916-340-6236 riverfrontstreetcar.com [email protected] Participate in an online open house from June 14-29 that will be available 24 hours a day. The online format will allow you to view the same information that will be shown at the in-person public open house and provide input. c/o Public Outreach 2379 Gateway Oaks Drive Suite 200 Sacramento, CA 95833 Unable to attend the open house? No problem, join the discussion online! PUBLIC INFORMATIONAL MEETING Downtown Riverfront Streetcar Public Information Open House As Sacramento and West Sacramento continue to transform into vibrant places to live, work and play, moving people to their desired destinations with ease is vital for residents, visitors and businesses alike. Mobility, access and convenience within our active and evolving urban core is a top priority and the Downtown Riverfront Streetcar will allow riders to reach key destinations in the corridor with ease. The Riverfront Joint Powers Authority, a unique partnership between the cities of West Sacramento and Sacramento, and their project team are nearing completion of the Final Design of the Streetcar project. STREETCAR Downtown Riverfront PRESORTED FIRST CLASS US POSTAGE PAID SACRAMENTO, CA PERMIT 1890

Upload: others

Post on 21-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PUBLIC INFORMATIONAL MEETING · Report completed Preliminary Engineering Environmental Analysis Completed Construction Begins Fall 2016 Initiate Final Design March 2017 50% Final

916-340-6236 riverfrontstreetcar.com [email protected]

Participate in an online open house from June 14-29 that will be available 24 hours a day.

The online format will allow you to view the same information that will be shown at the in-person public open house and provide input.

c/o

Pub

lic O

utre

ach

2379

Gat

eway

Oak

s D

rive

Suite

20

0Sa

cram

ento

, CA

958

33

Unable to attend the open house?No problem, join the discussion online!

PUBLICINFORMATIONALMEETING

Downtown Riverfront Streetcar Public Information Open HouseAs Sacramento and West Sacramento continue to transform into vibrant places to live, work and play, moving people to their desired destinations with ease is vital for residents, visitors and businesses alike. Mobility, access and convenience within our active and evolving urban core is a top priority and the Downtown Riverfront Streetcar will allow riders to reach key destinations in the corridor with ease.

The Riverfront Joint Powers Authority, a unique partnership between the cities of West Sacramento and Sacramento, and their project team are nearing completion of the Final Design of the Streetcar project.

STREETCARDowntown Riverfront

PRES

ORTE

DFI

RST C

LASS

US P

OSTA

GEPA

IDSA

CRAM

ENTO

, CA

PERM

IT 18

90

Page 2: PUBLIC INFORMATIONAL MEETING · Report completed Preliminary Engineering Environmental Analysis Completed Construction Begins Fall 2016 Initiate Final Design March 2017 50% Final

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2012SYSTEM PLAN ADOPTED

System Testing

SERVICE BEGINS

Economic Benefits Report completed

Preliminary Engineering

Environmental Analysis Completed

Construction Begins

Fall 2016Initiate Final Design

March 201750% Final Design

July 2017City of Sacramento Community Facilities District Approved

September 201785% Final Design

November 2017Formation of Joint Powers Authority

Summer 2018Vehicle Procurement

Summer 2018100% Final Design

FINAL DESIGN PHASE (2016-2018)

Find out the latest Streetcar news at our upcoming public open house!

What Streetcar Offers:

INTE

RST

ATE

5

STATECAPITOL

SACRAMENTOCONVENTION

CENTER

GOLDEN 1CENTER

SACRAMENTOVALLEY STATION

RAILYARDS

DOWNTOWN

MIDTOWNCROCKER ART

MUSEUM

THEBARN

MUSICCIRCUS

MEMORIALAUDITORIUM

STATE EASTEND COMPLEX

STATE EASTEND COMPLEX

CROCKERPARK

CALSTRS

ZIGGURATBUILDING

HOLIDAYINN

EMBASSYSUITES

SOUTHSIDEPARK

O’NEIL FIELD

ROOSEVELTPARK

STANFORDMANSION

TOWERTHEATRE

FREMONTPARK

SAC

RA

MEN

TO R

IVER

WEST SACRAMENTO

SACRAMENTO

HT

81

HT

02

HT

8

HT

41

DR3

HT5

HT31

HT

01

HT51

HT

9

HT11

HT21

HT

6

HT

61

TS1 2

HT

4

HT

91

HT71

HT7

JEFFERSON

WEST CAPITOL

HIGHWAY 50

F

T

U

V

W

S

K

O

H

G

L

R

I

J

CAPITOL

Q

N

P

CITY HALL

RALEYFIELD

RIV

ER W

ALK

PA

RK

OLDSACRAMENTOWASHINGTON

DISTRICT

ALKALI FLAT MANSIONFLATS

BOULEVARDPARK

BRIDGEDISTRICT

PIONEERBLUFF

REDEVELOPMENT

DOCKS

SACRAMENTO CITYCOLLEGE CENTER

HYATTREGENCY

SHERATONGRAND

CRESTTHEATRE

SAC COUNTYOFFICES

CHAVEZPLAZA

CITYHALL

CITIZENHOTEL

5TH

3RD

BALLPARK DR

WEST CAPITOL

MARKET ST

BRIDGE ST

TOWER B

RIDGE G

ATEWAY

RIV

ERFR

ON

T

GARDEN STMILL ST

SILO ALLEY

STREETCAR STOP

STREETCAR ALIGNMENT

EXISTING LIGHT RAIL ROUTE

MAINTENANCE FACILITY

H STREET LRT ALIGNMENT

EXISTING LIGHT RAIL STATION

NEW LIGHT RAIL STATION

$

Inspires ConnectionLinks major destinations between West Sacramento and Sacramento’s downtown and midtown districts

Takes Cars Off the RoadReduces traffic congestion and the need for additional parking facilities

Promotes MobilityOffers a reliable, convenient, high frequency alternative that enhances existing transit services for a complete network

Stimulates Economic Vitality Connects people to jobs and fosters redevelopment within the corridor

Encourages Environmental SustainabilityEnhances livability within the urban core while supporting healthier travel

Enriches Passenger ExperienceProvides riders with inexpensive modern travel that includes enhanced communications and easy access

1adult

Thursday, June 14, 20185:30 to 7:00 p.m.

Sacramento City HallHistoric Hearing Room

915 I Street, Sacramento

Final Design Progress

Station Planning - Amenities and Concepts

Alignment / Station Locations

Next Stop - Construction

M A R K YO U R CALENDARS!