presentation to kib-tek northern cyprus (16/11/2005)

74
1

Upload: constance-murray

Post on 02-Jan-2016

32 views

Category:

Documents


1 download

DESCRIPTION

Presentation to KIB-TEK Northern Cyprus (16/11/2005). Introductions. Graham Pryce – International Sales Manager Lucy Switchgear, UK Bill Carlyle – Business Development Manager Lucy Switchgear, UK. Company Background. Established in 1760 as an iron foundry - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

1

Page 2: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

2

Presentation to KIB-TEK Northern Cyprus(16/11/2005)

Page 3: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

3

Introductions

• Graham Pryce – International Sales Manager Lucy Switchgear, UK

• Bill Carlyle – Business Development Manager Lucy Switchgear, UK

Page 4: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

4

Company Background

• Established in 1760 as an iron foundry• Over £50m capital employed supporting the business

-- Lucy Electric Lucy Electric - Lucy Castings- Lucy Castings - Lucy Properties- Lucy Properties

• 100 shareholders both individual and institutional

Page 5: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

5

Company Structure

W Lucy & Co Ltd

Lucy Electric Group

Lucy Switchgear Lucy Lighting

Lucy Switchgear HQ – Thame, UK

Lucy Switchgear – BanburyPower Isolators Ltd

Lucy Switchgear - Dubai

Saudi Lucy – Saudi Arabia

Crompton Greaves Lucy - India

Lucy Switchgear FZE – Oil

Lucy Switchgear FZE – SF6

Lucy Switchgear – Commercial Office

Lucy Castings

Lucy Properties

Page 6: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

6

Lucy Switchgear - UK

Page 7: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

7

Company HQ - Thame

• New in 2005 - £6 million purpose built site in Thame, Oxfordshire.

• Modern Single Floor Manufacturing

• 200 employees

Page 8: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

8

Thame Activities

• Assembly, configuration, testing of Ring Main Units (RMU)

• Customisation of Low Voltage (LV) panels• Assembly of cast iron pillars• Steel shell configuration• Isolators assembly• Connectors assembly

Page 9: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

9

Lucy Switchgear - Banbury

– R&D for ground and pole mounted switchgear

– Automation– Manufacturing of pole mounted switchgear –

Rapier RX, Rapier DSB

Page 10: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

10

Lucy Switchgear FZE

Page 11: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

11

Lucy Switchgear FZE

• Manufacturing in Dubai since 1997

• Two Lucy Switchgear factories

• Over 200 employees

• Investment in the latest technologies, cutting-edge machinary and CAD software

Page 12: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

12

Lucy Switchgear FZE - Activities

• Manufacturing

– Medium voltage ring main units– Low voltage distribution equipment– Medium voltage overhead line equipment

Page 13: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

13

Global Presence

Page 14: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

14

Global Presence

Page 15: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

15

Global Network

• Lucy Switchgear has established a global network operating in over 50 countries

• Agents, joint venture associates and trading partners represent Lucy Switchgear products in key areas including the Middle East, the Far East, Europe, Africa, Australasia and South America.

Page 16: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

16

New SABRE VRN2a

Page 17: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

17

Sabre VRN2aProduct Description

Outdoor non-extensible ring main unit with 2 ring switches and tee-off vacuum circuit breaker in an SF6 filled enclosure with pressure relief facility

Page 18: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

18

SABRE VRN2a

Page 19: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

19

SABRE Comparison

Improved Features• Smaller and lighter• Easier to use• Improved test access

Page 20: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

20

SABRE VRN2a Main Features

• Vacuum tee off circuit breaker

• Common switching chamber with

sealed SF6 environment

• 12/15.5k/24V versions

• Indoor and Outdoor

• Enhanced electrical performance

• Interlocked for safe operation

Page 21: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

21

SABRE VRN2a Main Features

• Integral ring cable testing

• Internal arc tested cable boxes

• Side and rear cable access for maximum

operator safety

• Fault passage indicators

• IP54 rated sheet steel housing

• Pre-wired for motor actuation

• Variety of protection options including relay and

TLF

Page 22: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

22

SABRE VRN2a Options

• Remote operation of ring switches/ CB

• Fault passage indicators

• Intertripping

• Neon indication

• Top entry cable boxes

• Castell interlocks

Page 23: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

23

SABRE Protection Systems

• Time lag fuse protection (TLF)

• Relay protection

• Live parts are contained within

earthed stainless steel enclosures

• Positive safety interlocks on all

switch positions

• Padlocking facilities for all switch

and selector positions

• Internal ARC tests are carried out in

accordance with IEC and ENA

specifications.

