résumé trimestriel des opérations...1 bank unit of account (ua) = 1.35 united states dollars...

60
BANQUE AFRICAINE DE DEVELOPPEMENT AFRICAN DEVELOPMENT BANK Résumé Trimestriel des opérations (AU 30 MARS 2017) Quarterly Operational Summary (AS OF 30 MARCH 2017) DEPARTEMENT DES GESTIONS FIDUCIAIRE ET FINANCIERE, INSPECTION ET POLITIQUE DE PASSATION DES MARCHES FIDUCIARY & FINANCIAL MANAGEMENT, INSPECTION & PROCUREMENT POLICY DEPARTMENT OS/2017/01

Upload: others

Post on 28-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

BANQUE AFRICAINE DE DEVELOPPEMENT

AFRICAN DEVELOPMENT BANK

Résumé Trimestriel des opérations (AU 30 MARS 2017)

Quarterly Operational Summary (AS OF 30 MARCH 2017)

DEPARTEMENT DES GESTIONS FIDUCIAIRE ET FINANCIERE, INSPECTION ET POLITIQUE DE PASSATION DES MARCHES

FIDUCIARY & FINANCIAL MANAGEMENT, INSPECTION & PROCUREMENT POLICY DEPARTMENT

OS/2017/01

Page 2: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

N O T E S

1. Les renseignements contenus dans la présente publication concernent les projets, présentés par les Pays Membres Régionaux (PMR),

en faveur desquels un financement a été approuvé par les Conseils d'Administration du Groupe de la Banque pendant les six derniers

mois et ceux qui sont envisagés pour être soumis à l'approbation du Conseil pendant les six prochains mois.

2. De nouveaux projets y sont inscrits lorsque la Banque est convaincue qu'ils méritent d'être financés. Des projets déjà publiés dans ce

rapport peuvent également être retirés lorsqu'il a été décidé de ne plus les traiter.

3. Si l'emprunteur est le gouvernement d'un pays, le nom et l'adresse du département, du ministère ou de l'organe chargé de la mise en

œuvre du projet sont indiqués. Lorsque l'emprunteur est autre que le gouvernement, son nom est indiqué en lettres capitales.

4. Les titres et les descriptions des projets sont provisoires. La lettre (N) placée devant le titre du projet signifie que ce dernier est

nouveau dans la présente publication. La lettre (R) indique que le projet a été révisé depuis la dernière publication.

5. Les détails concernant chaque projet indiqué dans la présente publication s'inspirent des données disponibles à la fin du trimestre

considéré. Ces données sont mises à jour chaque trimestre au fur et à mesure du traitement du projet.

6. Le montant probable du prêt est provisoire sous réserve d'une révision après l'évaluation du projet.

7. Le terme "Groupe de la Banque" comprend la Banque Africaine de Développement (BAD), le Fonds Africain de Développement

(FAD) et le Fonds Spécial du Nigéria (FSN). Le montant probable du prêt est libellé en 1): UC. F.A.T signifie Fonds d'Assistance

Technique (dans le cadre du FAD).

8. Toute demande de renseignements concernant tel ou tel projet doit être adressée à l'organe d'exécution dans le PMR emprunteur et non

à la Banque.

9. Pour toute information supplémentaire, veuillez contacter le Chef de Division responsable du pays

Département des Gestions Fiduciaire et Financière, Inspection et Politique de Passation des Marches (SNFI)

Banque africaine de développement (www.afdb.org)

Siège – Abidjan (Côte d'Ivoire)

5 Avenue Joseph Anoma

01 B.P. 1387, Abidjan 01

Côte d'Ivoire

Tel.: +225 - 2020 4444

Fax: +225 - 2021 7753

Email: [email protected]

1 Unité de Compte de la Banque (UC) = 1,35 Dollars Américains (USD) au 30 mars 2017.

Page 3: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

N O T E S

1. The information provided in this publication relates to projects in Regional Member Countries (RMCs), for which financing has been

approved by the Boards of Directors of the Bank Group during the last six months and those which are expected to be submitted to the

Boards for approval during the next six months.

2. New projects are listed in the publication after the Bank is satisfied that they are suitable for possible financing. Approved projects will

be deleted from this document after two subsequent publications. Projects may also be dropped if a decision is made not to proceed

with further processing.

3. If the Government of a borrowing country is the borrower, the name and address of the Department, Ministry or Agency which is

expected to implement the project are given. If the Government is not the borrower, the borrower's name is given in capital letters.

4. The titles and descriptions of projects are tentative. The letter (N) before the project title refers to a new listing in this issue of the

publication. The letter (R) indicates that the project has been revised since the last publication.

5. Details relating to each project shown in this issue of the publication are based on information available at the end of the quarter under

reference. The information will be updated quarterly as project processing advances.

6. The amount of the probable loan is tentative and is subject to review after project appraisal.

7. Reference to "Bank Group" in this publication refers to the African Development Bank (ADB), African Development Fund (ADF) and

the Nigeria Trust Fund (NTF). Probable loan is expressed in 1): UA - "TAF" refers to Technical Assistance Fund loans under ADF.

8. All enquiries regarding information on any project should be referred to the Executing Agency in the borrowing RMC and not to the

Bank.

9. For further information please contact the Division Chief in charge of the Country

.

Fiduciary & Financial Management, Inspection & Procurement Policy Department (SNFI)

African Development Bank (www.afdb.org)

Headquarters – Abidjan (Côte d'Ivoire)

5 Avenue Joseph Anoma

01 B.P. 1387, Abidjan 01

Côte d'Ivoire

Tel.: +225 - 2020 4444

Fax: +225 - 2021 7753

Email: [email protected]

1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017.

Page 4: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

DE LA BANQUE AFRICAINE DE DEVELOPPEMENT (BAD)

DU FONDS AFRICAIN DE DEVELOPPEMENT (FAD)

ET DU FONDS SPECIAL DU NIGERIA (FSN)

(AU 30 MARS 2017)

QUARTERLY OPERATIONAL SUMMARY OF PROPOSED PROJECTS FOR

THE AFRICAN DEVELOPMENT BANK (ADB)

THE AFRICAN DEVELOPMENT FUND (ADF)

AND THE NIGERIA TRUST FUND (NTF)

(AS OF 30 MARCH 2017)

TABLE DES MATIERES

TABLE OF CONTENTS

OPERATIONS PAYS REGION NORD/COUNTRY OPERATIONS NORTHERN REGION (RDGN) ................................ 1

T U N I S I E............................................................................................................................................................................. 1

A L G E R I E ........................................................................................................................................................................... 2

E G Y P T ................................................................................................................................................................................... 3

M A R O C ................................................................................................................................................................................. 3

M A U R I T A N I E ............................................................................................................................................................. 5

MULTINATIONAL REGION NORD 6

OPERATIONS PAYS REGION EST/COUNTRY OPERATIONS EASTERN REGION (RDGE) ......................................... 7

B U R U N D I .......................................................................................................................................................................... 7

C O M O R E S .......................................................................................................................................................................... 7

D J I B O U T I ........................................................................................................................................................................ 8

E R I T R E A ........................................................................................................................................................................... 8

S O M A L I A .......................................................................................................................................................................... 9

U G A N D A ............................................................................................................................................................................. 9

K E N Y A ................................................................................................................................................................................ 10

S U D A N ................................................................................................................................................................................ 12

S O U T H S U D A N ........................................................................................................................................................ 12

T A N Z A N I A ..................................................................................................................................................................... 13

E T H I O P I A ...................................................................................................................................................................... 14

R W A N D A .......................................................................................................................................................................... 15

MULTINATIONAL EASTERN REGION .................................................................................................................................. 16

OPERATIONS PAYS REGION SUD/COUNTRY OPERATIONS SOUTHERN REGION (RDGS) ................................... 19

Page 5: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

Z A M B I A ............................................................................................................................................................................ 19

M O Z A M B I Q U E ......................................................................................................................................................... 20

A N G O L A ........................................................................................................................................................................... 21

M A L A W I ........................................................................................................................................................................... 22

S A O T O M E & P R I N C I P E ............................................................................................................................. 23

Z I M B A B W E .................................................................................................................................................................. 23

S W A Z I L A N D .............................................................................................................................................................. 25

B O T S W A N A ................................................................................................................................................................. 26

L E S O T H O ........................................................................................................................................................................ 26

MULTINATIONAL SOUTHERN REGION ............................................................................................................................... 27

OPERATIONS PAYS REGION CENTRE/COUNTRY OPERATIONS CENTRAL REGION (RDGC) ............................. 29

C A M E R O U N ................................................................................................................................................................. 29

R E P U B L I Q U E D E M O C R A T I Q U E D U C O N G O (RDC) ............................................................................... 30

T C H A D ................................................................................................................................................................................ 31

G A B O N ................................................................................................................................................................................ 31

R E P U B L I Q U E C E N T R A F R I C A I N E (RCA) ................................................................................. 34

OPERATIONS PAYS REGION OUEST/COUNTRY OPERATIONS WESTERN REGION (RDGW) .............................. 35

C A P V E R T ....................................................................................................................................................................... 35

G H A N A ................................................................................................................................................................................ 36

B U R K I N A F A S O ..................................................................................................................................................... 37

M A L I ...................................................................................................................................................................................... 38

N I G E R I A .......................................................................................................................................................................... 39

N I G E R .................................................................................................................................................................................. 41

C O T E D’I V O I R E ....................................................................................................................................................... 42

G A M B I A ............................................................................................................................................................................ 44

S E N E G A L ........................................................................................................................................................................ 44

G U I N E E ............................................................................................................................................................................. 46

G U I N E E B I S S AU .................................................................................................................................................... 47

L I B E R I A .......................................................................................................................................................................... 47

S I E R R A L E O N E ...................................................................................................................................................... 48

MULTINATIONAL REGION OUEST ....................................................................................................................................... 50

M U L T I N A T I O N A L - P A N-A F R I C A N ............................................................................................. 53

Page 6: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES
Page 7: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

1

OPERATIONS PAYS REGION NORD/COUNTRY OPERATIONS NORTHERN REGION (RDGN)

Directeur Général /General Director: M. EL AZIZI

Tel. +216 71 10 1414

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat

d’avancement

Stage of

Processing

T U N I S I E

Ministère des Finances 212,7 (BAD)

Programme d'appui à la modernisation du secteur financier (PAMSFI)

Le PAMSFI a pour but de contribuer à créer les conditions nécessaires pour

une croissance économique accélérée, résiliente et inclusive à travers un

renforcement du rôle du secteur financier dans le financement de l’économie

et des couches vulnérables. Il vise en particulier à accompagner l’émergence

d’un nouveau modèle de développement pour la Tunisie, dans lequel le

secteur privé peut se développer et créer de l’emploi sur tout le territoire

tunisien, et où les segments défavorisés de la population peuvent contribuer à

la croissance et en bénéficier. Les objectifs spécifiques du programme sont le

renforcement de la gouvernance du secteur financier et son

approfondissement à travers l’amélioration de l’accès des populations et des

entreprises aux services financiers et la diversification des instruments

financiers. Le PAMSFI se décline en deux composantes complémentaires : 1.

Amélioration de l’inclusion financière pour une réduction des disparités

sociales et régionales et 2. Renforcement de la résilience du secteur financier

et développement des marchés de capitaux pour un financement efficient de

l’économie. (catégorie environnementale III).

Approuvé en

juillet 2016

Page 8: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

2

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat

d’avancement

Stage of

Processing

Ministère de l’Agriculture, des Ressources

Hydrauliques et de la Pêche (MARHP)

100,00 (BAD)

0,80 (RWSSI)

Programme d’Alimentation en Eau Potable en milieu rural – Phase II

Le but du projet est d’améliorer les conditions de vie socio-économiques et

sanitaires des populations rurales par la sécurisation de l’approvisionnement

en eau potable en qualité et en quantité suffisantes. Es quatre composantes du

projet sont : 1. Développement des Infrastructures d’AEP dans les localités, y

compris création de forages d’AEP ; 2. Développement des Infrastructures

d’AEP et d’assainissement autonome dans les écoles ; 3. Appui institutionnel

et 4. Gestion du programme. (Catégorie environnementale II)

Service de

consultant requis

Approuvé en

septembre 2016

Ministère du développement, de l’investissement

et de la coopération internationale 142,85 (BAD)

Programme d'appui au développement régional inclusif (PADRI)

Le but du PADRI est de contribuer à la réalisation d’une croissance forte et

inclusive à travers la réduction des disparités régionales. Le PADRI s’articule

autour de trois composantes complémentaires et intégrées : (i) Amélioration

de l’inclusion économique des seize gouvernorats prioritaires ; (ii)

Renforcement de l’inclusion sociale aux niveaux local et régional ; et (iii)

Amélioration de la gouvernance locale. (Catégorie environnementale III).

