H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 1 P RE -B ID C ONFERENCE BAC MEETING NO: DATE OF MEETING: 2020-03 05 February 2020 (Wed) BIDDING NO.: TITLE/DESCRIPTION: IB20-395244-02 Category per RA9184: [ ]GOODS [X] INFRA/WORKS [ ]CONSULTING APPROVED BUDGET CEILING (ABC): “ONE (1) LOT REHABILITATION/ RENOVATION/ IMPROVEMENT OF THE 2F/A OF THE DAP BUILDING IN PASIG CITY INTO A DAP TECHNOLOGY CENTRE” P7,270,000. 00 BUDGET UTILIZATION SLIP NO.: PP19121095 PURCHASE REQUEST NO.: END-USER REPRESENTATIVE: OFFICE, CENTER/GROUP: 395244 ALLAN DE VENECIA OP SPECIAL PROJECTS PROCESSING CONTROL NO.: EARLY START-TIME: TIME ADJOURNED: VENUE OF MEETING: NP191219004 01:23PM 03:21PM Rizal Hall, DAP Bldg., Pasig City Minutes of the Pre-Bid Conference 01. CALL TO ORDER & VALIDATION OF QUORUM: 01.1. The Pre-Bid Conference for the abovestated Project started at exactly 01:23 PM and was presided by the BAC Chairperson SVP Bernardo A. Dizon; 01.2. The Program was called to order when the Acting Director of Logistics Division confirmed the quorum for both BAC and TWG, as asked by the Presiding Officer; 01.3. The BAC Chairperson recognized the presence of the BAC, End-User, TWG, Prospective Bidders, the Observers, and the other guests to the PBC; 01.4. BAC Chairperson introduced the members of Designation Bids and Awards Committee (SO-2018-119 & SO-2019-074A) P/A BAC Alternate Members P/A Chairperson BERNARDO A. DIZON P Vice-Chairperson MONINA A.R. DE ARMAS P Member 1 MONICA D. SALIENDRES P RICHA S. TIBO P Member 2 GILBERT E. LUMANTAO A DANILO C. FILARCA A Member 3 GERALD Y. CRUZ P ALVIN P. PRINCIPE - Provs’nl Member – End User ALLAN DE VENECIA P Acting Director, Logistics Division* RODEL DV. CASTILLO P BAC Documenter* MARIET RIZ M. BRADECINA P JESSERIE ANN P. TAGLE P BAC Sec, Staff* ERMILANDO V. MORATALLA JR. P APRIL P. ESPINO P Observer 1* COA Representative - Observer 2* OGCC Representative - NOTE: Alternate member automatically assumes post when the primary member is not available. The primary member shall be responsible to update his/ her alternate member if the latter is unable to attend a scheduled meeting. Likewise, it is the duty of the latter to do the same to the former. POSITION TWG Members Pres (P) /Abs (A) 01. TWG Chairperson ENGR. VENER V. MADERAJE P 02. TWG Vice-Chairperson ATTY. MARY ANNABELLE CRUZ-DOMINGO A 03. TWG Member 1 MICHAEL L. VICEDO P 04. TWG Member 2 ADRIAN A. RAMIREZ A 05. TWG Member 3 ENGR. MARJORIE M. WAJE-BAGANG P 06. TWG Member 4 ANGELICA N. FRANCISCO P development academy of the philippines B IDS & A WARDS C OMMITTEE (SO NO.2018-119 & SO-2019-074A)

Upload: others

Post on 01-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.1/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 1

PRE-BID CONFERENCE

BAC MEETING NO: DATE OF MEETING:

2020-03 05 February 2020 (Wed)

BIDDING NO.: TITLE/DESCRIPTION:

IB20-395244-02 Category per RA9184: [ ]GOODS [X] INFRA/WORKS [ ]CONSULTING

APPROVED BUDGET CEILING (ABC): “ONE (1) LOT REHABILITATION/ RENOVATION/

IMPROVEMENT OF THE 2F/A OF THE DAP BUILDING IN

PASIG CITY INTO A DAP TECHNOLOGY CENTRE”

