QUARTERLY PROGRESS REPORT NO. 02     

USDP‐R‐PMU‐10004

April – June 2010 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

ii

 

 

 

 

 

 

 

 

 

USDP‐R‐PMU‐10004

QUARTERLY PROGRESS REPORT NO. 02

April – June 2010 

i

CONTENTS 

Table of Contents  ........................................................................................................................... i 

List of Annexes ................................................................................................................................ i 

List of Tables ................................................................................................................................... i 

List of Figures .................................................................................................................................. i 

Glossary, Acronyms, Abbreviations .................................................................................................. ii 

1  INTRODUCTION .................................................................................................................. 1‐1 

1.1  Background ............................................................................................................................... 1‐1 1.2  Purpose of the Quarterly Reports ............................................................................................. 1‐2 

2  ACTIVITIES AND ACHIEVEMENTS OF THIS PAST QUARTER ................................................... 2‐1 

2.1  General progress of PPSP .......................................................................................................... 2‐1 2.2  USDP’s main events and results during the past Quarter ......................................................... 2‐1 2.3  Progress versus specified outputs and tasks ............................................................................. 2‐2 

3  PLANNED ACTIVITIES FOR NEXT THREE MONTHS: JULY‐SEPTEMBER 2010............................ 3‐1 

3.1  PPSP program ............................................................................................................................ 3‐1 3.2  USDP support for PPSP institutionalization and implementation ............................................. 3‐1 3.3  Quarterly work plans for PPSP and USDP ................................................................................. 3‐7 

4  ISSUES AND RECOMMENDATIONS ...................................................................................... 4‐1 

5  MANAGEMENT ................................................................................................................... 5‐1 

5.1  General ...................................................................................................................................... 5‐1 5.2  Staffing ...................................................................................................................................... 5‐1 5.3  Meetings ................................................................................................................................... 5‐2 

6  COLOPHON......................................................................................................................... 6‐1 

 

 List of Annexes  

Annex 1  Status Report USDP’s Outputs and Deliverables................................................................................... 2 Annex 2  Status Report on Earlier Issues and Recommendations ....................................................................... 6 Annex 3  List of Completed USDP Reports and Documents ............................................................................... 10  

List of Tables  

Table 2.1        Specific activities of USDP in the reporting period (April‐June 2010) ............................................... 2‐2 Table 3.1  PPSP Program Activities and USDP Support Activities scheduled for next quarter   (July‐September 2010) ...................................................................................................................... 3‐3 Table 4.1  Issues and Recommendations ........................................................................................................... 4‐1 Table 5.1  Engagement periods of international consultants in Q2‐2010 ......................................................... 5‐1 Table 5.2  Meetings/Workshops in April – June 2010 in which USDP has participated ..................................... 5‐2  

List of Figures  

Figure 3.1  Work plan for PPSP .......................................................................................................................... 3‐8 Figure 3.2  Quarterly work plan for USDP ......................................................................................................... 3‐9  

 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

ii

GLOSSARY, ACRONYMS, ABBREVIATIONS 

AKKOPSI  :  Aliansi Kabupaten/Kota Peduli Sanitasi AMPL  :  Air Minum dan Penyehatan Lingkungan  APBD  :  Anggaran Pendapatan dan Belanja Daerah APBN  :  Anggaran Pendapatan dan Belanja Negara AusAID  :  Australian Government’s Overseas Aid Program Bappenas  :  Badan Perencanaan Pembangunan Nasional CF  :  City Facilitator DAK  :  Dana Alokasi Khusus EHRA  :  Environmental Health Risk Assessment EKN  :  Embassy of Kingdom of the Netherlands FAQ  :  Frequently Asked Questions GoI  :  Government of Indonesia INPRES  :  Instruksi Presiden (Presidential Instruction) ISSDP  :  Indonesia Sanitation Sector Development Program KMW  :  Konsultan Manajemen Wilayah (Regional Management Consultant) Loknas  :  Lokakarya Nasional (National Workshop) MDGs  :  Millennium Development Goals MONEV  :  Monitoring and Evaluation OBA  :  Output Based Aid Pamsimas  :  Penyediaan Air Minum dan Sanitasi Berbasis Masyarakat (Community‐Based Water Supply 

and Sanitation Program) PF  :  Provincial Facilitator PHBS  :  Perilaku Hidup Bersih dan Sehat (Campaign for Clean and Hygienic Behaviour) PIU  :  Project Implementation Unit PIU‐AE  :  PIU Advocacy and Empowerment PIU‐IF  :  PIU Institutional and Finance PIU‐T  :  PIU‐Technical PM  :  Program Memorandum PMM  :  Project Management Manual PMU  :  Project Management Unit POKJA  :  Kelompok Kerja PPP  :  Public Private Partnership PPSP  :  Program  Percepatan  Pembangunan  Sanitasi  (Sanitation  Development  Acceleration 

Program) QA  :  Quality Assurance Rakernas  :  Rapat Kerja Nasional RPIJM  :  Rencana  Program  Investasi  Jangka Menengah  (Medium  Term  Investment  Development 

Plan)  RPJM  :  Rencana Program Jangka Menengah (Medium Term Development Plan) RPJMN  :  Rencana Program Jangka Menengah Nasional (National Medium Term Development Plan) Sanimas  :  Sanitasi Berbasis Masyarakat SC  :  Steering Committee SSA  :  Sanitation Supply Assessment SSK  :  Strategi Sanitasi Kota (City Sanitation Strategy, or CSS) STBM  :  Sanitasi Total Berbasis Masyarakat TNA  :  Training Needs Assessment TOR  :  Terms of Reference TTPS  :  Tim Teknis Pembangunan Sanitasi UC‐PMU  :  USDP Cell at PMU UC‐AE  :  USDP Cell at PIU‐AE UC‐IF  :  USDP Cell at PIU‐IF UC‐T  :  USDP Cell at PIU‐T UNICEF  :  United Nation Children’s Fund USDP  :  Urban Sanitation Development Program WB  :  White Book  

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

1-1

1 INTRODUCTION 

1.1 Background 

Indonesia’s commitment to the MDGs, as well as a World Bank report on the adverse economic impacts of poor sanitation  in  Indonesia, brought the sector under  increased attention of the authorities, although these drivers did not result in increased funding allocations until the current Medium Term National Development Plan. They did, however, contribute to the creation of the Sanitation Technical Team (Tim Teknis Pembangunan Sanitasi, or TTPS), a grouping of 8 Ministries with responsibilities regarding sanitation, with Bappenas as  leading Agency. In 2009 TTPS launched a challenging program to scale up and accelerate sanitation planning and investments during the period 2010‐2014: Percepatan Pembangunan Sanitasi Permukiman (Accelerated Sanitation Development for Human Settlements), or PPSP. This program targets 330 cities experiencing sanitation problems and focuses on particular goals to be achieved by 2014. 

PPSP provides a framework for all stakeholders  in sanitation development (government departments as well as foreign donors and private sector) to align their programs and projects in the tree sub‐sectors with the goals of this national sanitation program. To accelerate urban sanitation improvements and increase the effectiveness of investments  in  the  sector, GoI has decided  to encourage all cities  to apply a  five‐stage process  leading  to  the implementation of an  integrated sanitation strategy (Strategi Sanitasi Kota, or SSK).  In effect, the availability of an SSK has become a criterion  for allocating shares  in  the GOI’s specific allocation grants  to  local government (Dana Alokasi Khusus, or DAK).  

The role of the USDP will be to facilitate and further strengthen GoI  institutions at the national, provincial and, indirectly, at the local level involved in implementing the PPSP. USDP will also support the TTPS with the further development  of  a  national  sanitation  strategy  including  convincing  national  budget  holders  and  international donors to invest in sanitation development based on the integrated plans prepared by the city authorities. As per Administrative Arrangement, USDP will provide technical assistance to the urban component of PPSP.  

The USDP Program  is a co‐operation between  the State Ministry of National Planning  (Bappenas), as  the  lead agency of TTPS, and the Government of the Netherlands represented by the Royal Netherlands Embassy. USDP provides technical assistance to PPSP and its PMU and three PIUs as established by the core ministries of TTPS, i.e. Bappenas and the Ministries of Public Works, Home Affairs and Health. The Program started on February 1, 2010 and will be completed by December 31, 2014. 

The context of the USDP is determined by the Government’s Medium Term National Development Plan which is, in  effect,  reflected  in  the  Roadmap  for  the  “Accelerated  of  Sanitation  Development  Program  for  Human Settlements” (“PPSP”). The PPSP is meant to provide the framework for all interventions in the sanitation sector. The PPSP program will be carried out in the period 2010‐2014. 

To date  the average allocation of  sanitation  funds  in  the  local budget  (APBD) has never been higher  than 1% while less than 0.18% in the provincial budget and 0.036% in the national budget (APBN) respectively, including the  funds  that  are  allocated  through  DAK  (specific  transfer  from  national/central  government).  Notable developments have been  the  formulation of a policy  for  community based drinking water and  sanitation,  the introduction of urban strategic sanitation planning, and piloting approaches such as sanimas and community led total  sanitation. As  a  result,  the Ministry of Public Works became  active  in  the  sanitation  sector  through  the Community‐Based  Water  Supply  and  Sanitation  Program  (Pamsimas)  and  the  Community‐Based  Sanitation Program (Sanimas). The Ministry of Health carried out Community‐Based Total Sanitation (STBM) and conducted Campaigns for Clean and Hygienic Behaviour (PHBS). 

In 2007, the National Sanitation Conference‐I agreed on the government’s commitment to develop sanitation in line with the MDGs. The International Year of Sanitation  in 2008 was used to  increase the awareness and gage the  commitment  of  local  government  authorities.  Subsequently,  the  issues  and  targets  for  future  sanitation development were  identified  and  the  introduction  of  an  integrated  approach  of  city  sanitation  planning  and development was launched at the Urban Sanitation Convention in April 2009.   

The  Government  set  out  a  number  of  policies  and  strategies  to  overcome  various  structural  constraints  in sanitation development. These strategies are  stated  in  the RPJMN 2010‐2014  (5‐Years National Medium Term Development Plan). 

 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

1-2

The Government’s 2014 milestones for sanitation development include:   

• No open defecation in both urban and rural areas by providing access to off‐site sewerage systems to 10% and to on‐site sewerage facilities to 90% of the population;  

• Reduction of waste generation at  source, expansion of environmentally  sounds  solid waste manage‐ment  through  sanitary  or  controlled  landfills  and  other  safer  technologies.  These measures would affect 80% of the urban households; 

• Reduction  of  water  pounding  in  100  flood‐prone  cities/regencies  with  coverage  of  over  22,500 hectares. 

 

PPSP aims at lifting sanitation conditions in urban and rural areas, in particular for some 330 cities that are faced most  seriously  with  problems  in  one  or  several  of  the  sanitation  sub‐sectors.  PPSP’s  integrated  sanitation planning and implementation approach is consisting of five more or less subsequent stages and one overall stage, i.e.  1.  Awareness  rising  by  Campaigns,  Education  and  Advocacy  activities,  2.  Institutional  and  Regulatory Development, 3. Preparation of  Strategi  Sanitasi Kota  (SSK), 4. Preparation of Program Memorandum, and 5. Program Implementation. The overall stage 6 relates to Monitoring, Evaluation and Guidance. 