Approuvé en

novembre 2016

A L G E R I E

Ministère des Finances – DGREFE

Immeuble Ahmed Francis, Djenane El Malik,

Ben Aknoun – Alger ; Contact : M. M.

MESSOUCI ;

Stdr. : +213 21 59 51 51 Poste 3211

LD: +213 21 59 51 27 ; Fax : +213 21 59 53 16 ;

Email: [email protected]

Programme d’Appui à la Compétitivité Industrielle et Énergétique

(PACIE)

Le but du projet est de contribuer à la création des conditions d’une

croissance économique inclusive à travers des réformes économiques visant

Approuvé en

novembre 2016

Page 9: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

3

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat

d’avancement

Stage of

Processing

la consolidation budgétaire, l’amélioration du climat des de l’investissement,

et l’amélioration de la gouvernance du secteur énergétique et la promotion

des énergies renouvelables. Le PACIE se décline en trois composantes

complémentaires :(i) l’amélioration et la modernisation de la gestion des ressources

publiques (ii) l’amélioration du climat des investissements et (iii) l’amélioration de

la gouvernance du secteur énergétique et la promotion des énergies renouvelables.

(Catégorie environnementale III)

E G Y P T

Ministry of International Cooperation 363.940 (ADB)

Economic Governance and Energy Support Program II (EGESP II).

The Purpose of the project is to promote inclusive and resilient growth

through fiscal consolidation; improved governance, efficiency and private

sector engagement in the energy sector; and improved business environment.

EGESP II’s package of reforms is organised around three components,

namely: (i) Enhancing fiscal consolidation; (ii) Ensuring sustainable energy

supply; and (iii) Enhancing the business environment. The three components

are complementary and mutually reinforcing.

Approved in

December 2016

M A R O C

ONEE – Branche Eau

70, 642(BAD)

Projet d’amélioration de la qualité et du service de l’eau potable

Services de

consultants

requis

Approuvé en juin

2016

Page 10: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

4

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat

d’avancement

Stage of

Processing

Le projet permettra de satisfaire les besoins en eau potable de plusieurs

agglomérations (Bouznika, Ben Slimane, Youssoufia et Safi) et d’améliorer

la qualité d’eau (aération artificielle et ozonation) et les performances des

systèmes d’AEP existants (diminuer les pertes, optimiser l’exploitation,

…).Les différentes composantes du projet sont les suivantes : 1.

Renforcement de l’approvisionnement en eau potable des agglomérations

urbaines ; 2. Amélioration de la qualité d’eau au niveau du complexe de

Bouregreg ; 3. Amélioration des performances des systèmes d’AEP existants

et 4. Appui technique & gestion du projet. (Catégorie environnementale II).

Ministère de l’Economie et des Finances

Direction du Budget

95 981 (BAD)

Programme d’appui à la gouvernance de la protection sociale (PAGPS)

L’objectif du PAGPS est d’améliorer la protection sociale des Marocains, en

particulier celle des femmes et des personnes en situation de vulnérabilité.

Pour atteindre cet objectif, le programme se concentre d’une part sur (i) le

renforcement du dispositif de gouvernance de la protection sociale et

l’optimisation de l’utilisation des ressources, et d’autre part, sur (ii)

l’amélioration de la couverture de la protection sociale et de la qualité des

services. (Catégorie environnementale III).

Services de

consultants non

requis

Approuvé en juin

2016

Ministère de l’Economie et des Finances

Direction du Trésor et des Finances Extérieures

(DTFE)

112,235 (BAD)

Programme d’Appui au Renforcement de la Stabilité et de l’Inclusion

Financières (PARSIF)

Le Programme d’Appui au Renforcement de la Stabilité et de l’Inclusion

Financières (PARSIF), est structurée en deux composantes qui sont (i) le

renforcement du rôle des secteurs de l’assurance et de la retraite dans

l’amélioration de la qualité de vie de la population et (ii) le renforcement du

rôle du secteur bancaire et des marchés de capitaux dans le développement du

Approuvé en

juillet 2016

Page 11: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

5

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat

d’avancement

Stage of

Processing

secteur privé et dans l’amélioration de la qualité de vie de la population.

(Catégorie environnementale III)

Ministère de l’Agriculture et de la Pêche

Maritime – MAPM

62,70 (BAD)

Projet d'Appui au Programme National d'Economie d'Eau d'Irrigation

au Maroc tranche II (PAPNEEI-II)

L’objectif de ce projet est de promouvoir une irrigation intelligente à travers

une utilisation durable et valorisante des ressources en eau d’irrigation dans

un contexte de raréfaction croissante combinée à la maîtrise des coûts de

l’énergie utilisée dans l’irrigation. Pour atteindre les objectifs visés, le projet

prévoit quatre composantes comme suit : 1. Modernisation des infrastructures

en eau d’irrigation ; 2. Appui à la valorisation de l’eau d’irrigation ; 3.

Renforcement des capacités institutionnelles et 4. Coordination du projet.

(Catégorie environnementale II)

Services de

consultants

requis

Approuvé en

décembre 2016

M A U R I T A N I E

Unité de Gestion du projet 3,145 (FAD)

Projet d’appui à la promotion des micros petites & moyennes entreprises

et à l’emploi des jeunes (PAMPEJ)

But du Projet: Promouvoir des MPE durablement rentables et assurer une

offre pérenne des services financiers inclusifs. Trois composantes : 1. Appui

à l’entreprenariat et à la création d’emplois ; 2. Opérationnalisation du

FOREMI et Appui aux IMF et 3. Gestion du projet. (catégorie

environnementale III

Service de

consultants

requis

Approuvé en

septembre 2016

Page 12: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

6

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat

d’avancement

Stage of

Processing

MULTINATIONAL REGION NORD

AGEROUTE - Direction des Infrastructures des

Transports (DIT) de la Mauritanie 32,5 (FAD)

Projet de construction du Pont de Rosso

But du projet : Amélioration du niveau de service sur l’axe Nouakchott -

Dakar en vue d’accroitre les échanges commerciaux sur les axes routiers

transafricains. Les quatre composantes du projet sont 1. Travaux de

construction de Ponts et des voies d’accès ; 2. Aménagements connexes ; 3.

Mesures de facilitation du transport et du transit et 4. Gestion & suivi du

projet. Catégorie environnementale I).

Approuvé en

décembre 2016

Page 13: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

7

OPERATIONS PAYS REGION EST/COUNTRY OPERATIONS EASTERN REGION (RDGE)

Directeur Général/General Director: G. NEGATU

Tel +254 20299 8232

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

B U R U N D I

Office des Routes

(OdR)

9,720 (FAD)

4,080 (Transition

Support Facility

(TSF) - SSW)

Projet d’aménagement et de bitumage de la route Nyakararo-Mwaro-Gitega (RN18)/Phase

II - Tronçon Kibumbu-Gitega (Mweya) - (24 km)

L’objectif sectoriel du projet est de contribuer au désenclavement intérieur et extérieur du pays

pour soutenir les activités économiques et améliorer les conditions de vies des populations

rurales, ainsi que l’accessibilité aux zones de productions et aux infrastructures sociales,

administratives et commerciales. Le projet s’articule autour de cinq composantes : 1. Travaux

routiers et mesures environnementales ; 2. Aménagements connexes ; 3. Appui institutionnel ; 4.

Gestion et suivi du projet ; 5. Libération de l’emprise. (Catégorie environnementale II).

Approuvé en février

2017

C O M O R E S

Ministère de

l’Agriculture, de la

Pêche, de

l’Environnement, de

l’Aménagement du

15,165 (FAD)

Projet de réhabilitation du réseau routier

L’objectif sectoriel du présent projet est l’amélioration de la qualité des infrastructures sur les

RN2 et RN23 en vue d’accroitre les échanges commerciaux sur lesdits axes routiers, contribuant

ainsi à la croissance économique. Afin d’atteindre les objectifs, ci-dessus, le présent projet

Services de

consultants requis

Approuvé en

janvier 2017

Page 14: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

8

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

territoire, et de

l’Urbanisme/Direction

générale des routes et

du transport routier

s’articule autour des quatre composantes suivantes : (i) travaux routiers ; (ii) appui à.

l’autonomisation des femmes dans la ZIP ; (iii) appui institutionnel ; et (iv) gestion du projet.

(Catégorie environnementale II).

D J I B O U T I

Caisse Nationale de

Sécurité Sociale

(CNSS)

6,307 (FAD)

Projet d’appui au renforcement des compétences dans le secteur de la santé

L’objectif du projet est d’appuyer les efforts du Gouvernement pour améliorer l’accès aux soins

de santé de qualité et abordables pour la population de Djibouti. Le projet comprendra à cet effet

les trois composantes suivantes : (i) Développement des ressources humaines ; (ii) Appui à

l’opérationnalisation de l’Assurance Maladie Universelle (AMU) et au fonctionnement des

structures de santé y compris le futur hôpital de la CNSS ; et (iii) Gestion du projet. (Catégorie

environnementale III)

Services de

consultants requis

Approuvé en

décembre 2016

E R I T R E A

Ministry of Agriculture 5.310 (ADF)

Drought Resilience and Sustainable Livelihoods ((DRSLP-IV)

The project goal is to contribute to improving the national goal of food and nutrition security,

increment of employment rate and poverty eradication. Specific objective is to enhance drought

resilience and improve sustainable livelihoods of the smallholder farmers in Eritrea. This project

has been designed to complement the Eritrea component of DRSLP II. The project will have four

components: (i) Natural Resources Management; (ii) Value chain and support to livelihoods

diversification; (iii) Capacity building and; (iv) Project management in line with the DRSLP-II

which is already on-going. (Environmental category II)

Consulting

services required

Approved in

January 2017

Page 15: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

9

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

S O M A L I A

Ministry of Public

Works, Reconstruction

and Housing

(MPWR&H)

3.3 (ADF)

2 200 (Transition

Support Facility-

TSF)

Financing of the Strengthening Institutions for Public Works Project

The purpose is to Enhance the Capacities of Somali Public Works Authorities and to Create

Employment and Entrepreneurship Opportunities in Public Works. The proposed project will

have three components and the entire project design features transfer of knowledge and build-up

of capacity: component 1. Framework conditions for MPWR&H, 5 State Ministries of Public

Works and BRA established to plan, execute and monitor infrastructure projects; 2. MPWR&H,

State-Level Public Works Ministries and BRA enabled to fulfil their mandated roles and

employment opportunities for Somali youth created in Public Works in Mogadishu and 5 local

communities (1 in each of the 5 states) and 3. Project Management. (Environmental Category

III).

Consulting

services required

Approved in

December 2016

Ministry of Energy and

Water Resources

4.200 (ADF)

2.075 (Transition

Support Facility-

TSF)

Improving Access to Water and Sanitation Services in Somalia (IAWSS)

The overall objective of the project is to improve access to water and sanitation services in rural

areas of Somalia and contribute to reduce infant and under-5 mortality caused by Water,

Sanitation and Hygiene (WASH) related diseases. The proposed project will have the following

three components: 1. Capacity Development; 2. Water Supply and Sanitation Infrastructure for

Stability and Resilience and 3. Project Management. (Environmental Category II).

Consulting

services required

Approved in

December 2016

U G A N D A

Ministry of Energy 5.84 (ADF)

The Nile Equatorial Lakes Subsidiary Action Program (NELSAP) Interconnection Project

Approved in

Page 16: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

10

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

(Supplementary Loan)

The main development objective of NELSAP Interconnection Project is to improve the rate of

access of electrical power for the people of the member countries and to foster regional power

trade through interconnection of their electrical networks. As per initial design, the components

of NELSAP interconnection project are: 1. construction and upgrading of transmission lines; 2.

construction and upgrading of transformer substations; 3. operating and maintenance equipment;

4. environmental and social impacts; 5. project studies, control and supervision; and 6. project

administration and management.

November 2016

1.698 (Climate

Investment Funds

(CIF) - SCF - SREP

Decentralized Renewables Development Program (Project Preparation Grant -PPG)

The PPG objectives are to support providing modern energy to Ssese islanders and introduce

the Solar Photovoltaic (PV) net-metering rooftop industry into government buildings around

Kampala, Jinja, Mbale and Entebbe. The two components are: 1. Decentralized mini-grids and 2.

Decentralized Urban Small-Scale Solar PV.

Consulting

services required

Approved in March

2017

K E N Y A

The Kenya Power and

Lighting Company

Limited

P O Box 30099 - 00100

Nairobi, Kenya

Stima Investment

Plaza, 2nd Floor,

Mushembi Road,

Parklands.

