rate anaylsis!!! (1)

25
Analysis of Rate 9.3 Unit 100 Cft Labour for Laying 2.00 Cft @ Rs. 300.00 Per Cft. Rs For 100 Cft Total For 1Cft Say Total For 1Cu.m Excavation in foundations in all types of soils including gravels, boulders and rock for walls, columns and steps etc including re-filling around structures with excavated earth or common fill material in 6 inch layers, watering and ramming, up to any height/depth. complete in all respects as per drawings including blasting if required at site. excavated earth or common fill material in 6 inch

Upload: saeed-zafar

Post on 08-Nov-2015

231 views

Category:

Documents


3 download

DESCRIPTION

Rate Analysis For all Building items.

TRANSCRIPT

Excavation.H.SoilAnalysis of Rate9.3Excavation in foundations in all types of soils including gravels, boulders and rock for walls, columns and steps etc including re-filling around structures with excavated earth or common fill material in 6 inch layers, watering and ramming, up to any height/depth. complete in all respects as per drawings including blasting if required at site. excavated earth or common fill material in 6 inch layers, watering and ramming complete in all respects as per drawings including blasting if required at site.Unit100CftLabour for Laying2.00Cft@ Rs.300.00Per Cft.600Rs For 100 Cft600Total For 1Cft6Say6Total For 1Cu.m212

T.ProofingAnalysis of RateSpraying anti-termite proofing solution as per direction of manufacturer.Unit100SftTermite100.00Sft@ Rs.3.00Per Sft300Labour100.00Sft@ Rs.1.00Per Sft100400Rate for Ground Floor for 100 Sft400Total for 1 Sft4Say4-Total for Sqm43

P.C.C. 1.6.12Analysis of RateProviding and laying cement concrete (1:4:8) using coarse aggregate of 25.4mm maximum nominal size including compaction, curing etc., in foundations and under floors complete in all respects. Cement as specified on plans will be used.Unit100CftCement6.50Bags@ Rs.360.00Per Bag2340Sand48.00Cft@ Rs.18.00Per Cft.864Crush96.00Cft@ Rs.24.00Per Cft.23045508Add 5% wastage2755783Labour for Pouring100.00Cft@ Rs.15.00Per Cft.15007283Total for 100 Cft7283Total for 1 Cft73Say73Total for 1 Cu.m2578.36

P.C.C. 148Analysis of RateProviding and laying cement concrete (1:4:8) using coarse aggregate of 25.4mm maximum nominal size including compaction, curing etc., in foundations and under floors complete in all respects. Cement as specified on plans will be used.Unit100CftCement9.00Bags@ Rs.390.00Per Bag3510Sand48.00Cft@ Rs.18.00Per Cft.864Crush96.00Cft@ Rs.24.00Per Cft.23046678Add 5% wastage3347012Labour for Pouring100.00Cft@ Rs.15.00Per Cft.15008512Total for 100 Cft8512Total for 1 Cft85Say85Total for 1 Cu.m3002.2

FoundaAnalysis of Rate9.1Providing and laying reinforced cement concrete of compressive strength 3000 psi with cement, sand, crush ratio 1:2:4, using 20mm maximum nominal size crushed stone coarse aggregate and fine aggregate using well graded sand including screening and washing of aggregates, mechanical mixing, lifting and placing to all heights and dimensions as shown on the drawings, vibrating, curing, all formwork moulds, making arrangements for any grooves and pipe work and fittings (pipes and fittings provided for separately) all as shown on the drawings and as per the technical specifications including striking of all formwork complete in all respects but excluding the cost of reinforcement (Provided separately) for all types of concrete for structures. Cement as specified on plans will be used.Unit100CftCement17.60Bags@ Rs.360.00Per Bag6336Sand44.00Cft@ Rs.18.00Per Cft.792Crush88.00Cft@ Rs.24.00Per Cft.2112Shuttering40.00Sft@ Rs.40.00Per Sft.160010840Add 5% wastage54211382Labour for Pouring100.00Cft@ Rs.20.00Per Cft.2000Rate for Ground Floor for 100 Cft13382Total for 1 Cft134Say134-Total for 1 Cu.m4732.88