All Sabre units offer a high degree of safety, with customers benefiting from our experience in independent protection systems.

Page 24: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

24

Environment and Quality

• We are committed to providing products that minimise adverse

environmental impacts and contribute positively to customers’ own

environmental objectives

• We operate a quality management system, which conforms to and exceeds

international requirements of BSEN and ISO 9001:2000

Page 25: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

25

Sabre VRN2aGeneral Arrangement

NB T-off height 1320mm

Page 26: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

26

Sabre VRN2a – Technical Specification

• Rated voltage - 15.5kV

• Rated insulation level - 95kV/110kV lightning impulse

• Rated insulation level – 38kV/45kV power frequency

• Rated short time withstand current - 20kA/ 3 sec

• Rated peak withstand current – 50kA

• Internal Arc Relief - gas enclosure, 20kA for 1 sec, in enclosed secondary

substation housing, to fig 4, ENATS 41-36, no additional trunking

Page 27: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

27

Sabre VRN2a –Technical Specification

• Ring Main Switches Normal Current 630A

• Circuit Breaker Tee-Off Normal Current 250A

• Degree of protection - Outdoor to IP54 (door closed)

• Type tested to ENATS 41-36 issue 2, 2004

• Standard unit suitable for both direct transformer mounting and

freestanding cable connected applications

Page 28: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

28

Sabre Test Certificate

• IEC 62271 – 103

• IEC 62271 – 100

• IEC 62271 – 102

• IEC 60056

• BS EN 60265 – 1

• BS EN 60129

• BS EN 60694

• BS EN 60298

• ENA TS 41-36

Sabre has been fully certified in accordance with IEC standards:

Page 29: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

29

Package Substation

A selected Transformer supplier

LUCY RMU LV cabinets

Page 30: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

30

Compact substation Indoor and Outdoor type

Outdoor

Brick building

Indoor

GRP enclosure

Page 31: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

31

Automation Products & Systems

Page 32: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

32

RMU Automation & Retrofit Actuator Solutions

Page 33: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

33

Automated SABRE VRN2a

• Designed with automation in mind

• Wiring loom standard for both ring switches and indications

• Microprocessor controlled rotary actuator - same for both ring switches

• Simple plug-in installation to front of panel

Page 34: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

34

Automated Sabre VRN2a

• Easy to remove actuator for manual operation

• CB actuator available as an option

• Fully integrated with Gemini-RTU for remote control & monitoring

Page 35: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

35

Lucy Retrofit RMU Solutions

• Available on Lucy FRMU, EOS, SCRMU and the latest generation of RMU - the SABRE range

• Retrofit RMU kit also developed for Long & Crawford type T3/ T4GF3 & J3/ J4 (ring switches only)

• Non-intrusive

• Can be retrofitted with the RMU alive

Page 36: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

36

Lucy Retrofit RMU Solutions

• Single or double actuator ring switch retrofit kits available, including tee-off CB actuator on Sabre RMU & SCRMU

• Standard 24V actuator supply voltage

• Motor control unit for interfacing with the Gemini-RTU or third party RTUs

• Equip RMU with Earth Fault Passage Indicator and core balanced CT

Page 37: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

37

Automated FRMU

Page 38: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

38

FRMU & Gemini-RTU

Page 39: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

39

Automated L&C T3/ T4GF3 RMU

Page 40: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

40

L&C J3/J4 Retrofit Actuator

Page 41: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

41

RAPIER OverheadRange

Page 42: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

42

Rapier Overhead Range

Rapier GX - based on SF6 technology

• GX-M (manual, hook-stick operation)

• GX-RC (local/ remote control via Gemini-RTU)

• GX-S or Sectionaliser (under development)

