RISK ASSESSMENT FORM
PRODUCTION TITLE: Mosaik Aerial Music Video SHOOT DATE/S: 11.11.15LOCATION THIS FORM RELATES TO: Norwich City Centre Complete the following table rating
each risks severity on scale from Negligible (N), Low risk (L), Moderate risk (M), Severe (S), Very severe (V)
each risks likelihood on scale from Very unlikely (VU), Unlikely (U), Possible (P), Likely (L), Very likely (VL)
Determine the risk factor from the table overleaf.
HazardPresent?
SeverityLikelihoodRisk Factor
1Alcohol/drugs
2Animals/insects
3Audiences
4Camera cable/grip equipmentYesMU2
5Confined spaces
6Derelict buildings/dangerous structures
7Electricity/gas (other than normal supplies)
8Fatigue/long hoursYesLL3
9Fire/flammable materials
10Hazardous substances
11Heat/Cold/extreme weather
12Laser/strobe effects
13Machinery/industrial/ crane/hoist
14Materials - glass, non-fire retardant set materials
15Night operation
16Noise high sound levels
17Non standard manual handling
18Public/crowdsYesLU2
19Radiation
20Scaffold/Rostra
21Smoking on set
22Special effects/explosives
23Special needs (elderly, disabled, inexperienced)
24Specialised rescue/first aid
25Stunts, dangerous activities
26Tall scenery/suspended ceilings
27Vehicles/speedYesSU3
28Water/proximity to water
29Weapons
30Working at heights
31Working overseas
32Other risks
Calculate the Risk Factor:Very UnlikelyUnlikelyPossibleLikelyVery Likely
Very severe34455
Severe23335
Moderate22333
Slight12233
Negligible11223
Decide the action to take:
5Very severeTake immediate action
4SevereHigh priority
3Moderate RiskProgramme for action
2Low RiskAction may be required
1NegligibleProbably acceptable
Hazard no: 4Risk Factor (1-5)2
DescriptionI will be using a large tripod and a small camera stabilizer with my camera mounted on top
Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) )People exposed to: Director, actor, assisting crew and the public
Action to takeEquipment will be carried and moved with care, with any external wiring being taped down to the equipment and made to stand out with red tape
Person/company responsible for action Director
To be completed at agreed later date -
Exposed person(s) informed? (y/n)YAgreed action taken? (y/n)YRisk removed? (y/n)Y
Hazard no: 8 Risk Factor (1-5)3
DescriptionThere will be a lot of walking around the Norwich city centre, in addition to this the crew will be helping to carry slightly heavy equipment
Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) )People exposed to: Director, actor, assisting crew
Action to takeRegular rest breaks and I will ask if all of the crew are okay to continue with filming
Person/company responsible for action Director
To be completed at agreed later date -
Exposed person(s) informed? (y/n)YAgreed action taken? (y/n)YRisk removed? (y/n)Y
Hazard no: 18Risk Factor (1-5)2
DescriptionThe public will be present due to the filming taking place in the Norwich city centre in public areas
Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) )People exposed: Director, actor, assisting crew
Action to takeTo keep all crew in close proximity so nobody is lost within any crowds or negatively affected by the people of the public
Person/company responsible for action Director
To be completed at agreed later date -
Exposed person(s) informed? (y/n)YAgreed action taken? (y/n)YRisk removed? (y/n)Y
Hazard no: 27Risk Factor (1-5)3
DescriptionThere are many roads with high speed vehicles such as cars, busses and bikes on them
Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) )People exposed: Director, actor, assisting crew
Action to takeAll crew will be kept off the road by a chosen over watcher, and for the camera operator a person will stand behind so they do not move into the road
Person/company responsible for action Assisting crew member
To be completed at agreed later date -
Exposed person(s) informed? (y/n)YAgreed action taken? (y/n)YRisk removed? (y/n)Y
Completed by:
Jonathan Eley
Position: Director/Producer
Signature
Date: 9.11.15