N S

similarities ?

taken somewhere in China

However,we strive for implementing this „SAFe Program Board“Program Board“

globally distributed teamswhere shall we place the SAFe Program/Dependency Board ?

VirtualProgramProgramBoard

Program/Dependency Board ?

IBM‘s support for SAFe 4.0: a virtual program/(from developerworks) out-of-the-box -> we improved

source: jazz.net/safeJazz Reporting Services (JRS)

/dependency boardimproved this

text

realreal“wiring chaos”real-life examplereal-life example“wiring chaos”

click on a wire thenclick on a wire thenget its path highlighted

click on a wire

from wiring chaos to highlight dependencies

click on a wireget its pathhighlighted

click on a work itemclick on a work itemget its dependencieshightlighted

wire thenwire then

work item thenwork item thendependencies

how it is implemented in the Timebox Planning Widgetfrom wiring chaos to highlight dependencies

Planning Widget

text

realreal“public transport”real-life examplereal-life example“public transport”

Zurich Public Transport

S24

the color highlightsthe subway linethe subway line

from public transport system to different dependency types

use colored lines

use colored arrows

differentiate betweensubway lines

use colored arrowsdifferentiate betweendependency types

from public transport system to different dependency types

colored lines to

colored arrows to

differentiate betweensubway lines

colored arrows todifferentiate betweendependency types

how it is implemented in the Timebox Planning Widgetfrom public transport system to different dependency types

Planning Widgetfrom public transport system to different dependency types

SAFe Dependency / Program Board Demo

ART BROWN

Team YELLOW

Team PINK

Team BLUE

all TEAMs (Stories) of aProgram Increment (PI)

text

Absence WidgetAbsence Widget

Absence Widget – Scheduled Absences in RTCin RTC

e.g. import absences continuouslyand automatically from MS Outlook

Absence Widget (by Team)

JohnJohnBetty

PeterBeatMarkPabloNelsonMary

Current DayMaryAnnaTom

Current Week

Current Sprint / Iteration

Current Month

Sprint / Iteration

showing Absences in the Release Plan

Absence Widget Demo

what‘s next ?what‘s next ?

blog on https://timeboxplanning.wordpress.comhttps://timeboxplanning.wordpress.com

the brand new Timebox Planning Widget V3with “SAFe Dependency / Program Board” supportDependency / Program Board” support

IITimeboxPlanningWidget

Markus GiacomuzziSAFe Program Consultant (SPC4)ScrumMasterScrumMaster

Siemens Schweiz AGBuilding Technologies DivisionInternational HeadquartersControl Products & Systems

Gubelstrasse6300 Zug, Switzerland

E-mail:[email protected]

Markus GiacomuzziProgram Consultant (SPC4)

ScrumMaster and Team LeaderScrumMaster and Team Leader

Siemens Schweiz AGBuilding Technologies DivisionInternational HeadquartersControl Products & Systems

Gubelstrasse 226300 Zug, Switzerland

[email protected]

Abstract