Social Monitoring Report
Project No. 42378-016
Loan No 3087- BAN July 2018
Power System Expansion and Efficiency Improvement
Investment Program - Tranche 2
Part C1 and C2 – Augmentation and Rehabilitation of Distribution System in DESCO Area
January- June 2018
Prepared by Dhaka Electric Supply Company Ltd (DESCO) for People’s Republic of Bangladesh.
This Semiannual Social Monitoring Report is a document of the borrower. The views expressed herein
do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be
preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of
or reference to a territory or geographic area in this document, the Asian Development Bank does not
intend to make any judgments as to the legal or other status of any territory or area.
DHAKA ELECTRIC SUPPLY COMPANY LIMITED (DESCO)
MINISTRY OF POWER, ENERGY & MINERAL RESOURCES
GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH
Social Safeguard Report
on
Augmentation and Rehabilitation of Distribution System in DESCO
Area
Period: January 2018 to June 2018
Dhaka
July, 2018
Table of Contents
List of Tables ................................................................................................................... 5
List of Figures ................................................................................................................. 5
Unit of Measurement .................................................................................................... 6
Abbreviations and Acronyms ..................................................................................... 8
1. Introduction ............................................................................................................... 9
1.1 Background ............................................................................................................. 9
1.2 Objectives of the study ......................................................................................... 9
Specific Objectives ..................................................................................................... 9
1.3 Project locations ..................................................................................................... 9
1.4 Scope of the Social Safeguard Monitoring ....................................................... 14
1.5 Monitoring Law and Policy Standard ................................................................ 14
1.5.1 ADB Safeguard Policy ................................................................................ 14
1.5.2 ADB loan covenants with the DESCO ..................................................... 14
2. Approach and Methodology ................................................................................ 18
2.1 Overall Approach of Safeguard Monitoring ...................................................... 18
2.2 Study mobilization ............................................................................................... 18
2.3 Study Team Mobilization .................................................................................... 18
2.4 Data Collection Methods ..................................................................................... 19
3. Specific Social Safeguard Management Plan ............................................... 20
4. Monitoring Results ................................................................................................ 22
4.1 Social Safeguard Compliance ............................................................................ 22
4.1.1 Compensation ............................................................................................. 22
4.1.2 Livelihoods and employment .................................................................... 22
4.1.3 Occupational Health, Safety and Security ............................................. 23
4.1.4 Labor and Working Condition ................................................................... 23
5. Institutional Arrangement and Grievance Redress Mechanism ............ 27
5.1 Institutional Arrangement .................................................................................. 27
5.2 Grievance Redress mechanism.......................................................................... 27
6. Conclusions and Recommendations ................................................................ 28
6.1 Conclusions ........................................................................................................... 28
6.2 Recommendations ............................................................................................... 28
Appendix-A: Field Photos ......................................................................................... 29
Appendix-B: Monitoring Checklist ......................................................................... 31
Appendix-C: Contract Agreement Between DESCO and Simens India ... 112
List of Tables
Table 3.1: Specific Social Safeguard Management Plan ....................................... 20
Table 4.1: Matrix of Monitoring Results ................................................................... 24
Table 4.2: Implementation Plan for Non Compliance Issues .............................. 25
List of Figures
Figure 1.1: Map of Proposed 24 (Twenty Four) 33/11kv Substations in DESCO
Area 13
Figure 4.1: Institutional Arrangement of DESCO for Compliance and Monitoring
27
Unit of Measurement
1 Bigha = 33 Decimals
1 Katha = 1.65 Decimals
1 acre = 0.404686 Hectare
Abbreviations and Acronyms
ADB Asian Development Bank
CEGIS Center for Environmental and Geographic Information Services
DESCO Dhaka Electric Supply Company Limited
DoE Department of Environment
ECR Environmental Conservation Rule
ERF Extracting Area Rehabilitation Fund
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EPC Engineering, Procurement and Construction
GoB Government of Bangladesh
IESCs Important Environmental and Social Components
SPS Safeguard Policy Statement
ToR Terms of Reference
1. Introduction
1.1 Background
Dhaka Electric Supply Company Limited (DESCO) has a vision to strengthen its capacity
through the improvement of infrastructure in the distribution system. Regarding the
increased demand, DESCO has taken initiative to make a change with the construction of
the new line, substations, and renovation of existing substations taking financial support from
Asian Development Bank (ADB). In this respect, a project is being implemented, titled-
Augmentation and Rehabilitation of Distribution System in DESCO Area. There are 24
Substations (subprojects) within the DESCO service area should be implemented in
compliance with ADB’s social safeguard policy and the loan covenants between ADB and Bangladesh Govt. There is a provision to monitor the social safeguard compliance in
accordance with the Bangladesh and loan covenant between Bangladesh Govt and Asian
Development Bank (ADB).
In this aspect, social safeguard compliance monitoring is conducted to monitor social
safeguard status during the project implementation at the selected locations around the
DESCO circle area. Based on the prepared checklist, social safeguard monitoring (3rd
phase) completed on the twenty one (21) subprojects in through monthly field visit
considering the social safeguard indicators according to this project. All social safeguard
related issues like Compensation, Livelihood and Living Condition, Community Health,
Safety and Security and Labor and Working Condition are monitored with their compliance
status at the construction phase of this project.
1.2 Objectives of the study
Broad Objective
The broad objective of the social safeguard status monitoring is to observe how the social
safeguard indicators are complied during construction phase of the project in relation to
ADB’s safeguard policy, Environmental Management Plan (EMP)(i.e. social safeguard
indicators), and Bangladesh and ADB’s loan covenant.
Specific Objectives
There are some specific objectives in relation to broad objective of this study. The
specific objectives of the social safeguard compliance monitoring are to:
i. Analyze the Environmental and Social Safeguarding laws and policies of
Bangladesh and ADB
ii. Monitor working condition and occupational health safety during project
implementation phase
iii. Provide suggestion and measure addressing the Non compliance issues.
1.3 Project locations
Following figure 1.1 and table 1.1 shows the locations of proposed 24 (twenty four)
33/11kV Substations in DESCO area.
During this phase of the study, the implementions of activities of 13 substations have
been visited and monitored the compliance status following a prepared checklist. The
following 13 substations have been visited in this social safeguard monitoring
mentioned in the table 1.1 below:
Table1.1: Name and Locations of the studied Substations for social safeguard monitoring
(3rd Phase)
Sl. No.
Name of the
substations
Locations
Implementation Status
Remarks
1 Kazipara Switching Station
740/B, West Kazipara,Mirpur
(Beside the mosque of west Kazipara Bus station)
Ongoing
-
2
Mazar Road
Relocated:
Mazar Road shifted to Eastern Housing
Plot: J-82, J-10
Eastern Housing
Mirpur,Dhaka
Not Started Yet
It is fallow land and suitable for housing and any kind of infrastructure.
3 Kalshi (Shenpara)
Bijoy Rakeen City
Plot: 1/2, Block: D, Section: 15, Mirpur, Dhaka.
Ongoing Completed the Pilling and Construction Works is ongoing
4 Mirpur DOHS-2
Road#33, Plot#837, Mirpur 14, Dhaka.
Ongoing On the Right after entering in DOHS
5 Lake City Concord
Mouza: Joarsahara, Ward No: 17, Khikhet, Dhaka
Ongoing Area of Land: 11.8 Katha
1.
6 Satarkul-2
Sun Valley Abason, Swadesh Properties Ltd.
Plot#11, Block#E
Road#7, Sector#2
Mauza: Satarkul
Thana: Badda
Not Started Yet Area of Land: 16.0 Katha
Before United City
7 Satarkul-1
Road# 317,Plot#4, Sect#03,
Dag:1100,1105,1106
United City
Mauza: Satarkul
Thana: Badda
Ongoing
Area of Land: 1.0 bigha
2
8 Barua
Plot# 13,Road# 11, Block#A,Sector#1, Swarnali Properties Mauza: Borua,
Thana: Dakshinkhan.
Ongoing
Area of Land: 20 Katha.
1 1 katha = 1.6 decimals
2 1 bigha = 33 decimals
Sl. No.
Name of the
substations
Locations
Implementation Status
Remarks
9
Gulshan-03
Relocated:
Gulshan-03 shifted to Merul Badda
BRAC university, Merul Badda, Dhaka
Ongoing
10
Basundhara Block G
Relocated:
Basundhara shifted to AIUB
AIUB New campus
Ongoing
11 Sholahati
Uttara Third Phase (Sector-15, Block-G, Commercial Plot)
Besides Rajuk Apartment Project
Ongoing
12 Mohakhali DoHS
Mohakhali DoHs, Dhaka Cantonment, Dhaka
Not started yet The proposed location is located at Mohakhali DoHS, beside the British American Tobacco industry.
13 Uttarkhan (Promy)
Promy Agro Foods Ltd., Moinertek
Mauza: Gobindapur,
C.S.-305,306. R.S.-538
Ongoing
Area of Land :
22-23 Katha
14 Tilargati, Tongi Sataish
S.A.R.S-01, S.A-129, R.S-251, Mauza-Kakil 27, Tilargati, Tongi.
Ongoing West from S&D, Near Uttara Proborton City & Sangbadik Bari, Tilargati, Sataish,Tongi.
15
Agargaon
Existing 33/11 KV substation
New Colony, Behind BCS Computer City,With Probin Hitoishi Hospital, Opposite to the Agargaon S&D.
Ongoing
16
Mirpur DOHS
Existing 33/11 KV substation
At the end of R#10 , DOHS, Mirpur-12.
Ongoing
17
Mirpur-06
Existing 33/11 KV substation
Near Al-Markajul Mosque & Market of Section-06, Original Mirpur-10.
Ongoing
Sl. No.
