qm03 16 calibration
DESCRIPTION
CALIBERATIONTRANSCRIPT
Testing: Unit Testing / User Manual Module: Quality Management
ENVIRONMENT
SYSTEM : SAP R/3 ECC 6.0
CLIENT : 200
UNIT TESTING SCENARIO
SCENARIO NUMBER : BPML QM03-16
DESCRIPTION : GAUGE CALIBRATION
PREPARED & TESTED BY
NAME : JL Hatekar
SIGNATURE :
DATE :
TEAM :
Approved By : Kabir R (PwC)
Page 1 of 29
Testing: Unit Testing / User Manual Module: Quality Management
1. Transaction Code/ Path
Enter the menu path of the transaction code, which is going to be tested by the user.
Menu Path Logistics - CreateT.Code IP11
2. Input Data
1. Enter the Input parameters, which need to be given by the user during the testing of this scenario.
2. Input the value for the fields and then if required, copy the screen shot of the input screen after the table.
3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2 for every screen.
2.1 Input Screen Name – Create Sales Order: Initial Screen
Description of the Field
Nature of the Field Value of the Field
Order Type Mandatory
Select New entries
Page 2 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Select Packages
Click “New Entry” And make the entries as per requirement in respective columns as shown below
Page 3 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Save the data . Strategy 3_5_7days created.
END
Page 4 of 29
Testing: Unit Testing / User Manual Module: Quality ManagementTO CREATE CALIBRATION TASK LIST
Menu Path Logistics - CreateT.Code IA05 / 06
ENTER
GO TO “OPERATION “, TYPE CONTROL KEY – QM01 AND OPERATION DESC.
Page 5 of 29
Testing: Unit Testing / User Manual Module: Quality Management
GO TO “MntPack” AT BOTTOM MENU
Tick the required calibration frequency and Go to “Insp. Char”at bottom menu and click
Page 6 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Select the MIC by drill down or Select Quant. / Qual. Characteristics, type Short text of Insp Char. And go to “Control Indicator” and tick required data as shown in below screen and tick
Page 7 of 29
Testing: Unit Testing / User Manual Module: Quality ManagementClick on tick , following screen will display. Drill down on selected set as it is Qualitative Inspection char.
Click on “selected set selection” following screen will display
Page 8 of 29
Testing: Unit Testing / User Manual Module: Quality ManagementSelect the “selected set “ and click on tick following screen will display.
Also select the defect catalog and code group and ENTER
Select the sampling scheme from drill down. Enter, following screen will display.
Page 9 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Similarly for Quantitative char. –Tick on Quant. And type desc, select the line and go to control indicator. And select the required function as shown in following screen.
Click on tick,
Page 10 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Click on tick, enter the required values as shown in following screen.
Enter and select the “Sampling procedure” from drill down
Page 11 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Enter, following screen will display
Select both the lines and SAVE.------------------------------------------------------------------------------------------------------------CREATE MAINTENANCE PLANMenu Path Logistics - CreateT.Code IP42 / 02/ 03
Page 12 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Select Maint. Plan. Cat. As PM Maintenance Order and select the strategy from drill down.
Enter
Page 13 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Half portion of above screen as given below
Page 14 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Go to “Maint. Plan scheduling parameters” tab enter, enter Call horizon, Scheduling period, tick completion requirement, Start of cycle.
Page 15 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Page 16 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Click on next screen will display
Tick of Equipment task list if the task list is created for an equipment or tick on Gen. task if the task list is created for general ( All items same) & execute. Following screen will display.
Page 17 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Save and following screen will display, and Created maintenance plan No. will display at bottom of Screen ( Here it is 151)
Page 18 of 29
Testing: Unit Testing / User Manual Module: Quality Management
To created Scheduling – T code – IP10Enter maintenance Plan, Hit Enter
Page 19 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Click of “Start” date of start of cycle will display or give date of start of cycle
Click on Tick, calibration cycle sill display.
Page 20 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Save to start the Cycle, the Inspection lot / Order will get created.To check inspection lot – T code –QA32, The schedule call can be seen from IP24, to see the Order – T code – IW33
To see Inspection lot – T code—QA32
Page 21 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Execute,
List of inspection lot will get display. To see the Schedule calls – T code – IP24 ( Use Variant /PM)
Page 22 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Page 23 of 29
Testing: Unit Testing / User Manual Module: Quality ManagementExecute , -- Work order 4000502 is created.
Order can be seen from T Code -- IW33Give order No. – 4000502
Enter
Page 24 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Go to “Operation Tab”
END
Page 25 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Page 26 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Page 27 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Page 28 of 29
Testing: Unit Testing / User Manual Module: Quality Management
Page 29 of 29