The  overall  aim  of  the USDP  is  to  facilitate  and  support  the  implementation  of  PPSP. More  specifically,  the objectives are to: 

1. Develop capacity  in the PMU and PIUs responsible  for  implementing the PPSP  in effectively managing the development of the sector together with the stakeholders at the provincial and local levels; 

2. Consolidate  the SSK approach  for use by government  facilitators and cities  throughout  the country, while ensuring that the SSKs address the needs of the poor and underserved citizens; 

3. Support the implementation of fundable project proposals following the outcomes of the SSKs.  

The USDP consultants will provide technical assistance to the PMU and the PIUs to strengthen their capacity  in supporting  the provinces and  cities with  the planning and  implementation of  sanitation  improvements. More specifically, the technical assistance will ensure or support the following main activities: 

a) The  production  and  dissemination  of  technical,  financial,  administrative  and  operational  guidelines  for sanitation  planning,  program  memorandum  development  and  the  implementation  of  sanitation improvement projects; 

b) Capacity development and training of TTPS, PMU, PIUs and their facilitators and consultants at central and local government levels, such as for example the “Regional Management Consultants” which will guide and monitor the provincial facilitators and the city facilitators guiding the city working groups in SSK preparation; 

c) The establishment of a national monitoring system to track progress in PPSP implementation; d) The organization of a range of national and regional meetings/workshops to exchange lessons learned and 

disseminate information; e) The design of a sanitation investment strategy and framework; f) The provision of technical advice and support to a specific number of cities/regencies.  

1.2 Purpose of the Quarterly Reports 

Quarterly Reports represent one of the reporting mechanisms of USDP. Quarterly Reports describe the progress and achievements of the past three months, and the scheduled services and activities for the next three months, within the context of the Annual Work Plan, each year prepared in December for the next calendar year. 

In addition, in each Quarterly Report Issues and Recommendations are presented.    

This 2nd Quarterly Report describes  the progress of USDP over  the period April‐June 2010,  the 2nd quarter of 2010, and the scheduled activities for the period July‐September 2010. 

  

 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-1

2 ACTIVITIES AND ACHIEVEMENTS OF THIS PAST QUARTER 

USDP is providing support services to PPSP. It operates in the context and in conjunction with PPSP. This chapter will therefore start with a section on the activities and achievements of PPSP during the reporting period from the perspective of USDP. PPSP is assumed to produce its own progress reports for the participating Ministries.  

2.1 General progress of PPSP 

Main activities and achievements of PPSP during the past quarter can be summarized as follows: 

1. Monitoring by PMU of the two months special bridging funding, in period April‐May, for facilitators through WSP/Waspola and INDII. WSP/Waspola  funded the PFs and INDII the CFs. The latter arrangement followed in principle the OBA‐Approach with rather stiff requirements on the output to be provided by the facilitators after the two months engagement period.  

2. Recruitment, selection and contracting of  three Consortia of Regional Consultants  (“KMW”) by PU  for  the three PPSP Regions. The contracts were concluded  in May and  the KMW consortia, also  incorporating all facilitators, started operations per 1 June 2010. In the period June‐December assignments and outputs are to be completed which were originally foreseen for the period February‐December 2010.  

3. Preparatory activities were undertaken on advocacy, recruitment and selection of cities for Batch C (2011) for the production of White Books and SSKs, as well as of cities for the production of Program Memorandum in 2010‐2011. These preparatory activities included amongst others the formulation of a circular letter and the establishment of a program for a National Workshop (“Rakernas”).  

4. A Steering Committee meeting was held on 7th May to discuss the Draft Inception Report of USDP. Following apparent perception issues at PU regarding the nature and extent of USDP’s services further internal follow‐up  sessions  between  PMU‐PIUs  and  between  the  relevant Directors  (“Echelon  2”)  of  the  principal  TTPS member were held. The latter meeting resulted in a plan to write a letter to EKN proposing amendments to USDP’s TOR. To date no such request with supporting amendment propositions has been reported to have been received by EKN.  

5. Some additional staffing for PMU and PIUs, except for PIU‐T at PU which is still limited to one part‐time staff member.  

6. PMU and PIUs are  coordinating particular  initiatives  in  support of PPSP  such as development of  INPRESS documentation and a Program Management Manual (PMM). 

7. Organization and coordination of various events and workshops such as the National Networking Workshop for Cities/Regencies  in preparation of their 2011 participation  in PPSP  (organized by PIU‐AE on 28th April), and the City Sanitation Summit VII in Bukittinggi (organized by AKOPSI, supported by PMU/PIUs and USDP, on 20‐21 May).       

 

2.2 USDP’s main events and results during the past Quarter 

The main support services of USDP towards PPSP’s development and implementation in the past quarter can be summarized as follows (for a more detailed listing against outputs and tasks see section 2.3): 

1. General guidance and assistance to PMU and PIUs for their further institutionalization, desk‐to‐desk training of  PIU‐staff,  and  support  services  towards  the  implementation  of  PPSP  activities  such  as  design  and preparation of workshops, development of materials for workshop sessions, and facilitation of plenary and group sessions during workshops.    

2. Preparation of various options  for support programs,  incl. training and coaching,  for  facilitators and KMW consortia in relation to the ongoing PPSP Stage 3 activities, i.e. establishment of City POKJAs and preparation of White Books. 

3. Set‐up and activation of a helpdesk for facilitators and POKJAs where they can raise questions on problems and  issues  encountered. Questions  and  answers  are  coordinated  by  the  small  USDP  team which  seeks guidance and assistance from the various USDP experts and PIU staff for answering questions. 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-2

4. Development  of  basic  documentation  for  various  initiatives  such  as  Circular  Letter  to  Cities/Regencies approached  for  participation  in  the  PPSP  2011  activities,  Guidelines  for  Cities  regarding  institutional preparation and budgeting  for participation  in various PPSP stages, preparation of  the  INPRES procedures and development of a Program Management Manual.  

5. Specific support to the legal registration and further institutionalization of AKKOPSI, as well as assistance to AKKOPSI  and  Local  Governments  and  City  Sanitation  POKJAs  for  Bukittinggi  and  Tegal  regarding  the preparation and implementation of the City Sanitation Summit VII in Bukittinggi and the preparation of the City Sanitation Summit VIII in Tegal. 

6. Development  of  Approach  and  Methodology  for  the  Program  Memorandum  Stage,  including  the development of a draft outline of a Program Memorandum document and suggestions for a Pilot Stage. In addition, related activities were undertaken such as  initial visits to several cities and review of documents Incl. SSKs and RPIJMs) aimed at getting an overview of plans and short‐listed projects which could be further addressed in the Program Memorandum stage. 

7. Various  preparatory  activities  for  the  roll‐out  of  the  Program  Memorandum  Stage,  such  as    (i)  initial inventory  of  already  available  procedures  and  guidelines  related  to  the  planning  and  implementation  of master planning, feasibility studies, procurement and the construction and supervision of sanitation related civil works, and (ii) review of 13 available SSKs on type of listed interventions and cost estimates. 

 8. Development of  the  first specific parts of a web‐based Monitoring and Evaluation System  to monitor and 

consolidate the weekly‐monthly progress of the various activities of the PPSP stages at City, Provincial and National  levels,  as well  as  the  development of procedures,  systems  and  tools  for Quality Assessment of intermediate  and  final  products  of  various  PPSP  Stages,  in  turn  enabling  and  contributing  to  Quality Assurance.  

9. Updating and amending of Inception Report and compilation of first Quarterly Progress Report.     

 

2.3 Progress versus specified outputs and tasks 

The progress presented here concerns the activities implemented by USDP in the 2nd quarter of 2010, i.e. April, May  and  June,  2010. Main  activities  of  PPSP  and  USDP  during  this  reporting  period were  presented  in  the previous sections 2.1. and 2.2.  

USDP’s activities  in said period are presented  in Table 2.1 below  in relation to the outputs and tasks defined  in the TOR. 

Table 2.1 Specific activities of USDP in the reporting period (April‐June 2010) 

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

1  Output 1 

Large numbers of districts/cities are able to develop poor‐inclusive district/city (‐wide) Sanitation Strategies (CSS) 

1.T1  Support Government (i.e. TTPS and PMU/PIUs) in annual process of city selection (incl. support to planning and implementation of workshops, roadshows and production of publicity materials) 

UC‐AE5 Team‐AE  

USDP supported PIU Advocacy & Empowerment (PIU‐AE) in the recruitment and selection process of cities and regencies for the PPSP 2011 program, by giving technical assistance for the road shows and by developing workshop materials for PIU Advocacy and Empowerment.  

Some 61 cities/regencies were “recruited” for PPSP 2011, and ultimately 49 cities will have to enroll in 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-3

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

the program (the selection process is to be finalized in the next couple of months). PIU‐AE also received assistance in preparing a formal letter to PMU and PIU‐IF regarding the listing of potential cities/regencies for the 2011 program to participate in the National Workshop (Lokakarya Nasional). 

1.T2  Review and streamline the CSS process to enable efficient scaling up of the CSS at city level while maintaining quality and local ownership (incl. involvement of Public Works) 

UC‐T Team‐SSK Team‐IP  (Team SDI) 

In 2010, some 41 cities are preparing White Books and SSKs. USDP is giving guidance and assistance to KMWs by administering Q&A through facilitators, reviewing intermediate WB/SSK products, transfer of skills and knowledge, reviewing the outcomes of the MONEV and QA systems. These data are used to further upgrade and streamline processes and procedures at the completion of the 2010 cycle.   

A draft document on facilitation design of SSK has been developed. The draft is aimed to streamline the SSK process while SSK approach is replicated in PPSP. The draft is being discussed between PMU and PIUs for peer review. 

1.T3  Train PFs/CFs via Training‐of‐Trainers and provide subsequent coaching and facilitation re. planning processes and products. Identify national/regional learning institutions to serve as long‐term resources centre(s) for the training and supply of facilitators. 

UC‐IF CBT 

Support PMU and PIUs in orientation of PPSP facilitators to upgrade and refresh the knowledge of PPSP facilitators in term of White Book development (in two months bridging phase period). 

Provided progress‐monitoring tools as basis for weekly monitoring reporting (held on April 1, 2010 at Hotel Cemara, Jakarta). 

1.T4  Provide ongoing guidance and support to CFs and PFs to ensure that CSS are of a high quality, are poor‐inclusive and lead to action plans for pro‐poor investments in priority areas. 

UC‐T Team‐SSK Team‐IP CBT 

USDP established mentoring teams in the middle of April to support KMWs, PFs and CFs in 3 mentor teams (i.e. Team I (Aceh, Sumatera Utara, Sumatera Barat, Sumatera Selatan), Team II (Banten, Jawa Barat, Jawa Tengah, DIY), Team III (Jawa Timur, Bali, NTB, Kalimantan Barat, Kalimantan Timur, Kalimantan Selatan)). 

The Hub/Help‐desk scheme was established in the middle of April 2010 through PPSP hotline email i.e. [email protected]. The Help‐desk function is a communication medium between POKJAs, CFs, PFs and PMU or PIUs to 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-4

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

respond to questions from provinces and cities developing White Books and CSSs. POKJAs of cities/regencies and CF/PF have already been using the hotline e‐mail. 

