Renovation Project Presentation
Public Meetings
◦ SWBR Architects’ and Tappé Associates made a formal presentation to both the Board and Public in early February of a conceptual design of a proposed renovation plan for this facility. The design and project is the result of extensive work by the Board’s F&S Committee, staff and the architects. The Library Board unanimously voted to approve a resolution on 3/19 to move forward with a bond vote on May 20, 2014.
3/26/2014
2
The Board strongly believes that there is an evolving and increasing importance of the Library as part of our community’s infrastructure. Our experience shows that evolving technology and changing patron expectations add to the variety and quantity of services we provide. And – we believe we are obligated to provide a facility that supports those needs.
There are people who would prefer that we work toward an alternate site. The Board is committed to stay in the Village and there really are no viable sites available. Some of us are also concerned, based on 2010’s vote, that even if a site was identified outside the village, it seems unlikely that voters will support the expense of a new site & facility. Accordingly, we have concluded that, with renovation, taking advantage of our very inexpensive lease to 2028 makes sense and will appeal to most voters.
3/26/2014
3
1978 – Library Moves to Village Landing
1991 – Library Renovation – carpeting, wall covering, reupholstered furniture, electrical upgrades
1996 – Library Expands – Children’s Room
No renovations have taken place since 1996.
2010 –$16.2 million proposal to purchase part of the Village Landing & relocate was defeated by voters
2012-13 – Library’s Future Needs identified in Long Range Plan developed with community leaders input
2013
◦ Lease renewed with options to 2028
◦ Engineering Study of “Existing Conditions” identifies infrastructure issues, repairs needed, mechanicals replacement
◦ Architectural Firm SWBR hired for Space Planning and Proposal Preparation
◦ Community Meetings: September - October
2014
◦ Proposal Finalized: January – February
◦ Library Board voted to put a proposition on the ballot
◦ Public Vote: Tuesday, May 20th, annual budget vote date
◦ Implementation if approved – Fall 2014
3/26/2014
4
Equal Access to Educational, Informational & Recreational Resources
Professional, Courteous & Friendly Service
Integral & Cooperative Part of the Community Promoting Life Long Learning while maintaining Sound Fiscal Management
Facilities and Services Committee (two board members and staff) met constantly for the past four months.
Analyzed input from past project plans, the long range plan, public meetings, online survey, and daily feedback between staff and patrons.
Reviewed recommendations from the “Existing Conditions” report completed earlier this year.
Worked with the architects to develop a renovation plan (staying within the existing footprint) that will meet today’s needs and provide flexibility for the future.
We believe renovating the existing library will provide the community the best service to our residents and patrons and return on investment for the foreseeable future.
3/26/2014
5
The last renovation of the library was in 1996. Mechanical systems are at or near end of life. Electrical and computer network infrastructure needs
upgrade to accommodate changing technologies and additional portable electronic devices.
Better accessibility is needed. Carpeting is worn out. Furniture is old. Finishes have deteriorated and are showing wear and
tear. Lighting fixtures are outdated and inefficient. Need to
bring in natural lighting. Book security system is aged and difficult to support. Most book stacks are original equipment, now over
35 years old.
