EIA-EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited Environmental Appraisal of Mining Projects Page -1 PROFORMA FOR ENVIRONMENTAL APPRAISAL OF MINING PROJECTS (MINING SECTOR PROJECTS) Note 1: All information to be given in the form of Annex/s should be properly numbered and form part of reply to this proforma. Note 2: Please enter √ in appropriate box where answer is Yes / No Note 3: No abbreviation to be used - Not available or Not applicable should be clearly mentioned. Note 4: Core zone is the mining lease area. Buffer zone in case of ML area up to 25 ha. is to be considered as 5 km all around the periphery of the core zone and for ML area above 25 ha. an area 10 km all around the periphery of the core zone. Note 5: Adopt Scoping process in carrying out EIA study. Note 6: Please indicate source of data. 1. General Information (a) Name of the project : Mahaparbat (Unchabali) Iron Ore Mine i. Name of the proponent : Ms. Dr. Tilotama Basa Addl. General Manager (GEO) Odisha Mining Corporation Limited OMC House, Post Box No.: 34, Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation Limited OMC House, Post Box No.: 34, Bhubaneswar, PIN-751001 E-mail : [email protected] Telephone : 674-2377458 Fax No. : 674-2390431 (b) Objective of the project : Mining of Iron Ore (c) Location of mine(s) : Village(s) Tehsil District State Village Unchabali & Balda Joda Keonjhar Odisha (d) Does the proposal relate to : ii. New mine : Yes No iii. Expansion : Yes No Increase in ML area : Yes No

Upload: others

Post on 29-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA-EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -1

PROFORMA FOR ENVIRONMENTAL APPRAISAL OF MINING PROJECTS

(MINING SECTOR PROJECTS)Note 1: All information to be given in the form of Annex/s should be properly numbered

and form part of reply to this proforma.

Note 2: Please enter √ in appropriate box where answer is Yes / No

Note 3: No abbreviation to be used - Not available or Not applicable should beclearly mentioned.

Note 4: Core zone is the mining lease area.

Buffer zone in case of ML area up to 25 ha. is to be considered as 5 km allaround the periphery of the core zone and for ML area above 25 ha. an area 10km all around the periphery of the core zone.

Note 5: Adopt Scoping process in carrying out EIA study.

Note 6: Please indicate source of data.

1. General Information(a) Name of the project : Mahaparbat (Unchabali) Iron Ore Mine

i. Name of the proponent : Ms. Dr. Tilotama BasaAddl. General Manager (GEO)Odisha Mining Corporation LimitedOMC House, Post Box No.: 34,Bhubaneswar, PIN-751001Phone No.- 9437134765

Mailing Address : Odisha Mining Corporation LimitedOMC House, Post Box No.: 34,Bhubaneswar, PIN-751001

E-mail : [email protected] : 674-2377458Fax No. : 674-2390431

(b) Objective of the project : Mining of Iron Ore(c) Location of mine(s) :

Village(s) Tehsil District StateVillage Unchabali & Balda Joda Keonjhar Odisha

(d) Does the proposal relate to :ii. New mine : Yes No √

iii. Expansion : Yes √ No

Increase in ML area : Yes No √

Page 2: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA-EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -2

Increase in annual production : Yes √ No

iv. Renewal of ML : Yes No √

v. Modernization : Yes No √

(e) Site Informationi. Geographical Location Latitude : 21052’42.54705” N - 21053’23.54719” N

Longitude : 85025’ 5.66779” E - 85025’ 36.49480”E

Survey of India Topo sheet number : F45N5 (old topo-sheet no. 73G/5)

Elevation above Mean Sea Level : 525 - 610 m

Total mining lease area (in ha.) : 68.0

ii. Dominant nature of terrain Flat : Yes No √

Undulated : Yes No √

Hilly : Yes √ No

2. Land usage of the mining lease area (in ha.)(a) Agricultural : -

(b) Forest : 68.0

(c) Waste land : -

(d) Grazing : -

(e) Surface water bodies : -

(f) Others (Specify) : -

Total : 68.0

3. Indicate the seismic zone in which ML area falls. In case of zone IV &V, details of earth quakes in last 10 years.

The area falls in Zone – II(a) Severity (Richter Scale)(b) Impact i.e. Damage to

Life : Yes No √

Property : Yes No √

Existing mine : Yes No √

Page 3: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -3

4. BREAK-UP OF MINING LEASE AREA (IN HA.) AS PER APPROVED CONCEPTUAL PLAN:

Purpose Mining Lease Area Total Area acquired * Area to be acquired **Government Private Government Private Government Private

Forest Others Agri. Others Forest Others Agri. Others Forest Others Agri. Others1. Area to be excavated 50.399 - - - 50.399 1.843 - - - 43.436 - - -

2. Storage for top soil 3.185 - - - 3.185 - - - - 0.450 - - -

3. Overburden / Dumps - - - - - 0.124 - - - 0.124 - - -

4. Mineral storage - - - - - - - - - - - - -

5. Infrastructure(Work-shop, Adm. Building) - - - - - - - - - - - - -

6. Roads 0.238 - - - 0.238 0.383 - - - 0.383 - - -

7. Railways - - - - - - - - - - - - -

8. Green Belt/ Safety zone 14.178 - - - 14.178 14.178 - - - 14.178 - - -

9. Tailings pond - - - - - - - - - - - - -

10.Effluent treatment plant - - - - - - - - - - - - -

11.Coal handling plant / mineralseparation plant - - - - - - - - - - - - -

12.Township area (camp) - - - - - - - - - - - - -

13.Other (Specify) Untouched area - - - - - 51.472 - - - 9.429 - - -

TOTAL 68.00 - - - 68.0 68.00 - - - 68.00 - - -

* Already diverted forest land; ** Balance forest land proposed for diversion;

Page 4: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -4

5. Township (outside mining lease): *(a) Total area (in ha)

(b) No. of dwelling units

(c) Distance from mine site

* No township proposed for present project. Employees shall be accommodated in adjoiningtownship of BPJ Mine lease (~5 Km from proposed mine).