Name of the
substations
Locations
Implementation Status
Remarks
18
Tongi-01
Existing 33/11 KV substation
BSCIC I/A, Tongi, Gazipur
Ongoing
19
Tongi-2
Existing 33/11 KV substation
Cherag Ali, Beside Tongi S&D Division.
Ongoing
20
Civil Aviation (CAAB)
Existing 33/11 KV substation
Left from Jashimuddin, Beside Airport Boundary & Sector#1)
Kurmitola, Uttara, Dhaka
Ongoing
21
ADA
Existing 33/11 KV substation
Beside Civil Aviation Quarters’, Kaola.
Ongoing
22 Sector – 14,Uttara
Existing DESCO’s Sub-store
Ongoing
23
Tongi (BSCIC)
Existing 33/11 KV substation
Near BPDB’s 80 MW Power Station, Tongi.
Ongoing
24
Baunia (Existing 33/11 Kv substation)
Mouza: Faridabad, Airport, Uttara, Dhaka
Ongoing
Figure 1.1: Map of Proposed 24 (Twenty Four) 33/11kv Substations in DESCO Area
1.4 Scope of the Social Safeguard Monitoring
In line with the aforementioned objectives the scope of the services should cover the
following:
i. Review of social management and social monitoring plan suggested in the EIA
report in line with the action plan proposed by ADB;
ii. Upgrade (if required) the social safeguard monitoring framework and work plan
specifying the socal indicators, methods, location, time, frequency of monitoring
provided by the EMP of EIA report;
iii. Conduct monthly monitoring on the construction activities to see their compliance
with national environmental and social regulations, and ADB’s performance standards on social sustainability.
iv. assess that all mitigation measures through physical observationto confirm EMP
and action plan;
v. Conduct monthly monitoring on socio-economic issues like community safeguard
due to pollution, hazards and employment opportunity;
vi. Ensure social safeguard, regarding the national laws and policy. ;
vii. Keep close liaison with the project implementation office (Project Director), and
EPC contractor;
viii. Provide an interim monitoring report at the end of every three (3) months in line
with the reporting requirement of DESCO/ ADB satisfying equator principles;
ix. Provide a monitoring report at the end of every six (6) months in line with the
reporting requirement of ADB satisfying equator principles.
1.5 Monitoring Law and Policy Standard
1.5.1 ADB Safeguard Policy
The Safeguard Policy Statement (SPS) of Asian Development Bank reviewed tol understand
the compliance and terms of partnership with the Bangladesh GoB. Now Bangaldesh Govt
amended the ECA 1995 whereas the construction of substation is now under the Orange B
category like ADB categorization under the social safeguard policy. But, for the study social
safeguard monitoring EMP is considered as the compliance which was prepared during the
period EIA study. In addition, the standards determined by this policy are followed during this
study. The standards for social safeguard issue identified in which this project would be
socio-economic friendly. For this reason, this monitoring considers the risk of electrocution,
safety measures within the construction site, emergency plan, livelihood challenges,
restoration process, compensation process, whether any complaints from affected people
would be noted and provide clear measures at the construction phase of the project. Thus,
a standard checklist is prepared and understands the social safeguard compliance issues
through monthly field visit at the construction stage of the project.
1.5.2 ADB loan covenants with the DESCO
According to the Loan Covenant Article (II), section 2.01, DESCO should carry out the
project, with the due diligence and efficiency and in conformity with sound administrative,
financial, engineering, environmental and power sector practices. For the execution of
project following criteria should be followed. In this respect, social safeguard standard would
be maintained in terms of occupational health safety, employment opportunity, and
community social safety due to the project implementation.
Implementation Arrangement
DESCO should ensure the project implementation in accordance with the detailed
arrangements set forth in the PAM. Besides, it is the responsibility of DESCO to ensure their
project management staff that has the qualification to undertake necessary tasks of
procurement, construction, supervision, inspection, and testing of equipment, payments to
contractors, monitoring, environmental and social safeguards due diligence and reporting of
progress relevant to the components under their responsibility.
Environment
DESCO should ensure that the preparation, design, construction, implementation, operation,
and decommissioning of the project and all project facilities comply with;
All applicable laws and regulations of the relating to environment, health and
safety
The environmental safeguard
The EARF
All measures and requirements set forth in the respective IEE and EMP and
any corrective or preventive actions set forth in a safeguard monitoring report
Land Acquisition and Involuntary Resettlement3
All land acquisition and resettlement activities are implemented in compliance
with
Compensation and other entitlements have been provided to affected people
in accordance with the RP (if required).
A comprehensive income and livelihood restoration program has been
established in accordance with the RP (if required).
Human and financial Resources to implement Safeguards Requirements
The DESCO should make available, or cause the project executing agency to make
available, necessary budgetary and human resources to fully implement the EMP, the RP
and any small ethnic community peoples planning framework.
Safeguards-related provisions in bidding documents and works and work contracts
The DESCO should ensure the following compliance in relation to contract p or bidding
during the project implementation.
Comply with the measures and requirements relevant to the contractor set
forth in the IEE, EMP and RP (if required) any small ethnic community
peoples plan and any corrective or preventive actions set out in a safeguard
monitoring report.
Make available a budget for all such environmental and social measures
Provide the borrower with a written notice of any unanticipated environmental,
resettlement or small ethnic community peoples plan.
3There is no land acquisition and RP related activities that have been found in EIA study report under
this project.
Adequately record the condition of roads, agricultural land, and other
infrastructure prior to starting to transport materials and construction
Fully reinstate pathways other local infrastructure and agricultural land to at
least their pre-project condition upon the completion of construction.
Safeguard Monitoring and Reporting
The DESCO should comply the following section:
Submit semiannual safeguards monitoring reports to ADB and disclose
relevant information from such reports to the affected person
Any anticipated environmental and social as well as impacts arise during the
construction, implementation, or operation of the project that were not
considered in the IEE, the EMP or the RP promptly inform ADB of the
occurrence of such risks and impacts with detailed description of the events
and proposed corrective action plans.
The Monitoring process should be verified by the external experts
Reporting would be completed based on the any potential beach of
compliance with the measures and requirements set forth in the EMP
Labor standards
Following labor standards should be followed as per AND loan covenants:
Comply with all applicable labor law and related international treaty
obligations of the borrower and do not employ child labor as defined under
the Bangladesh law
Provide Safe working condition for male and female workers
Carry out HIV/Aids and human trafficking prevention and awareness
campaigns in the campsites and corridor of influence
Engage women workers as wage laborers depending on their skill and
Provide equal wage for equal work between men and women.
Project Reviews
The project progress would be reviewed by the ADB with necessary
midcourse corrections
The Assistance should be provided by the Executing Agency (i.e. DESCO).
The environmental monitoring will assess the compliance that has been suggested under the
Bangladesh Govt. laws, policies and national standards (i.e. air, noise and water quality) and
ADB loan covenants. As there is no involuntary resettlement and ethnic minority issues,
therefore, this monitoring assess the environmental and social safeguard issues in
accordance with the Govt. laws and ADB loan covenants like the above mentioned ways.
2. Approach and Methodology
2.1 Overall Approach of Safeguard Monitoring
The mixed approach (quantitative and qualitative approach) has been followed during this
study. The social safeguard monitoring has been conducted by a multidisciplinary team led
by an Anthropologist. All thirteen (21) substations locations visited and analyzed the
compliance status applying the different social tools (i.e. Questionnaire Survey, Observation,
Group Discussion) considering construction activities, Impacts, safeguard policies, and
Bangladesh and ADB’s loan covenants.
2.2 Study mobilization
A comprehensive checklist on environmental and social compliance was prepared. A
preliminary checklist (Appendix B) prepared based on the suggested recommendations
incorporated in the Environmental Management Plan (EMP) of EIA for the Augmentation and
Rehabilitation of Distribution System project in DESCO area. In this way, study team for this
study mobilized and visited twenty (21) substations where constructions activities are
ongoing. Based on the observation, this social safeguard monitoring has been conducted
and whole study mobilized according to the plan and the prepared methodology.
2.3 Study Team Mobilization
For the commencement of this study, a contract agreement between DESCO and CEGIS
(the Monitoring Consultant) was signed on 9 May, 2017. From this time, a multidisciplinary
team mobilized based on the work plan and monitored the social aspects in relation to the
study objectives and selected indicators.
.The consultant (CEGIS) started work under the overall supervision of the Project Director,
DESCO and maintain close liaison with DESCO offices (both field and head office). The
Team Leader supervised the study and guided the multidisciplinary team for achieving the
goal of the study. The progress of the study was reviewed in weekly progress review
meeting held in CEGIS.
Table 2.1: Variables and Indicators for Social Safeguard Monitoring
Variables Indicators
a) Compensation Compensation for Land Acquisition (if required)
b) Livelihoods and Employment Employment opportunity, Occupational Status
APs (If required), Income, Wage
c) Community Health, Safety and Security Community health condition, Safety and Security
Status, Threats for Community health and safety
d) Occupational Health and Safety Status of Labor Health, Accidental status,
Mitigation measure (i.e. First Aid Box,
Ambulance), Status of Safety Tools and
Instruments (i.e. Gumboots, Earmuffs, Helmet,
Gloves etc)
e) Labor and Working Condition Labor Shed, Condition of Kitchen, Status of Food,
Sanitation and Drinking Water, Status of Waste
management (i.e. Kitchen Waste).
