    Pl i d S h d li

    ann ng an c e u ng

    Basics

    EDGe Consulting Engineers Ltd.Hyderabad, India

  • 7/28/2019 Project Planning Basics

    2/28

    A project is a set of activities and theirassociated information that constitutes a planfor creating a product or service. A project

    has a start date and finish date, WBS,resource assignments and expenses. It canalso include risks, work documents andproject-specific codes and calendars.

  • 7/28/2019 Project Planning Basics

    3/28

    Characteristics of a Pro ect 5 Aspects of a Project

    , , , For a Project Management Software, It covers

    Schedule: Timeline core

    Resource: Man, Material, Plant

    Cost: Mone

    Risk: Identify, classify and quantify

    Life Span of a Project

    Planning: establish baseline when project starts

    Controlling: monitoring, updating during projectexecu on

    Managing: changes, variations and revision

    ,

  • 7/28/2019 Project Planning Basics

    4/28

    - In SMART Way Specific: scope of work to be clearly defined

    Measurable: able to measure progress (%),

    resource (MH) and cost ($) Achievable: realistic based on current

    roductivit

    Resource Availability: make ready for man,

    Time-bound: have start and finish date

  • 7/28/2019 Project Planning Basics

    5/28

    Add a project to EPS and assign one of OBS

    , ,account, duration type, percent completion type Project environment

    Set up project WBS

    Add a list of activities Determine activitys duration based on volume of

    work, production rate and past work experience ss gn a to act v ty

    Link activities ocate resources to act v ty rom resource poo Allocate cost to activity c e u e pro ect, rev ew an esta s ase ne

  • 7/28/2019 Project Planning Basics

    6/28

    way

    Record progress, manhour and cost and

    Analyze and report project status using

    Revise baseline when there are substantial

    the actual construction any more

    Lean construction (last planner) application

  • 7/28/2019 Project Planning Basics

    7/28

  • 7/28/2019 Project Planning Basics

    8/28

    P6 Module Overview

  • 7/28/2019 Project Planning Basics

    9/28

    Module: Features

    Centralised database for all project data (datares es on server

    Layout presentation and grouping based onWork Breakdown Structure (WBS)

    Hierarchal structure on EPS, OBS, ro ects,activities, resources and costs with codes and

    values

  • 7/28/2019 Project Planning Basics

    10/28

    Establish the Environment

    Enterprise Project Structure (EPS)

    Organisation Breakdown Structure (OBS)

    Global Calendars Resource pool

    Bud et structure

    Coding structure like project code and activitycode for filterin rou in and data anal sis

  • 7/28/2019 Project Planning Basics

    11/28

    an

    Enterprise Project Structure (EPS)

    Company-wide hierarchical project

    breakdown Structure Organisation Breakdown Structure (OBS)

    -managers for the projects

  • 7/28/2019 Project Planning Basics

    12/28

    Side

    PM1 PM2 PM3

    PJ1

    PJ2

    PJ3

    EPS

  • 7/28/2019 Project Planning Basics

    13/28

    OBS

    rocess v p ng qu pment

    nstrument

    ectr ca onstruction

    A

    B

    Pro ectC

    Pro ectD

  • 7/28/2019 Project Planning Basics

    14/28

    OBS Example

  • 7/28/2019 Project Planning Basics

    15/28

    EPS Example

  • 7/28/2019 Project Planning Basics

    16/28

    EPS -> Projects Example

  • 7/28/2019 Project Planning Basics

    17/28

    (WBS)

    Deliverable-oriented hierarchy

    ,highest level, followed by strings of

    level of work package

    - .

    customised project-specific WBS Play an essential role in P6. It can be

    assigned OBS, resource, budget and trackedy earne va ue or t e progress

  • 7/28/2019 Project Planning Basics

    18/28

    WBS Example

  • 7/28/2019 Project Planning Basics

    19/28

    WBS Example

  • 7/28/2019 Project Planning Basics

    20/28

    Global

    Project specific

    WBS s ecific Resource specific

    C di St t R

  • 7/28/2019 Project Planning Basics

    21/28

    Coding Structure: Resource

  • 7/28/2019 Project Planning Basics

    22/28

    Coding Structure: ProjectCode

  • 7/28/2019 Project Planning Basics

    23/28

    Resource and Role

    Resource includes

    Material

    an

    Role Required personnel skill and proficiency

    level -> Job title and function

    Resource calendar

    Resource limit (availability) (MH / day) Resource cost ($ / MH)

  • 7/28/2019 Project Planning Basics

    24/28

    Resource and RoleRole

    o e

    (Job Title)

    o e

    (Job Title)

    o e

    (Job Title)

    Resource 1

    (Personnel )Resource 2

    Resource 3ersonne

    Resource

  • 7/28/2019 Project Planning Basics

    25/28

    Resource Example

  • 7/28/2019 Project Planning Basics

    26/28

    Role Example

  • 7/28/2019 Project Planning Basics

    27/28

    Bud et and Cost

    - Bottom-up approach: for accurate estimate

    u get tota an spen ng p an mont ydistribution)

    esource c onary an cos accoun

    Budgeted cost=Budgeted unit (man-hour) xr ce per un or eac ac v y

    Roll up to Project, EPS or WBS level

  • 7/28/2019 Project Planning Basics

    28/28