6. Distance of water bodies (in km):Distance

FromRiver Bank * Other Water bodies *

Sea / creek / lake / nalla etc. (specify)Mining lease boundary Baitarani : ~3.0 E Surface nala: ~passes through mine leaseAncillary facilities - -[* From highest flood line / high tide line]

7. For projects falling within the Coastal Regulation Zone (CRZ)Not Applicable

Whether the mineral to be mined is of rarenature and not available outside CRZ? Yes No √if yes, annex a scaled location map showing low tide line (LTL), high tide line (HTL) dulydemarcated by one of the authorized agencies* [ *Director, Space Application Centre,Ahmedabad: Centre for Earth Sciences Studies, Thiruvananthapuram: Institute of RemoteSensing, Anna University, Chennai: Institute of Wetland Management & Ecological Designs,Kolkata: Naval Hydrographers’s Office, Dehradun: National Institute of Oceanography,Panjim, Goa: and National Institute of Ocean Technology, Chennai], boundary of mininglease area, distance of ML area from LTL and HTL CRZ boundary and CRZ classification ofthe project area as per the approved Coastal Zone Management Plan, and settlements, sanddunes, mangroves, forest land/patches, turtles breeding and nesting sites etc., if any, in theproject area.

Page 5: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -5

8. Indicate aerial distance from the periphery of core zone / area from the periphery of thebuffer zone to the boundary of following (up to 10 km):

S.No.

Areas Name Aerial distance from(in km.)

Core *Zone

Buffer*Zone

1. National Park / Sanctuary None - -2. Biosphere Reserve / Tiger

Reserve / Elephant Reserve /any other Reserve

None - -

3. Forest (RF / PF / unclassified) Un-surveyed Forest Land Baitarani RF Chamakpur R. F. Danda Huri Forest Pidhapokhari R.F. Balda Forest Naibhanga R.F.

In Core Zone-----

- 7.0-10Km 7.5 km 3.0 km 7.0 km 2.0 km 5.5 km

4. Habitat for migratory birds None - -5. Corridor for animals of

schedule I & II of the Wildlife(Protection) Act, 1972#

None

6. Archaeological sites* Notified* Others

None - -

7. Defence Installation None - -8. Industries / Thermal Power

Plants Tata Sponge Iron Plant - ~ 20 km

9. Other Mines Refer clause 3.1.5 of EIA-EMP Report

10. Airport None - -11. Railway Lines Banspani, on Padapahar -

Barajamda - Gua branchline of Southeasternrailway

- ~12 km N

Barbil, on South-easternrailway’s Barajamda –Bolani branch line at

- ~25 km NWN

12. National / State Highways NH-215 - ~16 Km NW

NH-75 - ~15 Km E

State Express Highwaypasses through

north mostcorner of ML.

[* Buffer zone in case of ML area up to 25 ha. is to be considered as 5 km all around the periphery ofthe core zone and for ML area above 25 ha. an area 10 km all around the periphery of the core zone].

# Authenticated map has been enclosed as Annexure 1.12 of the EIA-EMP report.

Page 6: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -6

9. Description of flora & fauna separately in the core and buffer zones. *[* Consult the Wildlife (Protection) Act, 1972 as amended subsequently and list species with (1)Common name (2) Scientific name and (3) under which schedule of the Wildlife (Protection) Act theidentified species fall. Get the list authenticated by an Expert in the field / credible scientific institute /University / Chief Wildlife Warden office. Information to be based on field survey.]

A. Flora Core Zone Buffer Zone1. Agricultural crops Paddy, Maize Paddy, Maize2. Commercial crops Vegetables Vegetables3. Plantation None None4. Natural vegetation /

forest typeNorthern Tropical Dry Deciduous

Forests.Northern Tropical Dry Deciduous

Forests; Dry Deciduous ScrubForests

5. Grass lands Present Present6. Endangered species None None7. Endemic species None None8. Others (Specify) None NoneB. Fauna1. Total listing of faunal

elements Application letter submitted** Application letter submitted**

2. Endangered speciesNone*

Indian Elephant, Sloth Beer,Python, Monitor Lizard, Pea

Cock*3. Endemic species None* None*4. Migratory species None* None*5. Details of aquatic

fauna, if applicableOnly common small species offish such as Danios, Loaches,

Barbs etc.

Only common small species offish such as Danios, Loaches,

Barbs etc.** Request letter to DFO-cum-Chief Wildlife Warden, Keonjhar Forest Division for authenticating‘List of flora and fauna’ has been enclosed as Annexure 1.13 of the EIA-EMP report.

10. Details of mineral reserves (as per approved Mining Plan)Quantity (in million tonnes)

(a) Proved -

(b) Indicated -

(c) Inferred -

(d) Mineable reserves 7.652

11. Major geological formation / disturbances in the mining lease area

(a) Geological maps submitted Yes √ # No#: Refer Drawing No. MEC/11/S2/Q778/2.1 of EIA-EMP Report.

(b) Geological sections submitted Yes √ # No#: Refer Drawing No. MEC/11/S2/Q778/2.2 of EIA-EMP Report.

(c) Contour map submitted Yes √ # No#: Refer Drawing No. MEC/11/S2/Q778/3.0 of EIA-EMP Report.

Page 7: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -7

(d) Whether the presence, if any, noted of(i) Faults Yes √ No

(ii) Dykes Yes No √

(iii) Shear Zone Yes No √

(iv) Folds Yes √ No

(v) Other weak zones Yes No √

(e) Source of data (Indicate) Approved Mining plan report

12. Production of mineral(s) and life of mine(a) Rated capacity of mine mineral wise (Tonnes / annum) 1,000,000

(b) Life of mine at proposed capacity (Years) ~ 8 years

(c) Lease period (in years) 40

(d) Date of expiry of lease (D/M/Y) 08.06.2058

(e) Indicate in case of existing mines

(i) Date of opening of mine Yet to be operated

(ii) Production in the last 5 years from year …. toyear ……. in million tonnes

1st year 5th yearNil Nil

Mine is yet to be operated.

(iii) Projected production in the next 5 years fromyear 2015-16 to year 2019-20 in million tonnes

6th – 10th year4.41

(iv) Whether mining was suspended after opening ofthe mine?

Yes No √

If yes, details there of including last production figureand reason for the same. -

(f) Whether plans & sections provided? Yes √ NoRefer drawings MEC/11/S2/Q778/3.0, MEC/11/S2/Q778/4.1, MEC/11/S2/Q778/4.2 &

MEC/11/S2/Q778/4.3 of the EIA-EMP Report13. Type and method of mining operations

TYPE METHOD

Opencast √ Manual

Underground Semi-mechanized

Both Mechanized √

Page 8: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -8

14. Details of ancillary operations for mineral processing

(a) Existing Nil

(b) Additional Dry crushing and screening process for sizing of iron ore.