Tel. +254 20 3201726

Email:

95,973 (ADB)

Last Mile Connectivity Project II

The project is aimed at extending low voltage system throughout the country so as to reach counties

with low penetration rates. It is envisaged that this will result in accelerated economic growth at

the micro-economic level in line with the Government’s vision 2030. The project includes the

following components: 1. Construction of the distribution network including installation of energy

meters for the connection of residential and commercial customers; 2. Project supervision

consultant to assist Kenya Power and Lighting Company Limited (KPLC) during the project

implementation; 3. Capacity - building activities which will include training of KPLC’s team in

Consulting

services required

Approved in June

2016

Page 17: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

11

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

[email protected] project management and 4. Financial audit of the project accounts carried out on an annual basis.

(Environmental Category II).

Ministry of Water and

Irrigation

Maji House, Upper hill,

Off Ngong road,

P.O BOX 49720 – 00100

Nairobi. Kenya

Telephone : +254 020

2716103, 4900000

Fax: +254 020 2727622

Email: [email protected]

Website:

http://www.water.go.ke

271.721 (ADB)

5.647 (ADF)

1.200 (MIC-TAF)

Towns Sustainable Water Supply and Sanitation Program

The main objective of the program is to improve the access, quality, availability and sustainability

of water supply (in 19 towns) and wastewater management services (in 17 towns), with a view to

catalyzing commercial activities, driving economic growth, improving quality of life of the

people and building resilience against climate variability and change. The three components of

Program are: 1. Water Supply & Sanitation Infrastructure; 2. Institutional Development Support

and 3. Program Management. (Environmental category II).

Consulting

services required

Approved in

November 2016

101.487 (ADB)

Partial Risk Guarantee Project in Support of the 1,050 MW Lamu Coal Power Project

The objective of this Project is to provide a partial risk guarantee in connection with the non-

payment under the Power Purchase Agreements between Kenya Power and Lighting Company

(KPLC) and the Independent Power Producer (IPP). The Project will increase the bankability of

the IPP project and will contribute to increased access to energy, a decrease in end-user tariffs in

the medium to long term, and an increase in the national electrification rate. (Environmental

category I)

Board presentation

scheduled for

December 2016

Kenya Electricity

Transmission Company

(KETRACO)

73.700 (ADB)

Lamu Coal Power Project

The purpose of the project is to support socio-economic development in Kenya by providing

reliable and affordable baseload electricity while diversifying the country’s energy mix. The two

key activities of this project are: 1. Construction of the Lamu coal power plant and 2. Operation

Board presentation

scheduled for

December 2016

Page 18: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

12

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

and monitoring of the project. (Environmental category I).

S U D A N

Ministry of Agriculture

and Forestry (MAF) -

Directorate of

International

Cooperation

19.70 (Transition

Support Facility-

TSF)

1.25 (ADF)

ENABLE Youth

The overall goal of the Program is to contribute to job creation, food security and nutrition,

income generation and improved livelihoods for youths in both urban and rural areas. The

specific objective of the ENABLE Youth Sudan is to create business opportunities and decent

employment for young women and men along priority agricultural value chains. The program

components are: 1. Enabling Environment for Youth Employment in Agribusiness; 2.

Entrepreneurship and employment through agribusiness incubation and 3. Program Management,

Coordination. (Environmental Category III).

Consulting

services required

Approved in

November 2016

S O U T H S U D A N

Ministry of Electricity,

Dams, Irrigation and

Water Resources

4.95 (Transition

Support Facility -

TSF))

Resilient Water Project for Improved Livelihoods in Juba (RWPILJ)

The purpose of the project is to improve water supply infrastructure and to contribute to improved

livelihoods of people in Juba city. The Project has three components: 1: Institutional

Strengthening and Capacity Development, Capacity building of SSUWC staff; supply of project

vehicles and equipment; baseline studies; 2. Water Supply Infrastructure development: works,

designs and supervision for water infrastructure and 3. Project management; project auditing;

reporting and other support activities. (Environmental Category II).

Consulting

services required

Approved in July

2016

Ministry of Finance 1.820 (DF)

Approved in March

Page 19: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

13

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

and Planning 8.830 (Transition

Support Facility

(TSF) - SSW

Non-Oil Revenue Mobilisation and Accountability in South Sudan Project (NORMA-SS)

The overall development objective of the project is to enhance sustainable and improved

economic growth through increased domestic resource mobilization and improved accountability

in the use of public resources. The project has three mutually reinforcing components: (i)

improve domestic resource mobilization in the non-oil sector; (ii) strengthening financial control,

accountability and oversight and (iii) Project management. (Environmental Category III).

2017

Ministry of Finance

and Planning

13.380 (ADF)

Regional Development Finance Institutions (TDB, ATI) Country Membership Programme

The main objective of the proposed intervention is to assist the Government of the Republic of

South Sudan (GRSS) with the required resources for its Trade Development Bank (TDB) and

African Trade Insurance Agency (ATI) membership application. The programme therefore

consists of two components: (i) TDB membership and (ii) ATI membership

Board presentation

schedule for April

2017

T A N Z A N I A

Ministry of Finance

and Planning 50.00 (ADF)

Power Sector Reform and Governance Support Programme Phases II & III (PSRGSP II &

III)

PSRGSP II & III is to contribute to the government’s effort in promoting inclusive growth and

enhanced competitiveness through power sector reform and improved economic and financial

governance. The components are: 1. Strengthening the Institutional Framework and Operational

Efficiency of the Power Sector; 2. Enhancing Competition and Private Sector Participation in the

Power Sector; and 3. Improving Governance through PFM Reforms, with particular emphasis on

strengthening procurement systems and reducing fiscal risks posed by parastatals.

Approved in

December 2016

Page 20: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

14

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Tanzania Agricultural

Development Bank

670270 (ADF)

Tanzania Agriculture Development Bank

The Project goal is to promote financial inclusion and support transformation of agriculture from

subsistence to commercial farming in order to effectively and sustainably contribute to economic

growth and poverty reduction. The following three components will serve as a good guide for

implementation: 1. Process and System Improvements; 2. Information Technology (IT) and 3.

Building staff capacity.

Consulting

Services required

Approved in

December 2016

Ministry of Finance

and Planning 19.580 (ADF)

Institutional Support Project for Domestic Resources Mobilization and Natural Resources

Governance

The overall development objective of the proposed project is to promote inclusive growth by

contributing to supporting the development of the natural resources sector and enhancing

domestic resources mobilization. The project has three components: (i) enhancing governance in

the natural resources sector (ii) enhancing domestic resources mobilization and (iii) Project

Management. (Environmental Category III)

Approved in March

2017

E T H I O P I A

The Ethiopian Electric

Power (EEP)

74.783 (ADB)

Mekele-Afdera-Dallol and Semers Afdera Power Supply for Industrial Development And

Access Scale-Up Project

The aims of the Project is to improve the socio-economic development and livelihood of the

population of beneficiary regions through increased access to affordable & sustainable electricity

supply and improvement in service delivery. The components of the Project are: 1. Transmission

Lines; 2. Substations; 3. Rural Electrification; 4. Consulting Services; 5. Capacity building &

Feasibility Study of Transmission Projects; 6. Distribution of advanced Cook stove & Solar

Consulting

Services required

Approved in July

2016

Page 21: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

15

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Panels (PV) including capacity building and 7. Project Management, Audit, Resettlement,

Compensation and ESMF. (Environmental Category I)

Ethiopian Roads

Authority (ERA) 67.267 (ADF)

Integrated Transport Program Phase 1 (Jimma –Chida & Sodo-Sawla Road Upgrading

Project)

The project objective is to provide all-weather climate – resilient road transport infrastructure to

the rich agricultural area of southern Ethiopia and connect Sawla in the hinterland to Jimma and

Addis Ababa. Furthermore, the project will provide capacity building and social infrastructure.

The project has seven components: 1. Civil Works for upgrading 240km of road; 2. Supervision

Consulting services for road upgrading activities; 3. Capacity Building in skills development in

the Transport Sector; 4. Capacity Building in Climate Risk Assessment and Management at ERA;

5. Women entrepreneurial Support; 6. Audit Consulting services and 7. Resettlement Action Plan

(RAP). (Environmental category I).

Consulting

Services required

Approved in

December 2016

Ministry of Water,

Irrigation and Energy 4.120 (ADF)

Support to the One Water, Sanitation and Hygiene National Program (OWNP)

The goal of the Program is to contribute to reducing poverty and improving the health and well-

being of Ethiopians, in line with the GTP, through increasing access to water supply and

sanitation services as well as the adoption of good hygiene practices in an equitable and

sustainable manner. The components being implemented under the Program are: 1. Rural and

Pastoral Water, Sanitation and Hygiene (WASH); 2. Urban WASH; 3. Institutional WASH and 4.

Sector Governance and Capacity Development.

Approved in March

2017

R W A N D A

Ministère des Finances 35,900 (FAD) Approuvé en juillet

Page 22: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

16

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

et du Plan

(MINECOFIN)

Programme pour les compétences, l’employabilité et l’entreprenariat (SEEP) III

L’objectif du programme consiste à soutenir la mise en œuvre des réformes tendant à développer

les compétences, Le SEEP III s’emploiera à améliorer la compétitivité et promouvoir la création

d’emplois par le secteur privé. Par conséquent, le programme portera sur deux (2) composantes, à

savoir : i) les Compétences et l’employabilité ; et ii) le Développement des entreprises et des

affaires. assurer la pertinence des compétences et développer l’entrepreneuriat et les entreprises.

(Catégorie environnementale III).

2016

Energy development

Corporation (EDCL)

Email:

[email protected]

27,365 (BAD)

Amélioration de la capacité d'adaptation des communautés rwandaises au changement

climatique

Le but du projet est d’accroître les capacités d'adaptation des communautés rwandaises

vulnérables aux effets néfastes du changement climatique par la diversification des moyens de

subsistance et l'investissement dans les infrastructures rurales. Les composantes du projet sont : 1.

: Multiplication et diversification des moyens de subsistance ruraux résilients au changement

climatique ; 2. Renforcement de la connaissance et de l'appropriation des processus d'adaptation

et de réduction des risques ; 3. Petites infrastructures rurales résilientes au changement

climatique ; 4. Suivi et évaluation et 5. gestion du programme. (Catégorie environnementale II).

Services de

consultants requis

Approuvé en

octobre 2016

MULTINATIONAL EASTERN REGION

Uganda National Roads

Authority (UNRA) and

Rwanda Transport

Development Agency

(RTDA)

64.44 (ADB)

109.060 (ADF)

Uganda-Rwanda: Busega-Mpigi and Kagitumba-Kayonza-Rusumo Roads Project

The sector goal of the project is to contribute to socio-economic development, poverty reduction

and regional integration through an improved and sustainable transport system that links centers

of economic activity. The project objectives are two-fold: at regional level (for both countries),

Consulting

services required

Approved in June

2016

Page 23: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

17

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

the objective is to contribute to improving road transportation and trade facilitation along the

Northern and Central Corridors. At the national level, the objective is to contribute to improving

transport services in the eastern Rwanda (Kagitumba-Kayonza-Rusumo area) and in central

Uganda (Kampala, Wakiso and Mpigi districts) to stimulate and support local economic activities

by reducing transport costs and travel time, and decreasing traffic congestion on the heavily

traveled Kampala-Mpigi road section. The project components are: A- Uganda: 1. Civil works

for the construction of Busega-- Mpigi express highway (23.7km) in one lot and cross-cutting

issues; 2. Supervision Consultancy; financial and technical audit; 3. Studies and Institutional

support and 4. Compensation B – Rwanda: 1. Civil works for the rehabilitation of Kagitumba-

Kayonza-Rusumo road (208km) in three lots and cross-cutting issues; 2. Supervision Consulting

services; technical audit; 3. Studies; Institutional support and ancillary works and 4

Compensation. (Environmental Category I).

Lake Victoria Basin

Commission (LVBC)

PO BOX 1510, Kisumu; 13th

Floor, New Nyanza Regional

HQ, Owuor Otiende Rd, Off

Kenyatta Highway.

The Executive Secretary

Attention: Head,

Procurement

Telephone: +254572023894

Email:[email protected];

copy to [email protected];

& [email protected]

17.750 (ADF)

Kenya-Uganda-Tanzania: Lake Victoria Maritime Communications and Transport Project

(LVMCTP)

The development objective of the project is to encourage increased transport and trade on Lake

Victoria by improving maritime transport infrastructure including maritime communications,

navigation safety aids, and maritime emergency search and rescue services. LVMCTP consists of

three main components: 1-Establishment of a Maritime communications system for safety on

Lake Victoria, 2- Maritime Transport for Lake Victoria Study, 3- Project Management and

Capacity Building. (Environmental Category II).