Space Shortage ◦ Staff & Public for Tutoring, Programs & Meetings
◦ Community Use
Updates Needed ◦ Carpeting, Furniture, General Appearance
Infrastructure Problems ◦ Mechanicals
◦ Wiring for technology expansion
◦ ADA Accessibility Compliance & Noise Abatement
3/26/2014
6
2013 Circulation: 688,224
Facility Utilized 65 / 68 hours per week
297,040 Visitors in 2013
94,990 Website Visits
28,812 Registered Borrowers
40,354 Reference Questions Answered
137,712 Items in our Collection
937 Public Programs – Attendance 25,252 ◦ Outreach Programs to Community Groups; Schools & Day
Care Centers; Job Search Programs
Book drop(s) • at main entrances • in garage
Renovated Children’s Library • More space • More windows for kids • Flexible storyhour space
Staff Spaces • Improved staff
efficiency • Staff break
upstairs • efficient use of
upstairs space
Community Room • Separate
kitchenette • More efficient
layout of toilets
Adult Services • More (& better) seating places
for Adults • More designated quiet places • Expanded computer resources
in Reference • Study/Computer Lab • Consolidated Collections
(Fiction & Non-Fiction)
Renovated Teen’s Place • More (& varied) seating places • Reconfigurable mobile furniture • Homework Center
Access & Entrance • Improved both entrances • New accessible entrance
focuses on the park & canal • Relocated & improved the
entrance off interior lobby downstairs
• Elevator access upstairs
More Study Rooms • Acoustically separated
study rooms for groups &tutoring
3/26/2014
7
• Comprehensive HVAC upgrade
• Added Exterior Windows • Upgraded Lighting Throughout
• “Tired” Finishes Updated • Demountable partitions Incorporated
• Incorporated Bookstack Mounted lights
• Comprehensive Electrical upgrade
• Improved garage access corridor
• Updated technology infrastructure throughout
upgrade fiber, additional computer workstations, mobile device accommodations, displays
• Enhanced sound-proofing of doors & ceilings
• Closed circuit security system to monitor key areas
• New phone system • Self check out system • RFID book security system
Adult Non-Fiction Shrinks? • Children’s Services grows
• Bookstacks Mobile • Mobile partitions • Desks Modular &
Repositionable • Walls Demountable • Furnishings Repositionable • Anticipatory Power/Data
Infrastructure • Many Improvements
Portable
Adult Fiction Shrinks? • Adult Seating increases
Media transitions to streaming? • Computer capacity increases
What if??
3/26/2014
8
3/26/2014
9
Areas that have planned increase in square footage
Children’s-increased space and flexible space
Teens-added teen study room
Added space for adult comfortable seating near windows
Added study spaces
Better use of upstairs space
Enlarged and improved bathrooms
Architectural /Structural $1,783,560 Infrastructure - MEP systems $ 807,635 Contingency costs design and
material escalation $ 297,987
Subtotal "Hard Costs " $2,889,182 Project Fees, Furnishings,
Equipment, Moving & Allowances
Subtotal "Soft Costs" $1,544,382
Bonding expense $ 80,000
Total estimated cost $4,513,564
Capital reserve offset -$ 200,000
Net Estimated Cost $4,313,564
Bond vote amount $4,314,000
3/26/2014
10
Required Bond Amount: $4,314,000
Interest Rate: 0.04%
Period: 13 years
Annual Payment: $43,020
Calculated Tax Rate: 0.14282 per thousand Annual Tax for $200,000 home: $28.56 Monthly Tax Payment for Average Homeowner: $2.38
If approved, detailed project plans will be developed and bids let. Renovations could start as early as Fall 2014. The length of the renovation time will be dependent on the extent of the renovations. It is anticipated the library will be closed during the majority of the renovation time period. Contingency plans are being developed for temporarily relocating library services.
3/26/2014
11
We will conduct public meetings and outreach in the upcoming months.
We welcome your feedback. Project information will be posted to the library
website. The school district was notified to place a
referendum on the May ballot. A vote will take place at the regular school
district/library vote on Tuesday, May 20th. We will keep the community up-to-date as we
proceed with this planning process through the library website, email and print newsletters, and other media.
The library mechanicals will continue to deteriorate resulting in downtime for repairs.
Library finishes will continue to deteriorate resulting in potentially unsafe and unsightly conditions.
More money will need to be spent on upkeep and maintenance.
Library patrons will continue to express their displeasure with the condition of the library.
Library patrons and residents will be inconvenienced and must go outside our community to obtain a quality library experience.
Construction costs will continue to escalate. Delaying improvements may results in higher costs in the future.
3/26/2014
12
We welcome your questions. We encourage you to complete and return a comment card (as stated earlier).