2855 W. 4th Street & 435 Stoker Ave.
MASTER PLAN AMENDMENT
APPLICATION TO CREATE
RESIDENTIAL & MULTI-FAMILY
NEIGHBORHOODS
PHOTO OF SITE FROM W. 4th Street
SUBMITTED JULY 10, 2017
Application for a Master Plan Amendment For
A Portion of the Mountain View Cemetery
Prepared For: RJM Ventures, LLC 27132 B Paseo Espada, Suite 1206 San Juan Capistrano, CA 92675 Prepared By:
KRATER CONSULTING Group A Nevada professional corporation
901 Dartmouth Drive Reno, Nevada 89509 (775) 815-9561
July 10, 2017
Table of Contents
I. Supporting Information A. Discussion of Current & Proposed Master Plan B. Project Summary C. Master Plan Amendment Findings D. Neighborhood Advisory Board Information E. Conclusion
II. Zoning/Vicinity Map III. Current Land Use IV. City of Reno Future Land Use (ReImagine Reno) V. Proposed Land Use VI. Proposed Land Use upon Adoption of ReImagine Reno VII. Proposed Land Use with Topo VIII. Master Plan Amendment Application
A. Checklist B. Application C. Owner Affidavit D. Assessor Map E. Applicant Affidavit F. Project of Regional Significance Analysis
IX. Legal Description X. Parcel Map 4944 XI. Annexation Tract Map XII. Traffic Information
July 10, 2017
Claudia Hanson, Planning Manager Community Development Department City of Reno P.O. Box 1900 Reno NV 89505 Dear Claudia:
SUBJECT: Master Plan Amendment – Mountain View Cemetery Vacant Land
DISCUSSION OF CURRENT & PROPOSED MASTER PLAN The proposed project is located between West Fourth Street to the south and Interstate 80 to the north. The project lies east of the Reno Vista Ridge development and Summit Ridge Drive. The Mountain View Cemetery, an aggregate processing facility, and an auto storage/wrecking yard lie to the west. The north and west side of the subject property has a master plan designation of Special Planning Area (parcel 006-250-51) while the southeast portion has a designation of Industrial. The Mountain View Cemetery has a land use designation of Public Facility and the auto storage/wrecking yard has a designation of Special Planning Area. The Reno Vista Ridge project has a small lot single family residential project to the north and apartments to the south. The small lot single family residential area has a land use designation of Mixed Residential while the multi-family development has a land use designation of Urban Residential Commercial. The City is currently working on a comprehensive Master Plan update called “ReImagine Reno”. The new master plan will have new land use designations specific to residential development, mixed use development, and employment. We believe the new residential categories of Mixed Neighborhood” and “Multi-family Neighborhood” will be entirely appropriate for the north and south portions of the site respectively upon adoption of the new master plan. Thus, we propose to initially designate the area due east of the small lot single family homes as “Mixed Residential” upon approval by the Reno City Council and a finding of conformance with the Regional Plan by the Truckee Meadows Regional Planning Commission. Mixed Residential allows 3 to 21 dwelling units per acre. We propose to initially designate the area due east of the Reno Vista Ridge multi-family homes as “Urban Residential Commercial” that allows a full range of commercial activities with increasing degrees of intensity. For example, MF-30 zoning is a common use in Urban Residential Commercial land use zones developed for residential use. We propose the west border between the two designations of Mixed Residential and Urban Residential Commercial coincide with the change from Mixed Residential and Urban Residential Commercial that currently exists today within the Reno Vista Ridge area.
KRATER CONSULTING GROUP A Nevada professional corporation
Krater Consulting Group Phone (775) 815-9561 901 Dartmouth Drive Fax (775) 786-2702 Reno, Nevada 89509 E-mail: [email protected]
Page | 2
We do not feel that commercial activity is appropriate in this area given the modest volumes of traffic on W. 4th Street and elevation difference between the site and W. 4th Street. Thus, it is our intension that upon council approval of the ReImagine Reno Master Plan update and a finding of conformance with the Regional Plan by the Truckee Meadows Regional Planning Commission that the new residential land use categories be assigned to the project as follows: change the designation of the Mixed Residential area to “Mixed Neighborhood” that allows moderate density housing from 8 to 15 dwelling units per acre; and, change the designation of the area due east of the Reno Vista Ridge multi-family homes as “Multi-family Neighborhood” that allows higher density housing from 15 to 30 dwelling units per acre. We feel that this change will be beneficial to the project by ensuring that no commercial activity occur in the future and that no densities occur that exceed 30 dwelling units per acre. PROJECT SUMMARY
To ensure compatibility with the Reno Vista Ridge project, we propose to designate the north side of our project as Mixed Residential and support a re-designation to Mixed Neighborhood upon adoption of ReImagine Reno that will ultimately allow for 8 – 15 units per acre. We propose to designate the area next to the existing apartments as Urban Residential Commercial and support a re-designation to Multi-family Neighborhood next to the existing apartment buildings upon a finding of conformance by the Regional Planning Commission. We envision a similar small lot single family residential development (possibly SF-4) next to the existing single-family homes to ensure compatibility. Note that the existing small lot single family development is zoned MF-4 while the existing multi-family homes are zoned MF-30. The Peavine Drain, a Major Drainage Way borders the Mountain View Cemetery. Currently, the Peavine Drain is part of the subject property (006-250-51) but we plan to submit a boundary line adjustment such that the Peavine Drain becomes a part of the main Mountain View Cemetery property (006-250-50). The Mountain View Cemetery has a current land use designation of Public Facility so the BLA will provide for a permanent buffer between the cemetery and what is planned to be a moderate to high density residential project. We are currently working to obtain boundary and topographic mapping to allow preparation of the BLA and a site plan to determine the appropriate zoning designations but envision a mix from SF-4, MF-14 of MF-21, and MF-30 to allow a variety of housing types with several ranges of affordability. West Fourth Street that adjoins the property will provide project access. 4th Street is a four-lane arterial with moderate access control that has existing striped bike lanes and RTC Ride bus stopes for Route 3. Route 3 is a seven day a week route that provide direct access to the RTC Centennial Plaza transfer station.
