February 19th, 2008 –

AlpineFebruary 20th, 2008 -

PresidioFebruary 25th, 2008 –

Midland/OdessaFebruary 26th, 2008 –

Fort Stockton

Public Meeting #2

Page 2: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Purpose of This Public Meeting

Second of Three Rounds•

Meetings in:–

Alpine

Presidio

Midland/Odessa

Ft. Stockton

Purpose:–

Provide information on the study process

Gather feedback on the process and issues

Page 3: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Meeting Format

Open House•

Presentation–

Project overview

Freight diversion analysis

Conceptual alternative evaluation

Where do we go from here

10 Minute Recess•

Comment Period

Page 4: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Project Overview

Page 5: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Project Overview

Data Collection•

Environmental Constraints Mapping

Freight Diversion Analysis•

Corridor Analysis

Economic Analysis•

Corridor Development Plan

Finance Plan•

Public Involvement/Outreach

Page 6: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Three Step Study Process

Step OneData CollectionFreight Diversion Analysis

Step Two

Alternative Development and Analysis

Step Three

Corridor DevelopmentPlan

Public Involvement

Page 7: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Project Study Area

Presidio

Marfa Alpine

Ft Stockton

Monohans

Odessa

Midland

Van Horn Balmohrea

Ft Davis

Pecos

Page 8: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Why are We Doing this Study

To determine the volume of freight and overall vehicle volumes that can reasonably

be

expected in this study area.

To determine the level of improvements required to effectively invest transportation dollars.

To provide proactive planning for the roadway network and communities in the area.

Page 9: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Summary of Results

• Freight Diversion to Presidio (Year 2030)–

Scenario

A

338 Trucks/Day Inbound

Scenario

B

739 Trucks/Day Inbound

• Based on These Numbers–

2 Lanes sufficient in southern segments

Existing infrastructure sufficient in the study area–

Urban areas will be evaluated in next phase

• Freight Diversion Analysis Looked at 2 Scenarios–

Scenario

A

All Mexico infrastructure completed

after the year 2030–

Scenario B

All Mexico infrastructure completed

prior to the year 2020

Page 10: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Freight Diversion Analysis

Page 11: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Freight Diversion Process

Identify key factors likely to influence future freight demand at the Presidio port-of-entry.

Develop a freight model through a risk analysis process to determine probable freight distribution.

Refine model assumptions to estimate a likely range of future freight demand given different Mexican infrastructure completion scenarios.

Converted freight to trucks for discussion purposes. Numbers can easily be converted to rail.

Page 12: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Key Factors Considered

Diversion from Port of Los Angeles/Port of Long Beach–

Other US Ports (West Coast and Gulf Coast)

Other Mexico West Coast Ports•

Share of Freight at Topolobampo–

Lazaro Cardenas

Manzanillo–

Others

Diversion From Other Border Ports of Entry–

El Paso

Santa Teresa–

Others

Internal Mexico Freight Growth–

Maquiladora interviews from previous studies

Historical trends

Page 13: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Freight Model/Risk Analysis Process (RAP)

• Detailed data collection process

• Assigned estimates and ranges (probability distributions) to each variable

• Gathered feedback from local Technical Advisory Committee members and expert sources

• Modified model results to reflect feedback

• Finalized draft results

Page 14: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Freight Forecast Results

Looked at two scenarios for Mexico infrastructure completion

Scenario A

-

Mexico infrastructure completion after 2030

Scenario B

-

Mexico infrastructure completion prior to 2020

Mexico infrastructure completion includes:•

Improvements at the port of Topolobampo

Roadway and/or rail improvements through the Copper Canyon

Page 15: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Freight Forecast Results Inbound Truck Volume at Presidio

2010 2020 2030Low Forecast Value 25 63 233Median (“Most Likely”) 47 195 739High Forecast Value 75 527 2224

Scenario A -

Mexico Infrastructure After 20302010 2020 2030

Low Forecast Value 25 43 37Median (“Most Likely”) 47 174 338High Forecast Value 75 501 1851

Scenario B -

Mexico Infrastructure Prior to 2020

Page 16: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Freight Forecast Results

Scenario Comparison

“Most Likely”Includes 2010 2020 2030

Baseline• Internal Mexico Growth

44 82 152

Scenario

A

Internal Mexico Growth•

Diversion from other ports of entry

47 174 338

Scenario

B

Internal Mexico Growth•

Diversion from other ports of entry

Mexico Infrastructure Completion

47 195 739

Page 17: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Other Factors That Could Influence Results

Mexico infrastructure completion date

Mexico’s emphasis on rail versus roadway

Potential route through Torreon and Camargo to Presidio via Mexico highway 67

Future competing ports (Puerto Colonet)

Others

Page 18: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Overall Traffic Forecast Results

