rate analysis
DESCRIPTION
Rate Analysis MCGMTRANSCRIPT
-
Rate Analysis of 100 mm Paver Block
Item Description & Item No. as per SOR 2013
RW-3-19 Providing & fixing in the carriageway 100mm thick interlocking concrete unisliape payers I monolithic- single layer precast concrete blocks) of gray cement coloured having average crushino stientith SON/sq.m.m. as per technical specification, placed on average compacted thickness of 25 rnnl. uniformly graded river sand cushioning with proper compacting with mechanical compactor with the proper level, grade and camber etc, complete as specified and as directed by the Engineer.
Rate Analysis for Wy 1 Sqm
Qty=lSqm
sui/iaver block including Transporting loading unloading. to the site.
Rate Quantity Cost
Material Including uansporatlon: (A)
I) Conrete paver blocks 600.00 1.00 ii) Material for fixing bedding sand (screened J (for 25mm thk ijointing) 10.00 1.00
Total (A) (A) Rate fsq.m:
(B) Labour
Labour charges for handling. laying of paver block including sand spreading ,levelling & compacting cuttting the edges etc. as directed compaction by rllInhI.Hi Vdu.ilcuuy .ulIu?.4(II,r
50.00 ltC
600.00
10.00
610.00 640.00
50.00
(13) Rate /Sq.mz
% supervision charges + 2 % &undries
IS % contiactors Profit + overheads
works contract tax
Total ( A +8)
Total
Total
Total
Final Rate per Sq
50.0 690.00
20.70 710.70
106.51 817.31 32.69
850.00
850.00
For MIS. NEW INDIA ItO YS
RER frOR J. KUM.RFR
-
Rate Analysis of Tack Coat
Item Description & Item No. as RW-5-23 = Providing and applying TACK COAT with CATIONIC BITUMEN per SOR 2013 EMULSION
IRS) @ 0.2 to0.25 Kg. of Sq.mt. over prepared surface to receive bituminous mix by applying TACK COAT with mechanical spray bitumen, including cleaning of road surface etc. completed, as directed For NORMAL BITUMINOUS SURFACES & the tack coat shall be left to cureunt all the volatile shavee vaporated before any subsequent construction Is started, which Is Indicated by change in colour from brown to black (As per New Road Specifications ClauseNo.314,curing as per 314.3.4
P.ato Analytir for Qty 1 Sqm
Qty = 1 Sqm
Rate Quantity
Tack coat with catonic Bitumen Emulsion 47.00
Labour for loading , unloading &
2.00 , spreading of Prime coat
1 % supervision charges + 2 % sundries
15 % contractors Profit overheads
4 %works contract tax
Cost
0.23 10.58
1.00 2 CJ
TOTAL
12.58
Total
Total
Total
0.38 12.95
1.94 14.90 0.60 15.49
FORJ.KUMARINFRF O ECT
For W. N 1A RQ "I"AYS IW IN8 LYER
-
I
Rate Analysis of Prime Coat
Item Description & item No. as per SOR 2013
RW520 Providing and applying PRIME COAT with CATIONIC BITUMEN EMULSION (SS) @ 7 to 121(g. of 10 Sqnit. over prepared surface to receive bituminous mix by applying PRIMER with mechanical spray bitumen, including cleaning of road surface etc. completed, as dIrected For tow Porosity surface & the primed surface shall be allowed to cure for atleast 21 hours or any other higher period, asis found Lobe necessary to allow all the moisture or volatiles to evaporate before any subsequent bituminous surface treatment or mix is laid (As per New Road Specifications Clause No. 323, curing as per 313.5)
Rate Analysis for Qty 1 Sqrn
Qty: 1 Sqm
Rate Quantity Cost
Prime coat with catonic Bitumen Emulsion - - 47.00 0.95
41.65
Labour for loading, unloading & 2.00 1.00
2 00 spreading of Prime coat
1 % supervision charges + 2 % sundries
15 % contractors Profit 4 overheads
% works contract tax
TOTAL
Total
Total
Total
Final Rate per Sq.m
46.65
1.40 48.05
7.21 55.26 2.21
57.47
57.47
For MIS. NEW INDIA RO1AYS
FOR ^ROJECTF,
-
Rate Analysis of Sand Metal
Item Description & Item No. as per SOR 2013
RW-10-28 : Supply & filling sand, metal GRAVELLY SAND Corresponded to CLASS Ill CLASS Ill GRADING of TABLE 100.1f new road specifications-2006 in trenche sup to required depth & watering, rummlng etc.complete as directed
te Analysis for Qty 1 Cum
= 1 curn -- Loose Volume = 1 Cum 1.4= 1.4 Cum
Rate Quantity Cost
I + II +111
650.00
0.70
455.00 1050.00
0,70
735.00
Labour for placing Sand Metal
LMEO
1.00
E:sX,I.]
