Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed Ali Cairo University Faculty of Engineering Mechanical Design & Production Dept.

Upload: others

Post on 14-Oct-2020

1 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Process Assessment in AMAN

Windshield Factory

By: Abdelrahman Mohamed Elshamy

Bahaa-Eldeen Mahmoud Qamar-Eldeen

Islam Mohamed Ali

Cairo University

Faculty of Engineering

Mechanical Design & Production Dept.

Page 2: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Abstract

The objective of this project is to assess the manufacturing processes in

AMAN & SAFETY INTERNATIONAL, the leading windshield manufacturer in

Egypt.

The major problem is the big percentage of defects in the final products,

which negatively affects the reputation, and the competitiveness of the

factory in the Egyptian and global market. This project also studies the

conformity of the manufacturing processes with the quality and workplace

standards

Page 3: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Content

Abstract

Methodology

Problem Definition & Objective

Windshield Industry

Aman & Safety Group

Process Sequence

Data Gathering

Quality System

Defects Types

Analysis

Areas of Improvement

Conclusion

Page 4: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

DMAIC Methodology

Define

Measure

AnalyzeImprove

Control

Page 5: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

DMAIC

The DMAIC (Define-Measure-Analyze-Improve-Control) is the classic Six

Sigma problem-solving process. Traditionally, the approach is to be applied

to a problem with an existing, steady-state process or product and/or

service offering.

Variation from customer specifications in either a product or process is the

primary problem.

Page 6: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Problem Definition & Objective

The problem we are facing in this project according to the feedback we had from the plant administrative & the customers can be all summarized in one main problem, which is “The different Defects in the final product”.

This problem can be divided into the following categories:

Different Types of Defects.

Large percentage of defected items.

Inventory Problems.

Workplace Conditions.

Quality Control System.

Our goals are making an assessment to the whole process made in AMAN, identifying the key problems, finding their causes & suggesting improvements can be made to eliminate them.

Page 7: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Glass Manufacturing

71%

10%

14%

5%

Materials

Silica

Lime

Soda

Oxide/Aluminia/Manganese

Page 8: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Automotive Glass

Laminated Tempered

Laminated glass is a kind of safety

glass used mainly for windshields.

As it consists of two layers of glass

laminated together by a film, in the

event of breakage the glass pieces

tend to adhere to the interlayer.

Tempered glass is mainly side

windows of vehicles.

It is very strong and has the unique

fracture characteristic of shattering

instantly in the event of breakage.

Page 9: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

AMAN & SAFETY Group

Factories

Products

Market

Page 10: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Factories

1. Aman Auto Glass

2. Aman For Glass Products

3. Safety Glass

4. Safety International

Page 11: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Products

1. Windshields

2. Backlights

3. Front Doors

4. Back Doors

5. Sidelights

Also, it covers all types of vehicles:

Passenger Cars

Trucks

Buses (In All Sizes)

Page 12: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Market

Page 13: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Safety International Factory

Location: 6 October City 3rd Industrial zone, plot no. 66

Total number of labors: 200

Total space: 20,000 sqm

Annual production capacity: 500,000 pieces of windshields

Main Products: Laminated safety windshields for all types of vehicles. It is

also equipped with a furnace for producing safety auto glass for trucks at a

very high capacity. There are also 2 processing lines for cutting, washing,

grinding & printing in addition to 3 furnaces.

Page 14: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Plant

Layout

Page 15: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Load from

Warehouse

Transport to

Initial Cutting

Initial Cutting

Transport to

Cutting Line

Cutting the

Profile

Grinding the

Edges

Washing

Powdering

Silk-

Screening

Drying

Quality

CheckYes

Rework

No

Yes

Scrap

Transport to

Furnace

No

Assembling

on Molds

Sag-Bending

in Furnace

Quality

Check

Transport to

Plastic Dept.Yes

A

Reworkable?

Reworkable?

No

No

Process

Map

Page 16: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

A

Cleaning and

Inspecting

PVB Sheets

Vacuum

Hosing

Vacuuming

Autoclave

Scrap

No

Transport to

InventoryQuality Check

Reworkable?

