R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012

Upload: idalee

Post on 22-Feb-2016

43 views

Category:

Documents


1 download

DESCRIPTION

R2E relocation & shielding LS1 preparation. Anne Laure Perrot EN/MEF- LE. Discussion with OP colleagues, 5 th July 2012. Contents. R2E shielding & relocation: status of activities LS1 provisional schedule Implementation & worksite organisation Manpower request. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: R2E  relocation & shielding LS1 preparation

R2E relocation & shielding

LS1 preparation

Anne Laure Perrot EN/MEF- LE

Discussion with OP colleagues, 5th July 2012

Page 2: R2E  relocation & shielding LS1 preparation

2

Contents

1. R2E shielding & relocation: status of activities

2. LS1 provisional schedule

3. Implementation & worksite organisation

4. Manpower request

Page 3: R2E  relocation & shielding LS1 preparation

3

Areas of the LS1 mitigation activitiesMain critical areas today considered

UJ76

UJ14/16RR13/17

UJ56RR53/57

US85

Page 4: R2E  relocation & shielding LS1 preparation

4

RelocationPoint 1

Point 5

Point 8

Point 7

ShieldingPoints 1, 5, 7 & 8

FinishedUnder approval

Integration studies

All integration & planning sequences are finished

R2E activities in

Point 1

Point 5

Point 7

Point 8

Planning – LS1

Status of the mitigation activities

Page 5: R2E  relocation & shielding LS1 preparation

5

Equipment / activity BE/APB survey eqpt.

BE/BI BTV, BLM

BE/CO timing & remote-resetWorldFip

DGS/RP RAMSES

EN/CV cooling/ventilation eqpt

EN/EL electrical eqpt& cabling activity

EN/HE eqpt. transportshielding inst.

EN/STI collimator control eqpt

GS/ASE fire/ODHaccess

GS/SE-CEP duct activities

IT/CS ethernet

TE/CRG cryogenics eqpt

TE/EPC power converters

TE/MPE QPS*PIC*current leads heatersBISWIC

TE/VSC vacuum eqpt

Groups involved during LS1

15 groups involved in the R2E mitigation activities

Page 6: R2E  relocation & shielding LS1 preparation

6

R2E LS1 Provisional Schedule

Work by M. Barberan (EN/MEF)

Page 7: R2E  relocation & shielding LS1 preparation

R2E review November 2011 7

UL16US15

UL14

UJ14 UJ16UJ13RR1 UJ17 RR1

POINT 1

RR13 RR17

10 groups involved56 weeks activities

Page 8: R2E  relocation & shielding LS1 preparation

R2E review November 2011 8

POINT 5

USC55

UXC55 UJ56

UL557

UL56

UJ57

UPS56

TU56 / UP56

UL55

UL558

UJ56RR57RR53

12 groups involved57 weeks activities

Page 9: R2E  relocation & shielding LS1 preparation

A. L. Perrot, EN-MEF/LE 9

POINT 7

UJ76

12 groups involved54 weeks activities

R771UJ76

RR73 RR77

TZ76

US76

PM76

R74, R76

Page 10: R2E  relocation & shielding LS1 preparation

A. L. Perrot, EN-MEF/LE 10

UL86

US85

UJ84 UJ86

UL84

UJ83

UJ1

UJ87RB84 RB86

UX85

RA87RA83

UA87UA83

UW85

POINT 8

7 groups involved24 weeks activities

Page 11: R2E  relocation & shielding LS1 preparation

A. L. Perrot, EN-MEF/LE 11

S12 S23P2 S34P3 S45P4 S56P5 S67P6 S78P7 S81P8

Dec.

Jan.

Feb.Mar.Apr.

MayJun.

Jul.

Aug.Sep.Oct.

Nov.Dec.

Jan.

Feb.Mar.Apr.

MayJun.

Jul.

Aug.Sep.

Oct.Nov.Dec.Jan.

Dec.

Jan.

Feb.Mar.Apr.

MayJun.

Jul.

Aug.Sep.Oct.

Nov.Dec.

Jan.

Feb.Mar.Apr.

MayJun.

Jul.

Aug.Sep.

Oct.Nov.Dec.Jan.

2013

2014

P1

2013

2014

Feb.Mar.Apr.

Feb.Mar.Apr.

