Railway Rehabilitation Project in Cambodia
![Page 2: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/2.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project in Cambodia
1- Southern Line : Phnom Penh – Sihanouk Ville 264 km
2- Construction of Sihanouk Ville Container Railway Terminal
3- 48 km Missing Link from SISOPHON – POIPET
(6km from Pk 380+000 to Cambodia-Thai Border)
4- Northern Line : Phnom Penh – SISOPHON 338 km
5- SAMRONG area Development and Green Trade Warehouse, (KM6)
Contents
![Page 3: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/3.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
1- PHNOM PENH – SIHANOUK VILLE 264 km
The constriction was completed in 2013, Speed design 50 Km/h, 20T
axle load, Concrete Sleeper, Rail P 43, Single Track Meter gauge (1000mm).
Railway Rehabilitation Project
Flush-butt welding of rails
![Page 4: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/4.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
2- Construction of Sihanouk Ville Container Railway Terminal
-Contractor : SINOHYDRO CORPORATION
-Notice to Proceed : 5 June 2013
-Contract Period : 365 days
-Construction was completed: 10, 2014
-Contract Value : USD 3,7 Million
-Construction size : 4ha
Railway Rehabilitation Project
![Page 5: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/5.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project 2- Construction of Sihanouk Ville Container Railway Terminal
Installation of interlocking concrete block
![Page 6: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/6.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project 3- 48km Missing Link from SISOPHON – POIPET
(6km, from Pk 380+000 to Cambodia-Thai Border)
Rebuilding 48 km Missing Link from SISOPHON – POIPET, this section was completed in April 2012 for 42km.
The remaining section 6km close to the border railway bridge has not completed yet.
![Page 7: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/7.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
3- 48km Missing Link from SISOPHON – POIPET
(6km, from Pk 380+000 to Cambodia-Thai Border)
Railway Rehabilitation Project
The remaining section 6km closed to the border of the railway bridge will start the construction in January 2015 -PC sleepers are stocked at PK 42nd -Rail BS 80 are stocked at POIPET Station
![Page 8: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/8.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project 3- 48km Missing Link from SISOPHON – POIPET
(6km, from Pk 380+000 to Cambodia-Thai Border)
- On 25 July 2014, the Royal Government of Cambodia and Royal Government of Thailand started to construct a railway bridge at border in the total length of 43m.
- Contractor : Italian-Thai Development Public Company Limited - Consultant for the Construction : The State of Railway Thailand - The Project will be completed in April 2015
Ground Breaking Ceremony of the new railway border bridge
![Page 9: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/9.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
4- Northern Line : Phnom Penh – SISOPHON 338 km
Railway Rehabilitation Project
-The existing of northern line Phnom Penh Station – SISOPHON 338km this section was completed in September 2012 for 23km, from PK 9+400 to Batdeung Station.
- The section Batdeung Station – SISOPHON 315km has not completedyet and The government is looking for additional funds.
![Page 10: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/10.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project 5- SAMRONG area development and Green Trade Warehouse, (KM6)
These development s are under consideration for future construction due to the resettlement issues
![Page 11: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/11.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project
![Page 12: Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference](https://reader038.vdocuments.us/reader038/viewer/2022110119/55620eb1d8b42a7d028b4e22/html5/thumbnails/12.jpg)
ASEAN RAILWAY CEOs’ CONFERENCE36
thTowards Closer ASEAN Connectivity
Technical Working Group
Railway Rehabilitation Project
THANK YOU !!