P7,270,000.00 BUDGET UTILIZATION SLIP NO.:

PP19121095 PURCHASE REQUEST NO.: END-USER REPRESENTATIVE: OFFICE, CENTER/GROUP:

395244 ALLAN DE VENECIA OP – SPECIAL PROJECTS PROCESSING CONTROL NO.: EARLY START-TIME: TIME ADJOURNED: VENUE OF MEETING:

NP191219004 01:23PM 03:21PM Rizal Hall, DAP Bldg., Pasig City

Minutes of the Pre-Bid Conference

01. CALL TO ORDER & VALIDATION OF QUORUM:

01.1. The Pre-Bid Conference for the abovestated Project started at exactly 01:23 PM and was presided by the BAC Chairperson SVP Bernardo A. Dizon;

01.2. The Program was called to order when the Acting Director of Logistics Division confirmed the quorum for both BAC and TWG, as asked by the Presiding Officer;

01.3. The BAC Chairperson recognized the presence of the BAC, End-User, TWG, Prospective Bidders, the Observers, and the other guests to the PBC;

01.4. BAC Chairperson introduced the members of …

Designation Bids and Awards Committee

(SO-2018-119 & SO-2019-074A) P/A BAC Alternate Members P/A

Chairperson BERNARDO A. DIZON P

Vice-Chairperson MONINA A.R. DE ARMAS P

Member 1 MONICA D. SALIENDRES P RICHA S. TIBO P

Member 2 GILBERT E. LUMANTAO A DANILO C. FILARCA A

Member 3 GERALD Y. CRUZ P ALVIN P. PRINCIPE -

Provs’nl Member – End User

ALLAN DE VENECIA P

Acting Director, Logistics Division*

RODEL DV. CASTILLO P

BAC Documenter* MARIET RIZ M. BRADECINA P JESSERIE ANN P. TAGLE P

BAC Sec, Staff* ERMILANDO V. MORATALLA JR. P APRIL P. ESPINO P

Observer 1* COA Representative -

Observer 2* OGCC Representative - NOTE: Alternate member automatically assumes post when the primary member is not available. The primary member shall be responsible to update his/ her alternate member if the latter is unable to attend a scheduled meeting. Likewise, it is the duty of the latter to do the same to the former.

POSITION TWG Members Pres (P) /Abs (A)

01. TWG Chairperson ENGR. VENER V. MADERAJE P

02. TWG Vice-Chairperson ATTY. MARY ANNABELLE CRUZ-DOMINGO A

03. TWG Member 1 MICHAEL L. VICEDO P

04. TWG Member 2 ADRIAN A. RAMIREZ A

05. TWG Member 3 ENGR. MARJORIE M. WAJE-BAGANG P

06. TWG Member 4 ANGELICA N. FRANCISCO P

development academy of the philippines B I D S & A W A R D S C O M M I T T E E (SO NO.2018-119 & SO-2019-074A)

Page 2: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.2/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 2

POSITION TWG Members Pres (P) /Abs (A)

07. TWG Member 5 FILIPINO FRANCISCO P. GOMEZ P

08. TWG Member 6 JENNIFER GAYLE G. FLORES P

09. TWG Member 7 MARK REX JAYSON T. ATOLE A

10. TWG Member 8 MICHAEL H. RAMOS P

11. TWG End User Representative YRA TURINGAN A

* Non -voting member

02. OPENING REMARKS:

02.1. Observers who were invited:

02.1.1. MS. ROSALIE D. SARMIENTO, DAP Auditor, Commission on Audit (COA);

02.1.2. JUDGE BEL D. DERAYUNAN, Assistant Government Corporate Counsel, Office of the Govt. Corp. Counsel (OGCC);

02.1.3. USEC. ROWEL S. BARBA, Undersecretary for Competitiveness & Ease of Doing Business Group (CEODBG), Construction Industry Authority of the Philippines (CIAP);

02.1.4. ATTY. HERBERT DG. MATIENZO, Executive Director III, Philippine Contractors Accredited Board (PCAB);

02.1.5. MR. AMADOR F. ESTUDILLO, Procurement Watch, Inc. (PWI); and

02.1.6. MR. DELFIN J. WENCESLAO, JR., President, Philippine Constructors Association, Inc. (PCAI).

From the above-invited Observers, none attended the Pre Bid Conference.