No

No

ReworkYesStore in

Inventory

Yes

Reworkable?

Yes Quality Check Yes

No

End

Page 17: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Video

Page 18: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Common Manufacturing

Defect Types

Page 19: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Defect Types

Scratch

Powder

Silk-Screen

Dirt

Lint

Hair

Bubble

Helix

PVB Shrinkage

Optical Distortion

Shift

Curvature

Chips

Page 20: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Scratches

Windshields have scratches on the surface

Scratch length tolerances differ from one specification to another

One auto-manufacturer allow up to 2 mm scratch length, while another

only permits 0.5 mm scratch length

Scratch at the dark silk-screened border zone

Scratch at the middle of the middle of the windshield

Page 21: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Powder

White, foggy-like spots appear between the layers of the glass sheets

Powder stain appearing between the glass layers

Page 22: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Silk-Screen

Distortion in the dark surrounding frame on the windshield

Stencil marks are tolerated up to 6 mm from the outer edge of the glass

A single drop of diameter 1 mm is tolerated on the whole windshield

Reworking or defect treatment using black band is tolerated on some

conditions

A windshield with nonhomogeneous silk-

screening fill

Page 23: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Dirt

Colored spots appear between the layers of the glass

They may take a dark, white or red color

Its tolerance limits range from 0.2 mm to 5 mm diameter according to

different auto manufacturers’ special specifications

Some specifications from some auto-makers only require that the dirt spot

does not affect the driving experience or the general look of the windshield

no matter how large the spot can be

Page 24: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Chips

It can be chips from the float glass sheets, or produced during the

manufacturing process

Tiny chips produced from either the cutting or grinding processes build up

on the sheet inside the furnace, which in turn cause either a scratch or

pitting defect

Page 25: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

PVB Shrinkage

The PVB sheet is not cut properly and it shrinks during the vacuum stage,

leaving the outer perimeter of the windshield improperly laminated

Tolerance up to 1.5mm from the edge of the windshield

Page 26: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Optical Distortion

Light fringes appear on the windshield distorting the vision

Example of optical distortion

Page 27: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Helix

A pitting or a surface crack appears on the windshield

Up to 2 spots of 1mm diameter are tolerated within a perimeter of 200mm

Pitting in windshields (magnified)

Page 28: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Quality System

Page 29: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Windshield Quality Standards

There are several standards and regulations that specify requirements for

glazing safety. They have several purposes:

Reduce injuries resulting from impact

Ensure the proper transparency for driver visibility

Minimize the possibility of occupants ejection in accidents

Common windshield quality standards:

ECE R43 – United Nations Economic Commission for Europe

Safety Regulations for Road Vehicles, Article 29 – Japan Automobile Standards

Internationalization Center (JASIC)

FMVSS No. 205, 212 and 219 – Federal Motor Vehicle Safety Standards

Page 30: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Windshield Quality Standards (cont.)

There are also standards and regulations set by individual auto-

manufacturers to meet their quality assurance needs

Most of these standards requires windshields to pass the following tests

Mechanical strength test

Resistance to the environment

Optical test

In Aman, sample finished products go under mechanical and optical tests

Page 31: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Quality Inspection Stations

Silk-Screen

Furnace

Plastic

Autoclave

Final Product

Page 32: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

After the Silk-Screening

Silk-screened sheets are inspected visually using a system of lighting to find

printing defects or scratches.

Powdered sheets are inspected visually against powdering sufficiency.

Inspection of silk-screened sheets

Page 33: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

After the Furnace

Pairs of bent glass sheets are inspected visually against shifting or

misalignment defects.

Curvature dimensions are inspected either visually or using a guide

according the regulation or standard set by the auto-maker.

Windshields on guides to measure curvature geometry

Page 34: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Before Plastic

In-process inspection is performed during the cleaning and wiping process

against a system of lighting.

