room solutions brochure - fp mccann brochures lo-res/fp... · 05 technical helpline 01476 562277...

12
Precast Concrete Solutions. v.1.0 room solutions brochure

Upload: others

Post on 28-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

Precast Concrete Solutions.

v.1.0

room solutionsbrochure

Page 2: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

fpmccann.co.uk

FP McCann is the UK’s market leader in the manufacture, supply and delivery of precast concrete solutions. Our comprehensive precast concrete business extends to include:

Drainage and Water Management Solutions Tunnel and Shaft Solutions Rail SolutionsPower and Infrastructure Solutions Walling Solutions Fencing SolutionsRoom Solutions Agricultural Solutions Flooring Solutions Specialist Precast Solutions

Modern manufacturing plants at Alnwick (Northumberland), Cadeby (Warwickshire), Ellistown (Leicestershire), Grantham (Lincolnshire), Knockloughrim (Northern Ireland), Littleport (Cambridgeshire), Lydney (Gloucestershire), Telford (Shropshire) and Weston Underwood (Derbyshire) incorporate the latest computerised batching, distribution, casting, curing and handling systems and are operated by skilled and experienced workforces to ensure consistency of quality. Their geographical spread gives us an unrivalled ability to serve the construction industry throughout the UK and Ireland.

cover University of Birmingham, Mason

Page 3: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

introduction

At FP McCann (Bell & Webster), we believe in working with you as a partner from the start, which means offering our expertise in designing and manufacturing rooms to suit your every individual project. Far from being an ‘off the shelf’ solution, our RoomSolutionsTM are ‘made to measure’ whilst maintaining our design philosophies and standard details.

All units are manufactured off-site and delivered to site ready for final preparation and decoration, with either wallpaper or emulsion. All sections are designed for ease of construction, fitting together to conform fully with building and structural regulations. And, as the windows are fixed, internal trades can commence work far earlier than on a traditional-build site. All this to ensure peace of mind for you “when you partner with us”.

03

Technical helpline 01476 562277fpmccann.co.uk/rooms

roomsolutions

Our bespoke software is BIM compatbile and ensures excellent design service levels and makes ‘off the shelf’ manufacturing processes more efficient.

Page 4: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

04

One of our most innovative projects has been the development of the University of East London’s campus at Royal Albert Docks. The campus provides 788 student bed spaces and ancillary facilities on a previously vacant site adjacent to the University’s existing Docklands campus. Located opposite London City Airport, the site is bounded by the Royal Albert Dock, a publicly accessible dock edge path to the south, the Docklands Light Railway, Gallions Reach Roundabout, University Way to the north and Woolwich Manor Way to the east. The building was constructed using mainly precast concrete because of its inherent robust nature, acoustic and thermal properties. This also helped eliminate wet trades, thus saving time and money and increasing the speed of erection.

university of east londonstudent residenciesaccommodation

Page 5: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

05

Technical helpline 01476 562277fpmccann.co.uk/rooms

roomsolutions

One of the main advantages of FP McCann’s (Bell & Webster’s) engineered precast concrete frame is that it provides a fair faced finish to the walls. This removes the need for plasterboard or a plaster skim. The frame incorporates the internal walls (excluding the bedroom to corridor wall) and the inner skin of the external wall, thus omitting the need for internal dry lined walls and external metal framed walls.

The system provides the major contribution to the acoustic rating for the external envelope; the choice of cladding dictates the final rating. This method of construction complies with the internal dB ratings as required by building regulations (Part E) for internal party walls and

floors without surface treatment being necessary (except the floor coverings being applied). These unique attributes

help FP McCann’s (Bell & Webster’s) RoomSolutionsTM reduce the overall cost and programme of the project. A fine example of all these benefits is the University of East London project.

high quality finish

Page 6: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

Concrete is one of the most versatile durable, strong and cost effective building materials known to man. It has superior fire resistance, vibration and sound performance. It is able to absorb, store and radiate heat.

You need to build rooms that are durable, rooms that are compliant with appropriate regulations and rooms that are quick to erect. Be it a hotel, student, military, key worker or prison accommodation project, our RoomSolutionsTM deliver a quick, safe and virtually maintenance free solution.

06

The Ramada Encore, Walsall

room solutions

Page 7: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

For over sixty years we have designed and manufactured quality precast concrete products for prestigious clients in the civil engineering, commercial, industrial, agricultural and utilities sectors.