1 % supervision charges + 2% sundries -
15 % contractors Profit + overheads
4% works contract tax
Rate per Cu.M
Total
Total
Total
Total
1270.00
38.10 1308.10
196.22 1504.32 60.17
1564.49 1564.49
FORJ.KUMARINFrR
i\Z22LS WR IWAICIFor MIS. HEW R
-
Rate Analysis of Sub base items
Description & Item RW-2-20 Providing & laying, spicading &
RW-2-21 Providing & laying, spreading 8 as per SOR 2013 r.ompnrJing grndnd criichnd dana acrc.rgnlr in compacting specified crushed stone in
wet mix macadam satisfaction including yiuiiuiui uuUbuuu vuuluu Iiiuuuiiiiy pIuIIuI*lIIy the material in mechanical mixer (pug mill or premixing the material with water to OMC In approved typo), spreading of mixed material
mechanical mix (pug mill) carriage of mix material in uniform layer of 100mm to 75mm by tipper to site laying in uniform layer of 75mm (compacted thickness each) with motor grader tolOOmm(compacted thickness each)with sensor or paver on prepared muruni surface & paver finisher on prepared subbase &
compacting with 10 tonne vibratory roller to compacting with vibratory rollerilo twine) to achieve desired density including all material, achieve desired density including lighing, guarding: labour, macfinery, lighing barncating to all lifts barricating & maintenance of diversion etc. as
& lead maintenance of diversion etc. complete directed by the Engineer, (Rebate for not using (metal gradation from 75mm to 75mm micron sensor paver should be taken4metal gradation U per MCGM Road Specifications clause from 53mm to 75mm micron as per MCGM Road no.210). Specifications clause no.240).
Analysis for Qty 1 Cum
1 Cum Loose volume = 1 Cum 1.4= 1.4 Cum
Rate Quantity Cost Quantity Cost
I
1.00 Total
Total
Total
Total
0.84 0.56 0.01
1.00
1.00
1.00
1.00
Metal I + II +111 1000.00 Stone Grit 1200.00 water 0.01
Lbijuui Plant Charges
10.00 (In Plant) Labour 6.00 Spreading Sensor Paver
20.00 Rolling by vibratory roller
8.03
Transportation to site or Mixed on site any where in mcgm limits
185.00
I % supervision charges +' 7% sundries
15 % contractors Profit + overheads
4 % works contract tax
840.00 672.00 0.00
10.00
5.00
20.00
8.00
185.00 1741.00
52.23 1793.23
268.98 2062.21
82.49 2144.70
1120.00 336.00
10.00
6.00
20.00
8.00
185.00 1685.00
SOS 5 1735.55
260.33 1995.88
79.84 2075.72 2075.72
1.12 0.78
1.00
1.00
1.00
1.00
1.00 Total
Total
Total
Total
Fop New India Rca ys
artner FOR J.KUMAR INFRAP JECTRIM
DI
-
Rate Analysis of Bituminous items
Description & Item RW-5-44 P/L hot Premix Dense as per SOR 2013 RW 540: I'lL hot premix Bituminous bituminous macadam with 4.50% bitumen
concroin with A flfl% of bitumen grade content of grade 30-40 to the requn ud 30140,surface cost by mix design as per line.level.and camber roiling with 10/12 MORTII to the conmpactod U3lcKusooa MT.powor vibratory roller & sensor pavnr of 40mm ,using now material to the
etc. complete as specified and as directed required line,level and camber rolling with to thickness of 50mm. with antistruping power vibratory roller & sensor paver,
agent at 1 .00%by weight of bitumen using eLc.complete as specified and as directed grading II of "MORTH"(As per new Road with lime filter 5.00%by weight and Specification clause no.354) antistnping agent 1% of bitumen by weight etc.compiete.As per new Road Specification clause no.364)
Rate for per MT.