Page | 3
West 4th Street – Looking West towards Summit Ridge Drive West 4th Street has an average annual daily traffic (AADT) count of around 9,100 to 10,000 trips (page 425 of the attached NDOT count information in the attached Traffic Information section). Table 3-4 in the attached Traffic Information section shows that a 4-lane moderate access control arterial (per Table E-3 Regional Road System) operates at a Level of Service “B”. A Level of Service “C” is maintained up to a volume of 32,200 average daily trips. We anticipate that this project will generate in the range of under 4,000 average daily trips depending on the final land use mix. This assume a range of 80 to 100 single family homes, 60 – 90 townhomes and 250 to 300 apartment units. A traffic study is not warranted at this time as adequate capacity exist on the Regional Roadway network. A detailed traffic study will be submitted with a project when both capacity and access issues can be thoroughly analyzed. This project will not meet any of the thresholds to qualify as a project of regional significance. The property has been previously annexed into the City of Reno in 2010 per Annexation Tract Map 4954. We plan to soon submit a zone change as we are able to develop a detailed site plan to determine logical zoning boundaries. We are working on a full range of engineering studies to demonstrate that adequate capacity exists for all public utilities and to determine if a special use permit will be required for cuts and fills. We do not feel that the site will qualify as hillside development as the site has only moderate slopes just north of 4th Street. MASTER PLAN AMENDMENT FINDINGS AND CONSIDERATIONS
MASTER PLAN CONSIDERATIONS:
IN ORDER TO APPROVE A MASTER PLAN AMENDMENT, THE CONSIDERATIONS AND FINDINGS LISTED BELOW MUST BE ANSWERED IN THE AFFIRMATIVE. ALL FINDINGS AND CONSIDERATIONS MUST BE ADDRESSED IN WRITTEN FORM AND IN WORD FORMAT WITH THE ORIGINAL APPLICATION, TO PROVIDE FACTS, EVIDENCE AND/OR THE BASIS BY WHICH THE PLANNING COMMISSION OR CITY COUNCIL COULD USE IN THEIR DELIBERATIONS.
Page | 4
For the Planning Commission:
(a) Bears relation to the planning and physical development of the City; Response: The property in question is currently part of the Mountain View Cemetery. The change from burial to cremation has drastically changed the amount of future land needed for the cemetery. In addition, the infill location of the property and proximity to an under-utilized four lane moderate access control arterial only minutes from downtown Reno, McCarran Boulevard, and Interstate 80 makes this property ideal for development. The proximity to the highly successful Reno Vista Ridge Development, great views of the Sierra Mountains and having the Peavine Drain as a natural buffer between the property and I-80 along with the Mountain View Cemetery will make this an ideal place to live. The existing auto storage yard and aggregate processing facility can both be screened from view and are ripe for future development. Reno is planning on sanitary and storm sewer upgrades within the UPRR right-of-way just east of the property on 4th Street and a 42” TMWA water line and NV Energy electric lines lie within the 4th Street right-of-way to provide service to the property. Three fire stations that are located on Ralston, Kings Row, and Mayberry Drive are all within a five to eight-minute response time. Police service is readily available as is ambulance service and mail delivery. The 4th Street Corridor area has adequate traffic capacity with no needed capacity improvements identified within the short term Regional Transportation Commission Regional Transportation Plan. Thus, development of a mix of moderate to high density (such as SF-4 single family detached lots, townhomes, and apartment buildings) will provide much needed housing and help fill in the “missing middle” as identified in the Truckee Meadows Regional Planning Agency, “Truckee Meadows Housing Study”, 2016.
o “There is a noticeable lack of higher density “Missing Middle” housing potential that can help fill the gap for workforce and lower-income households”.
(b) Is so prepared that it may be adopted by the City Council as a basis for the physical development of the City. Response: This master plan amendment application has been prepared in accordance with the requirements of the City of Reno and in accordance with the goals and policies of the city. Adoption of the proposed master plan amendment will provide for orderly physical development of the property.
For the City Council:
(a) As may be applied practically to the physical development of the City for a reasonable period next ensuing will:
1. Serve as a pattern and guide for that kind of orderly physical growth and development of the City which will cause the least amount of natural resource impairment; Response: Development of this site with moderate to higher density housing will take advantage of available infrastructure, service, and resources in an area with available roadway capacity, sewer and storm drain infrastructure, water transmission lines, and high voltage electric lines. As noted in the 2016 Truckee
Page | 5
Meadows Housing Study, using infill opportunities to help provide the “missing middle” can help our community save hundreds of millions of dollars on expensive infrastructure improvements compared to continued suburban sprawl. 2. Conform to the adopted population plan and ensure an adequate supply of housing, including affordable housing; and Response: This will be achieved by providing the opportunity to provide higher density “Missing Middle” housing potential that can help fill the gap for workforce and lower-income households. 3. Form a basis for the efficient expenditure of funds relating to the subjects of the City of Reno Master Plan. Response: This infill parcel is already provided with the full range of city services. Development of moderate to higher density housing will allow for a more efficient allocation of city services.
