final power point teckno profile

79
TECKNO SINCE 1991 TECKNO TOUCHING THE HEIGHTS

Upload: janakbhatt

Post on 21-May-2015

633 views

Category:

Business


7 download

TRANSCRIPT

Page 1: Final power point teckno profile

TECKNO

SINCE 1991

TECKNO TOUCHING THE HEIGHTS

Page 2: Final power point teckno profile
Page 3: Final power point teckno profile

CONTACT DETAILS

OFFICE : TECKNOA-216, RAJLAXMI APPT.

OPP. HARIBHAKTI EXTN. OLD PADRA ROAD,

VADODARA – 390 007 GUJARAT, INDIA.

MOBILE NO: 0091 98250 07851

PH.NO: 0091 265-2335621/2310880FAX NO: 0091 265-2310880MO. NO: 0091 9712997852

E-MAIL : [email protected] [email protected]

Web Site: www.teckno.co.in

 

Page 4: Final power point teckno profile

INDEXSR. NO.

DESCRIPTIONPAGE NO.

1 INTRODUCTION 62 BRIEF PRODUCT RANGE 73 MANUFACTURING FACILITIES 104 PLANT & MACHINERY 11

5 QUALITY ASSURANCE PLAN FOR STRUCTURES 126 GALVANISING PLANT AND PROCESS 22

7 A LIST OF IN-HOUSE TESTING FACILITY 23

8 OUR INDIAN SATISFIED CUSTOMERS 24

9 OUR ABROAD SATISFIED CUSTOMERS 2510 LIST OF ABROAD CUSTOMERS 26

11A LIST OF ORDERS SUCCESSFULY EXECUTED FOR EXPORTS 28

12 A LIST OF ORDERS SUCCESSFULY EXECUTED FOR EXPORTS FOR DESIGN CALCULATION & DRAWINGS 37

13 LIST OF INDIAN CUSTOMERS 39

14A LIST OF MAJOR ORDER SECURED (FOR B.M) STRUCTURES SUCCESSFULLY EXECUTED 42

15A LIST OF ORDERS SUCCESFULLY BOOKED AND EXECUTED FOR PGCIL BY MEI GROUP OF INDUSTRIES 43

16A LIST OF ORDERS SUCCESFULLY EXECTED FOR WIND MILL TOWER STRUCTURES (FOR B.M) 53

17 A LIST OF ORDER SUCCESSFULLY EXECTED FOR CABLE TRAYS & ACCESSORIES 58

►ALL PRODUCTS ARE MANUFACTURED AT OUR ASSOCIATED CONCERNS◄

Page 5: Final power point teckno profile

INTRODUCTION

FOR ALMOST TWO DECADES M/S. TECKNO , A JOINT STOCK COMPANY HAS BEEN DESIGNING, MANUFACTURING AND ERECTING THE TRANSMISSION LINE TOWERS, SUBSTATION / SWITCH YARD STRUCTURES, WINDMILL TOWERS AND CABLE TRAYS & SOLAR PHOTO VOLTIC SUPPORT STRUCTURES.

 

OUR THIS LONG EXPERIENCE GUARANTEES,FUNCTIONALITY AND COMPLETE OPERATIONAL SAFETY. WE HAVE A SOUND TECHNO – COMMERCIAL STRENGTH AND THAT PRECISELY GIVES US AN EDGE OVER OTHERS IN THIS FIELD.

 

WE ARE IN THE APPROVED VENDOR’ S LIST WITH SOME OF THE LEADING COMPANIES LIKE ABB., SIEMENS LTD., TATA’S, LARSEN & TUBRO., ESSAR OIL., RELIANCE, NATIONAL THERMAL POWER CORPOATION. BHEL.,TO NAME A FEW OF OUR PRESTIGIOUS CLIENTS IN ABROAD LIKE GALFAR ENGINEERING & CONTRACTING, POWERTECH ENGINEERING, AL-HASSAN ENGINEERING CO., LARSEN & TOUBRO, GLOBAL CORP ENTERPRISE, SAUDI NATIONAL CONTRACTING CO., AL-HASSAN TRADING & CONTRACTING CO. LOCATED IN SULTANATE OF OMAN.