2.4 Data Collection Methods
a) Physical Observation
The Site specific physical observation occurred during the field work at the Twenty one (21)
Substations. With the physical observation, working condition, use of safety tools, sanitation
and drinking water status, labor shed condition, kitchen waste management status, food
quality, status of pollution monitored and consider the compliance status. The Non
complaiance issues also identified which have been discussed with the relevant stakeholder
during the KII and Group Discussions.
b) Key Informant Interview
During the project implementation, some Key personnel from DESCO and Simmens india
were responsible to monitor the work progress. The site engineers from Simmens India
considered as the Key Informants (from each site) interviewed for understanbding work
progress and status of different social safeguard issues with the project implementation.
c) Group Discussion
During the field visit, group discussion held with labours, site engineers, supervisors,
concerned personnel from DESCO to be updated with the construction status and
compliance status of relevant issues. During the consultation, Non-compliance issues also
identified and discussed how to address them within the duration of project implementation.
d) Consultation with relevant Stakeholders
The project director and concerned personnel from DESCO consulted regarding several
issues. The Non compliance issues addressed during the field visit shared with the project
directors and concerned personnel and outlined the guidelines based on their suggestion for
implementation. In addition, any difficulties related to the study addressed through such
consultation and relate them with the study findings.
3. Specific Social Safeguard Management Plan
The site specific Environmental Management plan is suggested by the EPC contractor (i.e.
Simmens India). At this stage, it is found that they have that plan to guide their works for
these twenty one (21) substations locations. In their plan, Simmens will manage all social
safeguard issues during the construction phase of the project. Based on the following table
5.1, Simmens India started the construction work at the project locations whereas the
construction activities continued based on this specific environmental management plan.
Table 3.1: Specific Social Safeguard Management Plan
Sl. Environmental
Issue Proposed Mitigation Measures
Implementation Plan by Siemens
Traffic
congestion
Regulate traffic congestion, especially at the entry of the substation site and camp areas.
Traffic signs/signals and signboard will be installed in places where important. Flagman at entrance will be engaged for traffic control.
Road accident
Regulate all on-site vehicle speeds of all project vehicles at project site to avoid road accident.
Vehicle movement will be restricted or partially restricted inside of construction area. Allowable speed of driving all vehicles movement would be 10Km/Hour. Proper signage will also provide to aware drivers and flagman.
Community health
and safety (H&S)
Ensure safety inside substation, worker camp and construction yard areas.
At least 1.5m height wall including barbed wire on the top of wall wil l be constructed around the project area of substation, worker camp and construction yard areas.
Confirm public awareness
building/information.
Warning signs will put where applicable at surrounding the construction site.
Ensure physical safety to the surrounding natives and strangers.
Notification (signboard, billboard, etc.) and/or announce to the community will be done at reasonable time, if any construction event/plan would result inconvenience to the natives.
Occupational health
Ensure occupational safety measures
4 for the workers.
Only permitting trained/certified and experienced workers will be recruited to work specially with any electrical equipment. Safe/quality equipment will be provided to the workers to work with. Personal Protective Equipment (PPE) for all workers will be provided and use of it will be mandatory through official order.
4 The PPE materials are: hard hat, safety shoe, goggle, ear plug, waist belt, mask, hand glove, body
protective apron, ear muff and insulating cum steel - toed boot. Wear helmet for PPE are: Head
Protection, Ear plugs/muffs for Hearing Protection, Spectacles/Goggles/Face Shield/Arc-welding
Mask with Hand Masks for Eye and Face Protection, gas masks/dust filters/insulating appliances
with air supply for Respiratory Protection to work at septic tanks, dump sites, sewers etc., Over
sleeves/gloves for Hand and Arm Protection and safety shoes/boots for Foot Protection.
Sl. Environmental
Issue Proposed Mitigation Measures
Implementation Plan by Siemens
and safety Ensure accidental safety
measures for the employees.
A sickbay-room/place will be made available at a suitable location for combating emergency situation. First Aid Box (with supply of medicine and other aid materials) will be made available over there.
(H&S) 5
Ensure traffic safety measures for the employees
6.
Provide official order/instruction (written, verbal, signboard) to drivers and flagman for keeping speed limit of vehicles within 10 Km/Hour in the camp and construction areas. If necessary pedestrian-safe access routes will be provided inside the construction and camp areas.
Ensure personal safety measures of workers and employees at workplace.
Strict order/instruction (written, verbal, signboard) and engage supervisor for prohibited smoking in the workplace and also drinking alcohol in camp area by workers and employees will be provided. Site personnel will only allow smoking in designated smoking areas. Carry of any illegal substances, weapons and firearms in camp or construction area will be strictly prohibited. Site supervisors, team leader will continuously monitoring and counseling to ensure personal safety measures of workers and employees over there.
5 Educate all construction workers on the following issues but not limited to them: firearm possession,
traffic regulations, illegal logging and collection of non-timber forestry products, non-disturbance of
resettlement communities, hunting and fishing restrictions, waste management, erosion control,
health and safety issues, all prohibited activities, the Code of Conduct requirements and disciplinary
procedures, and general information on the environment in which they will be working and living. In
addition, educate workers on the identification of occupational expose to Electro Magnetic Field
(EMF) levels and hazards is required.
6 Safety signs, safety collar, health signs, prohibition sign, warning sign, mandatory sign,
emergency escape sign, first-aid sign, information sign, signboard, supplementary signboard,
symbol, pictogram, illuminated sign, acoustic signal, verbal communication and hand signal.
4. Monitoring Results
For the commencement of the project implementation, Dhaka Electric Supply Company
Limited (DESCO) has made a Contract Agreement with Simens India in consortium with the
Siemens Bangladesh to Design, Supply, and Install & Commission 24 (twenty four) 33/11kV
Substations in Turnkey Basis in DESCO area under the Dhaka and Gazipur districts against
Bid No. IFB 01/2016, Package-C1 of Lot-3 under ADB Loan No.: 3087- BAN: under “Power
System Expansion and Efficiency Improvement Investment Program” (Trench 2).
Getting the Topographical Survey Report, they have started their construction. Initially,
construction of three (3) substations started (mentioned in the 2nd social safeguard report).
Presently, there are twenty one (21) substations where the construction work is ongoing.
The social safeguard monitoring (3rd Phase) has been completed based on the construction
activities of these substations. All activities7 related to the construction observed and findings
of social safeguard monitoring compiled following the ADB social safeguard policy and ADB
–Bangladesh loan covenants.
4.1 Social Safeguard Compliance
The implementation of twenty one projects around the DESCO area is ongoing. The
complainace status for ensuring the better project implementation have been monitored
regarding the occupational health and safety, Impact of health and safety due to the
construction and other social issues according to the prepared checklist. People around the
project area showed interest for its successful completion and opined that there is urgency to
install Substations to meet the growing demands of electricity in these areas. The officials of
DESCO are aware to ensure occupational and health safety and participation of all
stakeholders with all stages for project implementation. In this section, the result of social
safeguard monitoring following the social safeguard indicators analyzed and presented in the
following ways:
4.1.1 Compensation
The compensation issues based on the land acquisitions monitored consulting with the
stakeholders. There is no compensation issues found as the result of social safeguard
monitoring as all construction is ongoing on the private land owned by DESCO. It is
understood that there is no compensation related matter prevailing at these construction
sites under this project.
4.1.2 Livelihoods and employment
The monitoring team found that most of the workers are from the locality or adjacent to the
locality. For digging soil, some labourers hired from Mymensingh, Tangail and Gazipur area
during the pilling. All labourers got salary based on daily wages (BDT 500 per day). With the
employment opportunity, the benefit addressed due to the regular payment, therefore, they
are happy and continue their works with satisfaction.
7 Piling, Electrical Works (i.e. Earth work),Transformer Foundation, RCC Works, Fellow Casting
4.1.3 Occupational Health, Safety and Security
The working environment was found as satisfactory level at the twenty one (21) project sites.
The Monitoring team found that almost all labours were not using safety equipment provided
by the EPC contractor. There is a lack for the availability of earmuffs for some substation
(Uttara 3rd Phase) but the EPC contractors are aware about this and took steps for its
allocations. In addition, the Simmens India facilitated three types of training for the labors
such as Induction and toolbox. The Simmens India (EPC contractor) is aware about the
health safety issue and they arrange regular tool box training to raise consciousness and
concern of the protective measure during the construction activity. They have the plan to
meet in case of any emergency; they have the preparation for ambulance service to carry
the injured person to adjacent hospital (2 to 6km distance from sub-station) for better
treatment. No accidental case recorded till the 3rd social safeguard monitoring.
4.1.4 Labor and Working Condition
The study team found that most of the laborers were trained used safety equipments before
starting of the work. The Simmens India provided adequate safety equipments (i.e.Helmet,
Shoes, Gown and other safety equipment) for laborers.
Dustbin Located in the Badda Area Fencing around the Substation Area at Badda
Photo 4.1: Working Condition at DESCO proposed Substation Area
As most of the labourers came from local or adjacent area, therefore, all of the labourers
work at this station from their own home. It is found that in average 15-20 labourers are
working as both technical and non technical labor force. All twenty one (21) substations have
their provision to provide adequate toilet, water and sanitation facilities for all labourers.
Workers are satisfied to work in this environment without any compliant.
Table 4.1: Matrix of Monitoring Results
Environmental and social components
Components Status Corrective Action Plan (CAP)
Compensation - Status of Compensation
- Impacts of Projects on the APs (where applicable)
There is no compensation issues at all twenty one (21) project sites
N/A
Livelihood and employment
- Employment opportunities
- Recruitments of laborers
- Labor Wages
- Payment Schedule
- Engagement of local Labors
- About 60% local labors engaged
- Some Labors collected nearby locations of Dhaka City
- BDT 500 has been allocated for daily wage
- No delay for payment
- Monthly Payment ensured based on daily wage rate.
N/A
Occupational health, safety and security
- Labor Health
- Use of Safety equipments (i.e. Gumboots, gloves Earmuffs etc.
