project objectives
DESCRIPTION
Project objectives. 4 main objectives Increase MV/LV PV integration thanks to a “Network Energy Manager” Study and model customers response Operate a pocket of LV network on an Islanding mode Study business models 2 key features Project based on ERDF Linky smart meter architecture - PowerPoint PPT PresentationTRANSCRIPT
Project objectives
4 main objectives– Increase MV/LV PV integration thanks to a “Network Energy
Manager”– Study and model customers response– Operate a pocket of LV network on an Islanding mode– Study business models
2 key features– Project based on ERDF Linky smart meter architecture– 3 levels of electricity storage
CARROS
TOULON
NICE
AVIGNON
MARSEILLE
400 kV line
Site description Carros located in Southern France, in an “electrical
peninsula” 10 500 inhabitants, with residential and industrial
areas Already 1,8 MWp of solar PV Single 400 kV line supplying the area 88 secondary substations 20 MW peak load
Use cases Optimize massive PV integration in the
distribution grid Test islanding within a low voltage district Test 3.5 MW load shedding within the city of Carros Incentivize prosumer behavior
Nice Grid Facts and Figures
Nice Grid Use Cases on a map
PV Area550 Linky clients150 kWp installed
Battery locations
Islanding area12 Industrial clients420 kWp installedCustomer Behavior :2600 Linky clients
Lou Souleou
Plaine 1
Cailletiers
Pesquier
Colombie
Docks Trachel
Rosemarines
Flexible Load Management
Power
Power
ConsumptionPV generation
Load shifting
Flexibilities
Traditional Generation / Consumption curves
Generation / Consumption curves with flexible load management
Time
Time
- +
Nice Grid Batteries
1 MW / 560 kWh
250 kW / 620 kWh
4 kW / 4 kWh
Sept. 2014Sept. 2014
33 kW / 106kWh Nov. 2014Nov. 2014
Oct. 2014Oct. 2014
Dec. 2013Dec. 2013
Nice Grid Architecture
NETWORK ENERGY MANAGER (NEM)
CONSUMPTION FORECASTS D-1
AGREGATOR B2B
NETWORK AGREGATOR
FLEXIBILITY REQUESTS
TRANSMISSION SYSTEM OPERATOR DEMAND RESPONSE REQUESTS
OPTIMIZATION AND MANAGEMENT
BIDS
GENERATION FORECASTS D-1
AGREGATOR B2C
www.grid4eu.eu
Load shifting
+2300 Wh consumption per client between 12 PM and 4 PM
- 1000 Wh consumption per client on previous off-peak block (no electrical boiler start)
-1100Wh consumption during on-peak time (appliances shifting)
+200Wh consumption in total per client
Average power consumption and generationin Watts
Average power consumption on 21 clients with solar off-peak hoursAverage reference power consumption for the 21 clientsAverage PV generation for 40 PV generators
Source: ERDF, EDF R&D
www.grid4eu.eu
The Nice Grid Consortium
Leaders
Participants
Academics, R&D
Sponsors, Local Authorities