Development of White Books is ongoing in 41 Cities/Regencies. 

Developed manuals and quality assurance tools for ‘White Book’ and SSK preparation, with particular attention to communication aspects and mainstreaming of poor‐inclusive and gender related issues as well as private‐sector participation (a facilitation on QA tools was conducted on May 18‐19, 2010, both re. process and product). 

Finalized QA assessment of White Book for 17 cities/regencies in 6 aspects such as technical, institutional, communication & media, community empowerment (with gender & poor inclusive) & hygiene promotion, financial and Sanitation Supply Assessment (SSA)/PPP. 

QA indicators consist of technical, institutional, financial, communication & media, community empowerment (including gender sensitivity and poor inclusive) aspects, private sector partnership aspects and personal hygiene aspects (which describes social and behavioral aspects). 

Developed a concept note on the role of the Provincial Working Group, and the Capacity Building Model to be implemented in 6 (six) pilot province working groups. 

Facilitated the PIU‐IF in developing the facilitation concept for the Provincial POKJA in channeling Sanitation Support Funds from Province to Cities (ongoing process). 

Developed and implemented TNA (Training Needs Assessment) for Provincial POKJA for 15 Provincial POKJAs (from which 6 are to be selected for pilot). 

Facilitated Learning Forum on White Book and CSS development for Provinces, Cities/Regencies during CSS VII, Bukittinggi. 

Provide coaching clinic of PPSP regarding 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-5

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

Stage 3 for CSS VII, Bukittinggi participants. 

2  Output 2 

Municipalities have access to skilled human resources for sanitation advocacy, planning and the formulation and implementation of technical proposals. 

2.T1  Ensure the technical capacity of the PMU/PIUs and of a high quality technical assistance to PFs/CFs and POKJAs including assistance from specialist consultants. 

UC‐IF UC‐PMU Team‐IP Team‐SSK Team‐SDI 

The PMU organization has been established: a supervisory team consisting of inter‐ministerial staff and a Secretariat of young professionals. Members are qualified and professional, yet routine operations need improvement. Support from USDP Cell at PMU has mainly been directed at higher TTPS levels, including advocacy to highly ranked officials, such as echelon‐2 and echelon‐1 officials. 

The PIU Advocacy and Empowerment organization has been established and consists of inter‐ministerial staffs with legal letter from the Director General of the Health Ministry. All members are qualified and professionals from various parts of the Health and Home Affair Ministries. USDP’s support services include advocacy to related government officials and stakeholders. 

Contributed to development of “Academic paper” and regulation for the INPRESS (PRESIDENTIAL INSTRUCTION) for PPSP. 

USDP has provided three EHRA Specialists (1 Senior Specialist and 2 Junior Specialists) for training and EHRA manual development. EHRA training was facilitated in two batches to members of PIUs and Provincial POKJAs as well as PFs. PMU and PIUs staff were involved in the training as trainees to upgrade their capacity. The 1st batch was facilitated on May 11‐12, 2010. The 2nd batch was facilitated on May 18‐19, 2010. 

Regular consultations and support by UC‐T and USDP Team Management to PIU‐T; Participation in meetings, workshop, training events. 

UC‐AE contributed to regular PIU‐AE coordination meetings. This has resulted in publication materials that pay adequate 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-6

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

attention to community aspects, poor‐inclusive and gender related issues. 

Prepared and developed training programs for TTPS, PMU/PIUs, Province, City/Regency and KMW about White Book and City‐wide Sanitation Strategy (CSS). Related draft TOR was finalized and syllabus completed; training events are scheduled for July and August. 

Facilitated PIU‐IF in identifying Funding Resources in seven ministries related to PPSP (the facilitation process is still ongoing). 

2.T1.1  Create enabling environment through Technical Assistance services (1.1.1‐1.1.6). 

All Cells Team‐IP Team‐SSK Team‐SDI 

UC‐OMU promoted to hold at least 3 Steering Committee meetings per year in order to direct principal policies and strategies in the implementation of PPSP. 

Team SDI ‐> See activities under output 3 and 4. 

2.T1.1.1  Community engagement, social equity (poor‐inclusive) and gender‐related issues in the planning process. 

UC‐AE Team‐A Team‐SSK 

Review of manual for community empowerment with gender & poor inclusive components, in support of the planning process of PPSP (ongoing).  

Support (direct and indirect) provided to City/Regency POKJAs by USDP specialists: 

- through Helpdesk to more than 10 cities in aspects of White Book preparation 

- coached and trained cities in White Book development (i.e; Probolinggo, Mataram, Cirebon, Loksumawe, Aceh Timur, Langsa). 

2.T1.1.2  Design of improved wastewater management, drainage, and solid waste management infrastructure and systems, including drafting of technical proposals (Stage 4). 

UC‐T Team‐SDI 

Team SDI ‐> pending, see activities output 4. 

Primary information about Program Memorandum was offered to the cities during the 7th City Sanitation Summit in Bukittinggi, 21‐22 May 2010. 

2.T1.1.3  Implementation including procurement and the management of physical works (Stage 5). 

UC‐T Team‐SDI 

2.T1.1.4  Sanitation advocacy and hygiene promotion, especially the promotion of 

UC‐A Team‐A 

During City Sanitation Summits USDP implements small pilots of public promotion to local 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-7

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

hand‐washing with soap. stakeholders, e.g. in the format of side events during the city sanitation summit VII in Bukittinggi.  

One of the side events conducted in Bukittinggi was a “Participatory Campaign of Clean & Healthy Behavior Change”, with involvement of policy decision makers, school students and communities. 

2.T1.1.5  Monitoring SSK implementation (Stages 3 and 6). 

UC‐PMU Team‐SSK 

In the middle of April, a first progress monitoring system was established and started to be implemented as PMU’s monitoring tool, in particular to monitor the establishment of POKJAs and the preparation of White Books (process and product) 

In the period April‐June 2010, the progress‐monitoring system was implemented, and the results (weekly reports) consolidated (every Friday); feedback is provided to provinces and cities the following Monday. 

2.T1.1.6  Institutional, financial and governance issues related to urban sanitation. 

UC‐IF CBT 

Assisted PIU‐IF to develop and finalize (i) the draft Surat Edaran (Circular Letter) from the Ministry of Home Affairs to all Cities potentially participating in PPSP, as well as (ii) the TOR for its socialization. 

2.T1.2  Provide feedback and guidance on draft ‘White Books’ and CSSs. 

UC‐T Team‐SSK 

Support PMU in offering facilitation and coaching to Provincial and City POKJAs in Aceh (Kota Loksumawe, Kabupaten Langsa and Kabupaten Aceh Timur) in priority setting (early June 2010). 

Supported PMU and PIUs in offering facilitation and coaching to various cities: Mataram, Cirebon, Probolinggo, in terms of Workshop on Sanitation situation assessment and mapping (April 2010). 

The ongoing development of the “QA System and Tools” was tested and simulated for the assessment of the quality of the WB for Kota Semarang. Findings and comments on WB Kota Semarang were presented during Public Consultation of WB on June 24, 2010. 

All USDP Cells contributed to the Quality Assessment of 16 Draft White Books handed over by TTPS for assessment.   

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-8

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

2.T1.3  Provide direct TA in the development of project proposals or support to (local) Government appointed consultants de‐veloping master plans. 

UC‐T Team‐SDI 

2.T1.4  Via PMU and PIUs facilitate the inclusion of any large‐scale technical proposals in Bappenas’ ‘Blue Book’. 

UC‐PMU Team SDI 

UC‐PMU has reviewed the contents of the existing Blue Book (for familiarization), and UC‐PIU‐T is following up on inclusion of Banda Aceh proposals in Blue Book. 

2.T1.5  Play an important role in advocacy and awareness‐raising at all levels of government. 

UC‐AE UC‐PMU Team‐AE 

UC‐PMU undertook advocacy not only towards Echelon‐2 and Echelon‐1 Officials, but also to the Secretaries General and Ministers of relevant ministries.  

Special advocacy is also addressed to the members of AKKOPSI in promoting the mainstreaming of sanitation development among the participants of PPSP. 

UC‐PMU and UC‐AE have provided support, a.o. in terms of preparation of programs and presentations, for regional and national workshops such as: 

- Rapat Kerja Nasional (National Meeting) for Provincial POKJA’s;  

- Lokakarya Nasional (National Workshop) selection new cities/regencies;   

- City Sanitation Summit (CSS) in Tegal; 

- Konferensi Sanitasi Nasional (National Conference on Sanitation), which is under preparation; 

- Rembug Sanitasi Nasional (National Gathering on Sanitation), scheduled for Dec 2010. 

2.T1.6  Ensure that CSSs and action plans and proposals pay full attention to: ‘hard’ and ‘soft’ issues affecting progress in urban sanitation, Institutional development, cost recovery, operation and maintenance, community engagement, gender‐related issues, social equity 

UC‐T All Cells All Teams  

UC‐IF is contributing considerably to the “Guidelines for Local Governments regarding Institutional Preparation and Funding reservation” as part of procedures for participation in PPSP 2011 (ongoing). . The CSS preparation at local government is to be supported by adequate local budget and POKJA. In this context the guidance for establishing a local budget for sanitation development is a very strategic point.  

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-9

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

through poor‐inclusive planning, pro‐poor investments and hygiene promotion. 

2.T2  Assist PMU and PIUs in providing ongoing support and guidance to all cities in PPSP: see 2.T2.1‐2.T2.4. 

UC‐PMU  Assisted POKJA Advocacy and Health Division‐TTPS and PMU to develop a National Communication Strategy for PPSP, and this is to be followed up by a kind of action support (ongoing). 

Assisted PMU to develop Program Management Manual (PMM) for PPSP (ongoing). 

Provided inputs for mainstreaming PPSP and securing PPSP budget at local level. The inputs are incorporated into the Decree of the Minister of Home Affairs No. 37/2010 on Guidance for Developing Local Budget in 2011. 

Provided inputs for the Letter of the Minister of Home Affairs No. 650/2010 on the implementation of PPSP at local level. 

2.T2.1  A dedicated PPSP website. UC‐PMU Team‐AE 

A  PPSP website has been established; it already plays its role to improve communication among the stakeholders of the PPSP program. 

Communication materials, and other documents, are published at the PPSP website. 

2.T2.2  Guidance notes, manuals, and other advisory material. 

UC‐PMU All Cells 

ISSDP’s Guidance Notes, Manuals and Reference Documents are being circulated by TTPS/PMU to all stakeholders; facilitators and POKJAs apply them in the PPSP 2010 program; monitoring of adjustments required in a next edition is ongoing.  

UC‐AE produced (draft) guidelines and tool for city/regency POKJAs on communication aspects, poor‐inclusive and gender related issues. 

- A draft TOR for Participatory Campaign for Sanitation Awareness, gender & poor inclusive, was prepared. 

- A draft TOR for “Upaya merintis pelibatan 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-10

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

swasta dalam kampanye” was prepared.  

Developed draft Guidelines on Institutional Preparation and Indicative Activities for PPSP Implementation at local level. 

2.T2.3  Networking events and national or regional workshops. 