Consulting

services required

Approved in

October 2016

Ministry of

Agriculture, Water,

Fisheries, Livestock &

Halieutic Resources

(Djibouti) Ministry of

Agriculture &

Livestock & Fisheries

Djibouti - 4.050

(GEF)

Kenya 2.056 (GEF)

Rural Livelihoods Adaptation to Climate Change in the Horn of Africa I

The overall objective of the programme is to improve resilience of pastoral and agro-pastoral

communities through their adaptation to climate change in targeted areas in Djibouti and Kenya.

The programme is structured around three components: 1. Improved resilience to climate change

of pastoral and agro-pastoral communities in targeted areas; 2. Invest in sustainable measures

Approved in

December 2016

Page 24: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

18

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

(Kenya) aimed at improving the resilience of pastoral communities to climate change and variability and

3. Support efficient, timely and accountable coordination and monitoring and evaluation of

project activities. (Environmental category III).

IGAD Climate

Prediction and

Applications Centre

(ICPAC)

1.938 ClimDev-

Africa Special Fund

(CDSF)

Satellite and Weather Information for Disaster Resilience in Eastern Africa

The overall Goal of this project is to enhance the use of high resolution satellite data to generate

severe weather forecasts to support Disaster Risk Management (DRM) in Eastern Africa. The

project has five components: 1. Numerical Weather Prediction (NWP) Infrastructure at ICPAC; 2.

Application of severe weather forecasts for Disaster Risk Management; 3. Regional Climate

Outlook Forums (RCOFs); 4. Numerical Weather Prediction (NWP) Infrastructure at NMHSs and

5. Project management and administration.

Consulting

services required

Approved in

December 2016

Uganda National Roads

Authority and Kenya

National Highways

Authority

88.928 (ADB)

76.575 (ADF)

Uganda-Kenya: Kapchorwa-Suam-Kitale and Eldoret Bypass Roads Project

The objective of the project is to improve access and connectivity between Uganda and Kenya as

well as to stimulate economic activity in the eastern parts of Uganda and western part of Kenya

and ease the traffic congestion along the Northern Corridor and within Eldoret Town. The project

components are: 1. Civil works for the upgrading of KapchorwaSuam road (73km); 2. Services;

3. Goods (Post-crash and emergency responses) and 4. Compensation.

Approved in March

2017

Page 25: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

19

OPERATIONS PAYS REGION SUD/COUNTRY OPERATIONS SOUTHERN REGION (RDGS)

Directeur Général/General Director: T. KANDIERO

Tel +27 120036900 (ext. 8403)

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Z A M B I A

Development Bank of

Zambia (DBZ) 35.49 (ADB)

Development Bank of Zambia (DBZ)

The overarching objective of this project is to stimulate economic growth in Zambia by

facilitating access to credit to SMEs in order to enable them to grow and enhance their productive

capacity. To achieve this objective, it is proposed to extend a line of credit to the DBZ, a

development finance institution with strong links to the Government of Zambia’s strategic plans.

Approved in

September 2016

Ministry of Fisheries &

Livestock

33.042 (ADB)

Aquaculture Enterprise Development Project

The Project objective is to provide the necessary guidance to aquaculture development by scaling

up the aquaculture programme in high impact areas; implementing mechanisms to enforce quality

standards while supporting small- and medium-scale enterprises in aqua-businesses in accordance

with the Government of Zambia (GRZ) priorities. (Environmental category II).

Consulting

Services required

Approved in

November 2016

Ministry of Local

Government and

Housing

79.275 (ADB)

7.070 (ADF)

10.918 (AGTF)

1.200 (MIC TAF)

Integrated Small Towns Water Supply and Sanitation Program

The Program Development Objective is to increase access, quality and sustainability of water

Consulting

Services required

Approved in

November 2016

Page 26: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

20

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

supply and sanitation services in the four Provinces served by Western Water & Sewerage

Company, Luapula Water & Sewerage Company and Chambeshi Water & Sewerage Company as

well as ensure effective management and operation of the water supply and sewerage facilities on

commercial principles. The four program components are: 1. Water Supply Infrastructure

Development; 2. Sewerage Infrastructure Development; 3. Institutional Strengthening: and 4.

Program Management. (Environmental category II).

University of Zambia

1.220 (ADF)

Education for Sustainable Development in Mineral Resources Management Project at the

University of Zambia

The development objective of the project is to contribute to youth employment and inclusive

economic growth through Sustainable Mineral Resources Development (SMRD) in Zambia. In

this respect, four components are foreseen: 1. Capacity building in sustainable mineral resources

development; 2. Internships for acquisition of field and practical knowledge; 3. Analytical work

on key sustainability issues in the minerals sector and 4. Support to project management.

(Environmental category III).

Approved in

December 2016

M O Z A M B I Q U E

National Roads

Administration

Avenida de

Moçambique, nr. 1225

Caixa Postal - 403

Tel: +258 21 476163

+258 21 476167

Fax: +258 21 475862

Maputo – Mozambique

53.520 (ADF)

Mueda Negomano Road project Phase I

The objective of this project is to contribute to socio-economic growth in Northern Mozambique

by increasing regional integration with Tanzania. It will foster physical, economic and social

integration of the sub-region and provide improved transportation and access to the port of

Mtwara in Tanzania at one end and Pemba port in Mozambique on the other. It will also assist in

developing a strategic planning of the transport infrastructure in the Northern Region of

Mozambique. The Project components are: 1. Construction of road and related infrastructure; 2.

Consulting

Services required

Approved in

December 2016

Page 27: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

21

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

And

Mozambique Road

Fund

Avenida Mártires de

Inhaminga, nr. 170

Caixa Postal – 797

Tel: +258 21 305589 /

+258 21 308499 Fax:

+258 21 305069

Maputo – Mozambique

Implementation of Social Inclusion & Biodiversity Program (SIBP; 3. Implementation of a

Capacity Development Program for entities in the roads sub-sector; 4. Development of the

Mozambique Northern Region Transport Masterplan; 5. Project Management activities and 6.

Implementation of the project’s Resettlement Action Plan. (Environmental Category I).

A N G O L A

Ministry of Finance 493,89 (ADB)

Policy Based Guarantee - Economic Diversification and Competitiveness Support Program

The overarching development objective is to contribute to inclusive and sustainable growth by

improving private sector investment and the business climate as well as public investment

management. It will support the government in its efforts, during the current financial straits, to

increase the efficiency and effectiveness of public investment and implement programs to

diversify the economy, critical in the context of declining oil revenue. To that end, the operation

supports economic diversification and competitiveness that is at the center of the Government’s

strategy. The proposed operation is articulated around two strategic and mutually reinforcing

components: 1. Improve the Business Environment and Investment Climate; and 2. Improve

Efficiency in Public Investment and Good Sector Governance.

Board presentation

scheduled for

December 2016

Page 28: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

22

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

M A L A W I

The Ministry of

Finance, Economic

Planning and

Development

12.00 (ADF)

Food Crisis Response Budget Support Programme

The objective of the proposed program is to contribute to achieving short-term food security at

household and national level, and thereby contribute to supporting economic stability and social

welfare in the country. The purpose of the operation is to assist the Government of Malawi in

addressing the fiscal challenges by contributing to reducing the food gap through direct maize

purchases to replenish the Strategic Grain Reserve (SGR) for immediate distribution to vulnerable

households. (Environmental category III).

Approved in

November 2016

Ministry of Labour,

Youth, Sports and

Manpower

Development

8.770 (ADF)

Job for Youth

The Project has three components: 1. Entrepreneurship Education and Sustainable Business

Enterprise Development; 2. Skills development for employability and 3. Institutional Support and

Project management. (Environmental Category III)

Consulting

Services required

Approved in

December 2016

Ministry of

Agriculture, Irrigation

& Water Development

16.00 (ADF)

Agricultural Infrastructure and Youth Skills Development in Agribusiness Project (AIYAP)

The proposed project will enhance youth participation in agribusiness, agro-processing, value

addition, crop diversification and market linkages. The project will contribute to increase in

agricultural exports, import substitution, foreign exchange and job creation especially for the

youth. The project will have four main components as follows: 1. Infrastructure development; 2.

Market Linkages, Agro Processing and Value Addition; 3. Youth empowerment actions and 4.

Project Management and Institutional Strengthening. (Environmental Category II)

Consulting

Services required

Approved in

September 2016

Page 29: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

23

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

S A O T O M E & P R I N C I P E

Central Bank of STP 1.50 (ADF)

Payment System Infrastructure and Financial Inclusion Project

The broad development goal of the project is to promote a competitive financial sector and

financial inclusion in São Tomé and Príncipe, by assisting the authorities to develop a national

payments system, improve its oversight, enhance the legal framework to include all electronic

payments and services and support preparation of a national financial inclusion strategy. The

proposed project has three mutually reinforcing components: (i) Institutional Preparation; (ii)

Strengthening Payments System Infrastructure and institutions; and (iii) Institutional Capacity

Building.

Consulting

Services required

Approved in

February 2017

Z I M B A B W E

Ministry of Finance

and Economic

Development

3.4 (ADF)

Youth and Women Empowerment Project (YWEP)

The overall development objective of the project is to contribute towards to the improvement of

livelihoods for youth and women through the development of economic opportunities. The three

components of this Project are: 1. Food Value Addition and Enterprise Development; 2.

Institutional Capacity Strengthening and 3. Project management support. (Environmental

category II).

Approved in

October 2016

Zimbabwe Electricity

Transmission and

Distribution

13.54 (ADF)

Alaska- Karoi Power Transmission Reinforcement Project. (AKTP)

Consulting

Services required

Approved in

December 2016

Page 30: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

24

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Company’s (ZETDC) The objective of the project is to strengthen and increase the country’s sub- transmission network

capacity resulting in increased reliability and quality of electricity supply in and around Karoi

area and to develop a national, prioritised, long-term network masterplan for the generation,

transmission and distribution asset base. The proposed project consists of four components; i) a

transmission line component supporting ZETDC; ii) a technical assistance component, supporting

ZESA holdings in the development of a prioritized, long-term network masterplan for the

generation, transmission and distribution asset base; iii) the development of environmental and

social impact studies for future projects within the sector pipeline projects; iv) and a social

upliftment component targeted at supporting communities directly affected by the project.

(Environmental Category II).

Ministry of Finance &

Economic

Development

3,00 (ADF)

Institutional Support for State Enterprise Reform and Delivery Project (ISERDP)

The purpose of the project is to strengthening result based management across government and

improve efficiency of the State Enterprises and Parastatals. The proposed Project has three

mutually reinforcing components: (i) Strengthening State Enterprises Governance; (ii) Integrated

Results Management System, and (iii) Project Management Support.

Approved in

January 2017

Department of Public

Sector Modernisation,

Performance

Management and State

Enterprises.

Governance and Institutional Strengthening Project (GISP II)

The development objective of the proposed project is to support Government to strengthen the

result based management system focusing on planning and budgeting and results monitoring.

The proposed project has three components: two mutually reinforcing components: 1.

Strengthened Result Based Management System; 2. Reviewed State Enterprise and Parastatals

Performance and 3. Coordination and Institutional Support to the Implementing Agency.

(Environmental Category III).

Board presentation

scheduled for

December 2016

Zim-Fund MDTF USD 7.32

Board presentation

Page 31: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

25

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Management Unit 1 UA = 1.358 USD

(Zim Fund))

Emergency Power Infrastructure Rehabilitation Project: Phase II Stage II (EPIRP II Stage

II)

The objective of the EPIRP II Stage II is to further improve the availability and reliability of

electricity supply through the rehabilitation of transmission and distribution facilities. The Project

target areas are Kwekwe, Gweru and Mutare with a combined target population of 2 million

people. The Project components are: 1. Power Infrastructure rehabilitation and 2. Project

Management services. (Environmental Category II)

scheduled for June

2017

S W A Z I L A N D

Swaziland Water and

Agricultural

Development

Enterprise Limited

(SWADE)

44,353 (ADB)

Lower Usuthu Smallholder Irrigation Project - Phase II (LUSIP II)

The objective of the project is to alleviate poverty in the project area by transforming the existing

subsistence farmers into commercial farmers on irrigated lands producing both food and cash

crops (principally sugarcane). It is to support the development and utilization of the water

resources of the Lower Usuthu River through provision of irrigation infrastructure to enable

smallholder farmers to intensify and diversify their agricultural production building on existing

market linkages with the private sector. It is also aimed at establishing an effective management

of infrastructure and equipment for the sustainable improvement of production and cost recovery.

The LUSIP Phase II has four main components, namely: (i) Development of the Main

Conveyance System (MCS); (ii) Development of Secondary Irrigation Pipe Network supplying

the different irrigation blocks, each covering 100-700 ha; (iii) On Farm Infrastructure

Development; and (iv) Project Management and Engineering Supervision. (Environmental

Category II).

