For total reliability in your critical power needs, contact us now. [email protected] | www.albahar.com POWER PROFILE CUSTOMER Road & Transport Authority (RTA)/Dubai Metro LOCATION Dubai, United Arab Emirates CUSTOMER BUSINESS ISSUE Electric power generation source to supply standby power to Dubai Metro facilities SOLUTION • Eight Cat 3516 generator sets • Eight Cat 3512 generator sets • Two Cat C18 generator sets • Two Cat C15 generator sets Since it opened in 2011, more than 170,000 passengers ride the Dubai Metro each day. There are currently 20 Cat® generator sets providing backup power to the Dubai Metro, including eight 3516 models. RELY ON CAT ® POWER POWER NEED First opened in 2009, the Dubai Metro system was constructed in two stages – the Red Line (Stage 1) and the Green Line (Stage 2). The Red Line was opened on September 9, 2009, and the Green Line opened in September 2011. Combined, the system carries more than 170,000 passengers each day. With the opening of its Green Line, the Dubai Metro regained the title of the world’s longest, fully automated driverless railway system, with 47 stations and 75 kilometers (46 miles) of lines. The initial studies for developing a metro system in Dubai began in 1997. A robust feasibility study was carried out from 1997 to 2000, followed by four years of extensive planning and preliminary engineering design. In July 2005, a Design and Build Contract was awarded to a consortium known as Dubai Rapid Link (DURL). This contract included the purchase of backup generator sets to provide reliable power to the metro system, which depends on electrified rails to move the metro trains. SOLUTION Local Cat ® Dealer Al-Bahar secured the turnkey project from Dubai Metro, supplying Cat generator sets and managing the installation, commission, testing and maintenance of the generator sets. Al- Bahar also provides ongoing technical training on the operation and maintenance (O&M) of the generator sets to Dubai Metro engineers and technicians. The order includes multiple units of Cat diesel generator sets rated between 320 kW and 1,820 kW which will be used as emergency power for Dubai Metro. In total, 19 generator sets were delivered in two phases. In Phase 1, 10 generator sets, including five 3512 generator sets, three 3516 generator sets, one C15 generator set and one C18 generator set were delivered. In Phase 2, 10 additional generator sets were delivered, including three 3512 generator sets, five 3516 generator sets, one C15 generator set and one C18 generator set. Phase 1 kicked off with a factory acceptance test conducted at Al-Bahar’s main Sharjah facility in May 2009. Several high level officials from DURL and the Road and Transport Authority (RTA) witnessed the full function endurance test, which demonstrated the exceptional performance of Cat products in the extreme heat of the Arabian summer. The second phase was executed later in the year, and included the testing of generator sets packaged in specially designed acoustic enclosures that would later be buried below ground level to compensate for space restrictions. “We are excited about the fact that we are the part of a team that will change the lives of thousands of commuters in Dubai,” said Narasimhan L. Jagadisan, Project Engineer at Al-Bahar. RESULTS Al-Bahar has provided excellent technical support services to DURL and achieved a milestone in the field of training, earning an 89 percent satisfaction rating from the DURL team. As a result, Dubai Metro has signed a three-year maintenance contract with Al-Bahar. Tejinder S. Sodhi, Project Manager from Al-Bahar and project lead on the Dubai Metro project, said, “Al-Bahar has a large pool of technically sound engineers and a robust infrastructure to support and execute mega projects, one like Dubai Metro. Projects of such large magnitude also give us the opportunity to strengthen and polish our delivery capabilities.” An interface and O&M manager at DURL said,“I deem myself quite lucky to work with the sub-contractor that carries a high sense of responsibility like Al-Bahar.” Currently the RTA is investigating the feasibil- ity of future projects that includes extension of the Red Line and the addition of two more lines. Additional power generation opportuni- ties will attract greater investment to the city of Dubai, as well as contribute to the national economy.