Sheets inspected before the PVB installation process

Page 35: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

After Autoclave

Sheets get inspected after releasing from the autoclave to check against

bubble defects or optical distortion.

Windshields racked on pallets for inspection

Page 36: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Final Product Inspection

Finished products are inspected visually before packing and warehousing

Some silk-screen and scratch defects are reworked here

Final inspection

Page 37: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Final Product Inspection (Video)

Page 38: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Quality Inspection ReportA bar chart showing the percentage of defective parts against the total inspected lots

49

5

70

8

78

1

44

1

35

8

42

1

42

6

45

4

51

4

52

31

75

58

59

04

67

85

67

85

77

69

54

56

66

08

92

26

JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER

Rejected Inspected

Page 39: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Frequency of Defect Types

37%

21%

11%

11%

4%2%

4%

1%

3%

1% 1%0%

4%

0%Scratch

Powder

Silk-Screen

Dirt

Chips

Shifting

Optical Distorion

Curvature

Helix

Hair

Air Bubble

PVB Shrinkage

Raw Material

Page 40: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Pareto Analysis

Scratc

h

Powd

er

Silk-

Scree

n

Dirt Chips

Raw

Materi

al

Optic

al

Distorti

on

HelixShiftin

gHair

Curva

ture

Air

Bubbl

e

PVB

Shrink

age

Lint

Frequency 1717 1007 504 501 214 199 189 137 75 61 46 30 5 1

Percentage 37% 58% 69% 80% 84% 88% 92% 95% 97% 98% 99% 100% 100% 100%

37%

58%

69%

80%84%

88%92%

95% 97% 98% 99% 100% 100% 100%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Pe

rce

nta

ge

Fre

qu

en

cy

Defect Types

Significant Defect Types

Frequency Percentage

Page 41: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Most Significant Defect Types

Scratch

37%

Powder

21%

Silk-Screen

11%

Dirt

11%

Other Defect Types

20%

Page 42: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Cause & Effect Analysis of the

Most Significant Defects

Page 43: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Scratches Potential Causes

Scratches

Man

Materials

Machines

Methods

Powder impurities

Unexperienced workers

Unclean machines

Unclean floor

Workers wearing rings & metal belts

Workers not wearing gloves

Metalic binder clips

Contamination not avoided Sheets scratched

by supplier

Unclean MHE

Page 44: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Powder

Powder Defect

Man

Materials

Machines

Methods

Excessive powder is used in the powdering stage

Improper cleaning in the plastic stage

Powder has impurities

Improper method of cleaning

Wiping fabrics are in efficient

Page 45: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Silk-Screen

Silk-Screen Defect

Man

Materials

Machines

Methods

Bad ink material

Improper loadingUnclean machine

Bad anti contamination

Bad inspection

Improper machine setup

Insufficient ink

Page 46: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Dirt

Dirt Defect

Man

Materials

Machines

Methods

PVB sheets are dirty

Workers not wearing gloves

Unclean machines

Contamination

Workers not wearing head covers

Unclean MHE

Unclean tools

Insuffiecient clean stages

PVB has impurities

Improper cleaning

Page 47: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Process Capability

Calculations Results

n (average) = 6813.556

p (average) = 0.074981

UCL = 0.084553

LCL = 0.06541

CL = 0.074981

Page 48: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed
Page 49: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Results

The process capability analysis shows that The process in AMAN is un-

controlled.

There are lots of variations with different causes.

The 2 key causes for the defects are the Man & Method.

Page 50: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Areas of Improvement

Page 51: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Quality Control Improvement

Page 52: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Quality Control Improvement

Apparatus to be purchased

1) Dropping tower

To assure credibility and

ensure safety of finished

products, we recommend

purchasing the dropping

tower for mechanical tests.

Dropping tower

Page 53: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Quality Control Improvement

Apparatus to be purchased

2) PVB Humidity Meter

The PVB Humidity meter

measures the water

contained in the PVB

before and after

lamination.