W-UpW-Up W-Up W-Up

CSCMW-Up

W-Up

W-Up W-Up W-Up

Splices

SplicesSplices

Splices

SplicesSplices

SplicesSplices

Cool-down

Cool-down

Cool-down Cool-downCool-down

Cool-downCool-down

Cool-down

13 TeV

Beam Commissioning

MM

M

R2E LS1 Provisional Schedule

56 weeks 57 weeks 54 weeks24 weeks

R2E R

2E R2E

R2E

13 TeVCourtesy of K. Foraz

Page 12: R2E  relocation & shielding LS1 preparation

12

https://espace.cern.ch/MEFactivitiesforR2E/R2E_home/Home.aspx

R2E relocation & shielding Web Site

Page 13: R2E  relocation & shielding LS1 preparation

13

Implementation & worksite organisation

Page 14: R2E  relocation & shielding LS1 preparation

1414

1. Day-to-day in-situ management & supervision (rapidly react/solve problems of all nature as they occurred, direct contact with the groups

supervisors, cleaning/ waste management)

5. Planning: follow – up and adaptation (detailed installation planning & critical path weekly updated, impact on/of the non R2E works)

4. Material delivery & contracts: weekly follow – up

6. Communicating (periodical reviews of the activities, non conformities & planning)

2. Safety supervision (sites managers to enforce safety and environment protection rules, ‘VIC’, follow the implementation of safety measures/procedures)

3. Integration: non conformities follow-up (weekly reports, intermediate survey scans )

Organisation during the LS1 installation

Implementation & worksite organisation

Point coordinator

in charge

Point coordinator

involved

Page 15: R2E  relocation & shielding LS1 preparation

15

Point coordinator activities

Implementation & worksite organisation

- In charge of one/two LHC Points (points 1 & 8, point 5, point 7) -> 3 persons needed

- Fluent in French (daily discussions in situ with firms personal)

- Before LS1:- Participation in R2E relocation meetings from September 2012 (Fridays 10h30-12h30, 2 meetings/month)

- Visits in situ during TS3 (September) and Christmas break to get knowledge of the environment/ equipment to be relocated

- be aware of the material delivery, storage, safety issues, installation procedures etc… In other words….get knowledge of the work/activities

- During LS1: - see previous slide AND…- Daily organisation of in-situ status meeting with the group supervisors- Daily short report to Anne Laure (by phone)- Weekly report status to ‘Friday meetings’

Page 16: R2E  relocation & shielding LS1 preparation

16

Ressources for the coordination & follow-up of the R2E mitigation activities

Manpower request

2011Manpower

[FTE]

2012 Manpower

[FTE]

LS1 Manpower

[FTE]

Overall coordination – work package holder 0.8 0.8 0.8

Layout modifications and database management

0.1 0.1 0.1

Shielding (design, purchase, logistics) 0.5 0.25 (to 0.5)

0.25

Integration activities 2 1 0.5 to 1

Planning activities 0.2 0.2 0.2

Work supervisors in-situ 3 t.b.d.Work supervisors in - situ

Page 17: R2E  relocation & shielding LS1 preparation

A. L. Perrot, EN-MEF/LE 17

Addendum

Page 18: R2E  relocation & shielding LS1 preparation

R2E review November 2011 A. L. Perrot, EN-MEF/LE 18R2E review November 2011 A. L. Perrot, EN-MEF/LE 18

Equipment / activity

Activity in Point 1

Activity in Point 4

Activity in Point 6

Activity in Point 5

Activity in Point 7

Activity in Point 8

BE/APB survey eqpt. - - - - -

BE/BI BTV, BLM - - - - -

BE/CO timing & remote-resetWorldFip

-

--

--

DGS/RP RAMSES - - - - -

EN/CV cooling/ventilation eqpt - -

EN/EL electrical eqpt& cabling activity

EN/HE eqpt. transportshielding inst.

- -

done

EN/STI collimator control eqpt - - - -

GS/ASE fire/ODHaccess

- -

done -

GS/SE-CE duct activities - - - -

IT/CS ethernet

TE/CRG cryogenics eqpt

TE/EPC power converters - - -

TE/MPE QPS*PIC*

current leads heatersBISWIC

- -

- -

-

-

- - - -

TE/VSC vacuum eqpt - - - - -

Page 19: R2E  relocation & shielding LS1 preparation

R2E review November 2011 A. L. Perrot, EN-MEF/LE 191919

Process towards LS1 installation March 2012

integration and planning studies finished(i.e. new locations= defined; activities= identified; works sequences= defined)

Implementation & worksite organisation

Merge the R2E LS1 planning with the overall LHC LS1

planning

Estimate the real intervention slots for each group

Finalise the manpower requests

Planning/manpowerPlanning/manpower

All material requests identified

Contracts / material orders launched vs delivery deadlines

Material

Follow-up of the material delivery

Material Documentation for installation

ECRs

Safety documentation&

Installation procedures&

Installation drawings

Documentation for installation

Finished by Automn 2012

Finished by summer 2012