Page 43: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

43

Rapier GX Load Break Switch - Features

• Ratings up to 38kV• SF6 gas utilised as both arc

quenching and insulating medium

• Equipped with 3 current transformers and 6 VCT’s in the bushings

• Stainless Steel enclosure sealed for life

• Motor actuator for DA• Overpressure membrane for

internal arc protection

Page 44: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

44

Rapier GX Load Break Switch - Features (contd)

• Options available include: - Low gas pressure lockout device

- Gas pressure switch

- 3 additional CT’s for SEF

- Manual locking device

- Built-in VT for control cabinet supply

• GX LBS integrated with Gemini-RTU controller (described later)

Page 45: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

45

Rapier GX Load Break Switch- Benefits

• Field proven LBS performance• Low capital and lifetime costs• Virtually maintenance free• Designed for maximum operator safety• Capable of live line installation• Integrated solution for distribution automation

Page 46: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

46

Rapier Overhead Range

Rapier RX - based on air break technology

• RX-M (manual down pole or hook-stick operation)

• RX-RC (local/ remote control via Gemini-RTU)

• RX-FS or Fuse Switch

Page 47: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

47

Problems Associated withOlder Air Break Designs

• Mechanisms would seize up over time due to stiff bearings and corroded main contacts

• Load Break Heads seized up due to complex design

• Braided flexes and joints suffered corrosion

• Significant maintenance over the switches’ lifecycle

Page 48: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

48

New Features in RX Design

• Low friction, corrosion resistant bearing leading to low maintenance and improved reliability

• Laminated flexes with no corrosive effects. (Tested for 2,000 operations before single lamination broke)

• New simpler design of Arc Chute device for rapid arc extinction when load breaking

• New tungsten tipped contacts so that Fault Make Heads can be fitted as an option

• All key components now stainless steel for corrosion resistance

Page 49: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

49

New Rapier RX Switch

Arc Chute

Fault Make Head

Laminated Flexes

Pin Bearing

Universal MainContacts

Page 50: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

50

New RX switch design

Page 51: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

51

Double Acting Spring Mechanism (DASM)

Closed orhook ends

Overtravel stops

Operatingarm

De-latchingarms

Verticaldrive rod

Page 52: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

52

Modular Design Approach

Switches can be specified with:

• FMH, LBH or EB• Current ratings of 400, 630 or 800A• Short circuit ratings up to 25kA for 3 seconds• Choice of insulators - traditional ceramic or

polymeric options such as EPDM and Silicone Rubber

• Manual or motorised mechanism• Remotely controlled with RTU and integral

motorised actuator

Page 53: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

53

Patented Fault Passage Indicator

FPI

Page 54: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

54

Why consider an RX switch as part of your DA?

• Much improved design so that the RX can be relied upon to be remotely controlled

• Significant price differential with SF6 enclosed switches e.g. £1,000 - £1,500

• No monitoring of SF6 gas pressure

• RX switch considered as a Point of Isolation

• Environmentally friendly “AIR BREAK TECHNOLOGY”

Page 55: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

55

GEMINI-RTU V2

Page 56: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

56

Gemini-RTU

• Servo Control of actuator• RTU to manage

communications• DNP3 protocol as standard,

IEC 60870-5-101 and WISP+ optional

• Programmable e.g. Automation sequences

• Expandable digital I/O and current monitoring

• Voltage sensing derived from CVTs

Page 57: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

57

Gemini-RTU

• 24V battery backup• Battery condition monitoring

- low battery voltage alarm

- deep discharge protection

- configurable on-load battery test

- loss of AC voltage alarm to DC charger unit• Local/ remote operation• Flexible communications media such as radio, Packet

Data, GSM/ GPRS, PSTN, leased lines and fibre optic• Common RTU platform for the pole and ground-mounted

switchgear - can control up to four switching functions

Page 58: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

58

Gemini-RTU

Page 59: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

59

Other GEMINI Systems

Page 60: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

60

Gemini-SCADA Secondary Control System

• PC based SCADA package from CI Technologies

• Lucy Switchgear is a Citect Integration Partner

• Monitoring, data logging and report tasks

• Monitoring of alarm conditions

• User display/ HMI interface

Page 61: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

61

Gemini-SCADA Secondary Control System

• Tasks can be installed on different machines

• Open and scaleable architecture

• I/O Communications - DNP3 provided as standard protocol

• Networking

• Password security

Page 62: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

62

Gemini-DCData Concentrator

• Provides distributed processing of secondary nodes

• DNP3 protocol as standard to secondary nodes

• Communications adaptation to corporate networks e.g. low power radio or GSM links to high speed networks

