presented to wisconsin department of transportation presented by traffic operation infrastructure...
TRANSCRIPT
![Page 1: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/1.jpg)
presented to
Wisconsin Department of Transportation
presented byTraffic Operation Infrastructure Plan Team
3/10/08
Traffic Operation Infrastructure PlanUpdate
![Page 2: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/2.jpg)
2
Agenda
Schedule/Progress
Overview and Feedback on Summary and Appendices
Finalize Deliverables
Planning and Programming Process Integration
Communications and Outreach
Technical Scan Update
Next Steps
![Page 3: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/3.jpg)
![Page 4: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/4.jpg)
Overview and Feedback
![Page 5: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/5.jpg)
5
Overview
Four components to recent submissions:
• Corridor Summaries
• Traffic Management and Surveillance Detailed Appendix
• Traveler Information Detailed Appendix
• Traffic Signal System Detailed Appendix
• Technology Scan
Potential Questions
• Does the information provided meet expectation?
• Is the formatting of the Summary section appropriate?
• What other elements should be included in the Appendices?
• Are there other issues/assumptions within the cost estimates that need to be explained or expanded?
• Any feedback from regions?
* Please note: these submissions are not the final deliverables.
![Page 6: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/6.jpg)
Summary
![Page 7: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/7.jpg)
![Page 8: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/8.jpg)
Traffic Management and Surveillance
![Page 9: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/9.jpg)
Traveler Information
![Page 10: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/10.jpg)
Traveler Information
![Page 11: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/11.jpg)
Signals
![Page 12: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/12.jpg)
Signals
![Page 13: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/13.jpg)
Signals
![Page 14: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/14.jpg)
14
Final Deliverables
Old outline for one “mother of all reports” perhaps not the best road forward given how the project has evolved
Considering a series of smaller documents
• TOIP Summary Document− Methodology/Approach (data, criteria, thresholds)
− Corridor summaries – all 37
− Cost summaries
− Priority and Emerging Priority corridors
− Statewide Maps by Technology Layer
− Update Cycle
• Four stand alone Appendices− Broken out by functional area
− Summaries for each corridor
− Cost estimates for Top 13
− Detailed cost estimate assumptions
− Tech Scan
• Executive Summary (approx 10 pages)
• High impact bi/tri-fold handout
![Page 15: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/15.jpg)
15
Process Implementation and Integration
Integrate with established WisDOT processes, procedures, manuals and guidance to ensure TOIP continues.
• Administratively− Program Management Manual?
− Facilities Development Manual
− Other…
• Technically− TOIP data/model
♦ LRPT/Six year Improvement Plan (Bi-annual?)♦ TOPS – Maintenance
− ITS design manual
− Other
![Page 16: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/16.jpg)
16
MeetingsMar08
Apr08
May 08
Jun08
Jul08
Aug 08
Sep08
Oct08
Nov08
Dec08
Jan09
BHO Bureau Director
DTSD Executive Briefings
DTIM Executive Briefings
Ops Managers
Planning Managers
PDS Chiefs
MP3
Regional Orientations (Combined Meeting with DTSD, DTIM, PDS)
TOIP COMMUNICATIONS AND OUTREACH SCHEDULE– Who, When, How
![Page 17: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/17.jpg)
Tech Scan
![Page 18: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/18.jpg)
18
Tech Scan
ftp sites:
• http://wisdot.projectpath.com/projects/1837141/files
• ftp://ftp.srfconsulting.com/outgoing/WI_ITS/TOIP_Technology_Scan
• Posted February 27
Send comments by email, fax, and phone
• Brian L. Scott
• Phone: (763) 475-0010
• Fax: (763) 475-2429
• email: [email protected]
![Page 19: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/19.jpg)
Next Steps
![Page 20: Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan](https://reader036.vdocuments.us/reader036/viewer/2022070413/5697bff41a28abf838cbd172/html5/thumbnails/20.jpg)
20
Next Steps
Send comments by email, fax, and phone by 3/19/08
• Word version available
Finalize and initiate roll-out approach
Finalize and initiate process implementation and integration
Final documents - set deadlines
• Suggestions:− April 1, 2008 – Draft Final Reports delivered to WisDOT
− April 18, 2008 – Final Comments due from WisDOT
− May 16, 2008 – Final Report delivered to WisDOT