Today we are recognised as the market leader in the design and manufacture of Precast Rooms for Hotels and Student Accommodation. Our previous clients include some of the major names in the hospitality industry as well as the education sector i.e. Holiday Inn, Accor Hotels, MacDonald Hotels, Ramada, Travelodge, City Inns, Radisson SAS, Days Inn, Tulip, Arora Hotels and Universities at Loughborough, Reading, Lancaster, Essex, London, Brunel, East London, Hertfordshire to name but a few, plus MOD projects at Shrivenham, Woodbridge and Lucknow.

Therefore, if you require a trusted partner with extensive experience, recognised for delivering on-time, with unrivalled quality; FP McCann (Bell & Webster) is the obvious choice.

years ofexperience

07

Technical helpline 01476 562277fpmccann.co.uk/rooms

roomsolutions

Page 8: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

Accelerated construction is a key advantage with FP McCann’s (Bell & Webster’s) RoomSolutionsTM. It reduces the time taken to complete a project thus resulting in a shorter period of disturbance for surrounding properties. Our precast units arrive ready for installation and are scheduled to be on-site ‘just-in-time’ so they can be lifted directly into place. This prevents unnecessary handling and so reduc-es the diesel or electricity used by mobile plant and cranes. Whats more, this rapid process compared with in-situ options means precast sites are less vulnerable to delays caused by inclement weather. For example using FP McCann’s (Bell & Webster’s) RoomSolutionsTM on a building footprint of 32 beds, 4 kitchens and central core area per floor, it takes approximately two weeks to complete the construction, including the installation of the bathroom pods.

08

rapid speed of installation

Page 9: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

09

Technical helpline 01476 562277fpmccann.co.uk/rooms

roomsolutions

left manoeuvring precast room sized slabs into position above, anticlockwise from top seating floor / ceiling slabs; bathroom pods in position; erecting wall panels

Page 10: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

10

Acoustically versatileAs a dense material, precast elements in a building make for a peaceful lifestyle. Privacy and effective sound reduction are ensured, which makes precast and makes a precast structure an ideal choice for residential buildings in particular. Because precast can be moulded to any shape, size and texture it can be used to deflect or absorb noise. This makes it a good acoustic host for music but also an effective sound barrier along side busy roads.

Thermally efficientConcrete can be dense or lightweight and this choice affects its thermal behaviour. In either case, precast concrete can act as a thermal sink or as an insulator. In some buildings you can see precast doing both.

Pre-installed servicesPrecast concrete can carry pre-installed services and fixtures, whether these are communications, plumbing or even windows. Services can be cast within the precast element or panels can include connection plates ready to receive heating and lighting fittings on site. This makes both construction and maintenance easy.

Technology friendlyWith homes and offices increasingly designed for information technology, it is good news that precast concrete buildings do not interfere with radio signals, local wi-fi or internet networks. This makes precast the most technology friendly material for residential buildings and places of work.

Fire proofPrecast is fireproof. It protects against the spread of fire between rooms or properties and it cannot catch fire, burn or drip molten particles. In tests, concrete performs consistently well in fire, often requiring only minor repairs to make good.

DurabilityConcrete buildings from hundred of years ago are still in use today. Some might say concrete can last up to 2000 years and there are certainly many structures around that are well on their way to such a ripe old age. This is primarily down to the fact that precast concrete goes on increasing its strength for hundreds of years after it is cast. What’s more, during that time it won’t shrink, warp, move or creep excessively so can be relied upon to perform consistently year after year.

benefits ofroom solutions

Page 11: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

completedprojects list

Hotels No. of bedsArora Hotel Crawley 96Arora Hotel Gatwick 311City Inn Manchester 284Days Inn Glasgow 110Etap Bradford 86Etap/IbisBirmingham Airport 282Express By Holiday Inn Aberdeen N/AExpress By Holiday Inn Ayr 108Express By Holiday Inn Bath 126Express By Holiday Inn Bath 120Express By Holiday Inn Bedford 80Express By Holiday Inn Brentford Lock 120Express By Holiday Inn Bristol 133Express By Holiday Inn Burnley 98Express By Holiday Inn Cheltenham 100Express By Holiday Inn Chester Racecourse 97Express By Holiday Inn Chingford 102Express By Holiday Inn Colchester 99Express By Holiday Inn Cowgate, Edinburgh 133Express By Holiday Inn Derby 120Express By Holiday Inn Doncaster 94Express By Holiday Inn Dundee 93Express By Holiday Inn Epsom 120Express By Holiday Inn Exeter 122Express By Holiday Inn Fulham 96Express By Holiday Inn Golders Green 83Express By Holiday Inn Greenwich 162Express By Holiday Inn Greenwich 150Express By Holiday Inn Hamilton 104Express By Holiday Inn Harlow 130Express By Holiday Inn Hemel Hempstead 112Express By Holiday Inn Kent 104Express By Holiday Inn Kettering 121Express By Holiday Inn Leicester 109Express By Holiday Inn Lincoln 118Express By Holiday Inn Luton 147Express By Holiday Inn Luton Airport 37Express By Holiday Inn Manchester 150Express By Holiday Inn Milton Keynes 178Express By Holiday Inn North Acton 108Express By Holiday Inn Northampton 127Express By Holiday Inn Oldbury 109Express By Holiday Inn Oxford 162Express By Holiday Inn Priddys Yard, Croydon 150Express By Holiday Inn Redbridge 126Express By Holiday Inn Redditch 100Express By Holiday Inn Sheffield N/AExpress By Holiday Inn Slough 142Express By Holiday Inn Southampton 131Express By Holiday Inn Southampton 45