15. Mine Details(a) Opencast mine

(iv) Thickness of top soil (in m.)

Minimum 0.5

Maximum 1.0

Average -

(v) Thickness of overburden (in m.)

Minimum -

Maximum -

Average -

(vi) Mining Plan

Height and width of the bench inoverburden/ waste

-

Height and width of the bench in orebody/ coal seam

6 m & 12 m

Proposed inclination / slope of the sides of the opencast mine(separately for overburden, coal / ore and overall slope of thepit sides) both while operating the mine as well as at the timeof closure of the mine.

-

Whether transverse sections acrossthe opencast mine at the end of fifthyear and at the end of the life of themine have been submitted?

Yes - No -

Refer drawings MEC/11/S2/Q778/4.4 of the EIA-EMP Report.

(vii) Type of blasting, if any, to be adopted. -

(i) Stripping ratio (mineral in tonnes to over burden in m3) 1: 0.6

(ii) Ultimate working depth (in m bgl) 525 m AMSL(iii) Indicate present working depth in case of existing mine (in m bgl) -

Page 9: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -9

(b) Underground mine: Not Applicable

(i) Seam/Ore body Min. Depth (m) Max. Depth (m) Avg. thickness (m)

Rate of dip(in degree)

Direction of dip

(ii) Mode of entry into the mine- Not Applicable

Shaft

Adit

Incline

(iii) Details of machinery

On surface

At Face

For transportation

Others

(iv) Mode of stoping (metalliferrous mines)

Open

Filled

Shrinkage

Caving

Combination of above

Others (specify)

(v) Extraction method

Caving

Stowing

Partial extraction

(v) Subsidence

Predicted max. subsidence (in m)

Page 10: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -10

Max. value of tensile strain (in mm/m)

Max. slope change (in mm/m)

Whether identified possible subsidence area(s)superimposed on Surface Plan has been submitted?

Yes No

Major impacts on surface features like naturaldrainage pattern, houses, buildings, water bodies,roads, forest, etc.

Salient features of subsidence management(monitoring and control).

16. Surface drainage pattern at mine site

(a) Whether the pre-mining surface drainage plan submitted? Yes √ No

Refer drawings MEC/11/S2/Q778/3.0 of the EIA-EMP Report.

(b) Do you propose any modification / diversion in the existingnatural drainage pattern at any stage? If yes, when. Providelocation map indicating contours, dimensions of water bodyto be diverted, direction of flow of water and proposed route/ changes, if any i.e. realignment of river/nallah/any otherwater body falling within core zone and its impact.

Yes No √

17. Embankment and /or weir construction(a) Do you propose, at any stage, construction of

(i) Embankment for protection against flood? Yes No √

(i) Weir for water storage for the mine? Yes No √

(b) If so, provide details thereof.(c) Impact of embankment on HFL and settlement:

(d) Impact of weir on downstream users of water:

18. Vehicular traffic density (outside the ML area)Types ofvehicles

No. of vehicles/day

(a) ExistingLight &Heavy

Vehicles

Near ML 2 wheelers: 1673LMVs: 1322; HMVs: 2283

Near Kalimati 2 wheelers: 2055Cars/ jeeps: 831; HMVs: 1116

Near KalimatiToll Gate

2 wheelers: 1582Cars/ jeeps: 1032; HMVs: 2508

Near JaroliRailway stn.

2 wheelers: 1462Cars/ jeeps: 1146; HMVs: 1972

Page 11: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -11

Types ofvehicles No. of vehicles/day

(b)After theproposed activity

Light &Heavy

VehiclesAdditional ~96 loaded trucks/day.

I Whether the existing road network is adequate? Yes √ NoIf no, provide details of alternative proposal.

19. Loading, transportation and unloading of mineral and waste rocks on surface:(a) Manual Yes No √

(b) Tubs, mine cars, etc. Yes No √

(c) Scraper, shovels, dumpers / trucks. Yes √ No

(d) Conveyors (belt, chain, etc.) Yes No √

(e) Others (specify).

20. Mineral(s) transportation outside the ML areaQty. (in TPD) Percentage (%) Length (in km)

(a) Road ~3333 100

(b) Rail * *

(c) Conveyors - - -

(d) Rope way - - -

(e) Water ways - -

(f) Pipeline - -

(g) Others (specify) - - -

Total ~3333 100

* Mineral transport 1 MTPA shall be carried out as recommended by CSIR-NEERI Report.

Page 12: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -12

21. Baseline Metrological and Air Quality data

(a) Micro-meteorological data[Continuous monitoring through autographic instrument for one full season other than monsoon]

(i) Wind rose pattern for one full season (16 points of compass i.e. N, NNE, NE, ---) based on 24-hourly data. For coastalarea also furnish day-time and night time data.

Day time Night time 24-hours period Refer Fig. 3.4.1, 3.4.2 & 3.4.3 of EIA-EMP report.

(ii) Site specific monitored data

MonthWind Speed

(km/hr) Temperature (oC) Relative Humidity (%) Rainfall(mm)

Solar Radiation(CCM)

Max Ave Calm Max Min Avg Max Min. Avg Total Max Min AvgOct. 14.3 2.61 47.45 32.60 16.50 24.49 93.30 17.20 63.03 5.00 1.6 0.0 0.3

Nov. 8.5 1.41 66.94 32.40 14.20 22.64 93.30 25.00 62.53 6.00 1.6 0.0 0.2

Dec. 7.1 1.18 70.83 27.40 12.00 19.50 90.30 30.10 63.60 12.00 0.6 0.0 0.1

Annual rainfall is 1269.1 mm and no. of rainy days : 71.4 (observed at IMD observatory, Keonjhar)

* 24-hours rainfall should be reported from 08:30 hrs. IST of previous day to 08:30 hrs. IST of the day.

(iii) Indicate name and distance of the nearest IMD meteorologicalstation from which Climatological data have been obtained forreporting in the EIA report, if any.