UC‐PMU UC‐AE All Cells      

Together with TTPS and AKKOPSI, regular events and workshops, incl. related preparatory meetings, have been organized to prepare: 

- National Conference on Sanitation once in two years (2011, under planning);  

- REMBUG or Sanitation Gathering at national level that will be held in December 2010;  

- City Sanitation Summits of AKKOPSI in Bukittinggi (April 2010), Tegal (July 2010) and Kediri (Q4‐2010); in future City Summits will be provided twice in a year at the maximum.  

Communications materials have been prepared and  distributed for a number of PMU/PIUs training and workshop events, as well as for City Sanitation Summits of AKKOPSI. 

Draft TORs were developed for: 

- Sanitation Campaign Training for City/Regency POKJAs; 

- Communication Strategy Skill Training for PMU & PIUs; 

- Seminar & Discussion on Mass Media & Business Sector Involvement. 

- Seminar & Discussion on Public‐Private Partnership. 

2.T2.4  Ensure close cooperation and good coordination with other projects and programs in the urban sanitation sector. 

UC‐PMU All Cells 

Based on TTPS policies, USDP has facilitated the incorporation of output of CSS documents produced by other programs and donors to be followed up under the implementation of PPSP.  

Participated in meetings and workshops related to sanitation, e.g. participation in 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-11

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

Workshop Grand Design of National Program on STBM and Workshop Grand Design of School Sanitation Program. 

Developed draft concepts for working groups at local level in the AMPL synergy implementation phase (presented 5th April 2010 and 14th July 2010). 

3  Output 3 

Quality technical proposals (Program Memorandums), based on poor‐inclusive City Sanitation Strategies, developed and being implemented in at least 30 small‐ to medium‐sized cities, with municipalities playing the lead coordinating role. 

3.T1  Provide technical assistance and quality assurance to both locally funded and centrally co‐funded proposals arising from SSKs, and to their implementation. 

For works that can be funded by local government from their own resources or through the special allocation budget (DAK), technical preparation and implementation is a local government responsibility. In the case of larger works, these will normally be centrally co‐funded and designed and implemented by MPW. 

UC‐T Team‐SDI CBT 

Developed approach and methodology (draft) for PM then submitted to PIU‐T for review and comments. 

Prepared a detailed implementation schedule for stages 4 and 5 for 2010 and 2011. 

Prepared a detailed schedule for PM implementation in 8 cities in 2010‐2011. 

Participated in several meetings with TTPS PMU and PIU‐T to discuss the PM stage. 

Prepared a Brief on PM, including presentations for general use (for example at CSS Tegal). 

3.T2  Ensure that program memoranda are pro‐poor, address the expressed needs of under‐served customers and work towards the national target of eliminating open defecation. 

UC‐T Team‐SDI Team‐A 

Reviewed available SSKs on possible investment costs for next 4 to 5 years.  

Reviewed 8 available SSKs on possible PM costs, for studies and designs, in 2010‐2011 period, based on 5% cost bracket of projected investments for studies and designs.  

3.T3  Facilitate small‐scale municipal pilot projects to resolve key challenges identified in SSKs. 

UC‐T Team‐SDI 

 

4  Output 4 

Technical and administrative guidelines and procedures for the preparation, financing and implementation of urban sanitation investments in small‐ to medium‐sized cities, developed or 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-12

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

updated as necessary, are formally adopted and disseminated widely.

4.T1  Ensure that municipalities/provincial Governments have all necessary standard documents for implementation of PPSP Stages: see 4.T1.1 ‐ 4.T1.3. 

UC‐T UC‐PMU All Teams CBT  

Compiled comprehensive inventory of guidelines and procedures used by PU for PM and Implementation related activities. 

Initial set‐up of procedures and guidelines for Master Plans and Feasibility Studies; carried out first inventory and gap analysis; started to develop practical guidelines on Master plans and feasibility Studies for use by city governments. 

Assisted PIU‐IF to develop Institutional Guidance for Province, City/Regency POKJAs. 

4.T1.1  Standard documents for City Sanitation Planning. 

UC‐T Team‐SSK  

Posted  all (ISSDP) manuals and guidance notes for SSK development on the PPSP website (April 2010).  

Distributed complimentary materials on Frequently Asked Questions (FAQ) and PPSP source/reference books to PPSP facilitators and PPSP stakeholders, especially on developing White Book and CSS. 

Provided TTPS with ISSDP Manuals and Guidance Notes in a sizeable number of hardcopies. TTPS is distributing those to PPSP stakeholders. 

UC‐PMU developed a draft Academic Paper for providing PPSP with INPRES status. Once formalized this will also contribute to further standardization of City Sanitation Planning. 

4.T1.2  Standard documents for preparation of technical proposals (program memorandum). 

UC‐T Team‐SDI  

Team SDI ‐> See output 3. 

Scheduled  to  discuss  guidelines  for  local advocacy  and  hygiene  promotion with  PIU‐T (during the next training of SSK development, as part of KMW or training events at regional level, and other proper forums/events). 

4.T1.3  Standard documents for procurement and implementation. 

UC‐T Team‐SDI  

Compiled listing of existing norms, standards and design criteria so as to develop practical guidelines for use by city governments. 

4.T2  Provide support in sector financing; see 4.T2.1 ‐ 4.T2.4. 

UC‐PMU UC‐IF CBT  

Assisted UC‐PMU in updating the estimates for investments as well as operational costs for the overall PPSP program as per PPSP 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-13

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

roadmap. 

Assisted PIU‐IF for identification of potential funding resources at all TTPS members, as well as related funding mechanism  

Organized coordination meeting with TTPS POKJA Finance to discuss the results of the identification initiative.  

Assisted PIU‐IF with conducting a Financial Demand Analysis from cities/regencies for CSS implementation, in view of providing a basis for a matching fund from central to district level based on CSS and own financing capacity of cities/regencies. 

4.T2.1  Advocate for, and support government in the establishment of operational links between CSS formulation and access to finance for sanitation improvements 

UC‐PMU UC‐IF CBT 

 

4.T2.2  Clarify and communicate to local governments the available financing options and mechanisms. 

UC‐IF UC‐A CBT 

Started the mapping of financing options.

4.T2.3  Advocate for, and support the development of an urban sanitation investment framework at national level. 

UC‐PMU UC‐IF 

Provided advocacy in support of the financial framework for PPSP’s future INPRES environment (obligation of each level of government to meet the investment needs to be figure out). 

Facilitated the PMU in developing the Roadmap PPSP Implementation 2010‐2014 (ongoing process). 

4.T2.4  Document and disseminate nationally lessons learned from PPSP implementation and use lessons learned in advocacy to inform strategy and decision making at national level. 

 

 

 

UC‐PMU UC‐A CBT  

Interim lessons learned from PPSP implementation are being documented for discussion, review and dissemination. 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-14

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

5  Output 5 

Systems are operational at national, provincial and city level for monitoring the progress of PPSP Implementation and outcome of new (urban sanitation) investments with particular reference to quality and equity 

5.T1  Assist with the design of a monitoring framework for PPSP and ensure that lessons learned from the monitoring information are used to inform national strategy and decision making. 

UC‐PMU Team‐ME 

Initially a spreadsheet‐based MONEV form was developed and distributed to facilitators as tool to collect information on the progress of POKJAs in PPSP Cities/Regencies.  

Results of the weekly monitoring are presented to the chairman of PMU as well to the Head of TTPS, Direktur Permukiman, and distributed to the PIUs.  

Support was given to develop consolidation report to head of PMU and PIUs. 

Supported PMU with implementing a regular feedback mechanism for progress monitoring. The system has now the status as PMU’s monitoring tool, and is currently focusing on establishment of POKJAs and preparation of White Books (process and product).  

In period April – June 2010, the monitoring system was further developed; the results (weekly reports) are consolidated every Friday and feedback is provided to provincial and city POKJAs every Monday the week after. 

Finalized Draft  Instrument for Quality Assessment and Assurance for White Books and CSSs. 

5.T2  Monitor the quality of PPSP activities to ensure quality of city planning process, as well as quality of the technical proposals (program memorandums), and the fostering of municipal ownership. 

UC‐T UC‐IF All Teams 

A spreadsheet‐based MONEV form was distributed to facilitators as a tool to report progress of POKJAs. White Book development started to be monitored from April onwards. Facilitators and/or POKJAs for 41 cities developing WBs report their progress weekly, and results are consolidated by PMU (in practice some problems are encountered as since the start of the KMW contracts the data flows are mainly channeled through KMW and PMU at times receives information late). 

Assisted the PIU‐IF to develop tools of Monitoring & Evaluation for Institutional Preparation of city/regency POKJAs. 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-15

No. 

of 

Output 

Key Task 

 

USDP Outputs and Key Tasks1 

(Terms of Reference USDP)

 

USDP2 

Cell 

Team 

Program Institutionalization and Implementation3

 Activities and Results USDP 

Provided guidance and support to the KMW, PMU, PIU in monitoring PPSP and QA of sanitation strategy. Initial training has been given attended by nearly 20 representatives of KMW. MONEV and QA mechanism were presented. 

First versions of QA forms were made available in June and have been tested to assess the quality of Semarang’s White Book. The finalized QA form for WBs has been distributed to all coordinators and WBs of 17 cities were assessed in term of content depth, conformity to outline and ownership. 

Prepared first version of CSS QA and distributed to USDP consultants for internal review. 

5.T3  Monitor the implementation of the CSS by the cities/regencies for the full range of activities prioritized by the CSS (e.g. including communication campaigns, pilot activities to improve O&M). 

 

 

 

UC‐T Team‐SSK Team‐SDI Team‐ME  

Supported PMU in implementing progress‐monitoring system; assisted in data consolidation, reporting and feedback to the cities.  

A web based MONEV system is established to further facilitate and professionalize municipal sanitation monitoring; now enabling monitoring of progress of White Books and City Sanitation Strategies. The system will gradually be expanded to all PPSP Stages and relevant issues.  

5.T4  Monitor the implementation of physical works and the outcome of new investments. (Small‐scale work will generally be managed by the municipality, with larger investments implemented by central government (via MPW). 

UC‐T UC‐IF Team‐SDI Team‐ME  

5.T5  Establish a system for monitoring of the technical quality of physical works being implemented (under DAK), as well as the effectiveness and equity of benefits related to these works. 

Team‐ME UC‐T  

Established an approach for involvement of Provincial POKJAs; developed training program plan for Provincial POKJAs in implementing monitoring and evaluation. 

 1    Outputs, Key Tasks (T) and Deliverables (D) as per USDP TOR relate to USDP support services towards PPSP 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

2-16

2   Principal Cells and Teams for particular tasks and Deliverables are indicated; in practice other Cells and Teams will also be involved 

3   Deliverables relating to Program Implementation are presented in italics 4   Text between squared brackets indicate internal differences in specifications in TOR     5   Abbreviations: UC= USDP Cell; A=Advocacy (at PIU‐AE); E=Empowerment (at PIU‐AE); UC‐AE= USDP Cell at PIU‐AE;  

IF=Institutional and Finance (at PIU‐IF); T=Technical (at PIU‐T); KM= Knowledge Management; CBT=Capacity Building and Training; ADV=Advocacy; ME=Monitoring and Evaluation (MONEV); IP= Institutional Preparation; SDI= Studies, Designs, Implementation; QA=Quality Assurance; FIN= Finance   

 

 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

3-1

3 PLANNED ACTIVITIES FOR NEXT THREE MONTHS: JULY‐SEPTEMBER 2010 

USDP is providing support services to PPSP. It operates in the context and in conjunction with PPSP. This chapter will therefore start with a section on the planned activities of PPSP during the next three months as perceived by USDP based on discussions with PMU and PIUs. PPSP is assumed to produce its own reports on planned activities as well as work plans to the participating Ministries.  