Please provide an analysis of the following considerations in addition to the required considerations listed above:
1. There has been a change in the area or in the conditions on which the current designation was based which warrants the amendment; The change from burial to cremation has drastically changed the amount of future land needed for the cemetery, affording the opportunity to develop the property in question with much needed moderate to higher density housing that will take advantage of existing and readily available city services. The completion of the Chalk Bluff Water Treatment Facility and 42” water line on w. 4th Street, McCarran Boulevard, and the single point urban-interchange are all important improvements that have occurred in the past two decades to allow for the development of this property. 2. The density and intensity of the proposed Master Plan Amendment is sensitive to the existing land uses and is compatible with the existing adjacent land use designations; Response: Small lot detached single family residential homes can be developed next to the existing Reno Vista Ridge single family homes located on Sandyhill Lane off Sky Valley Drive. The area east of these Reno Vista Ridge homes is proposed for Mixed Residential with an ultimate designation of Mixed Neighborhood that will allow densities ranging from 8 – 15 units per acre. Higher density homes can be located east of the apartments to the west. The area east of these Reno Vista Ridge apartments is proposed for Urban Residential Commercial with an ultimate designation of Multi-Family Neighborhood that will allow densities ranging from 15 – 30 units per acre. A boundary line adjustment is proposed to move the existing west property line of the Mountain View Cemetery that runs along the Peavine Drain. We propose to move the property line such that the development boundary of this project will be the southwest top of slope of the Peavine Drain. This will provide for a natural buffer between the Mountain View Cemetery and this development.
Page | 6
3. The amendment will provide for orderly physical growth of the City, enhance the urban core and foster safe, convenient and walkable neighborhoods and shopping districts; Response: The proposed amendment will provide for orderly growth of the city by providing for much needed residential housing in a highly built up infill area with a full range of available infrastructure and services. There is a multitude of nearby shopping centers with convenient and close proximity to major employment centers. W. 4th Street is a major RTC bus route with seven day a week access to all parts of the community. The roughly 32.75 acres of developable land will provide for a walkable community. We plan to work with the Reno Vista Ridge homeowners associated to look at the potential for allowing shared pedestrian access through both sites that could become a great amenity for the entire area. Development of a mix of housing types on property located only a six-minute drive from the intersection of Virginia Street and 4th Street and only a five-minute drive to Wingfield Park will provide significant additional customers for local businesses and restaurants within the downtown area and our urban core. 4. There are or are planned to be adequate transportation, recreation, utility and other facilities to accommodate the uses and densities permitted by the proposed Master Plan designation; and Response: The project is in close proximity to the existing city park on Summit Ridge Drive, Idlewild Park, and Wingfield Park. West Fourth Street, an underutilized 4 lane moderate access control arterial street adjoins the property and McCarran at I-80 and Keystone at I-80 are only minute away. Route 3 of the Regional Transportation Commission's Citifare Bus System passes by the site on West Fourth Street. Route 3 connects with the RTC Centennial Plaza bus transfer facility on 4th Street. 5. The proposed change is in substantial conformance with the goals and policies of the Master Plan and other adopted plans and policies. Response: The proposed land use change is in conformance with the following goals and policies of the Reno Master Plan. Goals
• Provide for maximum efficiency and effectiveness in delivery of City services.
• Provide effective municipal services, provide for safety and maintain a sound infrastructure through a well-planned and responsive customer oriented delivery system.
• Plan growth which is sensitive to the environment and recognizes significant community resources.
• Encourage an economic base which provides for long term economic health and improved quality of life.
POLICIES
C&R-5: The City should pursue a growth pattern which is fiscally responsible in order to maintain and possibly improve existing levels of service for current residents and future generations.
Page | 7
C&R-7 The City should work with area service providers to ensure that the water supply, water treatment and distribution capacity, sewage treatment and road network is capable of serving present and future demand within the city.
OS-19 The City should encourage citizen advocacy for open spaces and greenways.
GI-4 The City should consider offering development incentives to encourage new development projects in areas with existing streets, sewer lines and fire stations with priority given to areas within center and corridor plan areas.
GI-14 Maximum use of existing public facilities and services should be supported through encouraging new development to occur at higher densities, when appropriate, and through the development of vacant and underutilized land with particular emphasis in the center and corridor plan areas.
T-11 The City should encourage businesses and new land development which are substantial generators or attractors of traffic to implement programs to reduce trips and/or mitigate air quality impacts.
P-1 Site access and circulation should be safe, convenient, logical and minimize impacts onto adjoining roads.
F-2 The City should strive for a four-minute response time to 75% of the City, and not exceed a six-minute response time for any area of the City without mitigation.
CD-15 The City should encourage the clustering of services in locations convenient to neighboring residential areas in order to promote fewer vehicle trips.
CD-16 The City should encourage the development of attractive landscaping and green spaces in close proximity to center and corridor plan areas and along arterial streets.
BD-1 Development density, building mass, and architectural details should be sensitive to the context, scale and texture of surrounding development patterns and structures (This will be achieved with a mix of appropriate housing types next to Reno vista Ridge along with a boundary line adjustment to preserve the Peavine Drain area).
SD-13 The City should encourage the retention of natural features of hillsides by requiring any grading to achieve an undulating, natural appearance, and require densities to decrease as slope increases (This is achieved as the adjoining Peavine Drain will remain as a Public Facility).