• Utilized the results of the freight diversion analysis

• Use of SAM model to forecast volumes in the study area

• Developed threshold table to:•

Identify areas of needed improvement

Provide a basis for improvements if forecast volumes are reached sooner than projected

Page 19: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Level of Service

LOS DescriptionA Free flow operationsB Reasonable traffic flow conditions

C Near free flow operations, some minor flow restrictions

D Some minor congestionE Operation at roadway capacity

F Severe congestion, stop and go operation

Page 20: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Roadway Threshold Table

LOSAverage Daily Traffic

2 Lane Roadway 4 Lane RoadwayA 1,800 13,400B 3,300 21,900C 5,900 31,400D 10,200 40,100E 17,500 44,500F > 17,500 > 44,500

Page 21: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Alpine

Monohans

Odessa

Midland

Van Horn

Pecos

Presidio

Marfa

Ft Stockton

Ft Davis

Balmohrea

Crane

McCamey

LOS A or B

LOS C or D

LOS E or F

Year 2030LOS Results

Scenario BMost Aggressive

Alternative

67

6790

38510

10

20385

Page 22: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Overall Traffic Forecast Results

Recommendation of Corridor NeedsFocus on Safety and Mobility Improvements

Mexico freight diversion does not warrant additional capacity improvements

4 lane widening not warranted in southern segments

Existing infrastructure sufficient in the study area

Urban areas will be evaluated in next phase

Page 23: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Safety and Mobility Improvements

Passing Lanes

Clearance Issues

Roadway Geometric Improvements

Reliever Route Evaluations

Others

Page 24: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Reliever Route Evaluation

Reliever Routes will be reviewed in the next phase of the study based on the need in urban areas

Environmental, engineering and mobility criteria will be evaluated

Several options will be proposed along with a no-build alternative

Further evaluation and NEPA compliance will occur in subsequent studies

Page 25: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Alternative Analysis

Page 26: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Conceptual Alternative Analysis

To identify routes to develop potential safety and mobility improvements

To prepare a proactive plan in the event that the threshold is ever

met.

This Study will not make the final determination of location, rather recommend improvement type and location

The No-Build Alternative will remain through the end of this study for any improvements proposed

Subsequent NEPA studies will determine final location and detailed impacts analysis

Page 27: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Conceptual Alternative Analysis

Alternative Identification–

No-build

Upgrade Designated Corridor–

Other Alternatives

Determination of Feasibility–

Engineering

Environmental–

Mobility

Public Involvement

Page 28: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Presidio

Marfa Alpine

Ft Stockton

MonohansOdessa

Van Horn

Ft Davis

Pecos

Midland

McCamey

Crane

Conceptual Alternatives

Page 29: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Recommended Viable Alternatives

Propose to eliminate the new corridor alternatives

Reliever routes to be reviewed in the next phase of the study based on the need in urban areas

Rail alternative to be included in viable alternatives

No-build alternative will be included for all proposed improvements

Viable alternatives will be screened to the proposed routes for improvements

Page 30: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Project Summary

Page 31: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Summary of Freight and Traffic Results

Freight Traffic Numbers (Year 2030)–

Baseline –

152

trucks per day

Scenario A –

338

trucks per day

Scenario B –

739

trucks per day

Roadway Improvements–

Existing infrastructure is sufficient to handle forecasted traffic

Study to focus on safety and mobility improvements

Conceptual Alternative Screening–

New corridor alternatives eliminated

Page 32: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Where Do We Go From Here?

Data CollectionPublic Meeting #1Freight Diversion AnalysisConceptual Alt. ScreeningPublic Meeting #2Viable Alt. ScreeningPublic Meeting #3Corridor Development PlanStudy Complete

Dec 2006Mar 2007Jan 2008Jan 2008Feb 2008May 2008Aug 2008Oct 2008Oct 2008

Page 33: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Public Feedback is Vital to the Study

Three Rounds of Public Meetings•

Project Newsletter

Project Web-page:www.dot.state.tx.usKeyword: La Entrada

Project Hotline: 1-800-517-4652

Project Email:[email protected]

Written Comments To:Peggy Thurin, PE

Texas Department of Transportation17111 Preston Road, Suite 200

Dallas, Texas 75248-1232

Page 34: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

10 Minute Recess

Page 35: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

Comment Period

Names will be called from those who have filled out a comment card

The name of the following speaker will also be called

Please keep comments concise to provide an opportunity for everyone to speak

Once everyone has had a chance to speak an opportunity for additional comments will be provided

Page 36: Public Meeting #2 - plans.dot.state.tx.usplans.dot.state.tx.us/pub/txdot-info/library/projects/la_entrada/... · La Entrada al Pacifico February 19 th, 2008 – Alpine. February 20

La Entrada al Pacifico

February 19th, 2008 –

AlpineFebruary 20th, 2008 -

PresidioFebruary 25th, 2008 –

Midland/OdessaFebruary 26th, 2008 –

Fort Stockton

Public Meeting #2