 

3.1 PPSP program 

The activities planned by PMU and PIUs for PPSP for the period July‐September  2010 can be summarized as follows (for a more detailed listing of scheduled activities see Table 3.1): 

Regarding PPSP institutionalization: 

1. Compilation of PPSP’s Program Management Manual (PMM) 

2. Finalization and consolidation of IMPRESS documents and procedures; final endorsement scheduled by end of Q3‐2010  

3. Development and dissemination of information; formulation of a knowledge management system 

4. Consolidation of collaboration with AKKOPSI 

5. Formulation of draft sanitation development policy 

6. Development of national strategy (2010) on sanitation communication 

7. Promotion of more involvement in sanitation development by private sector and community 

8. Establishment and mobilization of potential funding sources for sanitation development 

9. Further upgrading and training of  staff at PMU and PIUs 

 

Regarding implementation of PPSP Stages: 

1. Finalization of recruitment and selection of cities/regencies for PPSP‐2011 program, incl. Circular Letter, Guidelines for Local Governments on POKJA establishment and budgetary reservations, etc.   

2. Inventory of needs for new facilitators for PPSP‐2011, incl. recruitment, selection and training 

3. Finalization of White Books and compilation of Draft SSKs for Batch B, PPSP‐2010 

4. As to Program Memorandum: decisions on approach and methodology, extent of studies and designs and their funding, piloting of PM application, training programming and implementation, and collecting lessons learned 

5. Start‐up of Implementation Stage, incl. construction works and non‐technical measures 

6. Further development of web‐based Monitoring and Evaluation system for all PPSP Stages and their crucial components for the local, provincial, regional and national levels.   

 

3.2 USDP support for PPSP institutionalization and implementation 

In  the next quarter  the  following main  support activities are  foreseen  (for a more detailed  listing of  scheduled activities see Table 3.1): 

 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

3-2

USDP Cell at PMU (Bappenas): 

1. Continued regular support, guidance, assistance and suggestions to PMU on PPSP development.  2. Support PMU  in developing  the criteria  for  the  final selection of Provinces, and Cities/Regencies  for PPSP’s 

2011 program. 3. Continue developing  the Monitoring  and  Evaluation  System  for national, provincial,  and  local  government 

levels, in joint cooperation with PMU. 4. Develop draft Knowledge Management Strategy and system for TTPS.  5. Finalization of USDP’s Knowledge Management  instruments,  including a.o. USDP’s  internal  Sharepoint  site 

with  document management  system,  and  a  PPSP  website  attached  to  the  TTPS  Sanitation  Portal.  Start preparing training programs to ensure utilization of the above tools for mentioned activities. 

6. Preparing the TOR for a Knowledge Event on Sanitation Technologies.  

USDP Cell at PIU‐AE (Ministry of Health): 

1. Preparation and dissemination of Circular Letter. 2. Support  to  UC‐IF  in  developing  suitable  promotional  materials  (incl.  a  video  program)  for  participating 

ministries and local governments regarding PPSP’s scheduled INPRES Regulation. 3. Preparation and implementation of a Strategic Communication Workshop for Echelons 2 and 3.   

USDP Cell at PIU‐IF (Ministry of Home Affairs): 

1. Support  the  preparation  and  socialization  of  the  “Circular  Letter”  from MOHA  to  all  Local  Governments involved in PPSP, as well as Guidelines informing them about various issues and activities, such as institutional preparation and budget reservation, required for a smooth further expansion of PPSP  in the next budgetary cycle. 

2. Preparations of separate training programs for staff of PMU‐PIUs and staff of KMWs. 3. Support AKKOPSI for conducting a City Sanitation Summit VIII in Tegal aimed at offering City/Regency POKJAs  

comprehensive attention to and understanding of financial sources and mechanisms for the implementation of measures listed in the SSKs (PM and its implementation); in addition, strengthen AKKOPSI institutionally. 

4. Support PMU to develop draft of Program Management Manual.  

USDP Cell at PIU‐T (Ministry of Public Works):   

1. Continued discussions with Directorate of Environmental Sanitation  regarding operational PPSP  issues, and manning of  the PIU‐Technical  (to date only one part‐time  staff available); assist PPLP and PIU‐T  in  further internalizing the commitments and requirements from MPW for the successful implementation of PPSP.  

2. Prepare a tentative cost estimate of PM preparation for 8 cities on the basis of data provided in available SSKs 3. Prepare a comprehensive technical review of 13 SSKs (11 former ISSDP 1‐2 plus Pekanbaru and Banda Aceh) 4. Provide inputs to upgrade the preparation procedures for the SSK (Stage 3) from the perspective of a smooth 

transition to the preparation of the Program Memorandum (Stage 4) 5. Review  ISSDP  Stage  D  process  and Manual  (‘Action  Programming”)  and  initiate  further  elaboration  ands 

integration in the PPSP process for Stages 3 and 4. 6. Provide support for the implementation of the Roadshow on Program Memorandum 7. Plan and assist with testing the PM approach, methodology and outline while preparing draft PMs  in 3 to 4 

pilot cities and expand this exercise to 8 cities (as soon as TTPS and PU have endorsed this) 8. Finalize the Guidelines on Financing Resources 9. Continue  the  preparation  of  Guidelines,  Procedures  and  Templates  for  undertaking  Master  Panning, 

Feasibility Studies and Detailed Engineering Design, including a review and upgrade as necessary of prevailing norms and standards for sanitation infrastructure. 

 

The planned PPSP activities and  the USDP  support activities during  the next quarter  (July‐September 2010) are further elaborated in Table 3.1 below. 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

3-3

Table 3.1  PPSP Program Activities and USDP Support Activities scheduled for next quarter (July‐September 2010) 

No. 

PPSP Program Activities 

       

Scheduled for next three months 

Target Group 

USDP Support Activities  

through USDP Cells and/or Teams 

 

Scheduled for next three months 

incl.  General Support Services 

 PMU    USDP Cell at PMU (UC‐PMU) 

1  Preparation and distribution of  Circular Letter from The Minister of Home Affairs, and Guidelines for implementing PPSP program incl. establishment of POKJAs and related budgetary reservations for compilation of White Books and SSKs. 

57 to 80 cities and regencies 

Supporting PMU and PIU‐IF to prepare the drafts of the Circular Letter and the Guidelines. 

2  Conducting of National workshop on the Guidelines for Implementing PPSP program and the development of SSK. 

57 to 80 cities and regencies 

Supporting the preparation of the workshop, incl. preparation of papers and presentations, and taking part in it. 

3  Further development of Monitoring System for the implementation of PPSP. 

14 Provinces 

63 + 57 Cities and regencies 

Assist and support TTPS and PMU in developing and establishing the MONEV System. 

4  Dissemination MONEV System for PPSP implementation. 

14 Provinces 

63 + 57 Cities and regencies 

Assist and support TTPS and PMU in providing 3 regional workshops to disseminate the MONEV System. 

5  Finalize PPSP Program Management Manual. 

Facilitate PMU in developing the PMM for PPSP Implementation 2010‐2014. 

Provide inputs for PPSP Program Management Manual based on agreed Table of Contents. 

6  Implementation of Training on White Book and SSK development to PMU/PIUs, scheduled at the end of July 2010. 

PMU, PIUs, TTPS 

Facilitate and train PMU, PIUs and TTPS staff on White Book and SSK development. 

7  Assess the quality of 41 White Books, which have been developed by POKJAs . 

Municipal POKJAs 

Support PMU and PIUs to develop a system for Quality Assessment for White Books and SSKs. 

8  Conduct training on White Book and SSK development to Provincial POKJAs.  

Provincial POKJAs 

Support PMU and PIUs to facilitate and train Provincial POKJAs on White Book and SSK development. 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

3-4

No. 

PPSP Program Activities 

       

Scheduled for next three months 

Target Group 

USDP Support Activities  

through USDP Cells and/or Teams 

 

Scheduled for next three months 

incl.  General Support Services 

9  Monitor the implementation of the CSS by the cities/regencies for the full range of activities prioritized by the CSS (e.g. including communication campaigns, pilot activities to improve O&M) 

Input is foreseen to develop indicators and protocols. 

10  Monitor the implementation of physical works and the outcome of new investments. (The municipality will generally manage small‐scale work, with larger investments implemented by central government (via MPW). 

Input is foreseen to develop indicators and protocols. 

 PIU‐AE    USDP Cell at PIU‐AE (UC‐AE) 

11  Collaborate with AKKOPSI to advocate the improvement of local government awareness to sanitation development 

22‐36 cities and regencies 

Support AKKOPSI in advocating and facilitating the participating local governments to utilize optimally the AusAID’s grant for funding action plan of SSK and sanitation investment. 

12  Assist PIU‐T in developing a PM Information Program to be presented during a City Sanitation Summit or special workshop to facilitate the development of Program Memorandum 

21 cities and regencies 

Support and facilitate AKKOPSI to present at the CSS‐VIII in Tegal the general set‐up of Program Memorandum, and the channelling of the Infrastructure Enhancement Grant (IEG) from AusAID. 

 PIU‐IF    USDP Cell at PIU‐IF  (UC‐IF) 

13  Organise the National PPSP Workshop aimed at recruitment and selection of participating cities/regencies for PPSP‐2011, incl. circular letter and Guidelines re. POKJA establishment and related budgetary reservations (scheduled for 6th August 2010) 

Local Secretary and Legislative in Province and Regency/City Level 

PMU and PIU TTPS and TPPAMS 

Develop draft Guidelines on Institutional Preparation and Indicative Activities for PPSP Implementation at Local Level. 

Give financial support for the National Workshop of PPSP Implementation at Local Level. 

Support PIU‐IF in technical preparation of the National Workshop. 

14  Develop the Presidential Instruction on PPSP as National Program 

All the related ministries 

TPPAMS, TTPS, PMU and PIUs 

Develop the academic paper on the Presidential Instruction on PPSP as National Program. 

Develop inputs for draft Presidential Instruction on PPSP as National Program. 

Facilitate PIU‐IF in handling the workshop 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

3-5

No. 

PPSP Program Activities 

       

Scheduled for next three months 

Target Group 

USDP Support Activities  

through USDP Cells and/or Teams 

 

Scheduled for next three months 

incl.  General Support Services 

All the Governors, Majors 

on development the Presidential Instruction on PPSP as National Program that will be held on 18th – 20th August 2010. 

15  Develop the MONEV system to monitor the development of the Provincial POKJAs. 

Facilitate PIU‐IF in identifying the inputs of related ministries, PMU and other PIUs, with regard to the development of the Provincial POKJAs as well as regarding the related MONEV system. 

Develop draft indicators for the MONEV system monitoring the development of the Provincial POKJAs. 

16  Facilitate the process of institutional development at local level. 

Facilitate PIU‐IF in developing the facilitation profile for Provincial POKJAs concerning channelling Sanitation Support Funds from Provinces to Cities. 

Finalize concept note on the Role of Provincial POKJAs, and the Capacity Building Model to be implemented in 6 (six) pilot province working groups. 