NEIGHBORHOOD ADVISORY BOARD The project lies in Ward 1, Councilwoman Jenny Brekhus’s ward. We look forward to presenting the project and abandonment request to the next available Ward 1 meeting. CONCLUSION This location of this project can take full advantage of available city and public and private utility resources, services, and infrastructure. The Peavine Drain will be protected and avoid development in steep slope and major drainage areas. The proximity to West Fourth street, an underutilized 4-lane moderate access control arterial that has existing bike lanes will ensure safe and adequate access for vehicles and bicyclists. Existing bus stops on West 4th Street for Route 3 on RTC Ride’s bus system will provide convenient access for transit riders.
Page | 8
But most important, in our current economic boom period, this project will provide for much needed moderate to higher density housing to help fill in the “missing middle”.
We greatly appreciate your consideration of this matter. Please do not hesitate to contact me with any questions. Sincerely,
Kenneth Krater, P.E.
City
of R
eno
GIS
Esri,
HER
E, D
eLor
me,
Map
myI
ndia
, © O
penS
treet
Map
con
tribu
tors
, and
the
00.
150.
30.
075
00.
20.
40.
1
SF-4
MF-30
PF
PF
IMU
M U
SITE I
City
of R
eno
GIS
Esri,
HER
E, D
eLor
me,
Map
myI
ndia
, © O
penS
treet
Map
con
tribu
tors
, and
the
00.
150.
30.
075
00.
20.
40.
1
Publ
ic F
acilit
yM
ixed
Res
iden
tial
Urb
anR
esid
entia
l C
omm
erci
al
SPA
I
SPA
Interstate 80
City
of R
eno
GIS
Sour
ce: E
sri,
Digi
talG
lobe
, Geo
Eye,
Ear
thst
ar G
eogr
aphi
cs, C
NES/
Airb
us
00.
10.
20.
05
00.
10.
20.
05
Mix
ed
Res
iden
tial
Urb
an R
esid
entia
lC
omm
erci
al
3 - 2
1 un
its/A
c.
PRO
POSE
D L
AND
USE
City
of R
eno
GIS
Sour
ce: E
sri,
Digi
talG
lobe
, Geo
Eye,
Ear
thst
ar G
eogr
aphi
cs, C
NES/
Airb
us
00.
10.
20.
05
00.
10.
20.
05
Mix
ed
Nei
ghbo
rhoo
d
Mul
tiFa
mily
N
eigh
borh
ood
8 - 1
5 un
its/A
c.
15 -
30un
its/A
c.
Land
Use
Upo
n Ad
optio
n of
ReI
mag
ine
Ren
o
ULT
IMAT
E LA
ND
USE
CO
NFI
GU
RAT
ION
OVE
RLA
ID O
N T
OPO
GR
PAH
IC M
AP
Parcel Map
Tract Map - Annexation
659
659
430
647
395
80
80 FRWA56
FRWA55
0852
1170
0850
011908721044 0840 0864
0504
05341012
0839
11550207
02080209 02031017
08511113
1018
1117
0656
0662
0932
1114
1115
2220
0211
0938
0994
1071
0915
0214
1005
02131156
01131174
1146
0868
0197
0196
0259
0487
0538
0539
02270835
0836
0225
0485
0895
0833
0578
0183
0541
0931
1118
06631116
1072
0072
04640664
2280
01490150
0925
0927
0064
0057
04170696
0053
0152
Trucke
e
River
MESAPARK
WHITEMAYBERRY
DR
FIR
DR
MAE
RO
BB
SIERR
A
DR
ANNE
7TH
ST
AVEN
IDA
DE
LANDA
AVE
KINGS
KEYSTONE
AVE
ROW
SUMMITRIDGE
AVE
DR
HIG
HL
ANDS D R
CALIFORNIA
PLUMB
IDLEWILD
HU
NTE
R
PLU
MAS
LAKE
MAR
SH
SAH
RO
NW
AY
ARLI
NG
TON
AVE
ST
AVE
DR
AVEDR
DRFOSTER
MONROE
MOUNT ROSE ST
ST
LN
ST
6TH
WASH
ING
TON
ST
4TH
ST4TH
IVES AVE
LEADER
SHIP
PKWY
COLE
MAN
DR
SIERR
A
VIRG
INIA
VIR
GIN
IA
VIRG
INIA
PANTHER
LINK LN
DR
DRWAYTALUS
DR
COM
STOC
K
PARR BLVD
SOCR
ATES
ST
ST
ST
ST
ST
STOK
ER
WELLINGTON WAY
HOGE RD
CAUGHLIN
PKWY
BLVD
MCCAR
RAN
SUNSETMOUNTAIN RD
NEWPORT LN
WESTERN RD
See Downtown Reno
Reno/SparksUrbanized Area
Sheet B-2Washoe (031)
MILES
0 10.5
395
Traffic InformationNDOT Count Sites
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
Stat
ion
Rou
te /
Loc
atio
nAA
DT
AAD
TAA
DT
AAD
TAA
DT
AAD
TAA
DT
AAD
TAA
DT
AAD
T
0310
211
May
berr
y D
r, .9
mi E
of t
he
brid
ge o
ver
the
Truc
kee
Riv
er &
.1
mi W
of F
enno
Rd.
5,00
04,
800
4,00
04,
000
4,00
0 4,
500
3,80
03,
800
4,10
03,
800
0310
213
SR64
7, 4
th S
t, .2
mi W
of
Ma y
berr
y D
r.8,
800
9,00
0 7,
300
7,60
07,
400
7,30
0 8,
400
8,50
0 8,
600
9,90
0
0310
214
SR64
7, 4
th S
t, .4
mi E
of
Ma y
berr
y D
r.6,
600
6,80
0 5,
600
5,60
05,
500
6,20
06,
000
6,10
0 6,
600
6,70
0
0310
215
Plum
as S
t, 7
5ft S
of M
arsh
Av.