Slab etcAnalysis of Rate9.1Providing and laying reinforced cement concrete of compressive strength 3000 psi with cement, sand, crush ratio 1:2:4, using 20mm maximum nominal size crushed stone coarse aggregate and fine aggregate using well graded sand including screening and washingUnit100CftCement17.60Bags@ Rs.390.00Per Bag6864Sand44.00Cft@ Rs.18.00Per Cft.792Crush88.00Cft@ Rs.24.00Per Cft.2112Shuttering200.00Sft@ Rs.45.00Per Sft.900018768Add 5% wastage93819706Labour for Pouring100.00Cft@ Rs.20.00Per Cft.2000Rate for Ground Floor for 100 Cft21706Total for 1 Cft217Say217-Total for 1 Cu.m7664.44

ColumnsAnalysis of Rate9.1Providing and laying reinforced cement concrete of compressive strength 3000 psi with cement, sand, crush ratio 1:2:4, using 20mm maximum nominal size crushed stone coarse aggregate and fine aggregate using well graded sand including screening and washingUnit100CftCement17.60Bags@ Rs.360.00Per Bag6336Sand44.00Cft@ Rs.18.00Per Cft.792Crush88.00Cft@ Rs.24.00Per Cft.2112Shuttering400.00Sft@ Rs.40.00Per Sft.1600025240Add 5% wastage126226502Labour for Pouring100.00Cft@ Rs.20.00Per Cft.2000Rate for Ground Floor for 100 Cft28502Total for 1 Cft285Say285-Total for 1 Cu.m10066.2

PVC TileAnalysis of RateProviding and fixing in position sheet vinyl flooring including application of adhesive material on the concrete floor for the fixing of vinyl sheet 2mm thick as per manufacturer instructions and as directed by the engineer complete as per drawing.Unit100SftPVC Tiles=100.00@ Rs.46.00P.Sft4600Laying Material100.00@ Rs.10.00P.Sft10005600Add 5% wastage2805880Labour100.00@ Rs.20.00P.Sft2000Rate for Ground Floor for 100 Sft7880Total for 1 Sft79Say79Rate For 1 Sqm850.00

Water ProofingAnalysis of Rate9.1Water ProofingUnit100SftBitumen100.00Sft@ Rs.20.00Per Sft.2000Polythene Sheet100.00Sft@ Rs.4.00Per Sft.400Jambolone Sheet100.00Sft@ Rs.45.00Per Sft.4500Cement3.00Bags@ Rs.360.00Per Bag1080Sand8.00Cft@ Rs.18.00Per Cft.144Crush16.00Cft@ Rs.24.00Per Cft.3848508Add 5% wastage425Labour for Pouring100.00Cft@ Rs.40.00Per Cft.4000Rate for Ground Floor for 100 Sft12933Total for 1 Sft129Say129-Rate For 1 Sqm1,388.00

Brick Masonry Analysis of Rate13.1Providing and laying Reinforced Precast Hollow Block (400mm x 200mm x 200mm) masonry in 1:5 cement sand mortar, in foundations and superstructures in all shapes including Grouting P.C.C(1:2:4), curing etc. Complete in all respects including provision of G.I wire mesh, Reinforced bar as per drawings and as directed by the "Employer". Cement as specified on plans will be used.3" thick Brick masonry in 1:4 mortarBrick 9"x4.5"x3" required for 100 Cft = 100 Cft =1350Bricks1,[email protected] each10125Cement for [email protected]@Rs18.00P.Cft1810233Add 5% wastage512Labour100.00Cft@ Rs.15.00Per Cft.1500Rate for 100 Cft12245Rate for for 1 Cft122.45Say122Rate for for 1 Cum4,309

