STUDENT RISK ASSESSMENT Date: 11/11/15 Location: Touchwood, Solihull Task being assessed: Filming inside of Touchwood building General Risk assessment Student Name: Nathan Pugsley, Eleanor Barter, Molly Littlehales HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLAN Hazard Regardless of control measures Perso ns at risk *1 Worst outcom e *2 Probabili ty *3 Risk Ratin g A-E Existing control measures taken against the risk What further control measures are required when and by whom

Upload: mollyapple

Post on 16-Jan-2017

105 views

Category:

Education


3 download

TRANSCRIPT

Page 1: Risk assessment touchwood filming

STUDENT RISK ASSESSMENT

Date: 11/11/15 Location: Touchwood, Solihull Task being assessed: Filming inside of Touchwood building

General Risk assessment

Student Name: Nathan Pugsley, Eleanor Barter, Molly Littlehales

HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLANHazard

Regardless of control measuresPersons at risk

*1

Worst outcome

*2

Probability

*3

Risk Rating

A-E

Existing control measures taken against the risk

What further control measures are required when

and by whomTripping over equipment

Dispute with public

Equipment falling over

ALL

St, Pu

ALL

Min

NR

Min

Ps

R

Ps

D

D

D

Put equipment in appropriate location, avoiding busy paths

Do not continuously talk to public if it is unwanted by them

Ensure equipment is set up properly prior to use

Make sure students are protecting equipment making sure nobody gets too close and that if anybody does that they are made aware before any incident occurs

Ask public prior to asking proper questions if they would mind being filmed so we know they are comfortable in front of camera

Double check everything is set up properly and that when using it everybody is aware not to get too close in case it does fall

*1Sf = staffSt = studentsCr = contractorsCl = cleanersPu = public

D = people with disabilitiesX = young/inexperiencedL = lone workersW = women of child-bearing age

*2 This is without control measuresF = fatalMaj = major injury or permanent disabilityMin = minor injuryNR = non-reportable

*3 This is with control measures in placeFr = frequent/likely/could occur repeatedly/expectedPr = probable/not surprised/might occur oftenPs = possible/could occur sometimeR = remote/unlikely but conceivableU = unlikely/improbable such that likelihood is almost zero