Consulting

Services required

Approved in May

2016

Page 32: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

26

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

B O T S W A N A

55,628 (ADB)

Botswana Development Corporation (BDC) - Line of Credit

The project aims to provide a sovereign guaranteed Line of Credit (LOC) to BDC amounting to

BWP 850 Mln (USD 76.2 Mln) with a tenor of up to 15 years. The LOC will be used for on-

lending to critical sectors in Botswana (see para 1.2 above) by mainly funding new investments

through loans, with a preference for projects need capital to grow and that support local

participation. The LOC will strengthen BDC’s liquidity and ability to finance beneficiaries in its

target sectors e.g. agri-business, clean energy and infrastructure, on appropriate terms. It will

further enable BDC to grow its loan asset base and rebalance its portfolio by increasing its debt

exposure in form of pure debt and quasi debt. This will improve cash-flow for BDC.

Consulting

Services not

required

Approved in April

2016

L E S O T H O

World Food Program

(WFP)

0.714 (Special

Relief Fund - SRF)

Emergency Humanitarian Relief Assistance to the Victims of Food Crisis

The objective of the proposed Bank Group Emergency Relief Assistance to the Kingdom of

Lesotho is to contribute to the on-going efforts of the Government and other humanitarian partners

to save lives and protect livelihoods in the current crisis situation caused by the drought being

experienced by the country. This objective will be achieved through the provision of emergency

food relief. This contribution will cover specifically the food commodity requirements from July

2016 to December 2016 consisting of 948 MT of maize, 142 MT of pulses and 47 MT of Vegetable

Oil for 13,160 beneficiaries in Thaba - Tseka, Quthing, Maseru, Qacha and Mohales` Hoek

districts.

Approved in July

2016

Page 33: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

27

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Lesotho Electricity

Company (LEC) 7.7800 (ADF)

Urban Distribution Rehabilitation and Transmission Expansion Project

The purpose of the project is to improve the reliability and availability of the power distribution

network to enhance quality of supply to existing consumers, including, specifically, the Letseng

diamond mine, and to provide a basis for gradual transition of existing electricity tariffs to

economic cost of service reflective levels in Lesotho. The project will comprise the following

components: 1. Transmission Upgrade and Distribution System Rehabilitation; 2.. Civil Works; 3.

Technical Assistance and 4. Supervision and Project Management and supervision. (Environmental

category II).

Consulting

Services required

Approved in

December 2016

Ministry of Trade and

Industry 7.22 (ADF)

Economic Diversification Support Project (EDSP)

The purpose of this project is to support private sector development through improving partnership,

entrepreneurship and skills development, access to finance and market, and investment promotion

in the selected sectors critical for economic diversification. The Project has three mutually

reinforcing components: (i) enhancing economic diversification; (ii) promoting enterprise

development; and (iii) project management support. (Environmental category III)

Approved in

December 2016

MULTINATIONAL SOUTHERN REGION

SOUTHERN AFRICAN

DEVELOPMENT

COMMUNITY CLIMATE

SERVICES CENTRE

(SADC CSC)

SADC SECRETARIAT

2.520 (ClimDev-

Africa Special Fund

(CDSF)

Southern African Regional Climate Information Services for Disaster Resilience Development

(SARCIS-DR)

The purpose of this project is to increase the capability of SADC countries to respond to climate

Consulting

Services required

Board presentation

scheduled for

April 2017

Page 34: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

28

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Private Bag 0095

Gaborone

Tel. +267 3951863

Fax: +267 3181070

Email: [email protected]

induced disasters and to reduce loss of lives and damages of resources and proprieties. The project

has four major components: 1. the improvement of meteorological infrastructure; 2. equipment for

catering early warning system in Member State countries; generation and dissemination of extreme

weather and climate information services for disaster risk reduction;3. capacity building in early

warning at national and regional levels and 4. the project management.

Page 35: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

29

OPERATIONS PAYS REGION CENTRE/COUNTRY OPERATIONS CENTRAL REGION (RDGC)

Directeur Général/General Director : O. DORE

Tel : +237 ….4902

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

C A M E R O U N

Ministère de l’Economie, de la

Planification et de

l’Aménagement du Territoire

(MINEPAT) - Direction

générale de l’économie et de la

programmation des

investissements publics

(DGEPIP)

11,210 (FAD

11,313 (BAD)

Projet d'appui à l'efficacité de la dépense publique

L’objectif général du projet est de contribuer à améliorer la gestion budgétaire et renforcer

l’impact de la dépense publique dans les secteurs de l’énergie et des transports. Le projet

se décline en trois (03) composantes : (i) Appui à la maturation des projets

d’investissement public et à la passation des marchés ; (ii) Appui à la planification

stratégique et à la régulation dans les secteurs du transport et de l’énergie ; et (iii) Gestion

du projet. (Catégorie environnementale III).

Services de

consultants

requis

Approuvé en

novembre 2016

Ministère des travaux publics -

cellule de suivi des projets

BAD/BM (CSEPR BAD/BM)

215.244 (BAD)

12,820 (FAD)

Programme d'appui au secteur des transports, Phase II

L’objectif global du projet est de contribuer au désenclavement et à la mise en valeur des

potentialités agricoles et l’accroissement des échanges entre et dans les Régions du pays.

Pour atteindre ces objectifs, les activités du projet ont été regroupées dans les quatre

composantes suivantes : 1. Travaux routiers ; 2. Aménagements connexes ; 3. Etudes et

Appui institutionnel et 4. Gestion du projet. (Catégorie environnementale I).

Services de

consultants

requis

Approuvé en

novembre 2016

Page 36: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

30

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

R E P U B L I Q U E D E M O C R A T I Q U E D U C O N G O (RDC)

Ministère de l’Agriculture,

Pêche et Elevage 40,00 (FAD)

Projet d’entreprenariat des jeunes dans l’agriculture et l’agro-business

L’objectif global du projet est de promouvoir la création par des jeunes diplômés,

d’entreprises rentables, intégrées dans les filières agropastorales porteuses. Le projet

poursuivra ces objectifs à travers les actions résumées comme suit : 1. Amélioration de

l’environnement de l’entreprenariat agricole jeunes ; 2. Développement des entreprises et

3. Coordination et gestion du Projet. (Catégorie environnementale III)

Services de

consultants

requis

Approuvé en

décembre 2016

Ministère de l’Energie et

Ressources Hydrauliques

71,100 (FAD)

25,00 (TSF)

Projet d’appui à la gouvernance et à l’amélioration du système électrique

Le projet a pour objectif de contribuer à la mise en œuvre des réformes et au

développement des infrastructures électriques. Les composantes du projet sont : 1.

Développement des infrastructures ; 2. Gouvernance ; 3. Appui institutionnel et 4. Gestion

du Projet. (Catégorie environnementale II).

Services de

consultants

requis

Approuvé en

décembre 2016

Ministère du Plan (CEP-

PADSP-CE) 4,190 (FAD)

Projet d’appui à la consolidation du tissu économique (PACTE)

L’objectif global du projet est de promouvoir le processus d’industrialisation du pays à

travers la consolidation du système de normalisation et l’appui à l’entreprenariat féminin.

Le PACTE comprend trois composantes complémentaires qui sont : 1. renforcement des

capacités du système de normalisation ; 2. appui à l’entreprenariat féminin ; et 3. appui à

Services de

consultants

requis

Approuvé en mars

2017

Page 37: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

31

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

la gestion efficiente du projet. Catégorie environnementale III

T C H A D

Ministère des Finances et du

Budget

16,147 (FAD)

15,00 (FAT)

Programme d'appui aux réformes économiques et financières, Phase II (PARFIP-II)

L’objectif opérationnel du PARFIP-II est d’abord d’améliorer la provision des services

sociaux de base de qualité aux populations à travers le renforcement de la qualité des

dépenses publiques (protection des allocations budgétaires pour les secteurs sociaux,

notamment pour la scolarisation des filles) et la transparence du processus budgétaire à

commencer par la passation des marchés publics et la reddition régulière des comptes).

Ensuite, le PARFIP-II vise à améliorer l’environnement des affaires du pays pour stimuler

la promotion des petites et moyennes entreprises, moteurs de la croissance économique

inclusive et notamment dans le secteur agricole. Le programme comprendra deux

composantes : (i) Appui au renforcement de la qualité de la dépense publique ; et (ii)

appui à la diversification de l’économie. (Catégorie environnementale III).

Approuvé en juin

2016

G A B O N

Ministère du Développement

Durable, de l’Economie, de la

Promotion des Investissements

et de la Prospective (MDDEPIP)

0,967 (FAT-PRI)

Appui Technique au Programme National d’Evaluation Environnementale des Sites

Industriels et des Services Environnementaux (PESISE)

Le but du projet est de contribuer à l’amélioration des conditions d’existence des

populations par la promotion d’un développement industriel à faible empreinte

écologique. et la lutte contre les effets changements climatiques au Gabon. L’opération est

articulée autour de trois composantes : 1. Préparation du PESISE ; 2. Renforcement des

capacités nationales; et 3. Coordination.

Services de

consultants

requis

Approuvé en févier

2017

Page 38: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

32

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Ministère de Développement

Durable, de l’Economie, de la

Promotion des Investissements

Immeuble ARAMBO, 623

boulevard Triomphal Omar

Bongo – B.P. 747 LIBREVILLE

Gabon. Tel : +241 01795527 ;

Fax : +241 01795798

0,991 (Fonds

d’assistance

technique en faveur

des Pays à Revenu

Intermédiaire FAT-

PRI)

Appui technique à la stratégie de transformation de l’agriculture et la promotion de

l’entrepreneuriat des jeunes dans le secteur agricole et l’agrobusiness

Cet appui technique a pour objectifs de : (i) contribuer à la sécurité alimentaire du Gabon,

en assurant l’autosuffisance en produits vivriers à l’horizon 2025, (ii) faire du Gabon un

pays exportateur de 1er rang des produits de cultures industrielles, et (iii) améliorer les

conditions de vie des populations par la promotion d’une agriculture rentable et créatrice

d’emploi pour les jeunes. L’étude s’articule autour de trois composantes : 1. Réalisation

de l’étude, situation de référence et système de suivi-évaluation, manuel de procédures et

mise en place du système ; 2. Renforcement des capacités (Acquisition d’équipements

bureautiques et informatiques pour l’Unité de Coordination) et 3. Gestion de l’étude

(Audit final, Indemnités des experts, frais de fonctionnement, frais comité de pilotage,

etc.) de gestion comptable.

Services de

consultants

requis

Approuvé en

février 2017

Ministère de Développement

Durable, de l’Economie, de la

Promotion des Investissements

Immeuble ARAMBO, 623

boulevard Triomphal Omar

Bongo – B.P. 747 LIBREVILLE

Gabon. Tel : +241 01795527 ;

Fax : +241 01795798

0,993 (Fonds

d’assistance technique

en faveur des Pays à

Revenu Intermédiaire

FAT-PRI)

Projet d’appui technique à l’Initiative Gabon Vert pour la préparation d’un projet

d’appui au Programme Graine – Phase II

Cet appui technique vise à : (i) contribuer, à travers la promotion des PPP, à la sécurité

alimentaire du Gabon en améliorant l’autosuffisance en produits vivriers à l’horizon 2025,

(ii) faire du Gabon un pays exportateur de 1er rang des produits de cultures industrielles

(notamment l’huile de palme), et (iii) améliorer les conditions de vie des populations par

la promotion d’une agriculture rentable et créatrice d’emploi pour les jeunes. (Catégorie

environnementale III).

Services de

consultants

requis

Approuvé en

février 2017

Ministère de l’Economie, de la

Prospective et de la

Programmation du

Développement Durable

156,820 (BAD)

Programme d’Appui aux Réformes Economiques et Financières (PAREF)

Le but du programme est de contribuer à la promotion d’une croissance économique

Approuvé en

janvier2017

Page 39: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

33

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

(MEPPD) accélérée et inclusive à travers le renforcement de la viabilité des finances publiques,

l’amélioration du climat des investissements et la compétitivité du secteur agricole. Le

Programme est conçu autour de deux lignes directrices complémentaires répondant aux

deux contraintes majeures suivantes : 1. renforcer l’assainissement budgétaire pour

rétablir la stabilité macroéconomique; et 2. appuyer la diversification de l’économie pour

une croissance inclusive.

Direction Générale de la

Formation Professionnelle /

Ministère en charge de la

Formation Professionnelle et de

l’Insertion des Jeunes

66,484 (BAD)

Renforcement des Capacités pour l’Employabilité des Jeunes et l’Amélioration de la

Protection Sociale (RC/EJPS)

L’objectif sectoriel du projet envisagé est de contribuer à la réduction du chômage des

jeunes et à l’amélioration des conditions de vie des populations. .Le projet comprend les

composantes suivantes : 1. développement des compétences pour l’employabilité ; 2.

promotion de la santé et de l’inclusion sociale et 3. Gestion du projet. (Catégorie

environnementale II).