IMD observatory, Keonjhar; ~33 km (aerialdistance)

Page 13: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -13

(b) Ambient air quality data* (RPM,SPM,SO2and NOX)[* Monitoring should be carried out covering one full season except monsoon – same season as in 21 (a) (i)]

[* Frequency of sampling: Sampling to be done twice a week for the entire season 24 hourly for SPM & RPM. For gaseous pollutants 24 – hourlydatabe given irrespective of the sampling period.]i.Season and period for which monitoring has been carried out. Refer Table No. 3.10 of EIA-EMP report.ii.No. of samples collected at each monitoring station : 24

* R = Residential; I = Industrial; S = Sensitive# Annex a location map indicating location of AAQ stations, their direction and distance with respect to project site.

Parameter Equipmentsensitivity

Norms Statisticaldata

On NEside

of ML(A1)

Unchabalivillage(A2)

Beldavillage(A3)

Jalpapasivillage(A4)

Bamudihavillage(A5)

Khajurdihivillage(A6)

Kalimativillage(A7)

Siljoravillage(A8)

Baldavillage(A9)

Jajangvillage(A10)

Namiravillage(A11)

Kamalpurvillage(A12)

PM10

(g/m3)Detection

Limit:5 g/m3

100 Max 92 91 84 89 89 87 91 88 93 88 90 86Min 63 57 56 61 61 55 59 56 62 61 62 61Ave. 82 74 71 80 77 76 75 73 76 74 75 75C98 91 90 83 88 88 86 90 87 92 87 89 85

PM2.5

(g/m3)Detection

Limit:5 g/m3

60 Max 58 57 51 57 54 58 49 52 58 57 55 51Min 35 32 29 32 31 40 28 28 29 36 30 31Ave. 46 45 37 44 42 49 37 39 41 47 43 40C98 57 56 50 56 53 57 48 51 56 56 54 50

SO2

(g/m3)Detection

Limit:4 g/m3

80 Max 19 28 13 17 19 21 16 13 15 20 19 18Min 7 5 4 6 8 6 4 4 4 8 5 8Ave. 13 11 9 12 14 13 11 9 10 14 12 13C98 19 23 13 17 19 21 16 13 14 19 18 18

Stn.No.

Name of monitoringequipment used

PM10 PM2.5 SO2 NO2 CORespirable Dust Sampler (RDS) PM2.5 Fine Dust Sampler RDS & Spectrophotometer RDS & Spectrophotometer NDIR

Equipment sensitivity Detection Limit :5 µg/m3

Detection Limit :5 µg/m3

Detection Limit :4 µg/m3

Detection Limit :10 µg/m3

Detection Limit :57µg/m3

AAQ monitoringstation Max. Min. Avg. C98 Max. Min. Avg. C98 Max. Min. Avg. C98 Max. Min. Avg. C98 Max. Min. Avg. C98

Page 14: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -14

NO2

(g/m3)Detection

Limit:10 g/m3

80 Max 28 25 22 24 30 25 22 23 26 29 33 24Min 15 10 11 13 17 12 10 12 10 18 15 12Ave. 22 19 18 19 22 18 17 18 17 22 22 17C98 28 24 22 24 29 24 22 23 25 28 32 23

CO(mg/m3)

DetectionLimit:0.057mg/m3

4 Max 1.286 1.519 1.377 1.517 1.632 1.639 1.894 1.286 1.36 1.519 1.55 1.08Min 0.345 0.262 0.261 0.241 0.258 0.285 0.284 0.214 0.43 0.219 0.362 0.436Ave. 0.606 0.54 0.546 0.704 0.901 0.805 0.762 0.418 0.956 0.483 0.9 0.84

NH3

(µg/m3)Detection

Limit:4.2 g/m3

400 Max 30 26 25 23 25 24 21 26 24 24 21 22Min 11 14 12 10 14 10 12 10 10 12 9 11Ave. 20 20 17 17 20 17 16 16 16 18 15 18

Ozone(µg/m3)

DetectionLimit:

2.0 g/m3

100 Max 27 28 34 33 35 29 30 32 31 28 37 35Min 21 24 26 27 24 21 21 21 22 21 27 27Ave. 24 26 31 30 29 25 25 24 26 25 31 30

Pb(µg/m3)

Detectionlimit:

0.0006µg/m3

1 Max 0.013 0.028 0.024 0.024 0.025 0.021 0.018 0.007 0.016 0.031 0.01 0.018Min 0.004 0.004 0.004 0.011 0.004 0.009 0.011 0.004 0.009 0.013 0.003 0.007Ave. 0.009 0.013 0.013 0.018 0.013 0.015 0.015 0.005 0.013 0.02 0.008 0.011

Ni(ng/m3)

Detectionlimit: 0.6ng/m3

20 Max 15 8 14 17 18 16 19 12 12 15 6 9Min 5 4 8 10 3 6 11 3 2 2 2 2Ave. 10 6 10 13 10 10 15 8 8 8 5 6

As(ng/m3)

Detectionlimit:

1.8ng/m3

6 Max <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80Min <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80Ave. <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80 <1.80

B(a)P(ng/m3)

Detectionlimit: 0.21

ng/m3

1 Max <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21Min <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21Ave. <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21

Benzene(µg/m3)

Detectionlimit: 2.08

µg/m3

5 Max <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08Min <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08Ave. <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08 <2.08

Refer Drawing Nos. MEC/11/S2/Q778/1.0.

Page 15: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -15

22. STACK AND EMISSION DETAILS, IF ANY*: Not applicable as there is no stack.Sl.No.

Process / unit ofoperation (e.g. DG

Set, Boiler)

Height ofstack (m)

Internaltop dia.

(m)

Flue gasexit

velocity(m/sec)

Emission rate (kg/hr) Heat emissionrate from top

of stack(K.cal/hr)

Exhaust / Flue gasSPM SO2 NOx CO Temp

(OC)Density

(kg/Nm3)Specific

Heat(kcal/kg)

Volumetricflow rate(m3/hr.)