PVB Humidity Meter

Page 54: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Material-Handling Equipment

Improvements

Page 55: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Material-Handling

Equipment Improvements

Free Standing Windshield Racks

Features:

1. Capacities from 15 to 90 windshields

2. Welded steel construction

3. Light gray enamel finish

4. Half inch thick neoprene glass stop strips

5. Polyethylene peg covers are slotted for easy installation

6. Plastic peg caps included

7. Partial KD for shipping

8. A virtual lifetime of service

9. Maximum use of floor space

Standing Windshield Rack

Page 56: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Material-Handling

Equipment Improvements

Windshield Carriers

Features:

1. Capacities from 5 to 44 windshields

2. Easy access top-loading

3. Polyethylene sleeves cover pegs between bumpers

4. No moving parts to repair or replace

5. Durable powder coat finish (steel models)

6. Windshields fit snugly between molded rubber bumpers

7. Lower bumper flanges interlock to form a continuous setting area

Windshield Carrier

Page 57: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Material-Handling

Equipment Improvements

Windshield Carts

Features:

1. Capacities from 15 to 30 windshields

2. Elevated windshield setting area

3. Pegs pivot downward for easier loading and unloading

4. Walk-in base

5. Polyethylene peg sleeves & caps

6. 1/2” thick rubber setting strips

7. Rugged 6 x 2 ball-bearing casters with the brakes on swivel casters

Windshield Cart

Page 58: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

5S Study Suggested Improvements

Page 59: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Workplace 5S Auditing

5S is a method of creating a clean and orderly workplace that exposes waste and makes abnormalities immediately visible. As such it’s important to realize that 5S is far more than a housekeeping initiative like so many confuse it to be.

When someone refers to 5S they’re generally referring to 5 Japanese words that start with S.

They are:

Seiri which is commonly translated as sort

Seiton which means to straighten

Seisou which means to sweep or shine

Seiketsu which actually means to sanitize but is most commonly referred to as standardize today

Shitsuke which means self discipline or sustain

Page 60: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

5S Study Suggested

Improvements

Sort

I. Removing the racks of

broken & defected

windshields from the plant.

II. Moving the old un-used

quality inspection jigs to the

inventory.

Broken glass

Page 61: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

5S Study Suggested

Improvements

Set in order

I. Making certain places for

the broken & defected

windshields.

II. Labels to be put on the

material handling

equipment showing the

processes done, next

processes & the quality

inspection tests made.

One of the material handling equipment left in a wrong place

Page 62: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

5S Study Suggested

Improvements

Shine

I. Removing the ashes of the

glass while cutting &

polishing.

II. Sweeping the floors

regularly.

III. Moving the broken glass out

of the plant area.

Broken glass on the floor

Page 63: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Conclusion

This thesis is about the assessment of a leading automotive glass manufacturers in Egypt and the Middle East. Upon the end of the analysis and evaluation of working conditions, the quality systems, the level of quality of the final product and the work system in the facility we could conclude the following:

There is a high level of defects in the final products.

The reasons behind vary widely to include almost all the 4M’s (Man, Machine, Method and Material).

The main reasons could be summarized to include the handling, storage tools and techniques.

The quality system in the factory is not conforming to the global standards and regulations.

The work environment lacks many of the standard work conditions.

Page 64: Process Assessment and Improvement in Aman Windshield ... Process Assessment in AMAN Windshield Factory By: Abdelrahman Mohamed Elshamy Bahaa-Eldeen Mahmoud Qamar-Eldeen Islam Mohamed

Conclusion

A plan is made to suggested solutions. These solutions are studied thoroughly and evaluated for feasibility in order to increase the plant’s productivity and to decrease the percentage of defects.

This plan can be summarized:

Investigating the similar global factories and imitating their operational and managerial systems.

Assuring the application of the standard global tests to achieve full conformity with the regulations.

Applying 5S techniques to improve the workplace productivity.

Investigating the available material handling equipment used in auto glass industry and suggesting better alternatives.

These suggested solutions need to be implemented to see the actual impact on productivity and product quality. However, due to the shortage on time and the factory’s managerial policies, it was not possible to make a full implementation of the study.