02.2. Participating Bidders as of 05 February 2020 (Wed): (self-intro = company

represented + name + position in the company)

02.2.1. KERGIE ENTERPRISES represented by (a) Enrique Libranda, General Manager; (b) Erik Anthony Libranda, VP-Operations; (c) Jeffrey Tadeo, Principal Architect; and (d) Ivana Libranda, I.T.;

02.2.2. E & S BUILDERS represented by (a) Roger A. Robiso, Architect; and (b) Domy Flestado, Liaison;

02.2.3. ACCENT MICRO TECHNOLOGIES, INC. represented by (a) Hannah Gonzales, Project Coordinator; (b) Daphne Pacia, Project Manager; (c) Lance Sebastian, Project Manager; and (d) Gerardo Baldevia, Electrical Engineer;

02.2.4. ASTRAM MARKETING GENERAL CONTRACTOR, INC. represented by Rodel Serrano, Project Engineer;

02.2.5. TRENDS AND CONCEPTS TOTAL INTERIOR SOLUTIONS represented by (a) Gab Cruz, Business Development; and (b) Eric Salimbagat, Interior Designer;

02.2.6. JAYMAR BUILDERS represented by Emmanuel Benito, Project Coordinator;

Page 3: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.3/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 3

02.2.7. FFJJ CONSTRUCTION represented by (a) Edwin Molao, Jr., Project Manager;

02.2.8. BIOMETRICS represented by (a) Noemi Paz, Account Manager; and (b) Arthur Linsangan, Project Architect; and

02.2.9. MZR BUILDERS represented by Marilou R. Quiroz, Marketing Officer.

03. PRE BID CONFERENCE PROPER:

03.1. BAC Chairperson acknowledged the presence of the Bidders who bought the Official Bidding Documents (OBD) and other Prospective Bidders who attended the Conference. Also, BAC Chairperson reminded all attendees that only those who bought the OBD are allowed to raise clarifications/questions for the Project.

03.2. BAC Chairperson introduced the following:

03.2.1. The Procuring Entity (DAP video);

03.2.2. The Bidding Process as per GPPB (video);

03.3. BAC Chairperson discussed the following (pptx presentation):

03.3.1. Reminders to the Prospective Bidders;

03.3.2. Packaging and Markings of the Bids to be submitted;

03.3.3. Two Stage Bidding Process;

03.3.4. Ranking of Preliminary Evaluated Bids;

03.3.5. Establishing the Lowest Calculated Bid (LCB)

03.3.6. Establishing the Lowest Calculated Responsive Bid (LCRB); and

03.3.7. Simulation of the Bill of Quantities (BOQ).

03.4. BAC End User Representative presented the Project Simulation for better appreciation on the Project’s Requirements.

04. FOR INFORMATION:

04.1. Activities conducted by the BAC as of date:

04.1.1. 1st Pre-Procurement Conference on 14Jan2020(Tue);

04.1.2. 2nd Pre-Procurement Conference on 17Jan2020 (Fri);

04.1.3. Posted Ads (Invitation to Bid w/ OBD) on 20Jan2020 (Mon) at:

(01) DAP Website;

(02) PhilGEPS Website; and

(03) DAP-Pasig designated areas.