Page 16: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -16

23. Details of fugitive emissions during mining operations *

Following mining & material handling operation has been considered for estimation of fugitivedust during mining operation- Drilling Loading of ore into haul trucks/dumpers Unloading of material into haul trucks/dumpers to stackyard Loading of OB, subgrade, & top soil into haul trucks/ dumpers Unloading of OB, subgrade, & top soil into haul trucks/ dumpers Vehicle (wheel) generated dust

24. Air Quality Impact Prediction (AQIP)*

a) Details of model(s) used for AQIP including grid size, terrain features, and inputmeteorological data

Fugitive dust emissions have been estimated using the methodologies outlined in theAP-42 (USEPA) and National Pollutant Inventory (NPI) Emission Estimation TechniqueManual (EET) for Mining Version 2.3 (DEH 2001) (Australia). Air quality impacts from theexisting and proposed mining and processing operations have been assessed using thecomputer dispersion model (AERMOD), developed by US EPA. It is a statistical Gaussianplume model that requires a time series of both meteorological and source emissiondata. Using the model, maximum 24-hour ground-level PM10 concentrations at thenearest sensitive receiver to the site has been predicted. All queries & waste dumps havebeen considered as area sources modeled using Open pit option. Meteorological datameasurements (wind speed, direction and temperature) recorded at site during Post monsoon,2018 have been used for modeling.

b) Maximum incremental GLC values of pollutants based on prediction exercise(in µg/m3)

S.No. Pollutants Incremental Value Ambient Air Quality Resultant AirQuality

1. PM ~13.0 (within core zone) 92 ~1052**. SO2 - - -3**. NOx - - -

# Meteorological data which gave maximum GLC of air pollutants is given in Table 4.8 of EIA-EMP report.

[* Question Number 22, 23 & 24 need not be filled-in for mines having ML area of 25 ha. or less.][** Information on item no. 2 & 3 to be provided in cases with captive power generation of 500 KVA andabove]

Page 17: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -17

25. Water requirement (m3/day) *

Parameters (Av. demand) m3/ day (Peak demand) m3/ dayDrinking water at work site 20 25Dust suppression at mines 40 45Drilling & spraying 15 15Equipment & vehicle washing 25 25Pit head bath 15 20Afforestation and green belt 20 25

Total 135 155

26. Source of water supply *

S. No. Source m3/day1. Borewell 20 [25]2. Baitarani river 80 [90]3. Recycle water 35 [40]

Total 135 [155]Fig. In bracket is peak demand.

[*Annex a copy of sanction letter / permission from the concerned authority (Central GroundWater Authority in case of ground water abstraction is from notified area / State GroundWater Board in case of non-notified area / State Irrigation Department for surface waterpumping) for drawing water.]

Refer Annexure 2.1 of EIA-EMP Report.

27. Lean season flow in case of pumping from river / nalla(cumecs)

Not applicable

28. Ground water potential of the study area28.1 Ground water availability

(a) Range of water table (m bgl)

i. Pre-monsoon (April/May)

Core Zone 10

Buffer zone 4.0 - 14.0

ii. Post-monsoon (November)

Core Zone 5

Buffer zone 0.5 - 7.0

(b)Total annual replenishable recharge (million m3/ year)

By ground water table fluctuation method 26.56

By rainfall infiltration factor method 22

Page 18: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -18

(c) Annual draft excluding estimated draft through

mine discharge (million m3/year)

0.05

(d) Estimated draft through mine discharge

(million m3/year)

0

(e) Net ground water availability

(million m3/ year)

2.78

(f) Stage of ground water development in % 1.78

*Ground water level in core zone varies 487 to 500 AMSL whereas the ultimate working levelwill be 525 m AMSL.

28.2 Water demand - Competing users of the water source

Sl.No.

Usage PresentConsumption

(m3/day)

Additional proposedas per local plan

(m3/day)

Total(m3/day)

Surface Ground Surface Ground Surface Ground1 Domestic 150 150 - - 150 1502 Irrigation 100 50 - - 100 50

3 Industry - - - - - -

4 Mining 200 - 90 - 290 -5 Others

(specify) - - - - - -

Total 450 200 90 - 540 200

29. Water quality (m3/day)*

(a) Annex physico-chemical analysis of water at intake point ** Refer Table No. 3.17(SW2) of EIA-EMP

report.

(b) In case of existing mine, annex report on quality of waterdischarge i.e. complete physico-chemical analysis**

Mine yet to beoperated. No mine

discharge envisaged.

[*For non-discharging mines at least four ground water samples to be taken preferably fromdownstream direction of the mine in pre-monsoon and post-monsoon periods and analyzed.For discharging mines six samples are to be analyzed]

Refer Table No. 3.18 of EIA-EMP report.

**All parameters as per BIS 10500. Indicate name of Methodology, Equipment used foranalysis, and Detection Level (DL) for each parameter.*** Wherever any analytical parameter is below detection level, “BDL” (Below DetectionLevel) should be written instead of ‘NIL’.

Page 19: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -19

30. IMPACT ON GROUND WATER REGIME / STREAM / LAKE / SPRINGS DUETO MINE DEWATERING *

(a) Radius of influence (in m)[To be estimated based on analysis of pumpingtest data and application of empirical formula]

-

(b) Whether saline water ingress will take place?(applicable to coastal areas) Yes No √

(c) Impact on stream / lake / springsNo discharge from mine.

[* Provide a comprehensive hydro-geological assessment report if the average mine dewateringis more than 100 m3/day and or going below water table in non-monsoon period. The reportshould be based on preferably latest one year pre-monsoon and post-monsoon baseline datacovering information on ground water situation, aquifer characteristics, water level conditions(April – May and November), estimate of ground water resources, predicted impact of theproject on ground water regime and detailed remedial / conservation measures such as artificialrecharge of ground water etc. The report should be based on actual field inventory out ofexisting wells, at least 30 observation wells in the buffer zone with supplementary informationfrom secondary sources (mention name). For estimation** of ground water resource (referquestion no. 28 above) be designated study area of the buffer zone may be sub-divided intocommand and non-command areas, watershed-wise (in case of hard rock / consolidatedformations) / block-wise / mandal-wise in case of alluvial / unconsolidated formations)]

[**For estimating ground water resources in the area follow the Ground Water EstimationCommittee recommendations of 1997]

31. Waste Water Management

Mine

(a) Daily average discharge (m3/day) from different sources

Mine water discharge during

Lean Period Nil

Monsoon period Nil

Workshop 15 (to be used for drilling &spraying)

Domestic (mine site) 8 [10] (to be used forplantation)

Beneficiation / Washeries Not applicable

Coal Handling Plant Not Applicable

Tailings pond Not Applicable

Others (Specify) - Pithead Bath 12 [15] (to be used forplantation)

Total 35 [40] (Recycled/Reused)

Page 20: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -20

(b) Waste water treatment plant flow sheet for treatmentprocess attached. Yes No √

(c) Quantity of water recycled/reused/to be recycled in

(i) Percentage :100

(ii) m3/day :35 [40]

(d) Point of final discharge

Final Point Quantity discharged(in m3/day)

1. Surface

(i) Agricultural land -

(ii) Waste land -

(iii) Forest land -

(iv) Green belt 20 [25]

2. River / nallah Nil

3. Lake Nil

4. Sea Nil

5. Other (specify) – Drilling and spraying 15

Total 35 [40]

(e) Users of discharge water

(i) Human Yes No √

(ii) Livestock Yes No √

(iii) Irrigation Yes No √

(iv) Industry Yes No √

(v) Others (specify)Plantation within minelease and drilling and

spraying(f) Details of the river/nalla, if final effluent is /will be

discharged (cumecs) No discharge from mine.