Try out and testing of the model in the 6 (six) pilot Provincial POKJAs through the following activities: 

- Develop the instrument for capacity assessment of Provincial POKJAs.    

- Hold serial thematic mini workshops with the 6 (six) pilot Provincial POKJAs. The themes of the workshop would be on organizing, communication, and monitoring and evaluating skills. 

 PIU‐T    USDP Cell at PIU‐T  (UC‐T) 

17  Training/Orientation on SSK development for 3 KMWs (KMW I in Medan, KMW II in Jakarta, KMW III in Banjarmasin), will be held on July ‐ August 2010. 

KMWs Experts 

Support PIU‐T in implementing the training/ orientation of SSK to 3 KMWs. 

18  Preparation for tender activities in recruiting KMWs (including CFs and PFs) for multiyear operation by the end of August 2010 

PIU Technical 

Review original TOR for KMWs and provide inputs to PIU‐T in preparing tender activities for the tender process for multiyear KMWs recruitment (including CFs and PFs recruitment). 

19  Refreshment training for CFs and PFs on SSK development, in the 2nd week of August 2010. 

CFs and PFs Support PIU‐T in facilitating and training the PFs and CFs regarding SSK refreshment training. 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

3-6

No. 

PPSP Program Activities 

       

Scheduled for next three months 

Target Group 

USDP Support Activities  

through USDP Cells and/or Teams 

 

Scheduled for next three months 

incl.  General Support Services 

20  Workshop on system selection and technology options of sanitation (scheduled at the end of August 2010). 

Provincial and Municipal POKJAs, PMU and PIUs 

Support PIU‐T in facilitating and implementing the workshop on sanitation system selection and technology options. 

21  Facilitate the cities in developing White Books (ongoing support) 

Municipal POKJAs, CFs and PFs 

Provide inputs and comments and answers/responses through the helpdesk mechanism. (Operate and consolidate the Helpdesk system). 

22  Preparation of Legal form of PPSP as National Program (INPRES) 

330 cities and regencies 

Support TTPS and PMU in the preparation of the Academic Paper regarding the Presidential Instruction (INPRES). 

23  Conduct National Workshop to disseminate INPRES for PN‐PPSP to participating Ministries and Local Governments 

8 Ministries, 33 provinces, 330 cities and regencies 

Support TTPS and PMU in preparing a National Workshop on disseminating INPRESS for PN‐PPSP. 

24  Provide guidance and support to PMU and PIUs in implementing QA monitoring of City Sanitation Strategies. 

Contribute to training programmes on specific issues related to the role of the Provincial POKJAs in the MONEV monitoring system. 

Contribute to training on web‐based MONEV for City/Regency POKJAs. 

Assist PMU in consolidating web‐based MONEV implementation. 

25  Provide guidance and support to the  KMW in developing QA work plan for cities and provinces 

Support refreshment training for KMW, PF and CF with regard to SSK progress monitoring and QA of SSK document. 

26  Provide guidance and support to the KMW in monitoring PPSP implementation progress. 

Regular coordination with KMW in monitoring progress. 

Collect inputs from PMU and PIUs in using web based MONEV. 

27  Provide guidance and support to the KMW in consolidating monitoring results with PMU and PIUs. 

Regular coordination with KMW in monitoring progress. 

28  Provide guidance and support to the PMU and PIUs in interpretation of monitoring results of PPSP implementation. 

Assist PMU in developing web based MONEV. 

Collect feedback from various PMU and PIUs in using web based MONEV. 

 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

3-7

3.3 Quarterly work plans for PPSP and USDP  

The quarterly work plan for the period July‐September 2010 for PPSP, as prepared by USDP for the PMU and PIUs, is presented  in Figure 3.1. The quarterly work plan for USDP for the period July‐September 2010  is presented  in Figure 3.2.    

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

3-8

Figure 3.1  Work plan for PPSP   

 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

3-9

Figure 3.2  Quarterly work plan for USDP  

 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

4-1

4 ISSUES AND RECOMMENDATIONS 

Main  issues  that  have  developed  during  the  past  quarter  are  presented  in  Table  4.1.  The  issues  and recommendations  reported  in QPR‐1  are  now  presented  in  Attachment  1  to  this  report,  together with  their current status as far as known to us.  

Several  of  those  issues,  amongst  others QRP1‐13/14/15  have  today  still  the  same  crucial  importance  to  the success of PPSP. 

Table 4.1  Issues and Recommendations  

No  Issues  Recommendation  Main Actors 

TTPS and member Ministries 

1  Improvement of coordination between TTPS, PMU and PIUs, as well as with USDP team. 

Regular meetings between said stakeholders with a formal and clear Agendas and Minutes of the coordination meeting. 

TTPS PMU USDP 

2  Mainstreaming PPSP in a legal format under INPRES. 

Setting up special Steering Committee meeting.  SC TTPS 

3  Overall Monitoring System development should be guided by proper PPSP Stakeholder. 

The involvement of POKJA MONEV at MPW should be more pro‐active. 

TTPS 

4  Decision of TTPS on possibly desired adjustments to USDP’s TOR. 

If adjustments are deemed necessary, then desired adjustments are to be specified and formulated by TTPS, followed by consultations with EKN. Those adjustments should be formulated as soon as possible in order to prevent further loss of time in the tight PPSP schedules, and to foster the implementation of PPSP’s Program Memorandum. 

SC  TTPS 

5  PIUs, in particular PIU‐T, have limited staff (or Consultants) to support PPSP implementation. 

Pressure from TTPS to all involved ministries to fulfill obligations with sufficient staff (if required supported by consultants) in support of PPSP implementation. 

TTPS PMU PU 

Program Management Unit (PMU) 

6  Development of PMM of PPSP. 

Establish a procedure and division of tasks between PMU/PIUs and USDP; USDP can take care of most of the write up, but essentials of PMM components are to be formulated in consultations with PMU and PIUs. 

PMU USDP 

7  PMU and its Secretariat, having limited capacity, may make more efficient use USDP consultants.  

Regular consultations between PMU Management and USDP Management on the required support services; USDP will step up support services whenever required and fitting with available capacity and resources. 

PMU Man. USDP Man. 

8  Communication mechanism between PMU/PIUs and Provincial and Cities/Regencies POKJAs is still unclear. 

Activate the PPSP Mailing List or Email Account for all POKJAs. 

PMU and PIUs 

9  Coordination and Working Mechanism between PMU and PIUs is still unclear. 

Accelerate finalization of PMM.  PMU and PIUs 

10  USDP Staff observe that KMW consultants need more training in order to prevent that valuable time and resources are lost in “re‐inventing the wheel”. 

Considering quality of intermediate products to date and the limited time available for “learning by doing”, USDP has proposed at several occasions that KMW and facilitators shall be called together more often for consultations and additional training. USDP can provide required training and coaching. 

PMU PIU‐T 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

4-2

No  Issues  Recommendation  Main Actors 

Availability of ISSDP Manuals and Guidelines itself does not guarantee their proper and successful application. Need for more training is also expressed by KMWs. 

Program Implementation Units (PIUs) 

11  Insufficiently defined MONEV and QA mechanisms between PMU‐PIUs, KMWs and facilitators. At the moment PMU has not the full information about progress and achievements of White Book development and QA results at its disposal. Communication on these data now flows from facilitators to KMWs. 

PMU‐PIUs need to develop proper coordination and communication mechanisms between all parties in more detail. 

PIU‐T PMU PIUs 

12  Some facilitators do not communicate adequately with PMU upon request. 

Patterns of formal and operational communication lines between stakeholders to be defined (also to be included in PMM)  

PMU PIU‐T 

13  Level of understanding on PPSP in PIU‐IF is limited to management of PIU‐IF. 

PIU‐IF management needs to inform and empower the human resources of PIU‐IF in terms of Institutional, Capacity Building and Financial issues and skills in PPSP context. 

The UC‐Team CBT needs to formulate specific method to accelerate the empowerment of PIU‐IF staff. 

PIU‐IF       UC‐Team CBT 

USDP 

14  Getting the same perception of the USDP ToR and its adjustments (if required). 

Special road show to all POKJAs of TTPS.  USDP Management PMU/PIUs 

15  Split between executing (PMU/PIUs) and supporting (USDP) tasks is sometimes not so clear; requires regular consultations. 

Coordinators should have regular consultations to clarify USDP position and prevent misunderstandings; this is part of the dynamics of the different roles.  

USDP Management 

16  Mechanism of financial support from USDP to PPSP (as event execution) needs to be agreed. 

Standard mechanism should be clarified.  USDP Management 

 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

5-1

5 MANAGEMENT 

5.1 General 

Staff engagement of USDP, in particular with regard to long‐term staff, is essentially in accordance with planning and  budget.  Some  positions  are  not  yet  filled  or  open  again  due  to  early  departures,  such  as  the  senior communications expert Farah Amini who has chosen to join the World Bank per early May. These positions will be reviewed and possibly be filled again once the position with PU regarding Program Memorandum and related USDP services will have been sorted out. 

Procurement  of  hardware  and  software  for USDP’s  internet  services,  Sharepoint  and  Intranet,  as well  as  the related installation, were completed by 1st June. By that date all necessary transfers from ISSDP environment to USDP environment were completed.    

It  is expected that the coordination and cooperation between PPSP and USDP will benefit considerably  if PMU and USDP will  start  up  regular  joint management meetings  and  consultations  to  review  together  the  issues needing urgent attention as well as to define remedial measures. To date several request and suggestions from USDP to this extent have remained unanswered. Similarly the cooperation will benefit if the Executive Authority will speed up the formal installation of the Technical Team as defined in the Administrative Arrangement. To date no developments can be reported on this. 

 

5.2 Staffing 

The overview of mobilization and demobilization of  international Consultants, during  the period of April, May and June 2010, is presented in Table 5.1. 

Table 5.1  Engagement periods of international consultants in Q2‐2010 

 

 

 

 

#  Name  Position  Firm 

Assignment 

Start  End 

1  Jan Oomen  Project Manager  DHV  08 Mar 2010  12 Apr 2010         22 Apr 2010  08 May 2010 

18 May 2010   2  John de Bresser  Capacity Building 

Specialist DHV  15 Apr 2010  05 May 2010 

3  Rik Dierx  Water and Sanitation Specialist 

DHV  29 Mar 2010  22 Apr 2010 

4  Mees van Krimpen  Environmental and Sanitation Engineer 

DHV  01 Feb 2010  03 Jun 2010 18 Jun 2010   

5  Jan Kraaij  DED  Witteveen + Bos  29 Mar 2010  09 April 2010 21 Jun 2010  16 Jul 2010 

6  Cees Keetelaar  Sewerage Specialist 

DHV  22 Mar 2010  23 April 2010 

7  Michael van de Watering   Master Planning  Royal Haskoning 

04 May 2010  31 May 2010 02 Jun 2010  30 Jun 2010 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

5-2

5.3 Meetings 

An overview of the most relevant Meetings and Workshops to which USDP has contributed is presented in Table 5.2 below. 

