Smith Street Motorway and Olsen Avenue Interchange upgrade Project completion July 2015 Construction on the Smith Street Motorway and Olsen Avenue Interchange upgrade is now complete. The Smith Street Motorway and Olsen Avenue Interchange Upgrade was part of a $119 million package of road upgrades to improve traffic flow and road capacity, increase road safety and provide better connectivity to the growing Health and Knowledge Precinct in Southport. Key features The key features of the upgrade include: a free-flowing loop from Olsen Avenue onto the Smith Street Motorway westbound, allowing southbound motorists to travel westbound towards the motorway without stopping at traffic lights a third eastbound lane on the Smith Street Motorway between the Pacific Motorway (M1) and the Olsen Avenue off-ramp, improving motorist safety and reducing congestion six lanes on Olsen Avenue between the interchange and Crestwood Drive, providing more capacity and reducing congestion a new signalised intersection between Parklands Drive and Kumbari Avenue six lanes on the Smith Street Motorway between the interchange and Kumbari Avenue, improving traffic flow shared footpaths, signalised pedestrian crossings and on-road cycling provisions throughout the interchange, increasing safety for pedestrians and cyclists widening and lengthening of the eastbound off-ramp to Olsen Avenue from three to five lanes, providing additional capacity and reducing congestion resurfacing works in both directions on the Smith Street Motorway and Olsen Avenue, to provide a smoother and more durable road surface. The project team would like to thank the residents and local businesses of Parkwood and Molendinar for their patience during this important road upgrade. Construction on the Smith Street Motorway and Olsen Avenue interchange is now complete.

Upload: others

Post on 23-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project completion July 2015 - tmr.qld.gov.au/media/Projects/S/Smith Street Motorway and … · Project completion July 2015 Construction on the Smith Street Motorway and Olsen Avenue

     

Smith Street Motorway and Olsen Avenue Interchange upgrade Project completion July 2015

Construction on the Smith Street Motorway and Olsen Avenue Interchange upgrade is now complete.

The Smith Street Motorway and Olsen Avenue Interchange Upgrade was part of a $119 million package of road upgrades to improve traffic flow and road capacity, increase road safety and provide better connectivity to the growing Health and Knowledge Precinct in Southport.

Key features The key features of the upgrade include:

a free-flowing loop from Olsen Avenue onto the Smith Street Motorway westbound, allowing southbound motorists to travel westbound towards the motorway without stopping at traffic lights

a third eastbound lane on the Smith Street Motorway between the Pacific Motorway (M1) and the Olsen Avenue off-ramp, improving motorist safety and reducing congestion

six lanes on Olsen Avenue between the interchange and Crestwood Drive, providing more capacity and reducing congestion

a new signalised intersection between Parklands Drive and Kumbari Avenue

six lanes on the Smith Street Motorway between the interchange and Kumbari Avenue, improving traffic flow

shared footpaths, signalised pedestrian crossings and on-road cycling provisions throughout the interchange, increasing safety for pedestrians and cyclists

widening and lengthening of the eastbound off-ramp to Olsen Avenue from three to five lanes, providing additional capacity and reducing congestion

resurfacing works in both directions on the Smith Street Motorway and Olsen Avenue, to provide a smoother and more durable road surface.

The project team would like to thank the residents and local businesses of Parkwood and Molendinar for their patience during this important road upgrade.

Construction on the Smith Street Motorway and Olsen Avenue interchange is now complete.

Page 2: Project completion July 2015 - tmr.qld.gov.au/media/Projects/S/Smith Street Motorway and … · Project completion July 2015 Construction on the Smith Street Motorway and Olsen Avenue

     

For more information Phone: During business hours 07 5563 6600 Outside of business hours 13 19 40 (call charges apply) Email: [email protected] Web: www.tmr.qld.gov.au or www.131940.qld.gov.au Post: Department of Transport and Main Roads, PO Box 442, Nerang Qld 4211

Constructed a third eastbound lane between the M1 and the Olsen Avenue off-ramp

Resurfaced both directions between the M1 and Parklands Drive

Widened and resurfaced eastbound on-ramp from Olsen Avenue

To Pacific Motorway (M1)

To Southport Smith Street Motorway and Olsen Avenue Interchange Upgrade project

Olsen Avenue widened from four to six lanes, between the interchange and Crestwood Drive

Additional signalised pedestrian crossings at the interchange

Free-flowing loop from Olsen Avenue onto Smith Street Motorway

Smith Street Motorway widened from four to six lanes between the interchange and Kumbari Avenue

New signalised intersection

Shared pedestrian and cycle paths

Widened and lengthened eastbound off-ramp from three to five lanes

On-road cycle lanes through the interchange

Crestwood Drive intersection widened

Key:

Completed by July 2015