H.DPC Analysis of Rate9.1Providing and laying 50mm thick damp-proof course of cement concrete (1:2:4) using graded crush stone including formwork, curing etc., with two coats of bituflex (or equivalent approved) after the concrete has dried, as per specifications and as approved by the Employer.Unit100SftCement3.00Bags@ Rs.360.00Per Bag1080Sand8.00Cft@ Rs.18.00Per Cft.144Crush16.00Cft@ Rs.24.00Per Cft.384Bituflex100.00Sft@ Rs.20.00Per Sft.20003608Add 5% wastage180Labour100.00Sft@ Rs.15.00Per Sft.1500Rate for Ground Floor for 100 Sft5288Total for 1 Sft53Say53-Total for 1 Sqm570

Chips FloorAnalysis of Rate9.1Providing and laying 50mm thick damp-proof course of cement concrete (1:2:4) using graded crush stone including formwork, curing etc., with two coats of bituflex (or equivalent approved) after the concrete has dried, as per specifications and as approvedUnit100SftCement3.00Bags@ Rs.360.00Per Bag1080Chips7.00Cft@ Rs.40.00Per Cft.2801360Add 5% wastage68Labour100.00Sft@ Rs.15.00Per Sft.1500Grinding & Polishing100.00Sft@ Rs.15.00Per Sft.1500Rate for Ground Floor for 100 Sft4428Total for 1 Sft44Say44-Total for 1 Sqm473

Chips SkirtingAnalysis of Rate9.1Providing and laying 50mm thick damp-proof course of cement concrete (1:2:4) using graded crush stone including formwork, curing etc., with two coats of bituflex (or equivalent approved) after the concrete has dried, as per specifications and as approvedUnit100SftCement4.00Bags@ Rs.360.00Per Bag1440Chips11.00Cft@ Rs.18.00Per Cft.1981638Add 5% wastage82Labour100.00Sft@ Rs.15.00Per Sft.1500Grinding & Polishing100.00Sft@ Rs.15.00Per Sft.1500Rate for Ground Floor for 100 Sft4720Total for 1 Sft47Say47Total for 1 Sqm506

Cement PlasterAnalysis of Rate14.1Internal and External Cement Sand 1:4 plaster on walls, ceiling, columns and beams as per drawings and specifications. Cement as specified on plans will be used.Unit100SftCement1.50Bags.@ Rs360.00P.Bags540Sand6.50Cft@ Rs18.00Each117657Add 5% wastage33690Labour100.00Sft@ Rs.15.00Per Sft.15002190Rate For 100 Sft2190Rate For 1 Sft22Say22Rate For 1 Sqm236.72Internal Plaster 1: 6Unit100SftCement1.50Bags.@ Rs360.00P.Bags540Sand7.00Cft@ Rs18.00Each126666Add 5% wastage33699Labour100.00Sft@ Rs.12.00Per Sft.12001899Rate For 100 Sft1899Rate For 1 Sft19Say19Rate For 1 Sqm204.00

Steel (40 Psi)Analysis of Rate10Provision & fabrication of mild steel reinforcement for RCC structures including cutting, bending laying in position, welding and fastening, including cost of binding wire and labor charges for binding of steel reinforcement (also include removal of rustUnit1000KgMarket rate of steel65000Binding wire10Kgs@ Rs110P.Kg110066100Add 5% wastage330569405Labour for cutting binding etc PT3500Carriage PT1000Rate for 1000 Kg73905Rate P.Kg74Say74

Steel (60 Psi)Analysis of Rate10Provision & fabrication of mild steel reinforcement for RCC structures including cutting, bending laying in position, welding and fastening, including cost of binding wire and labor charges for binding of steel reinforcement (also include removal of rust from bars) contractor shall include transportation from point of purchase nearby project location to site)Unit1000KgMarket rate of steel72000Binding wire10Kgs@ Rs110P.Kg110073100Add 5% wastage365576755Labour for cutting, bending etc PT3500Carriage PT1000Rate for 1000 Kg81255Rate P.Kg81Say81