Ashghal Overview
Public Works Authority
(Ashghal)
Overview
President’s Technical Office
October 2019
Ashghal Overview
Ashghal Headquarters▪ Established in 2004 to be responsiblefor planning, design, procurement,construction, delivery, and assetsmanagement of national infrastructureand public buildings in Qatar.
▪ Aims to deliver high profile projects for:
▪ Ministry of Public Health (MOPH).
▪ Ministry of Education and Higher Education.
▪ Ministry of Awqaf and Islamic Affairs
▪ Other public sectors.
Ashghal Portfolio
❖ Project AffairsRoads and Infrastructure
➢ Highway Projects➢ Local Roads projects➢ Drainage Networks projects
Buildings➢ Health projects➢ Education projects➢ Mosques and Awqaf projects➢ Public Projects
❖ Assets Affairs➢ Drainage Networks ➢ Operations & Maintenance➢ Roads Maintenance.
❖ Beautifications➢ Highways and local roads➢ Parks, bridges, tunnels and beaches➢ Corniche and Doha central development
Assets
4 Bn
Drainage
3 Bn
Buildings
8 BnExpressway
6 Bn
Local roads
and
Drainage
15 Bn
Ashghal Portfolio will exceed 40 Billion USD over the Upcoming 5 years (2020-2024)
Sample projects
5/6 Interchange
Drainage Management Centre Drainage Project
Health Project
Expressway Programme Overview
771/850Km New Road Network
151/200New or UpgradedMajor Interchanges
200/233Bridges / Underpasses
Delivered against 2022 Plans
853/1115Km Footpath / Cycleway and Shared Path
Local Areas Infrastructure Programme
Infrastructure all over Qatar.
• New Residential Divisions
• New Government Housing
• Upgrade Existing Areas
• Industrial Areas
• Villages & Outer Roads
6,700 km
Roads
3,400 km
Foul Sewer182,000
Plots
Local Roads Future Projects
Marine & Ports
Rail interfaces
Local roads and drainage programmewith Annual budget exceeding
$ 3 Bn/ Annum
Expected projects to start in 2019 and Beyond
▪ Al Meshaf South▪ Al Kharaitiyat/ Izghawa▪ Duhail South/ Umm Lekhba▪ Al Ebb/ Leabaib▪ Jeryan Nejaima▪ West Muaither▪ Al Mearad/Southwest Muaither▪ Industrial area (Pkg 03 & 04)▪ Call off Contracts Drainage Projects
Drainage ProjectsOverview
Doha South Sewage Infrastructure Project
Mesaimeer Tunnel
5,100 km Drainage
1,100 km TSE
Drainage Future Projects
Al Wakrah – Al Wukair Sewage treatment Plant:A main project that will be floated in 2019 (PPP)
Drainage programme Budget is expected toexceed USD 3 Billion over the upcoming years.Those projects will have different procurement schema including PPP.
Other projects include :
• Surface and ground water network Schema
▪ Health (Actual: 10, Planned: 11)
▪ Education (Actual: 19, Planned: 19)
▪ General and Municipal Projects (Actual: 26, Planned: 26)
Buildings
Ashghal is responsible for delivering Government Building Projects
Type of projects:
Sample Building Projects
Awqaf ProjectHealth Project
Health Project School ProjectSchool Project
Future Building Projects
• MOTC Public Bus Infrastructure Program (8 Bus stations , 4 Bus Depots) .
• Lusail Racing Circuit
• Expo 2021 Doha
• College of Medicine and Qatar University Admin and Service Building.
• Cultural District Project
• 16 Pedestrian Bridges
• General buildings
Doha Beautification Program
Al-Abraj Park
Cooled / shaded walkways
5/6 lighting
• Parks and Green Areas• Highways and Local roads , Airport Road• Doha Central And Corniche development• Bridges, Tunnels and Beaches
15
Thank You