7,40
07,
400
7,00
06,
800
7,00
07,
000
6,50
08,
000
7,20
08,
000
0310
218
S Vi
r gin
ia S
t, 1
00ft
N o
f St
ewar
t St.
19,0
0017
,000
16,0
0017
,000
16,0
0014
,000
14,0
0014
,500
15
,000
15
,000
0310
223
Wel
ls A
v, 7
0ft S
of S
tew
art S
t.18
,000
16,0
0016
,000
15,0
00
15,0
0011
,500
13,5
0014
,000
15
,500
14,0
00
0310
224
SR66
7, K
ietz
ke L
n, 1
50ft
S o
f M
ill S
t & 3
0ft N
of S
tew
art S
t.26
,000
25,0
0023
,000
24,0
0023
,000
23
,000
22,0
00
22,0
0025
,000
22,0
00
0310
225
W 4
th S
t, .1
5 m
i W o
f Sto
ker
Av.
9,80
09,
400
8,40
09,
400
8,80
09,
800
8,70
08,
800
8,80
09,
100
0310
227
W 4
th S
t, .3
5 m
i E o
f Sto
ker
Av.
12,0
00
13,0
0010
,000
10,0
00
9,90
0 11
,500
11,0
00
11,5
00
10,0
0010
,000
0310
231
W 2
nd S
t, 2
00ft
E o
f Ral
ston
St.
5,60
04,
800
5,00
04,
600
4,80
05,
400
4,70
04,
800
4,80
04,
800
0310
232
W 2
nd S
t, 2
00ft
W o
f N S
ierr
a St
5,90
05,
500
5,80
06,
000
5,00
07,
000
5,90
06,
000
6,30
0 5,
600
0310
233
N S
ierr
a St
, 75f
t S o
f W 2
nd S
t10
,000
10
,000
9,
200
6,70
07,
000
7,20
07,
500
7,30
07,
500
8,80
0
0310
236
N V
irgi
nia
St, 3
00ft
N o
f W 2
nd
St11
,000
12
,000
11,0
0011
,000
10,0
0010
,500
10
,000
10,5
00
11,0
00
11,0
00
0310
237
E 2n
d St
, 150
ft W
of C
ente
r St
.8,
000
7,30
07,
700
7,80
0 6,
900
6,80
0 6,
500
6,60
0 6,
700
6,50
0
0310
239
E 2n
d St
, E o
f Lak
e St
and
30f
t W
of 1
st S
t.8,
100
7,60
07,
300
7,30
07,
100
7,00
0 6,
300
6,30
06,
400
6,50
0
0310
240
E 2n
d St
, 250
ft E
of N
evin
n St
4,20
0 3,
800
3,70
03,
600
3,40
03,
700
3,20
02,
800
2,90
0 3,
000
0310
242
Wel
ls A
v, 1
00ft
S o
f E 2
nd S
t21
,000
20,0
0020
,000
21,0
0020
,000
20,0
00
16,5
0017
,000
17,5
0018
,000
0310
244
Kuen
zli L
n, 2
5ft E
of P
ark
St4,
700
4,50
04,
300
4,30
04,
400
3,30
04,
100
3,80
03,
600
3,60
0
0310
245
Kuen
zli L
n, 2
50ft
E o
f Wel
ls A
v4,
500
4,30
04,
100
4,00
04,
300
3,60
03,
900
3,70
03,
900
3,90
0
0310
249
E 2n
d St
, 300
ft W
of S
R66
7 (K
ietz
ke L
n).
18,0
0016
,000
15,0
0013
,000
15,0
0014
,000
13,5
0014
,000
13,0
0013
,000
Colo
rind
icat
esth
atth
eAA
DTva
lue
ises
timat
ed
425
Table 3-4 Average Daily Traffic Level of Service Thresholds
By Facility Type for Roadway Planning
Facility Type Maximum Service Flow Rate (daily for Given Service Level) Number of
Lanes LOS A LOS B LOS C LOS D LOS E Freeway
4 6 8 10
28,600 38,300 51,100 63,800
42,700 61,200 81,500
101,900
63,500 91,100
121,400 151,800
80,000 114,000 153,200 191,500
90,200 135,300 180,400 225,500
Arterial-High Access Control 2 4 6 8
n/a n/a n/a n/a
9,400 20,400 31,600 42,500
17,300 36,100 54,700 73,200
19,200 38,400 57,600 76,800
20,300 40,600 60,900 81,300
Arterial-Moderate Access Control 2 4 6 8
n/a n/a n/a n/a
5,500 12,000 18,800 25,600
14,800 32,200 49,600 66,800
17,500 35,200 52,900 70,600
18,600 36,900 55,400 73,900
Arterial/Collector-Low Access Control 2 4 6 8
n/a n/a n/a n/a
n/a n/a n/a n/a
6,900 15,700 24,800 34,000
13,400 28,400 43,100 57,600
15,100 30,200 45,400 60,600
Arterial/Collector-Ultra-Low Access Control 2 4 6 8
n/a n/a n/a n/a
n/a n/a n/a n/a
6,500 15,300 24,100 33,300
13,300 27,300 41,200 55,200
14,200 28,600 43,000 57,400
APPENDIX A
Complete Streets Projects Amendment No. 1 – April 15, 2016
A-2
Roadway Projects: 2013-2017
A-4
Regional Road Improvements 2013-2017
6 Keystone Ave California Ave to 7th St Multimodal improvements (corridor study initiated)
$9,400,000 Federal/Local
Project Limits Description Year of
Expenditure Cost
Potential Funding Source
7 Kietzke Ln Virginia St to Galletti Way Multimodal improvements (corridor study initiated) Phase 1
$15,600,000 Federal/Local/State
8 La Posada Dr @ Cordoba Blvd New roundabout (planning study complete)
$2,200,000 Local
9 McCarran Blvd Phase 2 Mira Loma Dr to Greg St Widen 4 to 6 lanes (final
design initiated) $16,300,000 Federal/Local/State
10 McCarran Blvd @ N Virginia St
