Project objectives 4 main objectives Increase MV/LV PV integration thanks to a “Network Energy Manager” Study and model customers response Operate a pocket of LV network on an Islanding mode Study business models 2 key features Project based on ERDF Linky smart meter architecture 3 levels of electricity storage

Upload: kameko-mack

Post on 31-Dec-2015

21 views

Category:

Documents


1 download

DESCRIPTION

Project objectives. 4 main objectives Increase MV/LV PV integration thanks to a “Network Energy Manager” Study and model customers response Operate a pocket of LV network on an Islanding mode Study business models 2 key features Project based on ERDF Linky smart meter architecture - PowerPoint PPT Presentation

TRANSCRIPT

Project objectives

4 main objectives– Increase MV/LV PV integration thanks to a “Network Energy

Manager”– Study and model customers response– Operate a pocket of LV network on an Islanding mode– Study business models

2 key features– Project based on ERDF Linky smart meter architecture– 3 levels of electricity storage

CARROS

TOULON

NICE

AVIGNON

MARSEILLE

400 kV line

Site description Carros located in Southern France, in an “electrical

peninsula” 10 500 inhabitants, with residential and industrial

areas Already 1,8 MWp of solar PV Single 400 kV line supplying the area 88 secondary substations 20 MW peak load

Use cases Optimize massive PV integration in the

distribution grid Test islanding within a low voltage district Test 3.5 MW load shedding within the city of Carros Incentivize prosumer behavior

Nice Grid Facts and Figures

Nice Grid Use Cases on a map

PV Area550 Linky clients150 kWp installed

Battery locations

Islanding area12 Industrial clients420 kWp installedCustomer Behavior :2600 Linky clients

Lou Souleou

Plaine 1

Cailletiers

Pesquier

Colombie

Docks Trachel

Rosemarines

Flexible Load Management

Power

Power

ConsumptionPV generation

Load shifting

Flexibilities

Traditional Generation / Consumption curves

Generation / Consumption curves with flexible load management

Time

Time

- +

Nice Grid Batteries

1 MW / 560 kWh

250 kW / 620 kWh

4 kW / 4 kWh

Sept. 2014Sept. 2014

33 kW / 106kWh Nov. 2014Nov. 2014

Oct. 2014Oct. 2014

Dec. 2013Dec. 2013

Nice Grid Architecture

NETWORK ENERGY MANAGER (NEM)

CONSUMPTION FORECASTS D-1

AGREGATOR B2B

NETWORK AGREGATOR

FLEXIBILITY REQUESTS

TRANSMISSION SYSTEM OPERATOR DEMAND RESPONSE REQUESTS

OPTIMIZATION AND MANAGEMENT

BIDS

GENERATION FORECASTS D-1

AGREGATOR B2C

www.grid4eu.eu

Load shifting

+2300 Wh consumption per client between 12 PM and 4 PM

- 1000 Wh consumption per client on previous off-peak block (no electrical boiler start)

-1100Wh consumption during on-peak time (appliances shifting)

+200Wh consumption in total per client

Average power consumption and generationin Watts

Average power consumption on 21 clients with solar off-peak hoursAverage reference power consumption for the 21 clientsAverage PV generation for 40 PV generators

Source: ERDF, EDF R&D

www.grid4eu.eu