Services de

consultants

requis

Approuvé en

décembre 2016

Le Ministère de la Protection de

l’Environnement et des

Ressources Naturelles, de la

Forêt et de la Mer

1,198 (FAT-PRI)

Projet d’appui technique à l’initiative « Gabon Vert » pour la transformation de la

filière forêt-bois au Gabon- Préparation du programme et études connexes

Objectifs stratégique et spécifiques: Cet appui technique vise à contribuer à la réduction

de la pauvreté et des inégalités sociales par la diversification des piliers de croissance et la

création de richesses et d’emplois durables. Les différentes composantes sont : 1. études

de faisabilité ; 2. renforcement des capacités et 3. Coordination de l’étude.

Services de

consultants

requis

Approuvé en juin

2016

Page 40: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

34

Organe d’éxécution

Executing Agency

Montant probable

& source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

R E P U B L I Q U E C E N T R A F R I C A I N E (RCA)

Ministère des Mines, de

l’Energie et de l’Hydraulique,

BP : 1481, BANGUI-RCA

TEL : 0023621613944

3,880 (RWSSI)

Premier Sous-Programme Sectoriel Eau Potable et Assainissement (PSEPA) de

Bangui et les milieux semi-urbains et ruraux des Préfectures de la Mambéré-Kadeï,

la Nana-Mambéré et de l'Ouham

Le but du programme est de contribuer à l’amélioration de la qualité de vie des

populations urbaines et rurales à travers un meilleur accès à l'eau potable, à

l’assainissement et aux petits métiers. Les activités de ce programme sont structurées

autour de trois composantes suivantes: 1. Renforcement des Capacités et activités

connexes ; 2. Développement des infrastructures d’eau potable et d’assainissement; et 3.

Gestion du Projet additionnel. (catégorie environnemental II).

Services de

consultants

requis

Approuvé en

décembre 2016

Page 41: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

35

OPERATIONS PAYS REGION OUEST/COUNTRY OPERATIONS WESTERN REGION (RDGW)

Directeur Général / General Director: J. LITSE

Tel: 225 2026 4047

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

C A P V E R T

World Health

Organization (WHO)

0.717 (Special

Relief Fund -SRF)

Emergency Assistance to Support Cabo Verde Preparedness and Response Plan to Fight the

Zika Virus Outbreak

The ultimate goal of this project is to strengthen Cabo Verde’s capacity to prevent, detect, control

and strengthen response towards Zika virus disease outbreak and other mosquito-borne viral

diseases. The project has three components: 1. Strengthening legislation, coordination and social

empowerment; 2. Strengthen prevention and preparedness for timely detection and 3. Strengthen

response to Zika virus and other arbovirus outbreaks.

Approved in

September 2016

Ministère de

l’Economie et de

l’Emploi (en charge de

l’économie maritime)

Adresse - Rua Cidade

do Funchal, nº 2 - 2º

piso - ASA

Cidade da Praia -

Republica de Cabo

Verde

1,000 (FAT-PRI)

Appui technique pour l’élaboration d’un plan national d’investissement en faveur de

l’économie bleue et la préparation du programme pour la promotion de l’économie bleue

Cet appui technique à préparer un cadre de réformes et d’investissements devant contribuer à la

réduction de la pauvreté et des inégalités sociales par l’exploitation durable des ressources

océaniques et côtières, la diversification des piliers de la croissance et la promotion d’une

économie bleue. L’Opération est articulée autour de trois composantes : 1. Etudes ; 2.

Renforcement des capacités ; et 3. Coordination de l’étude.

Services de

consultants requis

Approuvé en

octobre 2016

Page 42: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

36

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

C.P. 15 - Praia

Fax: + 238 -262 31 54

G H A N A

FORM GHANA Ltd 10.008 (ADB

Private Sector)

Form Ghana Reforestation Project

The project aims to establish and manage 11,700 ha of sustainable commercial forest plantation

composed of 10% indigenous tree species and 90% teak. The main activities involve: (i) Terrain

preparation; (ii) Plant production; (iii) Pegging; (iv) Planting stumps; (v) Weeding; (vi) Pruning

and Thinning; (vii) Final felling and (viii) Waste disposal. (Environmental Category I).

Approved in

September 2016

Ministry of Roads &

Highways-Department

of Urban Roads

60.00 (ADF)

Accra Urban Transport Project (AUTP)

The Development objectives of the Project are to promote sustainable économie growth,

enhanced inclusive urban development and reduced poverty whilst promoting regional

integration. The Accra Urban Development Project (AUTP) will enhance urban mobility and

inclusive growth in the Ga West Area and promote efficient, affordable transport services. The

AUTP project has four components detailed below: 1. Urban Transport Main Works; 2.

Community Support (Gender Mainstreaming); 3. Institutional Support and 4. Project

Management Services. (Environmental Category I)

Approved in

September 2016

Ministry of Finance

(MOF) 35.00 (ADF)

Public Financial Management and Private Sector Competitiveness Support Programme -

Approved in

December 2016

Page 43: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

37

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Phase II (PFMPSCSP II)

The purpose of the project is to restore macroeconomic stability through fiscal consolidation as a

solid foundation for an inclusive and resilient economic growth. The PFMPSCSP II has the same

Components as Phase I of the operation, namely (i) Strengthening Fiscal Consolidation; (ii)

Deepening Public Financial Management Reforms; and (iii) Enhancing Efficiency and

Competitiveness of the Private Sector.

Ministry of Sanitation

and Water Resources 35.950 (ADF)

Greater Accra Sustainable Sanitation and Livelihoods Improvement Project

The overall objective of the Project is to improve the socio-economic well-being and health

standards of the urban poor within the Greater Accra Metropolitan Area. The project components

are: 1. Sustainable Household and School Sanitation and Hygiene; 2. Improved Waste

Management Infrastructure and Services; 3. Institutional Strengthening and Capacity

Improvement; 4. Enhanced Livelihoods and Improved Economic Wellbeing and 5. Project

Management. (Environnemental Category II).

Consulting

service required

Approved in March

2017

B U R K I N A F A S O

Ministère de l’Energie,

des Mines et des

Carrières

27,23 (FAD)

Projet d’électrification des zones péri-urbaines de Ouagadougou et de Bobo-Dioulasso

L’objectif de développement du projet est d’accroître l’accès à l’électricité au Burkina Faso et

plus spécifiquement dans les zones péri-urbaines des villes de Ouagadougou et de Bobo

Dioulasso. Le projet vise à restructurer et à renforcer les réseaux électriques de distribution dans

ces deux villes et à les étendre aux zones péri-urbaines. Le projet s’articule autour de quatre

composantes : 1. Infrastructures ; 2. Etudes ; 3. Renforcement des capacités et 4. Administration

Services de

consultants requis

Approuvé en

septembre 2016

Page 44: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

38

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

et gestion du projet. (Catégorie environnementale II).

Ministère de

l’Environnement, de

l’Économie Verte et du

Changement

Climatique (MEEVCC)

2,943 (Climate

Investment Funds

(CIF) - SCF - FIP )

1,00 (FAD)

Projet d'appui au développement d'anacardes dans le Bassin de Comoé pour la REDD++

Le but du projet est de contribuer à l’augmentation de la capacité de séquestration de carbone et à

la réduction de la pauvreté en milieu rural. Le projet s’articule autour des trois composantes ci-

après : 1. appui à la production et à la séquestration du carbone ; 2. développement de la chaîne de

valeur Anacardes et 3. coordination et gestion du projet. (Catégorie environnementale II).

Services de

consultants requis

Approuvé en février

217

M A L I

SÉGOU SOLAIRE 6,675 (BAD

Secteur privé)

Projet de centrale solaire photovoltaïque de Ségou

L’objectif du projet est l’Installation et l’exploitation d’une centrale photovoltaïque de 33 MW à

Ségou. Les trois composantes du projet sont : 1. Installation d’une centrale solaire d’une capacité

de 33 MW ; 2. Achat et mise en place du matériel nécessaire et 3. mise en œuvre du PGES

(Catégorie environnementale II).

Approuvé en

octobre 2016

Ministère de la

Solidarité et de

l’Action Humanitaire

(Fonds de Solidarité

Nationale)

8,098 (FAT)

1,902 (FAD)

Projet d’appui à la réinsertion socio-économique des populations du Nord-Mali

Le but du projet : Appui aux populations et à la relance des activités socio-économique au nord

du Mali. Le projet a trois composantes qui sont : 1. Restauration des Services Sociaux de Base

(SSB) ; 2 : Renforcement des capacités et relance des activités socio-économiques et 3. Gestion

Services de

consultants requis

Approuvé en

novembre 2016

Page 45: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

39

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

du projet. . (Catégorie environnementale III).

Ministère de

l’Environnement, de

l’Assainissement et du

Développement

Durable (MEADD)

BP : 1634

Cité Administrative –

ACI 2000 ; Bâtiment

n°07 Bamako - MALI

Tél : (223) 20 22 41 84

ou 20 22 78 51 ou 20

79 60 11

15,000 (FAT)

15,000 (FAD)

Projet d'assainissement de Bamako

Le but du projet est de contribuer à l’amélioration durable des conditions d’assainissement,

d’hygiène, de santé des populations de Bamako, et subséquemment de leurs conditions de vie. Le

projet s’articulera autour des composantes suivantes : 1. Développement des Infrastructures

d’Assainissement ; 2. Renforcement des Capacités et Appuis aux Structures d’intervention et 3.

Gestion et Coordination du projet. (Catégorie environnementale I).

Services de

consultants requis

Approuvé en

janvier2017

N I G E R I A

Presidential Committee

for the North East

Initiative (PCNI) and

State Governments

110.802(ADB)

71.767 (ADF)

3.927 (Rural Water

Supply & Sanitation

Initiative -RWSSI)

Inclusive Basic Service Delivery and Livelihood Empowerment Integrated Program

The Purpose of the Programme is to contribute to reduced poverty and vulnerability in Nigeria by

promoting increased access of the poor and vulnerable to basic social services, livelihood

opportunities and job creation in the context of the North East emergency transition, recovery and

peacebuilding framework. The Program has three components: 1. Service Delivery; 2. Economic

Recovery and 3. Institutional Strengthening and Project Management. (Environmental category

III).*

Approved in

December 2016

Federal Ministry of

Agriculture and Rural

Development

(FMARD)

8.00 (ADF)

Plateau State Potato Value Chain Support Project (PS-PVCP)

The overall goal of the Potato Value Chain Support Project is contribute to employment

generation and shared wealth creation along the potato commodity value chain, as well food

Approved in March

2017

Page 46: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

40

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

security through increased access to rural infrastructure. The Project has three components,

namely: 1: Infrastructure Development; 2: Commodity Value Chain Development and 3: Project

Management and Coordination. (Environmental Category II).

Federal Ministry of

Agriculture and Rural

Development

(FMARD)

179.32 (ADB)

21.52 (AGTF

Africa Growing

Together Fund)

ENABLE Youth Nigeria

The overall goal of the ENABLE Youth Nigeria Programme is to contribute to job creation, food

security and nutrition, rural income generation and improved livelihoods for youths in both urban

and rural areas. The Programme has four components: 1. Enabling Environment for Youth

Empowerment; 2. Entrepreneurship and Agribusiness Incubation; 3. Business Development and

Financing and 4. Program Management & Coordination. (Environmental category III).

Consulting

service required

Approved in

December 2016

AFE BABALOLA

UNIVERSITY

(ABUAD)

29.141 ADB

(private sector)

AFE Babalola University

The purpose of the project is to provide corporate loan for expansion to enhance the quality and

competitiveness of the University. ABUAD expansion plan comprises (i) the construction of new

facilities, including a 400-bed teaching hospital, an industrial research park, a post-graduate

school, student hostels, a central library, and a small scale hydro power installation as well as (ii)

the strengthening of ABUAD’ s administrative and governance structures. (Environmental

Category IV)

Approved in

October 2016

Federal Ministry of

Finance (FMF) 715.880 (ADB)

Economic Governance Diversification and Competitiveness Support Program

The goal of the proposed operation is to support implementation of Federal Republic of Nigeria’s

medium term development agenda aimed at building a diversified, competitive, inclusive and

fiscally sustainable economy in the context of declining oil prices and security challenges. The

package of reforms under the proposed program is organized around three complementary

Approved in

November 2016

Page 47: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

41

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Components: 1. Strengthening Public Finance Management; 2. Promoting Economic

Competitiveness and Diversification through energy sector reforms, and agricultural

transformation; and 3. Fostering Social Inclusion.

73.868 (ADB

Private Sector)

Kainji and Jebba Hydropower Project

This project is a brownfield project entailing the rehabilitation of Kainji and Jebba hydro power

plants on River Niger, in the Niger State in Nigeria. The rehabilitation is aimed to bring the

power plants to their installed capacity of 1,338.4 MW from the current level of 917 MW.