I) Material Fine Aggregate Coarsp Aggregate
3) Plant charges 4 Antistriping Agent:
5) Lime Filler: 6) LD.0. /J Electricity: J Labours & loader:
10) Paver& Roller:
11) Transport; TOTAL 1 % Supervision charges & 2% for Sundries)
Rate Quantity
Cost Quantity Cost
159.01
132.24 35000.00
iq On
120.00 2.00
60.00 5.00
15.00 25.00
50.00 225.00
0.41
0.45 0.06 1.00
0.31 18.70 5.33 1.00
1.00 1.00
1.00 1.00
74.51
$9.03 2100.00
15.00
37.50 37.40
319.98 5.00
15.00 2S.O0
50.00 225.00
2963.42
0.36
0.57 0.05 1.00
0.23 19.00 5.33 too 1.00
1.00 1.00 1.00
57.69
75.11 1575.00
-I S.Oi)
27.00 38.00
319 9R S 00
15.00 0.00
$0.00 225.00
2402.84
88.90
72.09 3US243 2474.93
25 %Contractor's profit + overheads
t% W/C Tax OTAL AY RS. or Per Cum AY RS. or SO mm thick = A? R$. or 40mm thick MRS.
457.85 3510.18 140.41
3650.58 3651.00 8762.40 8763.00
-
- 350.52 351.00
371.24 2846.17 113.85
2960.01 2961.00 7106.40 7107.00 35S.35 356.00
For MIs. New India
Partner
FOR JUMARNRfl),I
-
Rate Analysis of 60 mm Paver Block
item Description & item No. as RW'317 Providing& fixing In the footpath, 60 'inn thick
per SOR 2013 Lacquer coated I Reflective) interlocking gray cement concrete povcri In icd ( Tc.r,gi Cult1,) Iulot K. iliuiy,i. Leinuit luiluw at any colour with vermellcuiar or any anhisicid texture on top surface of approved pattern/ shape and colour having erverage. crusting strength 40 Nfmm manufactured in double layer precast concrete blocks. The top layer or paver block should be 12 to 15 mm thick and consist cubical shape stone aggregate 8 aim size sieve 100% passing and retain on 4.75 atm size sieve, silica sand and with pure iron oxide ultra voilete stabilized pigment @5% by weight of cement and should be coated with lacquer having hard, high abrasive resistance and water repellent. The bottom layer should be 45 to 48 min thick haying 22 mm size sieve 100% passing aggregate as pet technical specification placed on unifornily graded river sand cushioning of average compacted thickness 25 mm properly
Rate Analysis for Qty 1 Slim
Qty:lSqm
supply of paver block Including Transporting loading unloading to the Site.
Rate Quantity Cost
Material including transportation
Conrete paver blocks 400.00 1.00 400.00 i} Material for fixing bedding sand (screened ) C for 25mm thk & jointing) 40.00 1.00 40.00
Total (A) 440.00 JAI Rate /Sg.m= 440.00
(B) Labour
Labour charges for handling, iaying of paver block including sand spreading ,levelling & compacting , cuttting the edges etc. as directed compaction by Mechanical Vibratory Compactor
55.00
(8) Rate / Sq.m = $5.00
Total (A.B) 495.00 1 % supervision charges. 2 % sundries 14.85
Total
509.85 15 % contractors Profit + overheads 76.48
Total
586.33 4% works contract tax 23.45
Total
609.78
FOR J. KUMAR
-
If
For MIS. New India Roa its
-
Rate Analysis of 80 mm Paver Block
Item Description & item No. as RW-3-11 Providing & fixing SQ man thick Interlocking per 5CR 2013 unlsliape concrete payers (monolithic' single layer precast
lOIS irIi hull bJ f U1 .1y 'vsiiijljt culu.'uivtl III (liti cnhiauu\/dy p having average crushing strength SON/sq.m.in. as per
technical specification, placed on average compacted thickness of 25 mm. uniformly , graded river sand cushioning with proper compacting with mechanical compactor with the proper level, grade and camber etc. complete as specified and as directed by the Engineer.