(i) Average flow rate

(ii) Lean season flow rate

(iii) Aquatic life

Page 21: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -21

(iv) Analysis of river water 100 meters upstreamand 100 meters downstream of discharge pointsubmitted.

Yes √ No

Refer able No. 3.17 of EIA-EMP report.Township

(a) Waste water generation from township (m3/day) -

(b) Are you planning to provide sewage treatment plant? Yes No √

© Usage of treated water (Only soak pits)

32. Attach water balance statement in the form of a flow diagram indicatingsource (s), consumption (Section-wise) and output.

Refer Fig. 2.3 of EIA-EMP report.

33. Ambient noise level dB(A)

Stn.No. Name Location

Day (0600-2200 hr.) Night (2200-0600 hr.)

Norm Max. Min. Avg* Norm Max Min Avg*

N1

NearMahaparbatLease(Industrial)

CoreZone 75 54.8 42.1 52.1 70 43.7 39.7 42.5

N2Jurudih nearmarket area(Commercial)

~8.0 kmN 65 64.6 48.5 61.9 55 51.8 41.8 47.9

N3Nayagarh nearRailway sidingarea (Industrial)

~4.0 kmSE 75 71.2 54.1 66.8 70 54.1 47.1 50.9

N4 Kalimati village(Residential)

~2.5 kmSW 55 54.7 42.2 52.1 45 44.0 39.7 42.1

N5 Unchabali village(Residential) ~2.50 SE 55 54.1 43.9 52.5 45 44.3 39.6 42.2

N6Guruda nearhospital(Silence)

~5.0 NW 50 50.0 42.2 48.0 40 39.7 38.2 39.2

N7 Namira village(Residential) ~2.0 NE 55 54.9 41.9 51.9 45 43.1 39.5 42.1

N8 Jalpapasi Village(Residential) ~3.0 SE 55 54.9 44.8 53.3 45 44.4 39.1 42.1

Day - 0600 to 2200 hrs.; Night - 2200 to 0600 hrs.; All values in dB(A); * Logarithmic Averages

Page 22: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -22

34. Solid Waste

(a) Top soil and Solid waste quantity and quality

Name(Lump/fines/slurry/

Sludge /others)

Composition Quantity(m3/month)

Method of disposal

Mining activity* Stored temporarily inearmarked sites.Subsequently utilized forplantation works.

a. Top Soil Top soil 0.00511 Mm3 to begenerated in mine life.

b. Over burden OB 3.3184 Mm3 to begenerated in mine life.

Entire waste will bebackfilled to quarry voids.

c. Others (specify)Subgrade

Sub-grade(45 to 55%Fe)

0.79829 Mm3 to begenerated in mine life.

To be stacked separatelywithin the ML area forblending with higher grade.

Effluent TreatmentPlant (sludge) Not applicable

Total --------------* Generation of top soil is very less/negligible.[* Annex layout plan indicating the dump sites.]

Refer Drawing Nos. MEC/11/S2/Q778/4.3 of EIA-EMP report.

(b) Top soil and Solid waste quantity and quality(i) Does waste (s) contain any

hazardous/toxic substance/radioactive materials or heavymetals?

Yes No √

(ii) If yes, whether details andprecautionary measures provided?

Yes No

(c) Recovery and recycling possibilities. Entire OB will be backfilled & top soil will beused for plantation.

(d) Possible user(s) of the solid waste. Refer reply of 34 (c)

(e) (i) Is the solid waste suitable forbackfilling? Yes √ No

(ii) If yes, when do you propose tostart backfilling.

From 2nd year of mineworking

(in million m3)Solid waste (s) Already

accumulated(A)

To begenerated

(B)

% of A & B to bebackfilled

A BOverburden Nil 3.3184 Mm3 Nil 100Others (specify)Subgrade Nil 0.00511 Mm3 Nil 100 reuse

Page 23: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -23

Land reclamation Plan

(f) In case waste is to be dumped on the ground, indicate

Associated environmental problems

o Fugitive dust generation

o Presence of suspended solids in surface run-offs

(i) Number & type of waste dumps

No. of external dumpsNil (dump will be re-handled at end of

working)

Existing (Addl. during expansion stage) -

Max. projected height of dumps (in m) -

No. of terraces and height of each stage -

Overall slope of the dump (degree) -

Proposed reclamation measures Dump will be re-handledfrom 2nd yr. of working.

Once the backfilling completed, the tops will be compacted. The area will be covered with alayer of topsoil and grasses and shrubs will be planted to stabilize the soil layer. Subsequentlyplantation will be developed over the area.

(ii) Section of the waste dump in relation to theadjacent ground profile attached Yes √ No

Refer Drawing No. MEC/11/S2/Q778/4.4 of EIA-EMP report.

35. Fuel/Energy Requirements*[*To be furnished for mines having ML area more than 25 ha. or captive power generation of 500KVA and above]

a) Total requirement (in MW)

S.No. Mine site Township Others (specify) Total1. Present2. Proposed/additional 0.5 MW 0.5 MW

Total 0.5 MW 0.5 MW

(b) Source of power (in MW)S.No. SEB/Grid* Captive power plant DG Sets

1. Present --

Nil

2.Proposed/additional 0.5 Nil

** For emergency power onlyRefer Annexure 2.2 of EIA-EMP Report

Page 24: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -24

(c) Details of fuels

S.No.

FuelDaily consumption

(TPD)Calorific value

(kcals/kg)% Ash % Sulphur

Existing Proposed1 HSD - 3.0 kld 10,900 - 0.0252 LSHS - - - - -

3Other

(specify) - - - - -

36. Storage of inflammable / explosive materials

S.No.