- Use of Gloves and Gumboots are remarkable (80%)
- Availability of Safety equipments ensured
- The availability
- Required to ensure Earmuffs for all workers during Pilling
- Adequate facilities for First Aid box is required
- More Fire extinguishers is required for Uttarkhan Promy and Solahati
Environmental and social components
Components Status Corrective Action Plan (CAP)
and of Earmuffs (60%)
- First Aid box are available at every project sites.
- Fire boxes are available at every project sites
Substation area
- Cognitive development through consciousness is required for the use of all available safety tools
Labor and working condition
- Labor Sheds
- Kitchen
- Sanitation
- Water Spray
- Foods
- Drinking water
- Arrangement for Entertainment
- Labor sheds used for rest and waiting
- Necessary window is required for passing air and sunlight
Needs to improve Labor Shed with space, Beds and other appliance
Needs to Arrange Television for their entertainment during the leisure time
During the monitoring it is found that here have some non compliance issues which would be
complied in the next phase of monitoring. The implementation plan has been suggested
through the consultation with the EPC contractor and PMU. In this following table 3.2
provides a implementation with action plan of such non compliance found during this phase
of monitoring. Based on this implementation plan, implementation performance would be
reported in the next monitoring report.
Table 4.2: Implementation Plan for Non Compliance Issues
Corrective
Action Plans
Action Plan Implementing
Period
Responsible
Agency
Remarks
Water can be sprayed twice in a day for controlling fugitive dusts.
Consulted
with PMU
and ensured
to monitor
the status
which would
be
At the next
phase, the
result will be
incorporated
EPC contractor
and PMU
PMU ensured
that all will be
complied (100%)
in the next
phase of the
monitoring.
Corrective
Action Plans
Action Plan Implementing
Period
Responsible
Agency
Remarks
incorporated
in the next
monitoring
report
Loose soil can be
covered by
Polythine or
sacks.
The EPC
contractor
will consider
the
mitigation
and will
cover loose
soil by
polythine or
sacks.
At the
construction
phase, this
non
compliance
issue will be
complied and
incorporated
in the next
phase of the
monitoring
EPC Contractor
and PMU
PMU ensured
that all will be
complied (100%)
in the next
phase of the
monitoring
Providing hearing
protection
equipment (air
plug/air muffler)
for the workers
who are directly
exposed to high
noise level.
Consulted
with PMU
and EPC
contractor
for ensuring
this
compliance.
It will be
compiled at
the
construction
phase before
the next
phase of
monitoring
EPC contractor PMU ensured
that all will be
complied (100%)
in the next
phase of the
monitoring and
the performance
of non
compliance
issue will be
reported in the
next report.
Facilitate garbage
bin for solid waste
disposal.
Construction
wastes need to be
collected and
disposed in a
particular site
inside the project
boundary.
It would be
provided
before the
next phase
of the
monitoring
Would be
arranged at
the
construction
phase and
taken it
granted as it
comply and
incorporated
in the next
monitoring
report.
EPC contractor The
performance of
this non
compliance
issue will be
reported in the
next monitoring
report.
Source: Social Safeguard
5. Institutional Arrangement and Grievance Redress
Mechanism
5.1 Institutional Arrangement
The organgram (provided by the DESCO) is responsible to monitor social safeguard
compliance during the project construction phase. The assistant engineer (electrical),
assistant manager, and sub assistant engineer are working under the supervision of the
deputy project director for monitoring of augmentation, rehabilitation of distribution system in
DESCO area. The project director is responsible to supervise and guide the whole work
following the prepared checklist on the compliance status. The following figure 5.1 shows the
institutional arrangement those who are responsible to ensure monitoring and compliance in
accordance with Govt. laws, rules regulations and ADB’s loan covenants.
Project Director
Deputy project
Director
Assistant EngineerAssistant Engineer
Sub assistant
Engineer
Manager
Sub assistant
Engineer
Figure 4.1: Institutional Arrangement of DESCO for Compliance and Monitoring
5.2 Grievance Redress mechanism
a) At this stage, there a sub assistant engineer stays at the project sites to understand
any complain related issues. The sub divisional engineer will work as the field officer
and would be responsible to arrange consultation for people’s awareness at the
respective project sites.
b) Presently, With the starting of construction activities, a sub assistant engineer is
playing key role to understand the people problems (if any related to the project
activity) and visited twenty one (21) sites. In addition, phone number attached in each
station to get compliant and emergency response during the construction activities.
6. Conclusions and Recommendations
6.1 Conclusions
This social safeguard monitoring is conducted from January 2018 to June 2018 at the twenty
(21) substations based on ADB safeguard policy, EMP provided in the EIA, Bangladesh
Govt and ADB loan covenant. In this study, social safeguard issues like occupational health
and safety, workers’ wellbeing have been observed through site specific field visit (monthly)
and following the indicators stated in the checklist. In addition, compliance status has been
provided to make it clear indications based on the status during the construction phase of
the project based on the field findings at the twenty one (21) substations locations. Finally,
Corrective Action Plan (CAP) is prepared regarding the monitoring result following the social
safeguard indicators.
6.2 Recommendations
Based on the observation and monitoring field visit the environmental and social monitoring
team suggested recommendations would be followed by the workers and the EPC
contractors to make this compliance more satisfactory during the construction phase of the
project.
To make the process more smooth and efficient, the following recommendations are
proposed by the study team to be followed with immediate effect:
Construction materials (i.e. Sand, Cement etc) should be covered by polythene
Earmuffs need to be available for the reduction of hearing damage of working
laborers
Area boundary demarcation is required for Solahati and Uttarkhan Substations
with Tin shed to avoid risks for community people.
Some Mobile toilets are required when the number of workers increased (where
required
There was no dustbin or specific waste disposal site in any of the project location.
Hence, a particular place for waste disposal should be earmarked for maintaining
ambient environmental neatness.
The level of safety for workers must be enhanced with comprehensive
enforcement on PPE usage, and regular (at least four times a day) health and
safety supervision should be carried out.
Besides, one paramedic doctors, and an ambulance need to be made available
for the labors in case of any injury and accident.
.
Appendix-A: Field Photos
Safety Sign at the ADA substation area Construction Site of Uttara 3rd Phase
Construction Activity at Baunia area. Construction Activity at Uttara (3rd Phase)
Construction Site at Badda
Construction Site at Mirpur DOHs Construction Site at Uttara
Monitoring Field Visit by Consultant
31
Appendix-B: Monitoring Checklist
(1)
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Social Safeguard Issues
Land Acquisition
Land owners livelihood status would be affected due to land acquisition
Conduct a rapid assessment through consultation with land losers (15 acres) to assess whether they are facing any significant livelihood restoration challenges and whether they have replaced their assets
✓ ✓ ✓
Cash payment and monitoring
Land owners may be deprived of proper compensation due to lack of monitoring or improper land ownership.
Disburse Cash for compensation of land (CCL)
✓ ✓ ✓
Develop a plan which includes compensation, restoration, livelihood, living standards etc.
✓ ✓ ✓
Provision of monitoring the
✓ ✓ ✓
32
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
compensation process
Livelihood and living condition
Livelihood and living system may be disturbed due to the development activities
Causing no threat to the livelihood of local people
✓ ✓ ✓
Prioritize local labors in employment
Develop a separate road network during construction
N/A N/A N/A
Separate water facilities for workers
Health, Safety and Security
Health, safety and security would be affected during pre, construction, operation and decommissioning phases of the project.
Construction of Fence around project area
✓ ✓ ✓
Evaluation for risks and impacts on health and safety during preconstruction, construction, operation and decommissioning of the project
Partially 75%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 75%
Rest of the percentage would be complied and incorporated with the next monito
33
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
ring report.
Involve Community in Risk Assessment Process
Partially 60%
Partiall
y 60%
Partially 60%
Consider Community Health and Safety in Designing infrastructure and equipment
Partially 70%
Non Compliance issue will be
addressed later
Partially 70%
Rest of the
percentage
would be
complied and
incorporated
with the next
monitoring
report.
Partially
70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Practicing safe management for hazardous materials which may pose threat to the community
34
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Availability of plan for natural hazards
Planned based on
SEMP
Planned based on
SEMP
Planned based on SEMP
Develop and Implement an Emergency Response Plan
Training and instruction to the security personnel about their behavior and communication with the local people
Practice of Tool box meeting and reporting
Partially Complied 75%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied
70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied 75%
Rest of the percentage would be complied and incorporated with the
35
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
next monitoring report.
Establishing a grievance mechanism for the community dwellers
Provision of health service facilities to community
Partially 30%
Consulted and will be improved in the next phase of the monitoring
Partially 30%
Consulted and will be improved in the next phase of the monitoring
Partially 30%
Consulted and will be improved in the next phase of the monitoring
Safety trainings for workers (i.e. fire control, working at height, working in heat, first aid etc.)
Partially 60%
Consulted and will be improved in the next phase of
Partially 60%
Consulted and will be improved in the next phase of
Partially 65%
Consulted and will be improved in the
36
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
the monitoring
the monitoring
next phase of the monitoring
Increase awareness amongst the workers and employees and conduct health awareness drivers and medical camps in the neighboring areas (HSBC)
Partially 65%
Consulted and will be improved in the next phase of the monitoring
Partially 60%
Consulted and will be improved in the next phase of the monitoring
Partially 60%
Consulted and will be improved in the next phase of the monitoring
Causing no disturbance on locally or culturally important sites
✓ ✓ ✓
Ensure no use of Polychlorinated Biphenyls (PCB) in transformers
✓ ✓ ✓
The workers’ camps should be located
✓ ✓ ✓
37
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
away from residents and sensitive receptors schools, health centers etc. All vehicles exit points from the construction site shall have a wash down or shakedown area where mud and earth can be removed from the vehicles before it enters the public road system. All wash down areas are to drain to a sedimentation basin.
Partially 70%
Will be complied
fully in the next phase
Partially 75%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
Information dissemination
Disputes may arise in the nearby community if public consultation meeting is not held.