Rate Analysis for Qty I Sqm
Qty: I Sqm
Supply of
paver block including Transporting loading unloading to the site.
Rate Quantity
Material including transportation i) Conrete paver blocks $00.00 ii) lklatori;l for finino bodding sand (screened ) (for 25mm
,thk & jointing) 40.00
Total (A) (A) Rate/ Sq.m=
Labour
Labour charges for handling, laying of paver block including sand spreading ,levelling & compacting cuttting the edges etc. as directed compaction by Mechanical Vibratory Compactor
Cost
LOU
C
(8) Rate / Sq.m =
1 % supervision charges + 2 % sundries
15 % contractors Profit + overheads
4 % works contract tax
Total fAts)
Total
Total
Total
Final Rate per Sq.rn -
17. 601.
27.95 726.81
For MJ New India Ba waF
t4aer DIR^rFl
-
Rate Analysis of Barricardes
m Description & Item No. RW-7-50 : P/f Polyethylene plastic water/sand fillE per SOR 2013 Metro Barricades having approx. size 1840mm.
440mm. X 1900mm., (LxWxD). 32-35 Kgs empty wt. tank capacity 100-120 lits.. manufactured by MIs. E Industries or equivalent ISO Codified Company ha% minimum experience of 3 years in manufacturing supplying to the Govt./Semi Govt./Other rep organisations alongwith necessary fixing arrangement specified and directed by the Engineer Incharge
Barricades of 2m including delivery & unloading on site 1 barricades used for 10 times rotation
Labour charges for Lifting & placing in position
% supervision charges 2
15 % contractors Profit + overheads
2% works contract tax
538.44
Cost
6500.00
6so.no
12.00
662.00
19.86 681.86
102.28 784.14 3137
815.50
Ml
Rate Quantity
6500.00
12.00
1.00
i_Do
Total
Total
Total
Total
For MIS, NEW iNDIA 8QADWjYS rUAD
. ?PITNER
-
Rate Analysis of Barricardes
toni Description & Item No. RW-7-51: P/F Polyethylene plastic water/sand fillable as per SOR 2013 Barricades having approx. size 2000mm. X 560mm. (
1000mm,, (LxWxO). 2fl-73 Ks viriply WI and Rink raparily Rfl 100 tits., manufactured by MIs. B.D. Industries or equivalent ISO Certified Company having minimum experience of 3 yeas in manufacturing and supplying to the Govt./Semi Govt./other reputed organisations alongwith necessary fixing and interlocking arrarw.ement s specifiid and dirpr.ttffl tnt the Engineer Incharge.
490
411.6
Rate Quantity Cost
es of 2m including $000.00 go $000.00
& unloading on site
1 Barricades used for 15 times rotation
Labour charges for Lifting & placing in position
1 % supervision charges + 2 % sundries
15 96 contractors Profit +
4% works contract tax
Rate per RM
8.00 tOO
Total
Total
Total
Total
333.33
800
341.33
10.24 351.57
52.74 404.31 16.17
420.48 210.24
FOR J. KUMAR INFRAPr ECTS IC (3 For MIS. NEW INDIA ROADWAYS
S r4/ - PMIIER
-
Rate Analysis of Earth Work Items
m Description & Item No. CS-EW1$ Excavation over areas For basements, roads,
per SOR 2013 land/plot developement in all types of soils, vegetable earth. soft muruni, running sand, shingle, turf clay, loam, peat, ash, shale, slag, chalk, garbage, muddy/ marshy/ slushy soil, marine clay, reclaimed land etc. for all depths/lifts including manual dewatering, Filling the selected excavated earth at the locations as directed, in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% Modified Proctor density conforming to relevant IS, stacking the selected material in measurable heaps For future use within owners space or dispQ$in5 within an initial lead of ISOm as directed, loading, unloading, leveling excluding shoring, strutting etc. complete as directed by Engineer-In-Charge. Note: 1) The rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc. 2) It also includes the royalty and other taxes it any.
