Testing: Unit Testing / User Manual Module: Quality Management ENVIRONMENT SYSTEM : SAP R/3 ECC 6.0 CLIENT : 200 UNIT TESTING SCENARIO SCENARIO NUMBER : BPML QM03-16 DESCRIPTION : GAUGE CALIBRATION PREPARED & TESTED BY NAME : JL Hatekar SIGNATURE : DATE : TEAM : Approved By : Kabir R (PwC) Page 1 of 29

Upload: kishore-kumar

Post on 25-Nov-2015

17 views

Category:

Documents


0 download

DESCRIPTION

QM03 16 Calibration

TRANSCRIPT

  • Testing: Unit Testing / User Manual Module: Quality Management

    ENVIRONMENT

    SYSTEM : SAP R/3 ECC 6.0

    CLIENT : 200

    UNIT TESTING SCENARIO

    SCENARIO NUMBER : BPML QM03-16

    DESCRIPTION : GAUGE CALIBRATION

    PREPARED & TESTED BY

    NAME : JL Hatekar

    SIGNATURE :

    DATE :

    TEAM :

    Approved By : Kabir R (PwC)

    Page 1 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    1. Transaction Code/ Path

    Enter the menu path of the transaction code, which is going to be tested by the user.

    Menu Path Logistics - CreateT.Code IP11

    2. Input Data

    1. Enter the Input parameters, which need to be given by the user during the testing of this scenario.

    2. Input the value for the fields and then if required, copy the screen shot of the input screen after the table.

    3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2 for every screen.

    2.1 Input Screen Name Create Sales Order: Initial Screen

    Description of the Field

    Nature of the Field Value of the Field

    Order Type Mandatory

    Select New entries

    Page 2 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Select Packages

    Click New Entry And make the entries as per requirement in respective columns as shown below

    Page 3 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Save the data . Strategy 3_5_7days created.

    END

    Page 4 of 29

  • Testing: Unit Testing / User Manual Module: Quality ManagementTO CREATE CALIBRATION TASK LIST

    Menu Path Logistics - CreateT.Code IA05 / 06

    ENTER

    GO TO OPERATION , TYPE CONTROL KEY QM01 AND OPERATION DESC.

    Page 5 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    GO TO MntPack AT BOTTOM MENU

    Tick the required calibration frequency and Go to Insp. Charat bottom menu and click

    Page 6 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Select the MIC by drill down or Select Quant. / Qual. Characteristics, type Short text of Insp Char. And go to Control Indicator and tick required data as shown in below screen and tick

    Page 7 of 29

  • Testing: Unit Testing / User Manual Module: Quality ManagementClick on tick , following screen will display. Drill down on selected set as it is Qualitative Inspection char.

    Click on selected set selection following screen will display

    Page 8 of 29

  • Testing: Unit Testing / User Manual Module: Quality ManagementSelect the selected set and click on tick following screen will display.

    Also select the defect catalog and code group and ENTER

    Select the sampling scheme from drill down. Enter, following screen will display.

    Page 9 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Similarly for Quantitative char. Tick on Quant. And type desc, select the line and go to control indicator. And select the required function as shown in following screen.

    Click on tick,

    Page 10 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Click on tick, enter the required values as shown in following screen.

    Enter and select the Sampling procedure from drill down

    Page 11 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Enter, following screen will display

    Select both the lines and SAVE.------------------------------------------------------------------------------------------------------------CREATE MAINTENANCE PLANMenu Path Logistics - CreateT.Code IP42 / 02/ 03

    Page 12 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Select Maint. Plan. Cat. As PM Maintenance Order and select the strategy from drill down.

    Enter

    Page 13 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Half portion of above screen as given below

    Page 14 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Go to Maint. Plan scheduling parameters tab enter, enter Call horizon, Scheduling period, tick completion requirement, Start of cycle.

    Page 15 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Page 16 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Click on next screen will display

    Tick of Equipment task list if the task list is created for an equipment or tick on Gen. task if the task list is created for general ( All items same) & execute. Following screen will display.

    Page 17 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Save and following screen will display, and Created maintenance plan No. will display at bottom of Screen ( Here it is 151)

    Page 18 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    To created Scheduling T code IP10Enter maintenance Plan, Hit Enter

    Page 19 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Click of Start date of start of cycle will display or give date of start of cycle

    Click on Tick, calibration cycle sill display.

    Page 20 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Save to start the Cycle, the Inspection lot / Order will get created.To check inspection lot T code QA32, The schedule call can be seen from IP24, to see the Order T code IW33

    To see Inspection lot T codeQA32

    Page 21 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Execute,

    List of inspection lot will get display. To see the Schedule calls T code IP24 ( Use Variant /PM)

    Page 22 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Page 23 of 29

  • Testing: Unit Testing / User Manual Module: Quality ManagementExecute , -- Work order 4000502 is created.

    Order can be seen from T Code -- IW33Give order No. 4000502

    Enter

    Page 24 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Go to Operation Tab

    END

    Page 25 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Page 26 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Page 27 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Page 28 of 29

  • Testing: Unit Testing / User Manual Module: Quality Management

    Page 29 of 29