04.1.4. Prospective Bidders who were directly invited thru email:

(01) Acquisition Service Implementation Construction, Inc.;

(02) All Asia Structures, Inc.;

(03) E.C. De Luna Construction Corporation;

Page 4: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.4/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 4

(04) E.M. Cuerpo, Inc.;

(05) Frey-Fil Corporation;

(06) IPM Construction & Development Corporation;

(07) Tri-Ex Tower Company, Inc.;

(08) Accent Micro Technologies, Inc.;

(09) Clix Logic, Inc.;

(10) Multi Style Specialist, Inc.;

(11) Capernaum Development Corporation;

(12) Mecel Construction and Electrical, Inc.;

(13) Ellcad Premier Construction Corporation;

(14) Figari Group;

(15) MaxiBuild, Inc.;

(16) SDW Construction;

(17) Ragojos Heritage Construction Corporation;

(18) Medavis Builders;

(19) Trends and Concepts Total Interior Solutions; and

(20) Don Pin Corporation

04.1.5. Prospective Bidders who inquired and sent their Letter of Intent thru email:

(01) Accent Micro Technologies, Inc.1; and

(02) Trends and Concepts Total Interior Solutions2.

04.1.6. Pre Bid Conference on 05 February 2020 (Wed);

04.1.7. Prospective Bidders who requested3 the Bidding Documents on PhilGEPS website as of 04 February 2020 (Tue):

(01) Padavela Business Development and Consultancy Corporation;

(02) Kergie Enterprises;

(03) Hiroki Construction;

(04) PDJ Integrated Construction [Integcon];

(05) Trix-Zion Ventures Corporation;

(06) MZR Unica, Inc. doing business under the name and style of MZR Builders;

(07) STAD Builders;

(08) R.M. Mangubat Construction & Realty Development Corporation;

(09) Builtrade Construction Supply;

1 Annex “A” – Letter of Intent from Accent Micro Technologies, Inc.

2 Annex “B” – Letter of Intent from Trends & Concepts

3 Annex “C” – Document Request List from PhilGEPS Website

Page 5: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.5/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 5

(10) CFV Arar Contractors Phils. Inc.;

(11) Oscord Builders Corporation;

(12) Liberty Rich Construction & Builders, Inc.;

(13) E & S Builders, Hardware & General Merchandise Co.

04.1.8. Contractors who Bought OBD as of 04 February 2020 (Tue):

Contractor / Supplier OR No. Date Amount

01. Kergie Enterprises 0024351 01/24/2020 ₱5,000.00

02. E & S Builders 0024312 01/28/2020 ₱5,000.00

03. Accent Micro Technologies Inc. 0024349 02/04/2020 ₱5,000.00

04.1.9. Submission & Opening of Bids on 20 February 2020 (Wed).

05. ISSUES, CONCERNS, AGREEMENTS:

05.1. Clarifications from Prospective Bidders <Bidder must introduce himself/herself

and the juridical entity he/she represents>:

05.1.1. Item No. 01 from Mr. Erik Anthony Libranda (Mr. Libranda) of Kergie Enterprises re: Specific Brand of Materials. Mr. Libranda asked the BAC whether the DAP has a specific brand for Vinyl Tiles or other materials that has to be installed for the Project or do they have to submit their proposal for the DAP to approve prior to installation?

BAC’s response: The BAC answered that the Contractor still have to submit a mock-up or document with all the actual specification of the materials that has to be installed. TWG Chairperson Engr. Vener V. Maderaje (Engr. Maderaje) added that materials that has to be installed shall be approved by the DAP according to the specifications provided in the OBD and will not exceed the Approved Budget for the Contract.

05.1.2. Item No. 02 from Mr. Libranda of Kergie Enterprises re: 90-caledar days project duration. Mr. Libranda asked the BAC whether the Project Duration of 90-calendar days includes the processing and approval of the Building Permits.

BAC’s response: The BAC answered in affirmative. The entire Project Duration shall include the processing and approval of the Building Permits and the actual Project Implementation.

05.1.3. Item No. 03 from Mr. Libranda of Kergie Enterprises re: Payment Method. Mr. Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents.

BAC’s response: The BAC answered that upon receipt of complete documents from the Contractor, the DAP allotted 28 working days, as the maximum days on processing payment. The Bidders also submit their Payment Schedule based on the percentage of their deliverables

Page 6: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.6/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 6

as their evidence on their Progress Billing.

05.1.4. Item No. 04 from Mr. Libranda of Kergie Enterprises re: Finalization and Approval of Design/Plans. Mr. Libranda asked the BAC who will approve the floor plans as their attachment when applying necessary permits.