Approved in

December 2016

N I G E R

Organisation Mondiale

de la Santé (OMS) et le

Fonds des Nations

unies pour l’enfance

(UNICEF)

0,717 (Special

Relief Fund -SRF)

Aide humanitaire d’urgence aux déplacés de guerre de la région de Diffa

Le principal objectif de l’aide d’urgence est d’améliorer les conditions sanitaires et d’accès à

l’eau potable, et à l’assainissement des populations affectées et/ou déplacées suites aux attaques

de Boko Haram. L’opération que financera la Banque comporte trois composantes, à savoir la

santé, l’eau et assainissement et l’administration des ressources.

Approuvé en août

2016

Ministère du Plan

Direction Générale de

l’Economie

10,00 (FAD)

Programme d’appui aux réformes financières et à la sécurité alimentaire – phase II

(PAREFSA II)

L’objectif principal du PAREFSA est de contribuer à la création des conditions favorisant une

croissance économique inclusive dans un contexte de sécurité alimentaire renforcée. Les

composantes du PAREFSA II demeurent les mêmes que celles qui ont été définies dans le rapport

d’évaluation du Programme initial, à savoir : (1) Renforcement de la gestion budgétaire et (2)

Approuvé en

novembre 2016

Page 48: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

42

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Renforcement de la résilience aux crises alimentaires. Ces deux composantes du programme se

complètent pour l’atteinte d’une croissance forte et inclusive.

Société Nigérienne

d’Electricité

(NIGELEC)

7,400 (FSN)

44,320 (FAD)

Projet d’Electrification Rurale, Périurbaine et Urbaine (PEPERN)

Le Projet d’électrification Rurale, Périurbaine et Urbaine (PEPERN) a pour objectif global

d’accroître le taux d’accès à l’électricité des populations dans les huit régions que compte le

Niger. Le projet vise également à améliorer la gouvernance sectorielle à travers le renforcement

des capacités des acteurs du secteur de l’énergie. Il consiste principalement en : (i) la construction

d’infrastructures électriques ; (ii) l’appui institutionnel à travers la réalisation des études de

faisabilité des projets en milieu rural et (iii) la gestion du projet. (catégorie environnementale II)

Service de

consultants requis

Approuvé en

décembre 2016

C O T E D’I V O I R E

Ministère de

l’agriculture et du

développement rural

(MINADER)

4,00 (FSN)

Projet de développement des chaines de valeur agricoles dans la Région de l’Indénié-

Djuablin (PDC-ID)

L’objectif du projet est d’améliorer la productivité des chaines des valeurs agricoles prioritaires

dans la région de l’Indénié-Djuablin. D’une manière spécifique, il vise à accroitre, sur une base

durable, la production et la productivité des principales cultures pratiquées et l’amélioration des

conditions de commercialisation. Le projet comporte trois composantes : 1. le développement des

infrastructures agricoles ; 2. le renforcement des capacités ; 3. la gestion du projet. . (Catégorie

Environnementale II).

Service de

consultants requis

Approuvé en

octobre 2016

CI-ENERGIES

01 BP 1345 Abidjan 01

Contact : Olivier

109,807 (BAD)

Projet de Renforcement des Réseaux Electriques de Transport et Distribution (PRETD)

L’objectif du projet est l’accélération de la transformation structurelle de l’économie par

Services de

consultants requis

Approuvé en

novembre 2016

Page 49: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

43

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

KOFFI Tél : (225) 20

20 61 71

l’industrialisation et l’amélioration des conditions des vies des populations. Les trois composantes

du projet sont : 1. Construction d’infrastructures ; 2. Gestion du projet et 3. Mitigation

environnementale et sociale. (catégorie Environnementale I)

Ministère des

Infrastructures

Economiques (MIE)

186,593 (BAD)

5,244 (Global

Environment

Facility - GEF)

Projet de Transport Urbain

L’objectif sectoriel du projet est de mettre en place, une infrastructure de transport pour renforcer

les fonctions urbaines, améliorer la qualité de vie, faciliter les activités économiques en offrant

une meilleure mobilité et un cadre de vie sain. Les composantes du projet sont : 1. Optimisation et

développement du réseau de voies primaires ; 2. Aménagements connexes et mesures en faveur

des femmes ; 3. Etudes et renforcement des institutions ; 4. Atténuation des impacts

environnementaux et sociaux du transport urbain et 5. Gestion du projet.

Services de

consultants requis

Approuvé en

décembre 2016

Ministère de

l’Agriculture et du

développement rural

(MINADER)

Projet de pôle agro-industriel dans la région de Bélier (2PAI-BÉLIER)

L’objectif sectoriel du projet est de contribuer à l’accroissement de la sécurité alimentaire et

nutritionnelle. L’objectif spécifique visé est de contribuer à l’émergence d’un pôle agro-industriel

dans la région du Bélier à travers une dynamisation des filières agricoles porteuses et une

implication accrue du secteur privé, des jeunes et des femmes. Le comprendra trois composantes

ci-après : 1. Restauration du capital productif ; 2. Développement des chaînes de valeur et 3.

Gestion du Projet. (Catégorie environnementale II)

Services de

consultants requis

Approuvé en

janvier 2017

Ministère auprès du

Premier Ministre

chargé de l’économie

et des finances

6,762 (FAD)

9,640 Transition

Support Facility

(TSF) - SSW

Projet d’appui à la gestion économique et financière (PAGEF)

L’objectif global du projet est d’optimiser la mobilisation des ressources budgétaires et renforcer

le cadre de gestion de la dépense publique en vue de contribuer à la mise en œuvre efficiente du

Plan National de Développement 2016-2020. Le PAGEF comporte trois composantes qui sont :

Approuvé en mars

2017

Page 50: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

44

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

(i) l’appui à la mobilisation des ressources internes ; (ii) l’appui à la gestion de l’économie et à la

transparence de la dépense publique ; et (iii) la gestion du projet.

G A M B I A

Ministry of Finance

and Economic Affairs 3.665 (ADF)

Inclusive Growth Promotion Institutional Support Project

The overarching goal of the project is to promote inclusive growth by enhancing economic

governance through strengthened capacities of key public and private institutions engaged in

private sector development. The expected project outcomes are: (i) Enhanced business enabling

environment; and (ii) Local businesses expanded. In the long run, the project will contribute in

generating higher output, greater employment and increased income for the poor. The project has

three (3) components: (i) Export and Investment Promotion; (ii) Entrepreneurship Development;

and (iii) Project Management.

Approved in March

2017

S E N E G A L

Compagnie Agricole de

Saint-Louis du Sénégal

(CASL)

12,48 (BAD-

secteur privé)

Projet rizicole de la Compagnie Agricole de Saint-Louis du Sénégal (CASL)

Le projet permettra de renforcer de manière durable la sécurité alimentaire du Sénégal en : (i)

améliorant la productivité agricole nationale grâce à une mécanisation et à l’utilisation des

meilleures techniques agricoles ; (ii) augmentant les revenus des agriculteurs ruraux ; (iii) créant

des emplois dans une zone rurale dans le respect des ressources disponibles, le tout contribuant à

la croissance inclusive et la transition vers une croissance verte. Il a trois composantes : 1.

production agricole ; 2. contrats de production et 3. composante agro-industrielle. (Catégorie

Approuvé en juin

2016

Page 51: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

45

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

environnementale I).

Ministère de

l’Économie, des

Finances, et du Plan

(MEFP)

34,780 (FAD)

Programme d’Appui aux Réformes du Développement Local Phase I (PARDL)

Le but du programme est de contribuer à la création des conditions favorables pour une

croissance économique inclusive, forte et soutenue à travers le renforcement de la

décentralisation, l’amélioration de la gouvernance multisectorielle et la promotion d’un

entreprenariat local. Le PARDL est structuré autour de deux composantes complémentaires : 1.

Renforcement de la décentralisation ; et 2. Promotion le développement des infrastructures et de

l’entreprenariat local. (Catégorie environnementale III).

Approuvé en

septembre 2016

Société Nationale des

Eaux du Sénégal

(SONES)

51,788 (BAD)

Projet de renforcement de l'alimentation en eau pour multi usages sur l'axe Louga - Thiès -

Dakar, à partir de la station de Keur Momar SARR

Les objectifs assignés au projet s’inscrivent dans les principales préoccupations des Autorités

Sénégalaises, à savoir : (i) Couvrir, à l’horizon 2025, les besoins en eau potable et industrielle des

régions de Louga, Thiès et Dakar, avec un accent particulier sur les localités riveraines de la

conduite du Lac de Guiers; (ii) Renforcer l’alimentation en eau pour multi usages dans la zone du

projet ; (iii) Assurer l’équilibre financer du sous-secteur de l’hydraulique urbaine. (Catégorie

environnementale I).

Service de

consultants requis

Approuvé en

novembre 2016

Ministère des

Infrastructures des

Transports Terrestres et

du Désenclavement

(MITTD)/AGEROUTE

; Rue David Diop X

Rue F, Dakar,

91,42 (BAD)

Premier Programme de modernisation des villes (Promovilles-1)

Sur le plan stratégique, le but du programme est de contribuer au renforcement de la

décentralisation pour promouvoir le développement économique et social du pays. Sur le plan

sectoriel, le programme vise à augmenter le taux d’équipements collectifs et les ressources

financières propres des collectivités locales. Pour atteindre cet objectif, les activités qui seront

réalisées sont regroupées dans les quatre composantes : 1. Aménagement ou/et réhabilitation

d'Infrastructures ; 2. Aménagement et mesures connexes ; 3. Appui aux Collectivités Locales et 4.

Service de

consultants requis

Approuvé en mars

2017

Page 52: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

46

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

(Sénégal), Téléphone :

(221) 33 869 07 5 / Fax

: (221) 33 864 63 50

Gestion du programme. (Catégorie environnementale II).

G U I N E E

Ministère de

l’économie et des

finances (MEF)

3,54 (Transition

Support Facility

(TSF)

6,98 (FAD)

Programme d’appui aux réformes économiques et financières (troisième phase) - PAREF

III

Le PAREF III est un appui budgétaire général L’objectif de développement du PAREF III est de

promouvoir une croissance économique forte et inclusive en améliorant la gouvernance

économique et financière grâce à un système des finances publiques plus efficace et transparent et

un secteur privé redynamisé. Le programme se décline en deux composantes : (i) le renforcement

de la gestion des finances publiques et (ii) l’amélioration du climat des affaires et de la

gouvernance dans les secteurs de l’énergie et des mines.

Approuvé en juillet

2016

Ministère des mines et

de la géologie – Unité

de Gestion du Projet

4,00 (FAD)

2,00 (FAT)

Projet d’appui au renforcement des capacités de l’administration pour la gestion des projets

intégrés (PARCA-GPI)

Le PARCA-GPI a pour but de renforcer les capacités de l’administration en matière de gestion

des projets intégrés pour impulser une croissance économique forte et inclusive. Il comprend trois

composantes : (i) Assistance technique pour la mise en œuvre et le suivi des projets miniers

intégrés; (ii) Renforcement des capacités de l’administration pour la mise en œuvre et le suivi des

projets miniers intégrés ; et (iii) Appui à la gestion et coordination. (Catégorie environnementale III).

Services de

consultants requis

Approuvé en juillet

2016

Page 53: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

47

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

G U I N E E B I S S AU

Ministère de

l’Agriculture et du

Développement Rural

(MADR)

4,215 (FAD)

Projet de développement de la chaine de valeur riz dans les régions de Bafata et de l’Oio

(PDCV Riz)

L’objectif global du PDCV Riz est de contribuer à l’amélioration de la sécurité alimentaire et

nutritionnelle et à la réduction de la pauvreté au niveau national. Le PDCV Riz est structuré

autour de trois composantes principales : 1. Modernisation et développement des infrastructures

agricoles ; 2. Développement des chaines de valeur ; et 3. Gestion du projet. (Catégorie

environnementale II).

Services de

consultants requis

Approuvé en

janvier 2017

L I B E R I A

Ministry of Finance

and Development

Planning

4.070 (ADF)

2.193 (TSF)

Integrated Public Financial Management Reform Project

The overarching objective of the project is to strengthen transparency and accountability in public

financial management; and enhance revenue mobilization from the natural resource sector. The

project has three components: 1. Strengthening efficiency, transparency, and accountability in

public financial management; 2. Enhancing domestic revenue mobilization from the natural

resource sector; and 3. Project management.

Approved in

January 2017

9.420 (ADF)

Energy Efficiency and Access Project (LEEAP)

Consulting

services required

Approved in

December 2016

Page 54: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

48

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Ministry of Lands,

Mines and Energy

(MLME)

4.200 (TSF)

7.060 (NTF)

7.855 (EU-

Africa

Infrastructure

Trust Fund -

EU-AITF)

1.949 (Global

Environment

Facility -GEF)

The ultimate objective of the LEEAP project is to increase the Liberian population's access to

electricity and strengthen institutional capacity in the electricity sector. The three component of

the project are: 1. Infrastructures Component; 2. Capacity building and 3. Project Implementation

Support.