Disclosure of EIA Report and sharing project information
Partially 60%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 40%
Will be complied fully in the next phase
Arranging public consultation meeting
Partially 60%
Will be complied
fully in the next phase
Partially 60%
Will be complied
fully in the next phase
Partially 60%
Will be complied fully in the next
38
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
phase
Quality of consultation and disclosure
Partially 70%
Will be complied
fully in the next phase
Partially 75%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
Working Condition
Community dwellers may feel that they are not giving substantial share in project related job opportunity
Adequate fire precautions in place (for example, fire extinguishers, escape routes)
Documentation and reporting of occupational accidents, diseases, and incidents
Ensuring fair treatment, non-discrimination and equal opportunity
Compliance of project’s labor policy with the national labor law
✓ ✓ ✓
No Child Labor No incident of forced ✓ ✓ ✓
39
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
labor Conduct regular third party audits during construction phase of the project to assess the contractors compliance levels in meeting the statutory and ADB requirements
✓ ✓ ✓
Develop a site specific safety plan including standard operating procedures (SOPs) and work permits required to protect employees (both full-time employees and contractors) from injuries
Provide adequate provision of drainage and access to toilets
Cleanup litters and other wastes regularly
Provide secure containers for disposal
✓ ✓ ✓
40
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
at designated area Properties safety on site, and illuminate well if work at night
N/A N/A N/A
Provision of PPE for workers and maintenance of work safety procedure
Partially 75%
Partially
75%
Partially 75%
Regular safety checks and maintenance
Emergency response plan for events such as accidents, spillage of hazardous materials ?etc.
Employment
Without the involvement of local labor, Social unrest will be held among the local people
Local Labor (technical and non-technical) should be recruited.
Site Closure
Environmental and social safety can be
At the completion of work at a particular site, or when the
41
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
hampered without completion of site works and restoration properly
construction program as a whole is completed, the contractor will be responsible for removing all equipment and structures, cleaning up and disposing all waste materials, and rehabilitating all construction sites and work areas so that these can be returned as much as possible to their previous use. There must be a stabilization of all project construction sites, roads, and tracks (where batters and embankment fill must be stabilized, and road drainage stabilized as well). All borrow pits and quarries are to be
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
42
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
rehabilitated; all fuel and oil depots closed; any contaminated soil removed; and the areas restored. All spoil heaps must be reshaped and revegetated. All work sites must be rehabilitated as per needs. Areas where topsoil has been removed will require a reapplication of topsoil, and revegetation as required.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
Care must be taken to ensure that the sites are adequately restored. This will require adequate time to ensure that the sites are effectively reestablished.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are
43
Category Description of potential impact
Measures/Indicators
Substation’s Name ADA Agargaon Mirpur 6
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
not finished
44
(2)
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Social Safeguard Issues
Land Acquisition
Land owners livelihood status would be affected due to land acquisition
Conduct a rapid assessment through consultation with land losers (15 acres) to assess whether they are facing any significant livelihood restoration challenges and whether they have replaced their assets
✓ ✓ ✓
Cash payment and monitoring
Land owners may be deprived of proper compensation due to lack of monitoring or improper land ownership.
Disburse Cash for compensation of land (CCL)
✓ ✓ ✓
Develop a plan which includes compensation, restoration, livelihood, living standards etc.
✓ ✓ ✓
Provision of monitoring the compensation process
Not Applicable at this stage
Not Applicable at this stage
Not Applicable at this stage
Livelihood Livelihood Causing no threat to ✓ ✓ ✓
45
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
and living condition
and living system may be disturbed due to the development activities
the livelihood of local people Prioritize local labors in employment
Develop a separate road network during construction
Not
applicable
Not
applicable
Not
applicable
Separate water facilities for workers
Community Health, Safety and Security
Health, safety and security would be affected during pre, construction, operation and decommissioning phases of the project.
Construction of Fence around project area
✓ ✓ ✓
Evaluation for risks and impacts on health and safety during preconstruction, construction, operation and decommissioning of the project
Partially 50%
Partially
75%
Partially 60%
Involve Community in Risk Assessment Process
✓ ✓ ✓
Consider Community Health and Safety in Designing infrastructure and equipment
Partially 60%
Rest of the
percentage would
be
Partially 70%
Rest of the
percentage
would
Partially
70%
Rest of the percentage would be
46
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
complied and
incorporated with the next monitoring report.
be complied and
incorporated
with the next
monitoring
report.
complied and incorporated with the next monitoring report.
Practicing safe management for hazardous materials which may pose threat to the community
Availability of plan for natural hazards
Develop and Implement an Emergency Response Plan
Training and instruction to the security personnel about their behavior and communication with the local people
47
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Practice of Tool box meeting and reporting
Partially Complied 65%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied
70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied 70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Establishing a grievance mechanism for the community dwellers
Provision of health service facilities to community
N/A N/A N/A
Safety trainings for workers (i.e. fire control, working at height, working in heat, first aid etc.)
Partially 60%
Consulted and will be improved in the next phase of the
Partially 60%
Consulted and will be improved in the next phase of the
Partially 70%
Consulted and will be improved in the next phase of the
48
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
monitoring
monitoring
monitoring
Increase awareness amongst the workers and employees and conduct health awareness drivers and medical camps in the neighboring areas (HSBC)
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 60%
Consulted and will be improved in the next phase of the monitoring
Partially 70%
Consulted and will be improved in the next phase of the monitoring
Causing no disturbance on locally or culturally important sites
✓ ✓ Partially 70%
Ensure no use of Polychlorinated Biphenyls (PCB) in transformers
✓ ✓ ✓
The workers’ camps should be located away from residents and sensitive receptors schools, health centers etc.
✓ ✓
No Sheds for Worker due to land shortage
All vehicles exit points Partially Will be Partially Will be Partially Will be
49
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
from the construction site shall have a wash down or shakedown area where mud and earth can be removed from the vehicles before it enters the public road system. All wash down areas are to drain to a sedimentation basin.
70% complied fully in
the next phase
70% complied fully in
the next phase
✓ complied fully in the next phase
Information dissemination
Disputes may arise in the nearby community if public consultation meeting is not held.
Disclosure of EIA Report and sharing project information
Partially 60%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 40%
Will be complied fully in the next phase
Arranging public consultation meeting
Partially 60%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied fully in the next phase
Quality of consultation and disclosure
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied fully in the next phase
Working Community Adequate fire
50
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Condition dwellers may feel that they are not giving substantial share in project related job opportunity
precautions in place (for example, fire extinguishers, escape routes) Documentation and reporting of occupational accidents, diseases, and incidents
Ensuring fair treatment, non-discrimination and equal opportunity
Compliance of project’s labor policy with the national labor law
✓ ✓ ✓
No Child Labor No incident of forced labor
✓ ✓ ✓
Conduct regular third party audits during construction phase of the project to assess the contractors compliance levels in meeting the statutory
✓ ✓ ✓
51
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
and ADB requirements
Develop a site specific safety plan including standard operating procedures (SOPs) and work permits required to protect employees (both full-time employees and contractors) from injuries
Provide adequate provision of drainage and access to toilets
Cleanup litters and other wastes regularly
Provide secure containers for disposal at designated area
✓ ✓ ✓
Properties safety on site, and illuminate well if work at night
N/A N/A N/A
Provision of PPE for workers and maintenance of work safety procedure
Partially 70%
Will be complied
fully in the next
Partially 70%
Will be complied
fully in the next
Partially 70%
Will be complied fully in the next
52
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
phase phase phase Regular safety checks and maintenance
Emergency response plan for events such as accidents, spillage of hazardous materials ?etc.
Employment
Without the involvement of local labor, Social unrest will be held among the local people
Local Labor (technical and non-technical) should be recruited.
Site Closure
Environmental and social safety can be hampered without completion of site works and restoration properly
At the completion of work at a particular site, or when the construction program as a whole is completed, the contractor will be responsible for removing all equipment and structures, cleaning up and disposing all
53
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
waste materials, and rehabilitating all construction sites and work areas so that these can be returned as much as possible to their previous use. There must be a stabilization of all project construction sites, roads, and tracks (where batters and embankment fill must be stabilized, and road drainage stabilized as well). All borrow pits and quarries are to be rehabilitated; all fuel and oil depots closed; any contaminated soil removed; and the areas restored. All spoil heaps must be reshaped and revegetated.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
All work sites must be All All All project
54
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi (BSCIC) Baunia Uttara 14
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
rehabilitated as per needs. Areas where topsoil has been removed will require a reapplication of topsoil, and revegetation as required.
project construction and others activities are not finished
project construction and others activities are not finished
construction and others activities are not finished
Care must be taken to ensure that the sites are adequately restored. This will require adequate time to ensure that the sites are effectively reestablished.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
55
(3)
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Social Safeguard Issues
Land Acquisition
Land owners livelihood status would be affected due to land acquisition
Conduct a rapid assessment through consultation with land losers (15 acres) to assess whether they are facing any significant livelihood restoration challenges and whether they have replaced their assets
✓ ✓ ✓
Cash payment and monitoring
Land owners may be deprived of proper compensation due to lack of
Disburse Cash for compensation of land (CCL)
✓ ✓ ✓
Develop a plan which includes compensation, restoration, livelihood,
✓ ✓ ✓
56
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
monitoring or improper land ownership.
living standards etc.
