roljclou ilsljebolc b9l1< o gu nçcou 66 ooq hook ch 19 ... · 178133 b lo emgÀ ire b9lu61j...

1
0 700 1,400 2,100 m 1:50,000 REPRODUCTION FROM ORDNANCE SURVEY MAPS, BY PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OS LICENCE NO.100035971/0160 THIS PLAN IS PRODUCED TO ASSIST WITH THE ASSESSMENT OF THE PRELIMINARY ENVIRONMENTAL INFORMATION. IT IS ISSUED WITHOUT PREJUDICE TO THE SCOPE, CONTENT AND ORDER LAND IN ANY SUBSEQUENT APPLICATION FOR DEVELOPMENT CONSENT Coordinate System: British National Grid Units: Metre THIS DRAWING IS SCALED AT PAPER SIZE A3, THEREFORE ANY PRINTS TAKEN AT SMALLER SIZES WILL AFFECT ACCURACY OF THE MEASUREMENT UNITS AND SHOULD NOT BE SCALED AGAINST Client ISSUE DATE COMMENTS DRAWN CHK'D APP'D A 27.08.15 DD TW SP Title APPLICATION No. GIS A3 DRAWING No. 6.4 D SCALE 1:50,000 ISSUE B COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF TRANSPORT FOR LONDON Notes ASSESSED CASE (2021) MODELLED ROADS A D C B ® KEY PLAN B 29.09.15 DD TW SP SILVERTOWN TUNNEL: PRELIMINARY ENVIRONMENTAL INFORMATION REPORT ASSESSED CASE (2021) MODELLED ROADS

Upload: others

Post on 28-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: rOLJClOU ILSLJebOLC b9L1< o GU nçcou 66 ooq HOOK CH 19 ... · 178133 b LO emgÀ IrE B9LU61J Leí co b!6L see eco O Il es q e BLosq sea/ Ise äciJ HO?br B rc oujlio rooqe oecgl 7.soe

0 700 1,400 2,100m

1:50,000REPRODUCTION FROM ORDNANCE SURVEY MAPS, BY

PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OFTHE CONTROLLER OF HER MAJESTY'S STATIONERY

OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OSLICENCE NO.100035971/0160

THIS PLAN IS PRODUCED TO ASSIST WITH THE ASSESSMENTOF THE PRELIMINARY ENVIRONMENTAL INFORMATION. IT IS

ISSUED WITHOUT PREJUDICE TO THE SCOPE, CONTENT ANDORDER LAND IN ANY SUBSEQUENT APPLICATION FOR

DEVELOPMENT CONSENT

Coordinate System: British National GridUnits: Metre

THIS DRAWING IS SCALED AT PAPER SIZE A3,THEREFORE ANY PRINTS TAKEN AT SMALLER SIZESWILL AFFECT ACCURACY OF THE MEASUREMENT UNITSAND SHOULD NOT BE SCALED AGAINST

Client

ISSUE DATE COMMENTS DRAWN CHK'D APP'DA 27.08.15 DD TW SP

Title

APPLICATION No. GISA3

DRAWING No.6.4 DSCALE1:50,000ISSUEB

COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF TRANSPORT FOR LONDON

Notes

ASSESSED CASE (2021)MODELLED ROADS

A

DC

B

®

KEY PLAN

B 29.09.15 DD TW SP

SILVERTOWN TUNNEL:PRELIMINARY ENVIRONMENTAL

INFORMATION REPORTASSESSED CASE (2021) MODELLED ROADS