Table 5.2  Meetings/Workshops in April – June 2010 in which USDP has participated   

#  Date  Meeting  Location 

April 1  7 April 2010  Preparation of AusAID Grant Program for 

Sanitation and Waste Sector Setditjen Cipta Karya’s Meeting Room 

2  8 April 2010  

Website Update  TTPS Secretariat’s Meeting Room 

3  8 April 2010  

Preparation for City Sanitation Summit VII, Bukitinggi 

TTPS Secretariat’s Meeting Room 

4  8 April 2010  

Change of White Book Guidance  TTPS Secretariat’s Meeting Room 

5  8 April 2010  

Preparation of AusAID Grant Program for Sanitation and Waste Sector 

Setditjen Cipta Karya’s Meeting Room 

6  12 April 2010  Draft Inception Report Preparation  TTPS Secretariat’s Meeting Room 

7  13 April 2010  Development of National Central Information (PIN – Pusat Informasi Nasional) AMPL 

Akmani Hotel 

8  14 April 2010  Advocacy Meeting of PPSP Planning   Bappeda Kota Mataram’s Meeting Room 

9  15 April 2010  POKJA Kota Bekasi Program Dissimilation and Consolidation 

Bappeda Kota Bekasi’s Meeting Room 

10  15 April 2010  Continuation of discussion AMPL synergy and explanation about RISPAM 

TTPS Secretariat’s Meeting Room 

11  15 April 2010  Preparation of Program Memorandum  PIU PU’s Meeting Room 12  21 April 2010  Monitoring and Evaluasi White Book Developing  TTPS Secretariat’s Meeting 

Room 13  27 April 2010 

 Preparation of Cities and Regencies Networking National Workshop 

TTPS Secretariat’s Meeting Room 

14  28 April 2010  Cities and Regencies Networking National Workshop 

Grand Alia Hotel 

May 15  7 May 2010  TTPS Steering Committee meeting to discuss the 

Draft Inception Report Grand Mahakam Hotel 

16  10 May 2010  TTPS POKJA Financial Sector Coordination Meeting  

TTPS Secretariat’s Meeting Room 

17  20‐21 May 2010  City Sanitation Summit VII  Auditorium of Bung Hatta Library, Bukittinggi 

18  24 May 2010  PMU‐PIU PPSP Consolidation Meeting  TTPS Secretariat’s Meeting Room 

19  25 May 2010  PMU‐PIU PPSP Consolidation Meeting Regarding PPSP City/Regency Networking for 2011 

TTPS Secretariat’s Meeting Room 

20  26 May 2010  Program Memorandum   PIU PU’s Meeting Room 21  26 May 2010  Review on Development and Activities 

Implementation, Formalization of Jejaring AMPL’s Working Plan 

TTPS Secretariat’s Meeting Room 

June 22  1 June 2010  Coordination and Evaluation of PPSP Program 

Implementation  Bappeda Propinsi Jawa Timur’s Meeting Room 

23  1 June 2010  PMU and PIU PPSP Coordination on Program Memorandum formalization 

Dit PPLP’s Meeting Room 

24  8 June 2010  PPSP UPP Advocacy Coordination Meeting  D Building 4th floor. Ditjen PP & PL’s Meeting Room 

25  9 June 2010  Socialization on Circular Letter of Ministry of  Kaca Building 2nd floor, Ditjen 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

5-3

#  Date  Meeting  Location 

Home Affair and Workshop of Financial Aspect on City Sanitation Summit VIII, Tegal 

Bina Pembangunan Daerah’s Meeting Room 

26  14 June 2010  Essentials of USDP’s role in Program Memorandum 

PIU PU’s Meeting Room 

27  16 June 2010  City Sanitation Summit VIII, Tegal preparation with AKOPSI 

TTPS Secretariat’s Meeting Room 

28  18 June 2010  Internal Preparation for KMW’s Training  PIU PU’s Meeting Room 29  18 June 2010  USDP Support for CSS VIII, Tegal Preparation 

Meeting. Consolidation materials of TTPS, AKOPSI and PMU‐PIUs 

TTPS Secretariat’s Meeting Room 

30  28 June 2010  TTPS and PMU‐PIU Consolidation due to Socialization on Circular Letter of Ministry of Home Affair 

Praja Bakti 2, 2nd floor, Ditjen  Bina Pembangunan Daerah 

31  29 June 2010  Discussion on Training Implementation of White Book and SSK Formalization for PMU‐PIU 

TTPS Secretariat’s Meeting Room 

32  30 June 2010  Grand Design of School Sanitation Development Workshop 

Manhattan Hotel 

Urban Sanitation Development Program 

Quarterly Progress Report No. 02, April‐June 2010 

6-1

 

6 COLOPHON 

This document was produced by  the Urban Sanitation Development Program  (USDP). USDP provides Technical Assistance to the ‘Accelerated Sanitation Development for Human Settlements” Program (PPSP), a Government of  Indonesia  Program  implemented  by  the  TTPS,  a  sanitation‐oriented  collaborative  program  between  eight Ministries, with Bappenas as  lead agency. PPSP  is  implemented through a PMU at Bappenas and three PIUs at the Ministries of Health, Home Affairs and Public Works.  USDP’s services focus on facilitation and capacity building and training targeting the principle stakeholders and actors in the PPSP Program. USDP is funded by the Embassy of the Kingdom of the Netherlands. 

DHV  BV  in  association  with  PT Mitra  Lingkungan  Dutaconsult,  Royal  Haskoning  Indonesia, Witteveen  +  Bos Indonesia,  MottMacDonald  Indonesia,  IRC  International  Water  and  Sanitation  Centre  and  PEM  have  been contracted to provided a range of technical services in support of the implementation of PPSP. 

Your letters, e‐mails, enquiries can be forwarded to: 

Urban Sanitation Development Program (USDP) 

Jl. R.P. Soeroso No. 50, Gondangdia Jakarta 10350, Indonesia Phone: (62‐21) 319 35312, 319 31013, 237 28748 Fax: (62‐21) 392 4113 Email: [email protected]  

For information, please also check our website: www.sanitasi.or.id 

 

 

 

 

 

 

 

 

 

 

 

 

Client  :  Embassy of Kingdom of the Netherland, TTPS – Bappenas 

Project  :  Urban Sanitation Development Program 

Length of report  :  48 Pages Including Annexes 

Author  :  USDP Management Team 

Project Manager  :  Jan Oomen 

Project Director  :  Paul van Ruiten 

Date  :  27 August 2010 

Report Status  :  Final

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

ANNEX 1 

Status Rep

ort U

SDP’s Outpu

ts and

 Deliverables 

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

2

 

Annex 1  Status Report USDP’s Outputs and Deliverables1 

No. 

Output 

Deliverable 

USDP Outputs and Deliverables 

(Terms of Reference USDP) 

USDP 

Cell 

Team 

Program Institutionalization and Implementation 

Status of Outputs/Deliverables 

 

Output 1

Large numbers of districts/cities are able to develop poor‐inclusive district/city (‐wide) Sanitation Strategies (CSS) 

1.D1  Four annual city selection processes facilitated (number of cities selected per year to be confirmed by PMU and PIU Ministry of Public Works). 

UC‐A Team‐A 

1.D2  At least 40 provincial/city facilitators trained and deployed by 2014, and provide ongoing technical support and guidance. 

CBT UC‐T Team‐SSK  (Team‐SDI) 

1.D3  By mid‐term review (early in 2012), at least 48 cities mobilised and developing SSKs. 

Team‐IP Team‐SSK 

1.D4  By mid term review at least 16 cities have completed SSKs and at least 32 have completed White Books. 

Team‐SSK   

1.D5  By 2014, at least 32 SSKs formally adopted, with implementation under‐way. 

Team‐SSK Team‐SDI 

 

1.D6  By mid term in at least 6 Provinces with more than 4 cities each, a Provincial POKJA is functioning to support the scaling up of the approach in the remaining cities, and in monitoring progress. 

UC‐IF Team‐SSK 

 

 

 

Output 2

Municipalities have access to skilled human resources for sanitation advocacy, planning and the formulation and implementation of technical proposals. 

2.D2  By the end of Year 1, PPSP website operational and regularly updated, and providing relevant information and guidance to participating cities. 

UC‐PMU 

2.D3  By Mid‐term, 48 [80] cities receive regular (at least bi‐monthly) support and guidance from institutional, technical, financial and hygiene promotion specialists 

Team‐SSK Team‐SDI Team‐A CBT  

 

2.D4  By mid‐term at least four national/regional workshops have been held for networking, lesson learning and/or dissemination of 

UC‐PMU Team‐A All Cells 

 

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

3

information and guidance materials.

2.D5  SSKs from targeted cities are poor‐inclusive. 

Team‐SSK 

2.D6  SSKs contain not only sound technical analysis of sanitation needs and priorities, but also address the financial, institutional, social and behavioural aspects of urban sanitation development. 

Team‐SSK CBT 

 

Output 3

Quality technical proposals (Program Memorandums), based on poor‐inclusive City Sanitation Strategies, developed and being implemented in at least 30 small‐ to medium‐sized cities, with municipalities playing the lead coordinating role. 

3.D1  By Mid‐term, 16 cities have developed technically sound memorandum/funding proposals based on their SSK. 

UC‐T Team‐SDI  

3.D2  All proposals are realistic in terms of available technical and financial resources. 

UC‐T UC‐IF Team‐SDI  

3.D3  All proposals include measures to address the needs of low‐income households. 

UC‐T Team‐SDI Team‐A  

3.D4  All proposals are technically sound and sufficiently detailed for procurement purposes. 

UC‐T Team‐SDI  

 

Output 4

Technical and administrative guidelines and procedures for the preparation, financing and implementation of urban sanitation investments in small‐ to medium‐sized cities, developed or updated as necessary, are formally adopted and disseminated widely. 

4.D1  By end of inception (3 months), priority list of technical and operational guidance material agreed with TPPS and the three PIUs (see also 4. D2). 

UC‐PMU All Cells All Teams 

4.D2  Provisional list of documents to be produced and disseminated by Mid‐Term: see 4.D2.1 ‐ 4D2.7. 

UC‐PMU All Cells All Teams 

4.D2.1  Guidelines on local advocacy and hygiene promotion. 

UC‐A Team‐A 

4.D2.2  Updates to the existing SSK development manual(s). 

UC‐T Team‐SSK  

4.D2.3  Standard design and Cost criteria. UC‐T Team‐SDI 

4.D2.4  Standard requests for Proposals, Terms of References, and Contract 

UC‐T Team‐SDI 

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

4

1 Final format of Status Report under development 

 

 

 

 

Documents. 

4.D2.5  Guidance on tenders and evaluation. UC‐T Team‐SDI 

4.D2.6  Guidance on Public‐Private partnerships. 

UC‐A Team‐A 

4.D2.7  Quality Assurance Systems for Proposal (Program Memorandum) development and implementation. 

UC‐PMU Team‐ME 

4.D3  By Mid‐Term, available financing options and mechanisms clarified and communicated to provincial governments and cities 

UC‐IF CBT 

 

4.D4  By Mid‐Term, interim lessons learned from PPSP implementation documented and disseminated widely. 

UC‐PMU Team‐A CBT 

 

Output 5

Systems are operational at national, provincial and city level for monitoring the progress of PPSP Implementation and outcome of new (urban sanitation) investments with particular reference to quality and equity 

5.D1  PPSP monitoring system operational at national, provincial, city/district level by end Year 1 (2010). 