Provision of monitoring the compensation process
Not Applicable at this stage
Not Applicable at this stage
Not Applicable at this stage
Livelihood and living condition
Livelihood and living system may be disturbed due to the development activities
Causing no threat to the livelihood of local people
✓ ✓ ✓
Prioritize local labors in employment
Develop a separate road network during construction
Not
applicable
Not
applicable
Not
applicable
Separate water facilities for workers
Community Health, Safety and Security
Health, safety and security would be affected during pre, construction, operation and decommissioning phases of
Construction of Fence around project area
✓ ✓ Partially
70%
Needs to Improved
Evaluation for risks and impacts on health and safety during preconstruction, construction, operation and decommissioning of the project
Partially 60%
Rest of the
percentage would
be complied
and incorporated with the next
Partially 60%
Rest of the
percentage would
be complied
and incorporated with the next
Partially 60%
Rest of the percentage would be complied and incorporated with the next
57
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
the project. monitoring report.
monitoring report.
monitoring report.
Involve Community in Risk Assessment Process
Partially 70%
Partially
70% ✓
Consider Community Health and Safety in Designing infrastructure and equipment
Partially 70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 70%
Rest of the
percentage
would be
complied and
incorporated
with the next
monitoring
report.
Partially
70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Practicing safe management for hazardous materials which may pose threat to the community
Availability of plan for natural hazards
58
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Develop and Implement an Emergency Response Plan
Training and instruction to the security personnel about their behavior and communication with the local people
Practice of Tool box meeting and reporting
Partially Complied 65%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied
70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied 70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Establishing a grievance mechanism for the community dwellers
59
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Provision of health service facilities to community
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 60%
Consulted and will be improved in the next phase of the monitoring
Safety trainings for workers (i.e. fire control, working at height, working in heat, first aid etc.)
Partially 60%
Consulted and will be improved in the next phase of the monitoring
Partially 70%
Consulted and will be improved in the next phase of the monitoring
Partially 70%
Consulted and will be improved in the next phase of the monitoring
Increase awareness amongst the workers and employees and conduct health awareness drivers and medical camps in the neighboring areas
Partially 50%
Consulted and will be improved in the next phase of
Partially 50%
Consulted and will be improved in the next phase of
Partially 50%
Consulted and will be improved in the next phase of
60
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
(HSBC) the monitoring
the monitoring
the monitoring
Causing no disturbance on locally or culturally important sites
✓ ✓ ✓
Ensure no use of Polychlorinated Biphenyls (PCB) in transformers
✓ ✓ ✓
The workers’ camps should be located away from residents and sensitive receptors schools, health centers etc.
✓ ✓ ✓
All vehicles exit points from the construction site shall have a wash down or shakedown area where mud and earth can be removed from the vehicles before it enters the public road system. All wash down areas are
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
61
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
to drain to a sedimentation basin.
Information dissemination
Disputes may arise in the nearby community if public consultation meeting is not held.
Disclosure of EIA Report and sharing project information
Partially 60%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 40%
Will be complied fully in the next phase
Arranging public consultation meeting
Partially 60%
Will be complied
fully in the next phase
Partially 60%
Will be complied
fully in the next phase
Partially 60%
Will be complied fully in the next phase
Quality of consultation and disclosure
Partially 40%
Will be complied
fully in the next phase
Partially 40%
Will be complied
fully in the next phase
Partially 40%
Will be complied fully in the next phase
Working Condition
Community dwellers may feel that they are not giving substantial share in project related job
Adequate fire precautions in place (for example, fire extinguishers, escape routes)
Documentation and reporting of occupational accidents, diseases, and incidents
62
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
opportunity Ensuring fair treatment, non-discrimination and equal opportunity
Compliance of project’s labor policy with the national labor law
✓ ✓ ✓
No Child Labor No incident of forced labor
✓ ✓ ✓
Conduct regular third party audits during construction phase of the project to assess the contractors compliance levels in meeting the statutory and ADB requirements
✓ ✓ ✓
Develop a site specific safety plan including standard operating procedures (SOPs) and work permits required to protect employees (both full-
63
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
time employees and contractors) from injuries
Provide adequate provision of drainage and access to toilets
Cleanup litters and other wastes regularly
Provide secure containers for disposal at designated area
✓ ✓ ✓
Properties safety on site, and illuminate well if work at night
Not
applicable
Not
applicable
Not
applicable
Provision of PPE for workers and maintenance of work safety procedure
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
Regular safety checks and maintenance
Emergency response plan for events such as accidents, spillage of hazardous materials ?etc.
Employment Without the Local Labor (technical
64
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
involvement of local labor, Social unrest will be held among the local people
and non-technical) should be recruited.
Site Closure
Environmental and social safety can be hampered without completion of site works and restoration properly
At the completion of work at a particular site, or when the construction program as a whole is completed, the contractor will be responsible for removing all equipment and structures, cleaning up and disposing all waste materials, and rehabilitating all construction sites and work areas so that these can be returned as much as possible to their previous use.
There must be a All All All project
65
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
stabilization of all project construction sites, roads, and tracks (where batters and embankment fill must be stabilized, and road drainage stabilized as well). All borrow pits and quarries are to be rehabilitated; all fuel and oil depots closed; any contaminated soil removed; and the areas restored. All spoil heaps must be reshaped and revegetated.
project construction and others activities are not finished
project construction and others activities are not finished
construction and others activities are not finished
All work sites must be rehabilitated as per needs. Areas where topsoil has been removed will require a reapplication of topsoil, and revegetation as required.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
66
Category Description of potential impact
Measures/Indicators
Due Diligence Kazipara Kalshi (Rakeen City) Mirpur DOHS-2
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Care must be taken to ensure that the sites are adequately restored. This will require adequate time to ensure that the sites are effectively reestablished.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
67
(4)
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Social Safeguard Issues
Land Acquisition
Land owners livelihood status would be affected due to land acquisition
Conduct a rapid assessment through consultation with land losers (15 acres) to assess whether they are facing any significant livelihood restoration challenges and whether they have replaced their assets
✓ ✓ ✓
Cash payment and monitoring
Land owners may be deprived of proper compensation due to lack of monitoring or improper land ownership.
Disburse Cash for compensation of land (CCL)
✓ ✓ ✓
Develop a plan which includes compensation, restoration, livelihood, living standards etc.
✓ ✓ ✓
Provision of monitoring the compensation process
Not Applicable at this stage
Not Applicable at this stage
Not Applicable at this stage
68
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Livelihood and living condition
Livelihood and living system may be disturbed due to the development activities
Causing no threat to the livelihood of local people
✓ ✓ ✓
Prioritize local labors in employment
Develop a separate road network during construction
Separate water facilities for workers
Community Health, Safety and Security
Health, safety and security would be affected during pre, construction, operation and decommissioning phases of the project.
Construction of Fence around project area
✓ ✓ ✓
Evaluation for risks and impacts on health and safety during preconstruction, construction, operation and decommissioning of the project
Partially 60%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 60%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 60%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Involve Community in Risk Assessment Process
✓ ✓ ✓
69
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Consider Community Health and Safety in Designing infrastructure and equipment
✓
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
✓
Rest of the
percentage
would be
complied and
incorporated
with the next
monitoring
report.
✓
Rest of the percentage would be complied and incorporated with the next monitoring report.
Practicing safe management for hazardous materials which may pose threat to the community
Availability of plan for natural hazards
Develop and Implement an Emergency Response Plan
Training and
70
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
instruction to the security personnel about their behavior and communication with the local people
Practice of Tool box meeting and reporting
Partially Complied 70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied
70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied 70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Establishing a grievance mechanism for the community dwellers
Provision of health service facilities to community
✓ ✓
Safety trainings for workers (i.e. fire control, working at
Partially 65%
Consulted and will be
Partially 65%
Consulted and will be
Partially 70%
Consulted and will be
71
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
height, working in heat, first aid etc.)
improved in the next phase of the monitoring
improved in the next phase of the monitoring
improved in the next phase of the monitoring
Increase awareness amongst the workers and employees and conduct health awareness drivers and medical camps in the neighboring areas (HSBC)
Partially 65%
Consulted and will be improved in the next phase of the monitoring
Partially 65%
Consulted and will be improved in the next phase of the monitoring
Partially 65%
Consulted and will be improved in the next phase of the monitoring
Causing no disturbance on locally or culturally important sites
✓ ✓ ✓
Ensure no use of Polychlorinated Biphenyls (PCB) in transformers
✓ ✓ ✓
The workers’ camps should be located
✓ ✓ ✓
72
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
away from residents and sensitive receptors schools, health centers etc. All vehicles exit points from the construction site shall have a wash down or shakedown area where mud and earth can be removed from the vehicles before it enters the public road system. All wash down areas are to drain to a sedimentation basin.
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
Information dissemination
Disputes may arise in the nearby community if public consultation meeting is not held.
Disclosure of EIA Report and sharing project information
Partially 60%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 40%
Will be complied fully in the next phase
Arranging public consultation meeting
Partially 60%
Will be complied
fully in the next phase
Partially 65%
Will be complied
fully in the next phase
Partially 65%
Will be complied fully in the next phase
Quality of consultation Partially Will be Partially Will be Partially Will be
73
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
and disclosure 40% complied fully in
the next phase
40% complied fully in
the next phase
40% complied fully in the next phase
Working Condition
Community dwellers may feel that they are not giving substantial share in project related job opportunity
Adequate fire precautions in place (for example, fire extinguishers, escape routes)
Documentation and reporting of occupational accidents, diseases, and incidents
Ensuring fair treatment, non-discrimination and equal opportunity
Compliance of project’s labor policy with the national labor law
✓ ✓ ✓
No Child Labor No incident of forced labor
✓ ✓ ✓
Conduct regular third party audits during
✓ ✓ ✓
74
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
construction phase of the project to assess the contractors compliance levels in meeting the statutory and ADB requirements
Develop a site specific safety plan including standard operating procedures (SOPs) and work permits required to protect employees (both full-time employees and contractors) from injuries
Provide adequate provision of drainage and access to toilets
Cleanup litters and other wastes regularly
Provide secure containers for disposal at designated area
✓ ✓ ✓
Properties safety on site, and illuminate
N/A N/A N/A
75
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
well if work at night Provision of PPE for workers and maintenance of work safety procedure
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
Regular safety checks and maintenance
Emergency response plan for events such as accidents, spillage of hazardous materials ?etc.