1

Page 63: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

63

Gemini-DCData Concentrator/ Bridge

• Product development close to completion (available Jan 2005)

• Provides distributed processing of secondary nodes

• DNP3 protocol as standard to secondary nodes with IEC 60870-5-101 or DNP3 on host port to master SCADA/ RTU

• Communications adaptation to corporate networks e.g. low power radio or GSM links to high speed networks

1

Page 64: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

64

System Architectures

Page 65: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

65

Existing SCADA Systems

Switchgear

Gemini-RTUs

Communications Media

Modems

Existing SCADA or NMS

Modem

Page 66: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

66

Existing SCADA Systems

• Protocols

Gemini-RTU (host port) DNP3,IEC 60870-5-101

WISP+

Modbus

NB - DNP3 & IEC 60870-5-101 open world standards,

WISP+ Schneider proprietary and Modbus for

industrial applications• Communications

Radio, Packet Data (Paknet), GSM/ GPRS, pilot wire orleased lines, Bluetooth and fibre optic

Page 67: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

67

Standalone Gemini-SCADA

Switchgear

Gemini-RTUs

Communications Media

Modems

Gemini-SCADA

Modem

Page 68: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

68

Standalone Gemini-SCADA

• Protocols

Gemini-SCADA DNP3

Gemini-RTU (host port) DNP3

For this system architecture, DNP3 is our preferred

protocol. However, IEC 60870-5-101 is available as

an option.

• Communications

As specified for existing SCADA systems

Page 69: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

69

Gemini-DC(Data Concentrator/ Bridge)

Gemini-DC

SCADA

NB - DNP3 links throughout

Gemini-RTUs

Repeater

Page 70: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

70

Gemini-DCData Concentrator/ Bridge• Protocols

Gemini-DC to SCADA DNP3/ IEC 60870-5-101 (serial link)

Gemini-RTU (host port) DNP3• Communications

Low power radio or GSM predominately

NB• Gemini-DC will reside mainly in primary substations

adjacent to primary RTU• Intermediate node acts as a Store/ Forward of

messages to other RTUs. This provides greater transmission coverage

Page 71: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

71

Automation Project References

Page 72: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

72

Recent Experience

Eastern Electricity (24-7), UK: Contract for 50 Remote control RMUs - inc. RTU, PakNet Pad and PSU.

Discussing complete installation, commissioning and radio studies.

London Electricity (24-7), UK: 400 RMUs installed fitted with single and double actuators. Pluto units also fitted to some units with PSTN line connection.

S&SE, UK: 500 retrofit automation kits installed comprising actuator and interface control electronics.

Discussing supply and installation of RTU and communications along with actuator simultaneously.

Power Grid, Singapore: 500 remotely controlled RMUs, equipped with actuators and provision for Control Box and with LV control and monitoring terminations.

Page 73: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

73

Recent Experience (contd)

EAC, Cyprus: 85 RMU retrofit actuators and 10 Rapier RX-RC24s for a remote control pilot project. Rapier RX-RC24 devices are embedded with DNP3 firmware and communications achieved via the GSM network.

Central Networks, UK: Trials of automated FRMUs for Auto-changeover at open point and Auto-open at midpoint. Equipped with Gemini-RTU and Paknet communications. 350 off Rapier RX-RC12’s installed on network.

Northern Ireland Electricity, UK: Trials of Rapier RX-RC12s being remotely controlled using the IEC 60870-5-101 protocol and high power radio communications. 120 off Gemini-RTUs supplied for autorecloser interfaces.

United Utilities, UK: Trial of two automated Rapier RX-RC’s at open points; equipped with Gemini-RTUs and GSM communications.

Page 74: Presentation to KIB-TEK Northern Cyprus (16/11/2005)

74

End of Presentation

Any questions?