BAC’s response: The BAC answered that the End User together with the DAP Engineers are in charge for the finalization of floor plans and with their recommendation for the approval of the Head of the Procuring Entity.

06. NEXT STEPS:

06.1. February 05-09, 2020 (Wed to Sun) = Request for Clarifications, thru writing (email);

06.2. February 12, 2020 (Wed) = Posted Bid Bulletin, if necessary;

06.3. February 20, 2020 (Thu) = Submission and Opening of Bids;

06.4. February 20-24, 2020 (Thu to Mon) = Bid Evaluation;

06.5. February 26, 2020 (Wed) = Notification of Lowest Calculated Bid (LCB);

06.6. February 27, 2020 to March 04, 2020 (Thu to Wed) = Post Qualification of Bids;

06.7. March 11, 2020 (Wed) = Issuance of Notice of Award;

06.8. March 11-16, 2020 (Wed to Mon) = Submission of Performance Bond; and

06.9. March 25, 2020 (Wed) = contract finalization, notarization & issuance of Notice-to-Proceed (NTP)

NOTE: Non-compliance to set mobilization date can be a ground of rescinding or pre-

termination of the Contract.

07. ADJOURNMENT:

The BAC Vice Chairperson asked each and every member of the BAC and TWG present of he/she has any other concern that must be taken up. Hearing none, BAC Vice Chairperson adjourned the meeting at exactly 03:21 in the afternoon.

Page 7: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.7/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 7

Concurred by the BIDS & AWARDS COMMITTEE SO-2018-119 & SO-2019-074A

-signed-

MONICA D. SALIENDRES BAC Member 1

-absent-

GILBERT E. LUMANTAO BAC Member 2

-signed-

GERALD Y. CRUZ BAC Member 3

-signed-

RICHA S. TIBO BAC Alternate Member 1

-signed-

ALLAN DE VENECIA BAC End-User’s Representative

-signed-

MONINA A.R. DE ARMAS

BAC Vice-Chairperson

Concurred by the TECHNICAL WORKING GROUP per BAC Resolution No. 002, s.2020

-signed-

MICHAEL L. VICEDO TWG Member 1

-absent-

ADRIAN A. RAMIREZ TWG Member 2

-signed-

ENGR. MARJORIE M. WAJE-BAGANG TWG Member 3

-signed-

ANGELICA N. FRANCISCO TWG Member 4

-signed-

FILIPINO FRANCISCO P. GOMEZ TWG Member 5

-signed-

JENNIFER GAYLE G. FLORES TWG Member 6

-absent-

MARK REX JAYSON T. ATOLE TWG Member 7

-signed-

MICHAEL H. RAMOS TWG Member 8

-absent-

YRA TURINGAN TWG End User Representative

-absent-

ATTY. MARY ANABELLE CRUZ-DOMINGO

TWG Vice Chairperson

-signed-

ENGR. VENER V. MADERAJE TWG Chairperson

2

Documented by: Reviewed by: APPROVED by:

-signed-

MARIET RIZ M. BRADECINA BAC Documenter

-signed-

RODEL DV. CASTILLO Acting Director, Logistics Division

-signed-

BERNARDO A. DIZON Chairperson, BAC (SO-2018-119)

<<<< Nothing Follows >>>>

Page 8: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.8/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 8

Annex “A” – Letter of Intent from Accent Micro Technologies, Inc.

Page 9: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.9/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx 9

Annex “B” – Letter of Intent from Trends & Concepts

Page 10: PRE-BID CONFERENCE 2020-03 05 February 2020 (Wed)...Libranda asked the BAC as to how many days does DAP process payments for their Contractor upon receipt of complete documents. BAC’s

…p.10/10

PRE-BID CONFERENCE

BIDDING NO. BAC MEETING NO: DATE OF MEETING:

IB20-395244-02 2020-03 05 Feb 2020 (Wed)

H:\BAC 2020\2A-RENOV\Meetings\PBC (05Feb2020)\DRAFT_MoM_PBC (05Feb2020).docx

Annex “C” – Document Request List from PhilGEPS Website