Upload: others

Post on 28-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

For total reliability in your critical power needs, contact us [email protected] | www.albahar.com

POWERPROFILE CUSTOMERRoad & Transport Authority (RTA)/Dubai Metro

LOCATIONDubai, United Arab Emirates

CUSTOMER BUSINESS ISSUEElectric power generation source to supply standby power to Dubai Metro facilities

SOLUTION• Eight Cat 3516 generator sets• Eight Cat 3512 generator sets• Two Cat C18 generator sets• Two Cat C15 generator sets

Since it opened in 2011, more than 170,000 passengers ride the Dubai Metro each day.

There are currently 20 Cat® generator sets providing backup power to the Dubai Metro, including eight 3516 models.

RELY ON CAT® POWER POWER NEEDFirst opened in 2009, the Dubai Metrosystem was constructed in two stages –the Red Line (Stage 1) and the Green Line(Stage 2). The Red Line was opened onSeptember 9, 2009, and the Green Lineopened in September 2011. Combined,the system carries more than 170,000passengers each day. With the opening ofits Green Line, the Dubai Metro regained the title of the world’s longest, fully automated driverless railway system, with 47 stations and 75 kilometers (46 miles) of lines.

The initial studies for developing a metrosystem in Dubai began in 1997. A robustfeasibility study was carried out from 1997to 2000, followed by four years of extensiveplanning and preliminary engineeringdesign. In July 2005, a Design and BuildContract was awarded to a consortiumknown as Dubai Rapid Link (DURL). Thiscontract included the purchase of backupgenerator sets to provide reliable powerto the metro system, which depends onelectrified rails to move the metro trains.

SOLUTIONLocal Cat® Dealer Al-Bahar securedthe turnkey project from Dubai Metro,supplying Cat generator sets and managingthe installation, commission, testing andmaintenance of the generator sets. Al-Bahar also provides ongoing technicaltraining on the operation and maintenance(O&M) of the generator sets to Dubai Metroengineers and technicians.

The order includes multiple units of Catdiesel generator sets rated between320 kW and 1,820 kW which will be usedas emergency power for Dubai Metro. Intotal, 19 generator sets were delivered intwo phases. In Phase 1, 10 generator sets,including five 3512 generator sets, three3516 generator sets, one C15 generator setand one C18 generator set were delivered.

In Phase 2, 10 additional generator setswere delivered, including three 3512generator sets, five 3516 generator sets,one C15 generator set and one C18generator set.

Phase 1 kicked off with a factory acceptance test conducted at Al-Bahar’s main Sharjah facility in May 2009. Several high level officials from DURL and the Road and Transport Authority (RTA) witnessed the full function endurance test, which demonstrated the exceptional performance of Cat products in the extreme heat of the Arabian summer. The second phase was executed later in the year, and included the testing of generator sets packaged in specially designed acoustic enclosures that would later be buried below ground level to compensate for space restrictions.

“We are excited about the fact that we arethe part of a team that will change the livesof thousands of commuters in Dubai,” saidNarasimhan L. Jagadisan, Project Engineerat Al-Bahar.

RESULTSAl-Bahar has provided excellent technicalsupport services to DURL and achieved amilestone in the field of training, earning an89 percent satisfaction rating from the DURL team. As a result, Dubai Metro has signed a three-year maintenance contract with Al-Bahar.

Tejinder S. Sodhi, Project Manager fromAl-Bahar and project lead on the Dubai Metro project, said, “Al-Bahar has a large pool of technically sound engineers and a robust infrastructure to support and execute mega projects, one like Dubai Metro. Projects of such large magnitude also give us the opportunity to strengthen and polish our delivery capabilities.”

An interface and O&M manager at DURL said,“I deem myself quite lucky to work with the sub-contractor that carries a high sense of responsibility like Al-Bahar.”

Currently the RTA is investigating the feasibil-ity of future projects that includes extension of the Red Line and the addition of two more lines. Additional power generation opportuni-ties will attract greater investment to the city of Dubai, as well as contribute to the national economy.