S I E R R A L E O N E

Ministry of Energy 9.309 (ADF)

Rehabilitation and Extension of the Bo-Kenema Distribution System

The project’s ultimate development objective is to provide reliable electricity supply and access

through the complete rehabilitation, upgrade and expansion of the Bo and Kenema distribution

network expected to cater for the newly developed communities who do not have access to

electricity. The four components of the project are: 1. Rehabilitation and Extension of

Distribution Networks; 2. Project Management & Engineering supervision services; 3. Technical

assistance and Capacity building and 4. Temporary generation. (Environmental category II).

Approved in

December 2016

Sierra Leone Water

Company

(SALWACO)

0.370

(SupplementaryLoan -

Three Towns Water Supply and Sanitation Project (TTWSSP)

Purpose of the Program is to contribute to the achievement of the SDG target for water, by

providing safe drinking water and sanitation facilities for sustainable socio-economic

development, with overarching aim of improving the living conditions of the population. The

Consulting

services required

Approved in

March2017

Page 55: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

49

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

ADF)

0.370 (supplementary

Grant-Transition

Support Facility

(TSF) - SSW

project components are: 1. Infrastructure; 2. Institutional Support and 3. Project Management.

BENIN

Ministère du Cadre de

Vie et du

Développement

Durable (MCVDD)

5,631 (FAD°

1,940 (Global

Environment

Facility (GEF)

Projet d’appui à la gestion des forêts communales - Phase II (PAGEFCOM II)

L’objectif global du PAFEMCOM-II est de contribuer à l’amélioration de la sécurité alimentaire

et nutritionnelle et à la réduction de la pauvreté des populations, par la Valorisation et la Gestion

Rationnelles des Ressources Naturelles. Pour cela, le projet est conçu pour une durée de cinq (05)

ans et comprend les quatre (04) composantes suivantes: (i) Promotion des chaînes de valeurs de

l’économie verte ; (ii) gestion durable des ressources naturelles ; (iii) Appui à l’adaptation aux

changements climatique ; et (iv) gestion du projet. (Catégorie environnementale II)

Approuvé en mars

2017

Ministère de

l’Economie et des

Finances

19,920 (FAD)

Programme d’appui budgétaire au secteur de l’énergie - Phase I (PASEBE I)

L’objectif principal du Programme est d’accroître l’offre de l’énergie électrique pour créer les

conditions d’une croissance économique plus inclusive et durable. Le Programme est conçu

autour de deux lignes directrices principales visant à soutenir la fourniture régulière de

l’électricité et à améliorer la gouvernance du secteur. (catégorie environnementale III).

Présentation au

conseil en avril

2017

Page 56: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

50

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

MULTINATIONAL REGION OUEST

Economic

Community of West

African States

(ECOWAS

Commission) & East

African Community

(EAC) - Multi-lateral

Implementation unit

(AUST); Multilateral

projects unit (2iE);

Externally-funded

projects management

unit (AIST); ECOWAS

Commission; EAC

9.400 (ADF)

Nelson Mandela Institute - African Institutions of Science and Technology

Project Goal: Increase Africa’s competitiveness and growth through improved capacity in science

and technology. The Project component are: 1. Strengthening the relevance of teaching and

research to the needs of Africa (in Water and Energy engineering, Life & Earth Sciences

engineering, and Sustainable housing engineering); 2. Improve the employability of graduates and

3. Project coordination and Regional cooperation. (Environmental Category III)

Approved in July

2016

COMESA,

CEDEAO, EAC COMESA, CEDEAO,

EAC

8,820 (FAD)

Projet de « Plateforme de réseautage 50 Millions de femmes africaines ont la parole »

But du projet : Améliorer la capacité des femmes entrepreneures à s'établir en réseau afin

d'accéder aux services financiers et non financiers et faire ainsi prospérer leurs affaires. Les

composantes du projet sont : 1. Appui aux équipements et applications TIC ; 2. Appui au

développement de la plateforme et de la base de données statistiques connexe/du contenu, et

services ciblés en faveur des femmes entrepreneures ; 3. Appui aux ressources de l'arrière-

guichet/nationales et 4. Gestion du projet.

Approuvé en juillet

2016

The Department of

Infrastructure,

ECOWAS Commission

9.00 (ADF)

Multinational (Côte d’Ivoire, Ghana, Togo, Benin and Nigeria) Abidjan-Lagos Corridor

Consulting

Services required

Approved in

September 2016

Page 57: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

51

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Highway Development Study

The development objective of the project, when implemented, will generate social and economic

activities, promote cross-border trade and integrate the economies within the ECOWAS

Community. This will contribute to reducing the poverty levels of the population that depend on

the transport modes of the corridor for livelihood. An outcome of this study is therefore to

provide stakeholders with the tools and capability to make informed decisions on investment

interventions and operating the corridor to meet the above development objectives. The

components are: 1. Feasibility Study, Environmental, Social Impacts Assessment (ESIA), and

Detailed Engineering Design; 2. PPP Structuring and Transaction Advisory; 3. Corridor Spatial

Development Study; 4. Trade and Transport Facilitation; 5. Corridor Management Authority

(ALCoMA), Study and Establishment and Operations; 6. Technical Assistance Service to

ECOWAS and Member States; 7. Road Safety Audits and 8. Financial Audits. (Environmental

Category III)

BANQUE

CENTRALE DES

ETATS DE

L’AFRIQUE DE

L’OUEST

(BCEAO)

4,600 (FAD)

Projet d’appui à la promotion de l’accès des Institutions de microfinance(IMF) (ou

Systèmes financiers décentralisés- SFD) au système de paiement régional de l’UEMOA

(PASFDSPR)

Le projet vise à contribuer à l’accès élargi aux services financiers des couches défavorisées de la

population dans l’UEMOA (femmes, jeunes, populations rurales, MPME, etc.), à travers la mise

en place de dispositifs permettant l'accès des IMF ou SFD aux systèmes de paiement de

l'UEMOA. Le projet comporte deux composantes principales, à savoir :(i) Mise à niveau des

systèmes d'information et de gestion et Renforcement des capacités des IMF ; (ii) Accès indirect

des IMF aux systèmes de paiement de l’UEMOA, amélioration de l’offre de produits des IMF et

de leur vulgarisation. (Catégorie environnementale III).

Services de

consultants requis

Approuvé en

septembre 2016

IGAD Secretariat

Consulting

Services required

Approved in

Page 58: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

52

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

IGAD Secretariat 2.50 (ADF) Multinational - IGAD Regional Infrastructure Master Plan (IRIMP)

The overall development objective of the project is to establish regional infrastructure

development priorities which will enhance physical connectivity and economic integration of

IGAD member States through increased economic development, trade, free movement of goods

and persons and poverty reduction. The two components are: 1. Regional Infrastructure

Masterplan & Financing Strategy and 2. Project Management and Capacity Building.

(Environmental Category III)

February 2017

Ministère des

Infrastructures et des

Transports (Togo)/

Direction Générale des

Travaux Publics

Ministère des

Infrastructures et des

Transports (Bénin)/

Direction Générale des

Infrastructures

Togo : 9,930 (FAD)

Togo : 18,380

(Transition Support

Facility - TSF)

Togo : 6,598

(Global

Environment

Facility - GEF)

Bénin : 1,00 (FAD)

Projet de Réhabilitation de la Route Lomé-Cotonou (Phase 2) et de Protection Côtière

L'objectif sectoriel du projet est de contribuer au renforcement de l'intégration régionale, à la

croissance des échanges intra régionaux et à la protection des côtes togolaise et béninoise. Les

composantes du projet sont : 1. Travaux routiers ; 2. Travaux de protection côtière ; 3.

Aménagements connexes et activités en faveur des femmes / jeunes ; 4. Facilitation de transport ;

5. Appui institutionnel et 6. Appui à la gestion du projet. (Catégorie environnementale I au Togo).

Approuvé en

décembre 2016

Ministère des postes, des

Télécommunications et de

l'Economie Numérique

(MPTEN) du Niger

Ministère des Postes et

des Nouvelles

Technologies de

l’Information (MPNTI)

du Tchad

34,818 (FAD)

Dorsale Transsaharienne à fibre optique (DTS)

L’objectif global du projet, dans les deux pays est de contribuer à la diversification de l’économie

en favorisant l’émergence d’une économie numérique au Niger et au Tchad à travers le

désenclavement numérique. Pour atteindre les objectifs susmentionnés, les actions du projet ont

été regroupées dans les quatre composantes résumées ci-après : 1. Infrastructures à fibre optique ;

2. Applications et services TIC ; 3. appui institutionnel et renforcement des capacités et 4.

Gestion du projet. (Catégorie environnementale II)

Approuvé en

décembre 2016

OMVG 95,50 (ADF)

Gambia- Guinea- Guinea Bissau-Senegal: The Gambia River Basin Development

Board presentation

scheduled for

Page 59: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

53

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Organization (OMVG) Energy Project

The energy project has two main components: (i) the Sambangalou hydro-power dam, located

partly in Senegal and partly in Guinea; and (ii) the interconnection transmission line which

crosses the four OMVG countries. The main objective of the infrastructure is to generate and

distribute electricity to the four OMVG member countries to meet the demand of the population,

foster economic development and make these countries less dependent on fossil fuels.

September 2016

AGRHYMET Regional

Centre

3, 094 (ClimDev-

Africa Special Fund

-CDSF)

Régional - Projet d’information satellitaire et météorologique pour la réduction des risques

de catastrophes en Afrique de l'Ouest

L'objectif de ce projet est de renforcer les capacités du Centre Climatique Régional de l'Afrique

de l'Ouest (CCR-AO) et des Services Météorologiques et Hydrologiques Nationaux (SMHN) à

produire et à diffuser des Prévisions Numériques du Temps (PNT) afin de réduire les risques de

catastrophes d'origine météorologique. Les activités prévues sont organisées en quatre (4)

composantes : 1. prévision Numérique du temps de la région Ouest Africaine et du Tchad ; 2.

soutien au SMHN pour l’exploitation de la PNT régionale dans la réduction des risques de

catastrophes ; 3. appui aux prévisions saisonnières pour l’Afrique de l’Ouest (RCOF) et du Tchad

et 4. Coordination.

Services de

consultants requis

Approuvé en juillet

2016

M U L T I N A T I O N A L - P A N-A F R I C A N

AFRICAN CAPACITY

BUILDING

FOUNDATION

African Capacity

7.00 (ADF)

Support Project to African Capacity Building Foundation (ACBF) Third Strategic Medium

Term Plan – Phase II

The overall aim of the project is to strengthen effective governance for inclusive growth and

sustainable development in Africa with a specific objective of providing capacity building to

RMCs to best contribute to their policymaking and enable them to make progress on their

Approved in

October 2016

Page 60: Résumé Trimestriel des opérations...1 Bank Unit of Account (UA) = 1.35 United States Dollars (USD) as at 30 March 2017. RESUME TRIMESTRIEL DES OPERATIONS RELATIVES AUX PROJETS PROPOSES

54

Organe d’éxécution

Executing Agency

Montant probable &

source de

financement/

Amount &

Financing source

(Million UA)

PROJET ou PROGRAMME

PROJECT or PROGRAMME

Service de

consultants

Consultants

Service

Etat d’avancement

Stage of Processing

Building Foundation transformational agenda, through two main components. These are: 1) Improving formulation and

implementation of economic and financial policies for Africa’s transformation and 2) Improving

intra-regional trade and Africa’s share in global trade. (Environmental category III).

African Centre of

Meteorological

Applications for

Development

(ACMAD)

ACMAD, 55 Avenue

des Ministères, PL 6,

BP 13184, 1er

Arrondissement,

Niamey-Plateau, Niger

[email protected],

[email protected]

Or Fax number: + 227

20723627

4.548 (ClimDev-

Africa Special Fund

-CDSF)

Satellite and Weather Information for Disaster Resilience in Africa

The ultimate goal of the project is to “improve core capacities of the specialized national and

Regional Climate Centers (RCCs), to meet the needs of Disaster Risk Management (DRM)

agencies and socio-economic sectors for effective use of weather and climate services and

community-focused and real-time early warning systems (EWS)”. The major activities can be

categorized into the following four major components: 1. Establishment of RARS Africa

Network; 2. Enhancement of the Numerical Weather Prediction (NWP) Capabilities at ACMAD;

3. Establishment and interaction of NWP Community of experts with Disaster Risk Reduction

(DRR)/DRM and 4. Project Coordination.

Consulting

Services required

Approved in

December 2016