Employment
Without the involvement of local labor, Social unrest will be held among the local people
Local Labor (technical and non-technical) should be recruited.
Site Closure
Environmental and social safety can be hampered without completion of site works
At the completion of work at a particular site, or when the construction program as a whole is completed, the contractor will be
76
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
and restoration properly
responsible for removing all equipment and structures, cleaning up and disposing all waste materials, and rehabilitating all construction sites and work areas so that these can be returned as much as possible to their previous use. There must be a stabilization of all project construction sites, roads, and tracks (where batters and embankment fill must be stabilized, and road drainage stabilized as well). All borrow pits and quarries are to be rehabilitated; all fuel and oil depots closed; any contaminated soil removed; and the
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
77
Category Description of potential impact
Measures/Indicators
Due Diligence Lake City Concord Satarkul 1 Barua
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
areas restored. All spoil heaps must be reshaped and revegetated. All work sites must be rehabilitated as per needs. Areas where topsoil has been removed will require a reapplication of topsoil, and revegetation as required.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
Care must be taken to ensure that the sites are adequately restored. This will require adequate time to ensure that the sites are effectively reestablished.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
78
(5)
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Social Safeguard Issues
Land Acquisition
Land owners livelihood status would be affected due to land acquisition
Conduct a rapid assessment through consultation with land losers (15 acres) to assess whether they are facing any significant livelihood restoration challenges and whether they have replaced their assets
✓ ✓ ✓
Cash payment and monitoring
Land owners may be deprived of proper compensation due to lack of monitoring or improper land ownership.
Disburse Cash for compensation of land (CCL)
✓ ✓ ✓
Develop a plan which includes compensation, restoration, livelihood, living standards etc.
✓ ✓ ✓
Provision of monitoring the compensation process
Not Applicable at this stage
Not Applicable at this stage
Not Applicable at this stage
Livelihood Livelihood Causing no threat to ✓ ✓ ✓
79
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
and living condition
and living system may be disturbed due to the development activities
the livelihood of local people Prioritize local labors in employment
Develop a separate road network during construction
Not
applicable
Not
applicable
Not
applicable
Separate water facilities for workers
Community Health, Safety and Security
Health, safety and security would be affected during pre, construction, operation and decommissioning phases of the project.
Construction of Fence around project area
✓ ✓ ✓
Evaluation for risks and impacts on health and safety during preconstruction, construction, operation and decommissioning of the project
Partially 60%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 60%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 60%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Involve Community in Risk Assessment Process
✓ ✓ ✓
80
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Consider Community Health and Safety in Designing infrastructure and equipment
Partially 70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 70%
Rest of the
percentage
would be
complied and
incorporated
with the next
monitoring
report.
Partially 70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Practicing safe management for hazardous materials which may pose threat to the community
Availability of plan for natural hazards
Develop and Implement an Emergency Response Plan
Training and
81
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
instruction to the security personnel about their behavior and communication with the local people
Practice of Tool box meeting and reporting
Partially Complied 70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied
70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied 70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Establishing a grievance mechanism for the community dwellers
Provision of health service facilities to community
phase of the monitoring
Consulted and will be improved in the next
82
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
phase of the monitoring
Safety trainings for workers (i.e. fire control, working at height, working in heat, first aid etc.)
Partially 60%
Consulted and will be improved in the next phase of the monitoring
Partially 60%
Consulted and will be improved in the next phase of the monitoring
Partially 60%
Consulted and will be improved in the next phase of the monitoring
Increase awareness amongst the workers and employees and conduct health awareness drivers and medical camps in the neighboring areas (HSBC)
Partially 60%
Consulted and will be improved in the next phase of the monitoring
Partially 65%
Consulted and will be improved in the next phase of the monitoring
Partially 65%
Consulted and will be improved in the next phase of the monitoring
Causing no disturbance on locally or culturally important
✓ ✓ ✓
83
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
sites
Ensure no use of Polychlorinated Biphenyls (PCB) in transformers
✓ ✓ ✓
The workers’ camps should be located away from residents and sensitive receptors schools, health centers etc.
✓ ✓ ✓
All vehicles exit points from the construction site shall have a wash down or shakedown area where mud and earth can be removed from the vehicles before it enters the public road system. All wash down areas are to drain to a sedimentation basin.
Partially 75%
Will be complied
fully in the next phase
Partially 75%
Will be complied
fully in the next phase
Partially 75%
Will be complied fully in the next phase
Information dissemination
Disputes may arise in the nearby community if
Disclosure of EIA Report and sharing project information
Partially 60%
Will be complied
fully in the next
Partially 60%
Will be complied
fully in the next
Partially 60%
Will be complied fully in the next
84
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
public consultation meeting is not held.
phase phase phase
Arranging public consultation meeting
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied fully in the next phase
Quality of consultation and disclosure
Partially 40%
Will be complied
fully in the next phase
Partially 40%
Will be complied
fully in the next phase
Partially 40%
Will be complied fully in the next phase
Working Condition
Community dwellers may feel that they are not giving substantial share in project related job opportunity
Adequate fire precautions in place (for example, fire extinguishers, escape routes)
Documentation and reporting of occupational accidents, diseases, and incidents
Ensuring fair treatment, non-discrimination and equal opportunity
Compliance of project’s labor policy ✓ ✓ ✓
85
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
with the national labor law No Child Labor No incident of forced labor
✓ ✓ ✓
Conduct regular third party audits during construction phase of the project to assess the contractors compliance levels in meeting the statutory and ADB requirements
✓ ✓ ✓
Develop a site specific safety plan including standard operating procedures (SOPs) and work permits required to protect employees (both full-time employees and contractors) from injuries
Provide adequate provision of drainage and access to toilets
86
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Cleanup litters and other wastes regularly
Provide secure containers for disposal at designated area
✓ ✓ ✓
Properties safety on site, and illuminate well if work at night
Not
applicable
Not
applicable
Not
applicable
Provision of PPE for workers and maintenance of work safety procedure
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
Regular safety checks and maintenance
Emergency response plan for events such as accidents, spillage of hazardous materials ?etc.
Employment
Without the involvement of local labor, Social unrest will be held among the local people
Local Labor (technical and non-technical) should be recruited.
87
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Site Closure
Environmental and social safety can be hampered without completion of site works and restoration properly
At the completion of work at a particular site, or when the construction program as a whole is completed, the contractor will be responsible for removing all equipment and structures, cleaning up and disposing all waste materials, and rehabilitating all construction sites and work areas so that these can be returned as much as possible to their previous use.
There must be a stabilization of all project construction sites, roads, and tracks (where batters and embankment fill must be stabilized, and road drainage
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
88
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
stabilized as well). All borrow pits and quarries are to be rehabilitated; all fuel and oil depots closed; any contaminated soil removed; and the areas restored. All spoil heaps must be reshaped and revegetated. All work sites must be rehabilitated as per needs. Areas where topsoil has been removed will require a reapplication of topsoil, and revegetation as required.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
Care must be taken to ensure that the sites are adequately restored. This will require adequate time to ensure that the sites are effectively
All project construction and others activities are not
All project construction and others activities are not
All project construction and others activities are not finished
89
Category Description of potential impact
Measures/Indicators
Due Diligence Badda (Gulshan 3) AIUB (Bashundhara) Solahati (Uttara)
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
reestablished. finished finished
(6)
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Social Safeguard Issues
Land Acquisition
Land owners livelihood status would be affected due to land acquisition
Conduct a rapid assessment through consultation with land losers (15 acres) to assess whether they are facing any significant livelihood restoration challenges and whether they have replaced their assets
✓ ✓ ✓
Cash Land owners Disburse Cash for ✓ ✓ ✓
90
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
payment and monitoring
may be deprived of proper compensation due to lack of monitoring or improper land ownership.
compensation of land (CCL) Develop a plan which includes compensation, restoration, livelihood, living standards etc.
✓ ✓ ✓
Provision of monitoring the compensation process
N/A N/A N/A
Livelihood and living condition
Livelihood and living system may be disturbed due to the development activities
Causing no threat to the livelihood of local people
✓ ✓ ✓
Prioritize local labors in employment
Develop a separate road network during construction
Existing road
network Used
Existing road
network Used
Existing road
network Used
Separate water facilities for workers
Community Health, Safety and Security
Health, safety and security would be affected during pre, construction,
Construction of Fence around project area
✓ ✓ ✓
Evaluation for risks and impacts on health and safety during preconstruction,
Partially 60%
Rest of the
percentage would
Partially 60%
Rest of the
percentage would
Partially 60%
Rest of the percentage would
91
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
operation and decommissioning phases of the project.
construction, operation and decommissioning of the project
be complied
and incorporated with the next monitoring report.
be complied
and incorporated with the next monitoring report.
be complied and incorporated with the next monitoring report.
Consider Community Health and Safety in Designing infrastructure and equipment
Partially 70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 70%
Rest of the
percentage
would be
complied and
incorporated
with the next
monitoring
report.
Partially
70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Practicing safe management for hazardous materials which may pose threat
92
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
to the community Availability of plan for natural hazards
Develop and Implement an Emergency Response Plan
Training and instruction to the security personnel about their behavior and communication with the local people
Practice of Tool box meeting and reporting
Partially Complied 70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied
70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied 70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Establishing a grievance mechanism
93
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
for the community dwellers Provision of health service facilities to community
Safety trainings for workers (i.e. fire control, working at height, working in heat, first aid etc.)