NameNumber ofStorages

Consumption(in TPD)

Maximum Quantityat any point of

time1. Fuels 1 Proposed : 3.0 kld (HSD)2. Explosives 1 Proposed : 145 kg/d

37. Human Settlement

Core zone Buffer zonePopulation* 132844No. of villages 2 Unchabali & Balda Refer Table No. 3.38

of EIA-EMP reportNumber of households village-wise 1059

[* As per 2011 census record or actual survey]

38. Rehabilitation & Resettlement (R&R) Plan*

[*Provide a comprehensive rehabilitation plan, if more than 1000 people are likely to be displaced,other-wise a summary plan]

(a) Villages falling within the study areaVillages

Number NameCore zone Nil -500 m from the blasting site (s) - -

Buffer zone 148 Refer Table 3.38 of EIA-EMPReport

Township site 1 Nearby BPJ mines

(b) Details of village(s) in the core zone

S. No. Village namePopulation* Average

AnnualIncomeTribal Others

1. Nil Nil Nil -[*As per 2011 census / actual survey]

Page 25: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -25

(c) Population to be displaced and / or Land oustees

Name of village(s) falling withinNumber of oustees

Land(only)

Homestead(only)

Homestead(both)

Mining Lease1.2.

No displacement / land oustees areenvisaged for proposed expansion of project

Township Site1.2.

As above

(d) Whether R&R package has been finalized?If yes, salient features of R&R plan for oustees

Not applicableR&R is not involved

(i) Site details where the people are proposedto be resettled & facilities existing / to becreated.

(ii) Funds earmarked for compensation package.(iii) Agency /Authority responsible for their

resettlement.(iv) Time of commencement of resettlement of

Project Affected People (PAP).(v) Period by which resettlement of PAP will be

over.39. Lease-wise plantation details

(a) Lease area (in ha.) Existing New Mine

(i) Area broken up 68.00 Not Applicable

(ii) To be broken up ~44 Not Applicable

(iii) Area not to be broken-up ~24 Not Applicable

(b) Township area (in ha.) - Not Applicable

(c) Area afforested and proposed (in ha.)

Peripheral Dumps Roads Township Others TotalExisting 2.1 2.1

Proposed * 14.178 50.399 (pit)0.238 (road)

3.185 (vacantstorage area)

68.0

* 7.5m along the ML boundary and 50 m on either side of road & nala.

Page 26: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -26

(d) No. and type of trees planted and proposed

(i) Existing When plantation was started? Month/Year Since 2010

No. of plant species planted Number saplings (per ha.)Ashok, Aam, Sal, Sheesham, Neem, Karanj etc. 1600

Survival rate % 80% Avg. height 0.5 – 6 m

(ii) Proposed

No. of plant species to be planted Number saplings (per ha.)~108640 1600 trees / ha

40. Environmental health and safety

(a) What major occupational and communityhealth and safety hazards are anticipated?

Dust inhalation, exposure to noise, fly rockdue to blasting

(b) What provisions have been made/ proposed toconform to health and safety requirement?

1. Dust will be controlled by water sprinklingand wet drilling practice.2. Operators of HEMMs, rock drills, crushers,screens will be issued with dust masks andear plugs.3. Proper safety precautions, in accordancewith DGMS regulations, will be practicedbefore and during blasting.

(c) In case of an existing mine Yes No √

(i) Comprehensive report on health statusof the workers as under the Mines Actannexed.

Mine yet to be operated.

(ii) Mineralogical composition of RPM(dust)

Free silica : 1.2 to 3.1 µg/m3

Chromium* (Total as well asHexavalent)

Lead **

[* Only for Chromite mines][**Only for Base Metal mines]

Page 27: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -27

(d) Information on radiation protection measures, ifapplicable. Not applicable

41. Environmental Management Plan

SNEnvironment

al issues*Already practiced, if

applicableProposed

1 Air pollution 1. Regular water sprinkling on haul, accessroads and all transfer points.2. Haul roads to be maintained by surfacegrading to minimize excessive road surfacewearing.3. Roads no longer required will be re-vegetated as soon as possible.

2 Waterpollution

1. Run-offs from canteen and rest areaswill be diverted through drains toplantation areas.

2. Effluents from garage / work-shop arerouted through settling pits with oil &grease traps. Clarified water used forindustrial purposes.

3. Sewage from mines treated in soakpits.

3 Waterconservation

1. Recycling of effluents for industrial use.2. GW recharge structure and watershed

management structure shall beconstructed.

4 Noisepollution

1. Static machinery will be housed and ifpossible placed on vibration isolators.

2. Rigorous lubrication & maintenance ofmachinery.

3. Provision of personal noise protectiongear.

4. Green belt development5 Solid waste 1. Entire OB to be backfilled to quarry

voids. No external waste dumps.2. Subgrade & top soil to be stacked

separately for future use.6 Land

degradation1. Tree plantation will be carried out on

backfilled areas,2. Quarry benches and floors and shall be

biologically reclaimed7 Erosion &

Sediment1. Storm water routed through settling

pits.

Page 28: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -28

8 Top soil Top-soil to be stored temporarily indedicated dumps before being used forplantation works.

9 Groundvibration

Controlled blasting to be practiced.

10 Wildlifeconservation

Wildlife conservation plan will beimplemented.

11 Forestprotection

Compensatory afforestation & plantation

12 Others(specify)

[* As applicable]

42. Compliance with environmental safeguards (For existing units)

(a) Status of the compliance of conditions ofenvironmental clearance issued byMoEFCC, if any, enclosed. Yes * √ No

* Refer Annexure 6.1 of EIA-EMP report.

(b) Status of the compliance of ‘Consent toOperate’ issued by SPCB, if any, enclosed. Yes No √

Mine is yet to be operated.

(c) Latest ‘environmental statement’enclosed. Yes √ No

Enclosed as Annexure A.

43. Scoping of EIA

Whether environmental impactassessment of the project has beencarried out by following scoping process? Yes √ No

If yes, a copy of scoping of EIA annexed.Yes √ No

*Refer Annexure 1.1 of EIA-EMP.

44. Mine Closure

(a) Have you planned mine closure? Yes √ No

(b) Submitted a conceptual mine closure Plan. Yes √ No

Refer MEC/11/S2/Q778/8.0 of EIA-EMP Report.