 

UC‐PMU Team‐ME All Teams 

 

5.D2  Quality assurance system in place for SSK formulation and technical proposals by end of Year one (2010). 

Team‐SSK Team‐SDI Team‐ME 

  

5.D3  Municipal sanitation monitoring systems operational in at least 32 cities by Mid‐Term. 

UC‐PMU Team‐ME 

  

5.D4  Technical monitoring of investments under “DAK” established at national and local levels by Mid‐Term. 

UC‐IF Team‐ME CBT 

5.D5  Provincial sanitation monitoring systems operational in at least 8 provinces by Mid‐Term; system based on national SPMs and systems developed under ISSDP QA system applied in cities and provinces. 

UC‐PMU Team‐ME CBT 

 

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ANNEX 2 

Status Rep

ort o

n Earlier Issues and

 Recom

men

datio

ns 

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

6

Annex 2  Status Report on Earlier Issues and Recommendations  

No  Issues  Recommendation Main Actors 

Status 

TTPS and member Ministries QPR1‐1  Ministerial Decrees re. 

establishment and staffing of PMU and PIUs may need to be reviewed and updated to answer to current views on their roles, tasks and responsibilities 

Updates to be prepared  TTPS PMU 

QPR1‐2  Define operational framework for Program Memorandum: methodologies re. studies and designs, division of tasks between central and local government, guidelines on funding, role and status of POKJA’s, need for facilitators   

Develop one or more approaches and undertake pilots 

TTPS PMU USDP 

No progress 

QPR1‐3  Lack of information and understanding re. Administrative Arrangements for USDP between Bappenas and the Embassy of the Kingdom of the Netherlands, and the contract between the Netherlands Embassy and the Consultants Consortium 

All relevant Arrangements re. USDP between Bappenas, the Embassy of the Kingdom of the Netherlands (EKN), and the Consultants Consortium need to be shared by TTPS/PMU with the Ministries participating in PPSP 

Bappenas TTPS PMU 

Relevant copies handed over to TTPS/PMU; no feedback re. distribution 

QPR1‐4  Formal status and ownership of “SSK Methodology”  

SSK concept plays an important role in PPSP. The formal status, required contents, quality, endorsement, and ownership of the “SSK Methodology” need to be formally regulated between TTPS members 

TTPS (USDP) 

Program Management Unit (PMU) 

QPR1‐5  Roadmap, specifying PPSP targets only, needs to be expanded with “Who”, “When”, “How” documentation  

Preparation of a comprehensive Program Management Manual (PMM), to be prepared in close cooperation between TTPS and PMU with support from USDP 

TTPS PMU USDP 

Table of Contents approved; TTPS/PMU have no capacity; USDP will step by step write text, each time after consultations with PMU and PIUs 

QPR1‐6  Overall full time management of PPSP and its PMU require urgent upgrading in qualitative and quantitative terms  

Allocate funds for a fulltime (Executive) Director, recruit and appoint such Director; preference should be given to someone with a PU background at sufficient senior level   

TTPS  limited progress; PMU remains weak, under‐staffed 

QPR1‐7  Legal Status of PPSP as a national program (Draft INPRES documentation prepared by USDP) 

INPRES documentation to be processed urgently; is most relevant for required multi‐year budgeting 

TTPS PMU 

Draft INPRES docs virtually completed; endorsement foreseen by end 

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

7

No  Issues  Recommendation Main Actors 

Status 

of Q3‐2010 QPR1‐8  Coordination between PMU and 

PIUs to be improved  Establish fixed meeting cycle with senior representation, formal agendas and Minutes of meeting specifying decisions and actions. Achievements, delays and substandard performance to be reported to higher echelons of participating Ministries at regular intervals 

PMU PIUs 

Some improvements, futher procedures required 

QPR1‐9  Resources, staff and funds, at PMU and PIUs need to be expanded and increased in qualitative and quantitative terms for a program of the size of PPSP.   

Formation plan on staffing (2010‐2014) for PMU and PIUs to be developed; in addition capacity building and training plan  

TTPS PMU (USDP) 

No progress; PIU‐T still consisting of 1 part‐time staff  

QPR1‐10  Distribution of tasks and responsibilities between PMU and PIUs to be elaborated and clarified (e.g. ownership and responsibility for EHRA studies) 

Integrated work plan PMU‐PIUs, PMM, distribution of operational tasks, MONEV on PMU‐PIUs activities incl. enforcement” options 

TTPS PMU 

QPR1‐11  PPSP procedures, e.g. on DAGRI’s Circular Letter to local government, require further elaboration in order to improve quality and speed of process and output  

Guiding and coordinating role of PMU, based on PMM 

TTPS PMU 

Guidelines for PPSP 2011 over comprehensive information; further follow‐up required 

QPR1‐12  Proper scheduling and budgetary planning of events/workshops 

Events: annual program to be established complete with budget and funding contributions from various parties  

PMU PIUs 

Program Implementation Units (PIUs) 

QPR1‐13  Resources, staff and funds, at PMU and PIUs need to be expanded and increased in qualitative and quantitative terms for a program of the size of PPSP.   

Formation plan for PMU and PIUs to be developed; in addition capacity building and training plan 

TTPS PMU PIUs (USDP) 

QPR1‐14  Level of understanding of PIU staff on mobilization of authority and resources, in particular funds, within their own Ministry 

Specific training for PIU‐staff  PMU USDP 

QPR1‐15  Ownership in PIUs to be strengthened 

Level of delegation of responsibilities, and related deci‐sion‐making power and resources mobilization to be improved in order to enable PIUs to become creative vibrant initiating entities 

TTPS PMU 

QPR1‐16  Status of Provincial and City Facilitators 

Ensure fulltime availability of facilitators in PPSP participating cities/regencies, under multi‐year contracts 

TTPS PMU 

Multi‐year contracts for KMWs under consideration 

QPR1‐17  Information materials on PPSP need more completeness and coherence  

Once the modus operandi of PPSP is elaborated in more detail in the Program Management Manual updates on information materials need to be prepared; storage at central site, with improved accessibility 

PMU PIU‐A  

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

8

No  Issues  Recommendation Main Actors 

Status 

QPR1‐18  Development of Program Memorandum 

Position of PU and PIU‐T re. Program Memorandum to be clarified shortly 

TTPS PU 

QPR1‐19  For the further elaboration of SSKs and development of Program Memorandum the Local Governments are in need of Guidelines and criteria for investment and funding  

Formalization of Minimum Service Standards (SPM) by PU is urgently required  

PU PIU‐T 

QPR1‐20  Local Governments needs guidelines on sanitation systems and technology options which qualify for support from central government  

Guidelines to be prepared by PU/PIU‐T 

PU PIU‐T 

USDP 

QPR1‐21  Central system for document storage and retrieval not operational yet 

Development of USDP Share point site; once completed its use will be more stimulated and enforced 

USDP  Sharepoint site completed; doc. Storage has started  

QPR1‐22  Coherence between PIUs on operations  

Information exchange between USDP Cells at PIUs so as to keep informed about developments in each PIU, and be able to pursue coherence between the PIUs 

USDP  Discussed during monthly MTMs; Minutes of MTMs are posted on Sharepoint 

QPR1‐23  Log frame as presented in Technical Proposal needs to address in more detail the Program Memorandum Stage, and some of specified outputs and deliverables 

Log frame to be updated for Final Inception Report  

USDP  Updated Logframe in Annex to revised Inception Report 

QPR1‐24  Information on non‐availability of USDP funds for implementation of PPSP activities  

Information to be circulated to PIUs by PMU, so as to prevent further misunderstandings 

PMU  Communicated through Cell Coordinators 

 

 

 

 

 

 

 

 

 

 

 

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

ANNEX 3 

List of C

ompleted

 USD

P Re

ports and Docum

ents 

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

10

Annex 3  List of Completed USDP Reports and Documents  

Urban Sanitation Development Program 

Number  Issued  Report Title  Author 

USDP‐R‐PMU‐10001  April 2010  Inception Report USDP Management and Coordinators 

USDP‐R‐PMU‐10002  April 2010  Quarterly Progress Report 1 USDP Management and Coordinators 

USDP‐R‐PIU.T‐10003 

June 2010  Required additional Procedures and Guidelines related to implementation of Sanitation Development 

Jan Kraaij 

USDP‐R‐PMU‐10004  August 2010  Quarterly Progress Report 2 USDP Management and Coordinators 

USDP‐R‐PIU.T‐10005 

June 2010  Laporan Overview SSK dan Identifikasi Kebutuhan Studi Lanjutan Sektor Sanitasi di 13 kota , yaitu: Jambi, Payakumbuh, Blitar, Banjarmasin, Batu, Pekalongan, Pekanbaru, Tegal, Banda Aceh, Kota Bukittinggi, Kota Denpasar, Kota Surakarta dan Kota Kediri 

Team 45 

USDP‐R‐PIU.T‐10006 

June 2010  Tabulasi Overview Strategi Sanitasi Kota_13 Kota (Juni 2010) 

Team 45 

USDP‐R‐PIU.T‐10007 

April 2010  Laporan Kunjungan Lapangan Dalam Rangka Penyusunan Memorandum Program_Pekalongan_Kediri_Blitar (bulan April 2010) 

Team 45 

USDP‐R‐PIU.T‐10008 

April 2010  Laporan Kunjungan Kota Pendahuluan Dalam Rangka Pengenalan USDP & Memorandum Program Sektor Sanitasi_Kota Pekalongan 

Team 45 

USDP‐R‐PIU.T‐10009 

April 2010  Laporan Kunjungan Kota Pendahuluan Dalam Rangka Pengenalan USDP & Memorandum Program (DRAFT) Sektor Sanitasi_Kota Blitar 

Team 45 

USDP‐R‐PIU.T‐10010 

April 2010  Laporan Kunjungan Kota Pendahuluan Dalam Rangka Pengenalan USDP & Memorandum Program (DRAFT) Sektor Sanitasi_Kota Kediri 

Team 45 

USDP‐R‐PIU.T‐10011 

Outline dan Format Isian Memorandum Program 

 

USDP‐R‐PIU.T‐10012 

April 2010  Ringkasan Eksekutif Laporan Kunjungan Lapangan Dalam Rangka Penyusunan Memorandum Program_Pekalongan_Kediri_Blitar (bulan April 2010) 

Team 45 

USDP‐R‐PIU.T‐10013 

30 July 2010  Laporan Review Strategi Sanitasi Kota (SSK)_13 Kota 

Team 45 

USDP‐R‐PIU.T‐10014 

May 2010  Proceeding City Sanitation Summit VII‐Bukittinggi 

USDP Management and Coordinators 

Urban Sanitation Development Program Quarterly Progress Report No. 02, April‐June 2010 

11

Urban Sanitation Development Program 

Number  Issued  Report Title  Author 

USDP‐R‐PIU.T‐10015 

March 2010  Proceeding Rakernas Peran Provinsi USDP Management and Coordinators 

USDP‐R‐PIU.T‐10016 

April 2010  Proceeding Lokakarya Nasional – Penjaringan Minat Kab/Kota Peserta Program PPSP 

USDP Management and Coordinators 

USDP‐R‐PIU.T‐10017 

4 August 2010  Pedoman Penyiapan Kelembagaan dan Indikasi Kegiatan Program Percepatan Pembangunan Sanitasi Permukiman Daerah 

Team PPSP