Rate Qudiltity
Excavation By JCB including 25.00 1.00 all fuels & consumable
Removal By Labour & Transpc 100.00
1.00
Total 1 % supervision charges + 2 % sundries
Total 15 % contractors Profit +
Total 4% works contract tax
Total Cu.M
Cyst
25.00
100.00
125.00
175 128.75
19.31 145.06 592
153.99
For MIS. NEW INDIA ROAD
t PARTNER
-
Rate Analysis of Earth Work Items
tern Description & Item No. CSEW-16 Excavation over areas for basements, roads, land/plot
is per SOR 2013 developement In soft/ disintegrated rock, sand stone, stiff clay, gravel, cobblestone, hard laterite, water bound macadam, wet mix macadam, pitching, soling, paths and hardcore, lime concrete, plain cement concrete, stone masonry and all types of brick/ block masonry below ground level, rock boulders, etc. For all depths/lifts Including manual dewatering, filling the selected excavated earth at the locations as directed, in layers not more titan 200mon tlikk.iess, watei me, I.0II5ulklItirIg, Cullip'lClille Ic, .it.liit'v,, uiot less then 97% Modified Proctor density conforming to relevant IS, stacking the selected material in measurable heaps for future use within owners space or disposing within an initial lead of isOm as directed, loading, unloading, leveling oxciuding shoring, strutting oft. complete ac dirottod by Engineer-in-Charge. Note 1) The rate Includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc. 2) It also includes the royalty and other taxes if any.
Rate Quantity -
xcavation By iCe including' 60.00 1.00
II fuels & consumable
emoval By Labour & Transp 130.00 1.00
Total % supervision charges + 2 sundries
1: Total % contractors Profit 4
Total % works contract tax
Total CUM
Cost
9.00
130.00
190.00
5.70 195.70
29.36 225.06
9.00 234.06 234.06
T NDR ROADS;.
FORJ.KUIRINF RO TSL
-
Rate Analysis of Earth Work Items
rn Description & Item No. CS-EW-3 Excavation for foundation, substructures, basements, tanks,
per SOR 2013 sumps, walls, chambers, manholes, trenches, poles, pits & general building works in soft/disintegrated rock, sand stone, still clay, gravel, cobblestone, hard laterite, water bound macadam, wet mix macadam, asphalt mix carpet of any type, pitching, soling, paths and hardcore, lime concrete, plain cement concrete, stone masonry and all types of brick/ block masonry below ground level, rock boulders, etc. for depths/ lifts upto 1.5M measured from the ground lp.vpl, inr.11icIing dressing/ trimming thp cidps, levpling ni bottoms, manual dewatering, removing rank vegetation, back(llling in layers not more than 200mm thickness, watering, consolidating, compacting to achieve not less then 97% Modified Proctor density conforming to relevant IS, stacking in measurable heaps for future use within owners space or disposing within an initial lead of iSOm as directed, loading, unloading, leveling excluding shoring, strutting etc. complete as directed by Engineer- In-Charge. Note: 1) The rate includes the handling/supporting the existing utilities such as cables, drains, pipes, water mains etc. 21 It also includes the royalty and other taxes if any.
Cost
Ill)
130
220.00
6.60 226.60
33.99 260.59 10.42
271.01 271.01
Rate Quantity
FJH;lY.II liii My 1(14 ItlIiIIrllISC 'SIJ.tn,
n all fuels & consumable Removal By Labour &
130.00 1.30
Total 1 % supervision charges + 2 % sundries
Total 15 % contractors Profit +
Total 4% works contract tax
Total Cu.M
For MIS. NEW INDIA ROADWS FGRJ.KUMARIN OJ TS 7UD, 7 PARTNER
-
Rate Analysis of M-10 Concrete Item
Description & Item No. as per 2013
RW-10-27: P/L R.M.C. M-10 C.C. having avg. compressive strength 13.5 Mpa grade in foundatIon/encasement/pavement with or without chequered design including formwork, mixing in batching plant, placing vibrating with plate or needle curing etc. complete as directed by the Engineer. C/s. has to make his own arrangement for water for curing with Hessian cloth etc. & will not be paid separately.(MINIMUM CEMNT CONTENT 220 Kg/m 3.)