Intersection widening & operational improvements (traffic study complete)
$4,400,000 Federal/Local/State
11 Mill St/Terminal Way
Reno-Tahoe International Airport to Lake St (downtown Reno)
Multimodal improvements, design & ROW (corridor study complete)
$1,100,000 Federal/Local
12 Oddie Blvd/Wells Ave
Kuenzli Ln to Pyramid Way Phase 1 - US 395 to Pyramid Way
Multimodal improvements (corridor study complete)
$20,100,000 Federal/Local
13 Plumb Ln McCarran Blvd to Ferris Ln
Pavement reconstruction & new shared use path; (design initiated)
$6,500,000 Federal/Local
14
Pyramid Hwy/Sun Valley/US 395 Connector Phase 1
@ US 395 and Dandini Blvd
Parr/Dandini service interchange improvements, design & ROW (currently in NEPA/PE)
$32,500,000 Federal/Local/State
15 Pyramid Hwy @ McCarran Blvd
Improve capacity, safety & multimodal access (construction in 2015; currently in NEPA/PE)
$71,400,000 Federal/Local/State
16 SouthEast Connector
South Meadows Pkwy to Greg St
New 6 lane road (CMAR initiated) $230,000,000 Local
17 Sun Valley Blvd 2nd Ave to Pyramid Hwy/Sun Valley/US 395 Connector
Multimodal improvements (corridor study initiated)
$8,600,000 Federal/Local
18 Sutro St 4th St to McCarran Blvd Multimodal improvements (construction 2013)
$1,900,000 Federal/Local
A-6
Roadway Projects 2018-2022
A-9
Roadway Projects 2023-2035
A-11
Regional Road Improvements 2023-2035
12 I-80/I-580/US 395 (Spaghetti Bowl)
I-80/I-580/US 395 interchange & northbound lanes on US 395 from I-80 to McCarran Blvd
Operational & capacity improvements - widen to 8 lanes
$560,200,000 Federal/Local
Project Limits Description Year of
Expenditure Cost
Potential Funding Source
13 Keystone Ave California Ave to 4th St Multimodal improvements $113,300,000 Federal/State
14 Kiley Ranch Rd Lazy 5 Pkwy to Henry Orr Pkwy New 2 lane road $11,100,000 Federal/Local/Private
15 Kirman Ave Mill St to 2nd St Widen 2 to 4 lanes $14,200,000 Federal/Local
16 Lazy 5 Pkwy David Allen Pkwy to Wingfield Hills Dr New 2 lane road $8,600,000 Federal/Local/Private
17 Lazy 5 Pkwy Delores Dr to Wingfield Hills Dr Widen 2 to 4 lanes $11,200,000 Federal/Local/Private
18 Lazy 5 Pkwy W Sun Valley Arterial to Pyramid Hwy New 4 lane road $53,600,000 Federal/Local/Private
19 Lemmon Dr Sky Vista Pkwy to Military Rd Widen 4 to 6 lanes $11,400,000 Federal/Local/State
20 Lemmon Dr Limber Pine Dr to Deodar Way Widen 2 to 4 lanes $15,000,000 Federal/Local
21 Lemmon Dr US 395 to Sky Vista Pkwy Widen 4 to 6 lanes $4,900,000 Federal/Local
22 Longley Ln S Virginia St to Maestro Dr Widen 4 to 6 lanes $24,300,000 Local
23 Loop Rd Vista Blvd to Eastern Slope Rd New 2 lane road $9,000,000 Federal/Local/Private
24 McCarran Blvd 3 intersection improvements
Improved Intersections $159,200,000 Federal/State
25 McCarran Blvd 7th St to N Virginia St Widen 4 to 6 lanes $67,600,000 Federal/Local/State
26 McCarran Blvd El Rancho Dr to Rock Blvd Widen 4 to 6 lanes $28,800,000 Federal/Local/State
27 McCarran Blvd Sky Mountain Dr to I-80 Widen 4 to 6 lanes $8,400,000 Federal/Local/State
28 Mira Loma Dr McCarran Blvd to SouthEast Connector Widen 2 to 4 lanes $12,000,000 Local
29 N Virginia St Parr Blvd to Business US 395
Multimodal improvements $9,700,000 Federal/Local
30
Pyramid Hwy/Sun Valley/US 395 Connector Phase 5 – Pyramid Hwy
Queen Way to US 395 Connector Widen 4 to 6 lanes $39,300,000 Federal/Local/State
31 Pyramid Hwy/Sun Valley/US 395
@ US 395 New system ramps to/from the south $212,600,000 Federal/Local/State
B4
Regi
onal
Road
Impr
ovem
ents
2013
2017
Prog
ram
Desc
riptio
n/Li
mits
High
Cras
hLo
catio
nor
RSA
Find
ing
Com
patib
lew
ithAd
jace
ntLa
ndU
se
Bicy
cle
orPe
dest
rian
Com
pone
nt
Tran
sit
Com
pone
nt
ITS
/O
pera
tions
Com
pone
nt
Com
mun
ityIn
put
(per
cent
ofsu
rvey
resp
onse
sfor
top
prio
ritie
s)
2035
Traf
ficCo
nges
tion
.=
LOS
Eor
F,.