(c) If yes, indicate estimated amount forimplementing the same (in Rs. lakhs) Rs. 133.179 lakhs*

Page 29: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -29

45. Capital cost of the project (in Rs. Lakh)(based on latest estimate) Rs. 2000 Lakhs

46. Cost of environmental protection measures

(in Rs. Lakh)

ActivitiesRecurring cost (Lakhs Rs./y) Capital cost (Lakhs

Rs.)

Pollution control - 53.07a

Pollution monitoring (laboratory) 14.27 Nil b

Occupational safety 5.00c 5.00d

Green belt - 27.81Wildlife Conservation - 320.42e

Socio-economic welfare measures 39.00f -Total 58.27 406.30

a = Surface drainage (garland drains, settling its, retaining wall etc.) + dust suppression system.b = Cost for EMC.c = Cost towards routine medical examinationd = Cost towards safety appliances procurement, training & awarenesse = Will be spent over a period of 10 years.F = Budgeted amount for social welfare

47. Amount earmarked for socio-economicwelfare measures for the nearby villagesother than R&R plans. ~Rs. 42 Lakhs

[Budget for 2019-20. Budgetto be prepared every year.]

48. Public Hearing:

(a) Date of Advertisement 25.07.2019

(b) Newspapers in which the advertisement appearedThe New Indian Express(English)The Sambad (Odiya)

(c) Date of public hearing (DD/MM/YYYY) 28.08.2019

(d) Public Hearing Panel chaired by & members present

1. Dr. Bhakta Charan Pradhan, ADM Keonjhar2. Shri Pusker Chandra Behera, Regional Officer, OSPCB, Keonjhar

(e) No. of people attended the public hearing meetingand number of people from the lease area.

447

(f) Summary /details of public hearing in tabular form.

Issues raised by thePublic

Response/Commitment of ProjectProponents

Suggestions made by thePublic Hearing Panel

Page 30: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -30

Proceedings of Public Hearing covering issues raised by public and commitment made by the projectproponent on the same along with time bound action plan to implement the same has been given inAnnexure 7.1 of the EIA-EMP report.

49. Whether the following approvals* (wherever applicable) have been obtained?

(i) Site clearance from MoEFCC. Yes √ No

* Refer Annexure 1.1 of EIA-EMP Report (Approved ToR)

(ii) ‘Consent for Establishment’ from the

State Pollution Control Board.

Yes No √

(iii) NOC from Atomic Mineral Division Yes No √

Not applicable

(iv) Mining plan approval from IBM / Ministry ofCoal

Yes √ No

* Refer Annexure 1.5 of EIA-EMP Report

(v) In case of existing mines, mining schemeapproval from IBM

Yes √ No

* Refer Annexure 1.5 of EIA-EMP Report

(vi) Forestry clearance under FCA, 1980 Yes √ No

Refer Annexure 1.6 of EIA-EMP report.

(vii) NOC from Chief Controller of Explosives Yes √ No

Enclosed as Annexure B.

(viii) Commitment regarding availability /pumping of water from the concernedAuthorities

Yes √ No

Refer Annexure-2.1 of EIA-EMP report.

(ix) In case of ML area falling in notified areasof the Central Ground Water Authority, NOCfrom them.

Yes No √

Not applicable

[* Annex copies of approvals and number them]

Page 31: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

EIA/EMP Studies for Mahaparbat (Unchabali) Iron Ore Mine of M/s OMC Limited

Environmental Appraisal of Mining Projects Page -31

50. Was / is there any court case relating to the project or related activities?If so, provide details present status.

No court case is pending.

Verification: The data and information given in this proforma are true to the best of myknowledge and belief.

Date: Signature of the applicant* withfull name & address

Place: [* Owner or his authorized signatory]Given under the seal of organization on

behalf of whom the applicant is signing

Page 32: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

List of Annexures & MapsQuestion no. Referred Annexures & Maps Remarks

8 Annexure 1.12 of the EIA-EMP Report Authenticated Wildlife map

9 Annexure 1.13 of the EIA-EMP Report Authenticating List of flora & fauna

11 (a) MEC/11/S2/Q778/2.1 of EIA-EMP Report Geological maps

11 (b) MEC/11/S2/Q778/2.2 of EIA-EMP Report Geological sections

11 (c), 16 (a) MEC/11/S2/Q778/3.0 of EIA-EMP Report Surface Plan / Contour map

12 (f) MEC/11/S2/Q778/4.1 of EIA-EMP Report Surface plans

12 (f) MEC/11/S2/Q778/4.2 of EIA-EMP Report Surface plans

12 (f), 34 (a) MEC/11/S2/Q778/4.3 of EIA-EMP Report Surface plans

15 (vi), 34 (f) (ii) MEC/11/S2/Q778/4.4 of EIA-EMP Report Cross section of mine working

21 (a) Fig. 3.4.1, 3.4.2 & 3.4.3 of EIA-EMP Report Wind rose diagram

21 (b) MEC/11/S2/Q778/1.0 of EIA-EMP Report Map showing monitoring locations

26, 49 (viii) Annexure 2.1 of EIA-EMP Report. Water permission

35 (b) Annexure 2.2 of EIA-EMP Report Electricity permission

42 (a) Annexure 6.1 of EIA-EMP Report EC compliance report

42 (c) Enclosed as Annexure A Environmental statement

43, 49 Annexure 1.1 of EIA-EMP Report Terms of Reference

44 (b) MEC/11/S2/Q778/8.0 of EIA-EMP Report. Mine Plan & Closure

48 (f) Annexure 7.1 of the EIA-EMP report. Public hearing proceedings

49 (iv) & (v) Annexure 1.5 of EIA-EMP Report Mining plan approval from IBM

49 (vi) Annexure 1.6 of EIA-EMP report Forestry clearance

49 (vii) Enclosed as Annexure B NOC from Chief Controller ofExplosives

Page 33: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation
Page 34: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation
Page 35: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation
Page 36: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation
Page 37: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation
Page 38: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

Scan

ned

by C

amSc

anne

r

Page 39: PROFORMA FOR ENVIRONMENTAL APPRAISAL OF ...environmentclearance.nic.in/writereaddata/online/EC/...Bhubaneswar, PIN-751001 Phone No.- 9437134765 Mailing Address : Odisha Mining Corporation

Scanned by CamScanner