Express By Holiday Inn Stevenage 108Express By Holiday Inn Stoke 123Express By Holiday Inn Stratford 114Express By Holiday Inn Stratford 45Express By Holiday Inn Swiss Cottage 69Express By Holiday Inn Tamworth 120Express By Holiday Inn Tamworth N/AExpress By Holiday Inn Taunton 92Express By Holiday Inn The Armouries Leeds 130Express By Holiday Inn Walsall 100Express By Holiday Inn Wandsworth 148Express By Holiday Inn Warwick 117Express By Holiday Inn Watford 98Express By Holiday Inn Winnersh 174Express By Holiday Inn Witney N/AGolden Tulip Manchester 50Hilton Croydon 120Hilton Edinburgh 110Hilton Luton 180Holiday Inn Woking 161Holiday Inn Woking 150Howard Johnson Glasgow 108Ibis Aldgate 348Ibis Birmingham 90Ibis Borehamwood 122Ibis Bristol Harbourside 180Ibis Carlisle 102Ibis Gatwick 131Ibis Hull 106Ibis Leicester 150Ibis Liverpool 127Ibis Luton Airport 64Ibis Manchester 127Ibis Temple Quay 2, Bristol 141Ibis Wembley 210Macdonalds Hotel Sheffield 166Park Inn Manchester 252Quest Shoreditch 180Radisson Blu Guildford 180Radisson Jersey 166Ramada Birmingham 120Ramada Chatham 93Ramada Derby 112Ramada Hotel, Chase Pk, Doncaster N/ARamada Newcastle Airport 156Ramada Swansea 102Ramada Walsall 121Splash Landings Alton Towers 120Telford International Hotel 101Travelodge Slough 180Village Ashton Moss 120Village Elstree 120Village Farnborough 114Village Leeds South 115Village Solihull 122Westbridge Hotel Stratford 75

Student accommodation No. of bedsUniversity of Worcester 177University of Sussex 228University of London 197University of Lancaster 422University of Kent, Pier Rd, Gillingham 350University of Hertfordshire 1601University of East London, Docklands Campus 788University of Abertay, Dundee N/ASwansea 500Southend on Sea 561Sheffield University N/AReading University, Bridges Hall 400Reading University 120Reading University 967Plymouth University 329Pitfield St, Hackney 350North Cambridge 321Newcastle 300Masons Hall, Birmingham 800Mallet St, London 166Loughborough University London Mile End Rd 595London Metro Univ, Huddleston, Tufnell Pk 450Lancaster Phase 3 1500Lancaster Phase 2 1870Homerton College, Cambridge 138High Wycombe 234High Wycombe 200Great Dover Street 350Crewe 51Colchester 767Brunel University Phase 5 538Borough high Street 300Abertay 700

Ministry of Defence No. of bedsJRSLA, Lucknow Barracks 450SNCO, Lucknow Barracks 50RAF Woodbridge 344RAF Woodbridge 58DACI Shrivenham 460DACI Shrivenham B36 250

Technical helpline 01476 562277fpmccann.co.uk/rooms

roomsolutions

Page 12: room solutions brochure - FP McCann Brochures Lo-Res/FP... · 05 Technical helpline 01476 562277 fpmccann.co.uk/rooms room solutions One of the main advantages of FP McCann’s (Bell

Grantham Office:Alma Park RoadGranthamLincolnshireNG31 9SE

Tel: 01476 562277Mob: 07976 [email protected] fpmccann.co.uk