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 65%
Consulted and will be improved in the next phase of the monitoring
Increase awareness amongst the workers and employees and conduct health awareness drivers and medical camps in the neighboring areas (HSBC)
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Causing no disturbance on locally
✓ ✓ ✓
94
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
or culturally important sites
Ensure no use of Polychlorinated Biphenyls (PCB) in transformers
✓ ✓ ✓
The workers’ camps should be located away from residents and sensitive receptors schools, health centers etc.
✓ ✓ ✓
All vehicles exit points from the construction site shall have a wash down or shakedown area where mud and earth can be removed from the vehicles before it enters the public road system. All wash down areas are to drain to a sedimentation basin.
Partially 60%
Will be complied
fully in the next phase
Partially 60%
Will be complied
fully in the next phase
Partially 60%
Will be complied fully in the next phase
Information disseminat
Disputes may arise in the nearby
Disclosure of EIA Report and sharing project information
Partially 60%
Will be
complied fully in
Partially 50%
Will be
complied fully in
Partially 50%
Will be complied fully in
95
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
ion community if public consultation meeting is not held.
the next phase
the next phase
the next phase
Arranging public consultation meeting
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied fully in the next phase
Quality of consultation and disclosure
Partially 40%
Will be complied
fully in the next phase
Partially 40%
Will be complied
fully in the next phase
Partially 40%
Will be complied fully in the next phase
Working Condition
Community dwellers may feel that they are not giving substantial share in project related job opportunity
Adequate fire precautions in place (for example, fire extinguishers, escape routes)
Documentation and reporting of occupational accidents, diseases, and incidents
Ensuring fair treatment, non-discrimination and equal opportunity
Compliance of ✓ ✓ ✓
96
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
project’s labor policy with the national labor law No Child Labor No incident of forced labor
✓ ✓ ✓
Conduct regular third party audits during construction phase of the project to assess the contractors compliance levels in meeting the statutory and ADB requirements
✓ ✓ ✓
Develop a site specific safety plan including standard operating procedures (SOPs) and work permits required to protect employees (both full-time employees and contractors) from injuries
Provide adequate provision of drainage
97
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
and access to toilets Cleanup litters and other wastes regularly
Provide secure containers for disposal at designated area
✓ ✓ ✓
Provision of PPE for workers and maintenance of work safety procedure
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
Regular safety checks and maintenance
Emergency response plan for events such as accidents, spillage of hazardous materials ?etc.
Employment
Without the involvement of local labor, Social unrest will be held among the local people
Local Labor (technical and non-technical) should be recruited.
Site Closure
Environmental and social
At the completion of work at a particular
98
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
safety can be hampered without completion of site works and restoration properly
site, or when the construction program as a whole is completed, the contractor will be responsible for removing all equipment and structures, cleaning up and disposing all waste materials, and rehabilitating all construction sites and work areas so that these can be returned as much as possible to their previous use. There must be a stabilization of all project construction sites, roads, and tracks (where batters and embankment fill must be stabilized, and road drainage stabilized as well). All borrow pits and
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
99
Category Description of potential impact
Measures/Indicators
Due Diligence Uttarkhan (Promy) Tilargati (Tongi 27) Mirpur DOHS
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
quarries are to be rehabilitated; all fuel and oil depots closed; any contaminated soil removed; and the areas restored. All spoil heaps must be reshaped and revegetated. All work sites must be rehabilitated as per needs. Areas where topsoil has been removed will require a reapplication of topsoil, and revegetation as required.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
Care must be taken to ensure that the sites are adequately restored. This will require adequate time to ensure that the sites are effectively reestablished.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
100
(7)
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Social Safeguard Issues
Land Acquisition
Land owners livelihood status would be affected due to land acquisition
Conduct a rapid assessment through consultation with land losers (15 acres) to assess whether they are facing any significant livelihood restoration challenges and whether they have replaced their assets
✓ ✓ ✓
Cash payment and monitoring
Land owners may be deprived of proper compensation due to lack of monitoring or improper land ownership.
Disburse Cash for compensation of land (CCL)
✓ ✓ ✓
Develop a plan which includes compensation, restoration, livelihood, living standards etc.
✓ ✓ ✓
Provision of monitoring the compensation process
N/A N/A N/A
101
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Livelihood and living condition
Livelihood and living system may be disturbed due to the development activities
Causing no threat to the livelihood of local people
✓ ✓ ✓
Prioritize local labors in employment
Develop a separate road network during construction
Existing road
network used
Existing road
network used
Existing road
network used
Separate water facilities for workers
Community Health, Safety and Security
Health, safety and security would be affected during pre, construction, operation and decommissioning phases of the project.
Construction of Fence around project area
✓ ✓ ✓
Evaluation for risks and impacts on health and safety during preconstruction, construction, operation and decommissioning of the project
Partially 60%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 60%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially 60%
Rest of the percentage would be complied and incorporated with the next monitoring report.
102
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Consider Community Health and Safety in Designing infrastructure and equipment
Partially 70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially
70%
Rest of
the percent
age would
be complied and
incorporated
with the next
monitoring
report.
Partially 70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Practicing safe management for hazardous materials which may pose threat to the community
Availability of plan for natural hazards
Develop and Implement an Emergency Response Plan
103
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Training and instruction to the security personnel about their behavior and communication with the local people
Practice of Tool box meeting and reporting
Partially Complied 70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied
70%
Rest of the
percentage would
be complied
and incorporated with the next monitoring report.
Partially Complied 70%
Rest of the percentage would be complied and incorporated with the next monitoring report.
Establishing a grievance mechanism for the community dwellers
Provision of health service facilities to community
Partially 30%
Consulted and will be improved in the
Partially 30%
Consulted and will be improved in the
Partially 30%
Consulted and will be improved in the
104
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
next phase of the monitoring
next phase of the monitoring
next phase of the monitoring
Safety trainings for workers (i.e. fire control, working at height, working in heat, first aid etc.)
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Increase awareness amongst the workers and employees and conduct health awareness drivers and medical camps in the neighboring areas (HSBC)
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Partially 50%
Consulted and will be improved in the next phase of the monitoring
Causing no disturbance on locally
✓ ✓ ✓
105
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
or culturally important sites
Ensure no use of Polychlorinated Biphenyls (PCB) in transformers
✓ ✓ ✓
The workers’ camps should be located away from residents and sensitive receptors schools, health centers etc.
✓ ✓ ✓
All vehicles exit points from the construction site shall have a wash down or shakedown area where mud and earth can be removed from the vehicles before it enters the public road system. All wash down areas are to drain to a sedimentation basin.
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
Information disseminat
Disputes may arise in the nearby
Disclosure of EIA Report and sharing project information
Partially 60%
Will be
complied fully in
Partially 50%
Will be
complied fully in
Partially 40%
Will be complied fully in
106
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
ion community if public consultation meeting is not held.
the next phase
the next phase
the next phase
Arranging public consultation meeting
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied fully in the next phase
Quality of consultation and disclosure
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied
fully in the next phase
Partially 50%
Will be complied fully in the next phase
Working Condition
Community dwellers may feel that they are not giving substantial share in project related job opportunity
Adequate fire precautions in place (for example, fire extinguishers, escape routes)
Documentation and reporting of occupational accidents, diseases, and incidents
Ensuring fair treatment, non-discrimination and equal opportunity
Compliance of ✓ ✓ ✓
107
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
project’s labor policy with the national labor law No Child Labor No incident of forced labor
✓ ✓ ✓
Conduct regular third party audits during construction phase of the project to assess the contractors compliance levels in meeting the statutory and ADB requirements
✓ ✓ ✓
Develop a site specific safety plan including standard operating procedures (SOPs) and work permits required to protect employees (both full-time employees and contractors) from injuries
Provide adequate provision of drainage
108
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
and access to toilets Cleanup litters and other wastes regularly
Provide secure containers for disposal at designated area
✓ ✓ ✓
Properties safety on site, and illuminate well if work at night
Not
applicable
Not
applicable
Not
applicable
Provision of PPE for workers and maintenance of work safety procedure
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied
fully in the next phase
Partially 70%
Will be complied fully in the next phase
Regular safety checks and maintenance
Emergency response plan for events such as accidents, spillage of hazardous materials ?etc.
Employment
Without the involvement of local labor, Social unrest will be held among the
Local Labor (technical and non-technical) should be recruited.
109
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
local people
Site Closure
Environmental and social safety can be hampered without completion of site works and restoration properly
At the completion of work at a particular site, or when the construction program as a whole is completed, the contractor will be responsible for removing all equipment and structures, cleaning up and disposing all waste materials, and rehabilitating all construction sites and work areas so that these can be returned as much as possible to their previous use.
There must be a stabilization of all project construction sites, roads, and tracks (where batters and embankment fill must be stabilized,
All project construction and others activities are not
All project construction and others activities are not
All project construction and others activities are not finished
110
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
and road drainage stabilized as well). All borrow pits and quarries are to be rehabilitated; all fuel and oil depots closed; any contaminated soil removed; and the areas restored. All spoil heaps must be reshaped and revegetated.
finished finished
All work sites must be rehabilitated as per needs. Areas where topsoil has been removed will require a reapplication of topsoil, and revegetation as required.
All project construction and others activities are not finished
All project construction and others activities are not finished
All project construction and others activities are not finished
Care must be taken to ensure that the sites are adequately restored. This will require adequate time to ensure that the
All project construction and others activities
All project construction and others activities
All project construction and others activities are not
111
Category Description of potential impact
Measures/Indicators
Due Diligence Tongi 1 Tongi 2 CAAB
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
Co
mp
lie
d
No
t C
om
pli
ed
Re
ma
rks
sites are effectively reestablished.
are not finished
are not finished
finished
Legend:
Complied
= ✓
Partially
complied= (--)✓ Not
complied= ✓
Appendix-C: Contract Agreement Between DESCO and Simens India