=LO
SD
orBe
tter
.=
yes,
=no
,=P
artia
llyor
Furt
herA
naly
sisN
eede
d
6Ke
ysto
neAv
eCa
lifor
nia
Ave
to7th
St3%
7Ki
etzk
eLn
Virg
inia
Stto
Galle
tti
Way
0%
8La
Posa
daDr
@Co
rdob
aBl
vd1%
9M
cCar
ran
Blvd
Phas
e2
Mira
Lom
aDr
toGr
egSt
1%
10M
cCar
ran
Blvd
@N
Virg
inia
St1%
11M
illSt
/Te
rmin
alW
ay
Reno
Taho
eIn
tern
atio
nalA
irpor
tto
Lake
St(d
ownt
own
Reno
)
3%
12O
ddie
Blvd
/Wel
lsAv
e
Kuen
zliLn
toPy
ram
idW
ayPh
ase
1U
S39
5to
Pyra
mid
Way
5%
13Pl
umb
LnM
cCar
ran
Blvd
toFe
rris
Ln7%
14
Pyra
mid
Hwy/
Sun
Valle
y/U
S39
5Co
nnec
tor
Phas
e1
@U
S39
5an
dDa
ndin
iBl
vd5%
15Py
ram
idHw
y@
McC
arra
nBl
vd7%
16So
uthE
ast
Conn
ecto
rSo
uth
Mea
dow
sPkw
yto
Greg
St4%
B9
Regi
onal
Road
Impr
ovem
ents
2023
2035
.
Prog
ram
Desc
riptio
n/Li
mits
High
Cras
hLo
catio
nor
RSA
Find
ing
Com
patib
lew
ithAd
jace
ntLa
ndU
se
Bicy
cle
orPe
dest
rian
Com
pone
nt
Tran
sit
Com
pone
nt
ITS
/O
pera
tions
Com
pone
nt
Com
mun
ityIn
put
(per
cent
ofsu
rvey
resp
onse
sfor
top
prio
ritie
s)
Traf
ficCo
nges
tion
=LO
SE
orF
=LO
SD
orbe
tter
in20
35.
=ye
s,=n
o,=P
artia
llyor
Furt
herA
naly
sisN
eede
d
10I8
0W
McC
arra
nBl
vdto
Vist
aBl
vd0%
11I8
0@
Gars
onRd
1%
12I8
0/I5
80/U
S39
5(S
pagh
etti
Bow
l)
I80/
I580
/US
395
inte
rcha
nge
&no
rthb
ound
lane
son
US
395
from
I80
toM
cCar
ran
Blvd
0%
13Ke
ysto
neAv
eCa
lifor
nia
Ave
to4t
hSt
7%
14Ki
ley
Ranc
hRd
Lazy
5Pk
wy
toHe
nry
Orr
Pkw
y0%
15Ki
rman
Ave
Mill
Stto
2ndSt
2%
16La
zy5
Pkw
yDa
vid
Alle
nPk
wy
toW
ingf
ield
Hills
Dr1%
17La
zy5
Pkw
yDe
lore
sDrt
oW
ingf
ield
Hills
Dr0%
18La
zy5
Pkw
yW
Sun
Valle
yAr
teria
lto
Pyra
mid
Hwy
0%
19Le
mm
onDr
Sky
Vist
aPk
wy
toM
ilita
ryRd
0%
20Le
mm
onDr
Lim
berP
ine
Drto
Deod
arW
ay0%
21Le
mm
onDr
US
395
toSk
yVi
sta
Pkw
y1%
22Lo
ngle
yLn
SVi
rgin
iaSt
toM
aest
roDr
0%
23Lo
opRd
Vist
aBl
vdto
East
ern
Slop
eRd
0%
B10
Regi
onal
Road
Impr
ovem
ents
2023
2035
.
Prog
ram
Desc
riptio
n/Li
mits
High
Cras
hLo
catio
nor
RSA
Find
ing
Com
patib
lew
ithAd
jace
ntLa
ndU
se
Bicy
cle
orPe
dest
rian
Com
pone
nt
Tran
sit
Com
pone
nt
ITS
/O
pera
tions
Com
pone
nt
Com
mun
ityIn
put
(per
cent
ofsu
rvey
resp
onse
sfor
top
prio
ritie
s)
Traf
ficCo
nges
tion
=LO
SE
orF
=LO
SD
orbe
tter
in20
35.