Rate Analysis for Qty 1 cum Rate Quantity
Qty= I cum
RMC from approved plant 3800 1
Labour charges for unloading, placing in position 70.00 1.00
Total 1 % supervision charges +2 % sundries
Total 15 % contractors Profit + overheads
Total 4 % works contract tax
Total Rate per Cu.M
Cost
3800
70
3870.00
116.10 3986.10
597.92 45.94.02 183.36
'1767.38 4767.38
FORJUM C 'J5 "Ll"
For MIS. NEW INDIA ROADWAYS
PIINER
-
Rate Analysis of M-20 Concrete
Description & item No. as per 2013
RW-10-29 P/L R.M.C.M-20 C.C.having avg. compressive strength 24 Mpa procured from M.c.G.M. approved R.M.C. plant including use of approved makes plasticizer/retarder & transported by transit mixer & placing at worksite, compacting, finishing curing etc. by contractor's water & tarring the sides of from work with hot bitumen as specified & directed by the Engineer.(M1NiMUM CEMNT CONTENT 260 Kg/ml.)
Rate Analysis for Qty 1 cum Rate Quantity
Qty = 1 turn
RMC from approved plant 5100
1
Labour charges for unloading, placing in position 70.00
1.00
Total 1 % supervision charges. + 2 % sundries
Total 15 36 contractors Profit + overheads
Total 4 % works contract tax
Total Rate per Cu.M
Cost
5100
70
5170.00
icc in 5325.10
798.77 6123.87 244.95
6368.82 6368.82
FOR J. KUMAR INFP^Rclj S ^Pq^ ('^' For L415. NEW 1140k RCPc
-
Rate Analysis of M-15 Concrete Item
Description & Item No. as per 2013
RW-10-26: P/I ready mix cement concrete M-1$cc having avg compressive strength 18.5 Mpa for foundation/encasement/ pavement/cradle including forni of mixing in batching plant,compacting by internal & surface vibrator,curing,finishing etc. complete as specified & as directed by the Engineer. Contractor has to make his own arrangement for water for curing etc.& will not be paid separately for it.(MINIMUM CEMNT CONTENT 240 Kg/m 3 .)
Analysis for Qty 1 cum Hate Quantity Cost
= I turn
from ipproved plant
bour charges for unloading, placing Position
I % supervision charges + 2 % ;undries
L5 % contractors Profit + overheads
% works contract tax
ate per Cu.M
4800 I
4800
70.00 1.00
Total
Total
Total
Total
70
4870.00
146.10 5016.10
752.42 5768.52 230.74
5999.26 5999.26
FORJ-KUMART F'br Uisi NEW INDIA ROADWAYS
*kTNER
-
Rate
Item Description & Item No. as per 5CR 2013
sis of UTWT Concrete
RW-10-15 Providing & laying M-60 C.C. and Avg. Flextural Strength of 5.0 MN in 3 days procured from M.C.G.M. approved R.M.C. plant including use of Microsilica approved make superpiastisizer and transported by transit mixer and placing of work site. Compacting finishing, initial curing by approved curing compound contrauctors water and tarring the sides of slab with hot bitumen as specified and directed (w/c ratio 0.35 maximum) (vata for cursing will be paid separately.)
Rate Analysis for City 1 cum
Qty = 1 cum
AMC from appu'ivMI plant
Labour charges for unloading. placing In position, Compacting & cutting 15000
ruring rhrr.5.', I 151tJ
Cost
bOO
bOO
1.00
Total
Rate Quantity
1,8(10 6800.00
15G. DO
6965.00
I % supervision charges + 2 % sundries
15 % contractors Profit i. overheads
I % works contract tax
Rate per Cu.M
Total
Total
Total
208.95 7173.95
1075.09 8250.04 330.00
8580.04
8580.04
For MJs. New India Rca ay
FORJ KUMA Fr
-
Rate Analysis of Bituminous Items
Item Description & item P/L hot mixed Bituminous mecadam with No. as per tIU11 2013 3.30% (with tolereance ot + 0.3) of +60/70 pen.
