restricted © siemens industry, inc. 2015 all rights reserved.siemens.com/answers siemens power...

15
Restricted © Siemens Industry, Inc. 2015 All rights reserved. siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23 April 2015

Upload: vincent-turner

Post on 19-Dec-2015

239 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

Restricted © Siemens Industry, Inc. 2015 All rights reserved. siemens.com/answers

Siemens Power Technologies International

PSS®E 34.0 Release Webinar23 April 2015

Page 2: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 2 Siemens Power Technologies International

Announcements

1. PSSE 34.0 will be available for download within the next few days• You will receive an email with the download link and new password.

2. PTI User Group Meetings 2015• Europe

May 5th-7th (PSS®E meeting on 6th, PSS®E training on the 7th)Prague, Czech RepublicIbis Praha Wenceslas Square

• US (filled to capacity)May 12th-14th (PSS®E meeting on 13th, PSS®E training on the 14th)New Orleans, LouisianaCrowne Plaza French Quarter

3. PSS®E Customer Advisory Board• Play an active role in directing the future of PSS®E• Will be rolled-out during upcoming UGMs• Look for information for how to participate in the next few weeks

Page 3: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 3 Siemens Power Technologies International

PSS®E 34.0 Highlights

• Integrated Node-Breaker Support• Node-Breaker topology support in engine• Automatic substation topology generation• Novel approach for linking Bus-Branch and Node-Breaker worlds• Node-Breaker contingency analysis

• Updated study file management system• Improved power flow models• Solution parameters saved in SAV, RAW and SEQ• Support for branch names• 12 Customizable ratings groups• Results spreadsheets• Geomagnetic Induced Current (GIC) improvements• New dynamics models• Many user interface, diagram, settings and plotter improvements

Page 4: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 4 Siemens Power Technologies International

Automatic Substation Building

• Choose from several common substation configurations (breaker and a half, ring bus, etc)

• Easily add multiple buses at different voltage levels

• 90% of the work is done for you. Terminals can easily be moved after the initial layout is generated

Page 5: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 5 Siemens Power Technologies International

Linked Bus-Branch and Node-Breaker Diagrams

• Visual indication and clickable link for substation diagram in bus-branch view• Easily drill down to substation detail from the bus-branch model• Customized substation diagrams will automatically be loaded if available, or

diagrams will be create dynamically as needed.

Page 6: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 6 Siemens Power Technologies International

Example Node-breaker Contingencies

fault line from bus 101 to bus 102 ckt 1 / open line with

brkrs

isolate branch from bus 201 to bus 202 ckt 2 / open line with

brkrs

fault bus 3005 / clear bus with

brkrs

disconnect swd sub 4 from node 5 to node 2 / open brkr or switch

close swd sub 2 from node 1 to node 7 / close brkr or

switch

isolate swd sub 1 from node 3 to node 8 / isolate brkr with

brkrs

contingency "stuck_brkr_example" fault line from bus 101 to bus 102 ckt 1 / open line with brkrs isolate swd sub 1 from node 1 to node 2 / stuck brkr at remote termend

Notes: PSS®E 34.1 will have expanded NB contingency support including automatic NB contingency generation

Page 7: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 7 Siemens Power Technologies International

PSS®E 34 Node-Breaker Demo

Page 8: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 8 Siemens Power Technologies International

Improved Study File Management System

• Formally known as Scenarios• Streamlined operation• New Study Explorer view for simple file management

Page 9: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 9 Siemens Power Technologies International

Power Flow Modeling Additions

• Distributed generation mode and parameters in load model• In-feed control mode for machines

Page 10: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 10 Siemens Power Technologies International

Solution Parameters in RAW and SEQ

• Power flow and short circuit solution parameters are stored in the SAV, RAW and SEQ files

• The exact solutions can be replicated when re-opening or transferring case data

Page 11: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 11 Siemens Power Technologies International

Branch Names and 12 Ratings Sets

• Branch names are supported

• Must be unique (future PSS®E versions will use as key fields for APIs, contingency definitions, reports, etc)

• There are now 12 ratings sets with customizable names and descriptions

• Use for various conditions, seasons, time limits, or anything you want.

• Select from these 12 ratings for single line diagram loading results, ACCC violations, etc

Page 12: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 12 Siemens Power Technologies International

Results Spreadsheets

• Spreadsheets for results (and totals data) for network elements and aggregations

• Examples: • Branch spreadsheet with all branch flows and losses• Fixed shunts spreadsheet with actual MVAR• Area spreadsheet with total load, losses and interchange

Page 13: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 13 Siemens Power Technologies International

Dynamics Models

• New IEEE 421.5 ModelsST1C, ST5C, ST7C, AC1C, AC2C, AC3C, AC4C, AC5C, AC6C, DC1C, DC2C, AC6A

• New Governor Model (Pratt amp; Whitney Turboden turbine-governor)PWTBD1

• New Machine Protection Model (V/Hz Generator Relay Model)VPERHZU1

• The following user models have been converted to standard modelsDCTC1 is now DCTC1TLOEXR1 is now LOEXR1T

Page 14: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 14 Siemens Power Technologies International

PSS®E 34 Demo

Page 15: Restricted © Siemens Industry, Inc. 2015 All rights reserved.siemens.com/answers Siemens Power Technologies International PSS®E 34.0 Release Webinar 23

May 2015

Restricted © Siemens Industry, Inc. 2015 All rights reserved.

Page 15 Siemens Power Technologies International

Questions

Joe HoodPSS®E Product Manager

Phone: +1.803.397.8539

email: [email protected]

Glenn PietrowPSS®E Development Manager

Phone: + 1.518.395.5196

email: [email protected]

siemens.com/answers