=ye
s,=n
o,=P
artia
llyor
Furt
herA
naly
sisN
eede
d
24M
cCar
ran
Blvd
3in
ters
ectio
nim
prov
emen
ts0%
N/A
25M
cCar
ran
Blvd
7thSt
toN
Virg
inia
St0%
26M
cCar
ran
Blvd
ElRa
ncho
Drto
Rock
Blvd
8%
27M
cCar
ran
Blvd
Sky
Mou
ntai
nDr
toI
800%
28M
iraLo
ma
DrM
cCar
ran
Blvd
toSo
uthE
astC
onne
ctor
0%
29N
Virg
inia
StPa
rrBl
vdto
Busin
ess
US
395
0%
30
Pyra
mid
Hwy/
Sun
Valle
y/U
S39
5Co
nnec
tor
Phas
e5
–Py
ram
idHw
y
Que
enW
ayto
US
395
Conn
ecto
r0%
31
Pyra
mid
Hwy/
Sun
Valle
y/U
S39
5Co
nnec
tor
Phas
e3
@U
S39
50%
32
Pyra
mid
Hwy/
Sun
Valle
y/U
S39
5Co
nnec
torP
hase
4
Disc
Drto
Spar
ksBl
vd9%
33
Pyra
mid
Hwy/
Sun
Valle
y/U
S39
5Co
nnec
torP
hase
7
Sun
Valle
yIn
terc
hang
e7%
E-3
Table E-2 Access Management Standards
Access Management Standards-Arterials1 and Collectors
Access Management
Class
Posted Speeds
Signals Per Mile and Spacing2
Median Type
Left From Major
Street? (Spacing
from signal)
Left From Minor Street or
Driveway?
Right Decel Lanes at
Driveways?
Driveway Spacing3
High Access Control
45-55 mph
2 or less Minimum
spacing 2350 feet
Raised w/channelized turn pockets
Yes 750 ft.
minimum
Only at signalized locations
Yes4 250 ft./500 ft.
Moderate Access Control
40-45 mph
3 or less Minimum
spacing 1590 feet
Raised or painted w/turn pockets
Yes 500 ft.
minimum
No, on 6- or 8-lane roadways
w/o signal Yes5 200 ft./300 ft.
Low Access Control
35-40 mph
5 or less Minimum
spacing 900 feet
Raised or painted w/turn pockets or
undivided w/painted turn pockets or
two-way, left-turn lane
Yes 350 ft.
minimum Yes No 150 ft./200 ft.
Ultra-Low Access Control
30-35 mph
8 or less Minimum
spacing 560 feet
Raised or painted w/turn pockets or
undivided w/painted turn pockets or
two-way left-turn lane
Yes 350 ft.
minimum Yes No 150 ft./200 ft.
100 ft./100 ft.6
1 On-street parking shall not be allowed on any new arterials. Elimination of existing on-street parking shall be considered a priority for major and minor arterials operating at or below the policy level of service.
2 Minimum signal spacing is for planning purposes only; additional analysis must be made of proposed new signals in the context of existing conditions, planned signalized intersections, and other relevant factors impacting corridor level of service.
3 Minimum spacing from signalized intersection/spacing from other driveways. 4 If there are more than 30 inbound, right-turn movements during the peak-hour. 5 If there are more than 60 inbound, right-turn movements during the peak-hour. 6 Minimum spacing on collectors.
RTC is involved in a dialog with the Nevada Department of Transportation (NDOT), Washoe County, City of Reno, and City of Sparks regarding differences in agency access management standards throughout the region. NDOT anticipates initiating a revision of their access management standards in 2013. RTC and the partner jurisdictions will participate in this effort to bring more consistency to access management standards. The Transportation Research Board (TRB) is currently revising its 2003 Access Management Manual. New standards from TRB will be incorporated into this regional dialog. The regional road system shown in Table E-3 includes roadway limits, functional class and the access management class as described in Table E-2. The criteria for determining the regional road system includes:
Arterials that are direct connections between freeways and other arterials, insure continuity throughout the region and generally accommodate longer trips within the region, especially in the peak periods on high traffic volume corridors. Collectors that meet one of several criteria including: an ADT level of 5,000 (either currently or in the 2035 time frame); crossing of a significant travel barrier such as the Truckee River, I-80, US 395/I-580; provides access to major existing or future regional facilities. An industrial roadway A roadway including a transit route
E-4
Table E-3 Regional Road System
Street Name From To Functional Class
Policy Access
1st St Keystone Ave Lake St Arterial LAC
2nd St Keystone Ave Kuenzli St Arterial LAC
2nd St Kuenzli St Kietzke Ln Arterial MAC
3rd St (Verdi) I-80 West Bridge St Arterial MAC
4th St I-80 West Galletti Way Arterial MAC
5th St Keystone Ave Sierra St Arterial MAC
5th St Sierra St Evans Ave Arterial ULAC
6th St Ralston St Evans Ave Arterial ULAC
6th St Evans Ave 4th St Arterial MAC
7th Ave Dream Catcher Dr Chocolate Dr Arterial MAC
7th Ave Chocolate Dr Sun Valley Dr Arterial LAC
7th St Robb Dr Vine St Arterial MAC
9th St Sierra St N Virginia St Collector LAC
9th St N Virginia St Evans Ave Arterial LAC
9th St Wells Ave El Rancho Dr Collector LAC
Airway Dr Neil Rd Longley Ln Arterial MAC
Arlington Ave Skyline Blvd 6th St Arterial MAC
Armstrong Ln Susileen Dr Yuma Ln Collector LAC
Arrowcreek Pkwy Thomas Creek Rd S Virginia St Arterial MAC
Avenida de Landa Sharlands Ave Silverado Creek Dr Collector LAC
Baring Blvd McCarran Blvd Vista Blvd Arterial MAC
Beaumont Pkwy Clubhouse Dr Avenida de Landa Collector LAC
Belmar Dr Los Altos Pkwy Earthstone Dr Collector LAC
Bluestone Dr E Huffaker Ln Patriot Blvd Collector LAC
Boomtown Garson Rd I-80 Cabela Dr Arterial MAC
Bridge St US Hwy 40 (Verdi) S Verdi Rd Collector LAC
Brinkby Ave Plumas St S Virginia St Collector LAC
Business 395 US 395 N Virginia St Arterial HAC