Bitumen by weight of mix to the required grade, level & camber, rolling with 10112 tonnes power roller, vibratory roller & sensor paver etc. complete as specified & as directed using grading II of MORTH & adding antistrippirig agentat the rate of 1.00 % of bitumen by weight to a thickness of 65mm. (using new materials). (As per New Rnnrl Spc'cificcitions claua, Nci.flhal)
for per M.T. Rate Quantity Cost
1) Material: Pine Aggregate 159.01 Coarse Aggregate 131.24 2) Bitumen: 33400.00 3) Plant charges: 15.00 4) Antistriping Agent: 120.00 5) Lime Filler 6) L.D.O. 60.00 7) Electricity ,5.00 8) Labours & loader: 15.00 9)Laying Lbours 25.00 10) Paver & Roller: 50.00 11) Transport: 225.00
1 % Supervision charges &2% for Sundries )
TOTAL 15% Contractor's profit + overheads
W/CTax
SAY RS. For Per Cum = SAY RS. for 65 mm thick = SAY RS. for 75 mm thick SAY RS.
0.47
74.51 0.45 59.03
0.033 1102,20 1.00
15.00 0.33
39.60 0.00
5.33
319.98 1.00
5.00 1.00 35.00 1.00 25.00 1.09
50.00 1.00
225.00 1930.32
57.91 1988.23
298.24 2286.47
91.46 2377.93 2378.00 4993.80 4994.00 324.61
325/Sq.m 374.55
CTO For, ,ltdjs. j1 .W Jfl(L:J I
%trier
-
Rate Analysis of Mastic Asphalt
Item Description & Item No. as er SOft 2013
RW-5-63 P/I, mastic asphalt 40mm thick with 10/2C grade bitumen including producing the same ai computerized batch mix plant. Transporting the same Ic Site tileans of mastic cookers, laying the some with mastic paver including all necessary tools, labours & barricading, spreading of aggregates as anliskid measures by means over newly laid mastic asphalt as per clause no.365 of 'Road Specification' as directed b Engineer in charge (Note; The materia specifications/gradiation & content shall be as specified in the relevant I.S. Codes)
Rate Analysis for Qty 1 cum Rate Quantity Cost
Qty = 1 Ton
1 Ton Mastic Asphalt as per specification from plant including Mastic Cooker Transportation, 13165 Laying, Spreding & Rolling.
1.00 13165.00
Total
Rate per Cu.M Say KS. For 40mm thick Say Rs.
13165.00
32912.50 32913
1316.52 1317.00
For MIS. New India Road; ys
FOR J. KUMAR INE tier
CT
-
Rate Analysis of M-40 Concrete
Item Description & Item No. as per RW-1033: Providing & laying M-40 C.C. avg. conipressive
SOR 2013 strength 45 MI'a and avg.Ilexturat strength of 5.0 Mpa (As per 111 15.2002.N.1.6) procured I torn M.C.G.M. approved R.M.C. plant including use of approved make plasticizer I retarder & Contractors water with ice laikes and transported by transit mixer and placing at work site. Compacting finishing initial curing by approved curing conipund and Contractors water and tarring the sides of slab with hot bitumen as specified and directed (w/c ratio 0.4 maximum) (vata for curing will be paid separately.) (MINIMUM CEMENT CONTENT 350 kg/in3)
Rate Analysis for wy I cum
Rate quantity Cost
Qty: 1 cum
RMC from approved plant
5300.00 1.00 5300.00
Labour charges for unloading, placing in position, Compacting & cutting 90.00 1.00
Curing charges 10.00
1.00
Total
1 % supervision charges + 2 % sundries
Total 15 % contractors Profit + overheads
Total 4 94 works contract tax
Total
Rate per Cu.M
90.00
10.00
5400.00
162.00 5562.00
834.30 6396.30 255.85
6652.15
6652.15
For Mis. New India Roadw '
FORIKUMARINF
4w' er