 WE ARE SELF SUFFICIENT IN MANUFACTURING , INSPECTION FACILITY. WE HAVE ESTABLISHED SYSTEMS, PROCEDURES AND DOCUMENTATION.

 

Page 6: Final power point teckno profile

PROPRIETOR

INTRODUCTION :

MR. NARENDRA SHARMA PASSED B. TECH FROM M.S. UNIVERSITY, BARODA IN THE YEAR 1980 WITH THE SECOND POSITION.

  JOINT M/S. ASEA BROWN BOVERI LTD IN 1982 AND BY VITUE OF PERFORMANCE WAS CONFIRMED WITHIN 6 MONTHS INSTEAD OF 1 YEAR. HE WORKED WITH PROJECT ENGINNERING DEPARTMENT OF M/S. ASEA BROWN BOVERI UPTOFEBRUARY 1984.

1ST MARCH 2004 ONWARDS, WORKED WITH M/S CROMPTON GREAVES LTD.,AS A MARKETING ENGINEER. TWICE IN TENOR OF 6 YEARS, WAS AWARDED MAN OF THE QUARTER BY THE VIRTUE OF EXCELLENT PERFORMANCE UNDER 178 MARKETING ENGINEERS.

  DURING THE ASSOCIATION WITH M/S CROMPTON GREAVES LTD, HAD BOOKED ORDER FOR FIRST INDIGINOUS 11KV FLAME PROOF MOTOR AGAINST STIFF INTERNATIONAL COMPETITION FOR MGCC (IPCL) NAGORTHNE PROJECT. LEFT M/S CROMPTON GREAVES LTD. IN OCT 1991, THAN PLUNGGED INTO THE BUSINESS.

  TODAY GIVING CONSULTANCY FOR ELECTRICAL SUBSTATIONS, DESIGNING OF WIND MILL TOWER AND DOING PHYSICAL EXPORTS OF ELECTRICAL OVERHEAD LINE.

 

Page 7: Final power point teckno profile

We have extensive expierence in the field of Transmission Line tower, by virtue of this we offer excellent competitive design.

Towers supplied by us are working in vide range of ambient temperature from -10 °C to 50 °C. We offer Tower as per the international standard as desired by our valued customer. To provide the best available craftmenship, we extensively use CNC machines for the various operation to churn out the excellent error free product.

All the material passes through the magnifing eye’s of our well experienced QC team. Finaly for excelent and long life materials is hot dip galvanized in the modern plant.

01. TRANSMISSION Line TOWER STRUCTURES :

BRIEF PRODUCT RANGE

Page 8: Final power point teckno profile

02. SWITCHYARD / SUB-STATION STRUCTURES :

All sub station structures are manufactured from very standard steel procured from approved and reputed Rolling Mill. These steel section are artequaleted by our craftman with atmost care and under strict quality control of our Engineers, having couple of clouble experience. On demand we also provide pipe type support Structure.

We follow International code to satisfy our customers spread over the world. All crafted material is than treated for corrosive protection by Hot dip galvanizing.

We also assist our valued cusotmers by providing the total solution from designing to execution all under one roof.

Page 9: Final power point teckno profile

.

03. WIND MILL TOWER STRUCTURES :

We offer custom made towers for wind Electric genrator from 225 KW to 1250 KW. Height of tower varries from 30 mts to 65 mts. Raw material is sourced from international market and processed to international standards. The finish of the product is done as per customer specification from Zn coating, PU plant to hot dip galvanizing.

The only major alternative available to us after the fossile fuel is Wind Energy. To keep the place with the trend we started manufacturing of windmill tower since 1994. Till date we have successfully manfactured more than 4000 nos. of Wind Mill Towers.

Page 10: Final power point teckno profile

04. CABLE TRAYS :

We offer extensive range of cable trays, which are manufactured from stainless steel, CRC, HRC Sheet, Aluminium or FRP. We also offer extensive range of accessories for the cable tray, such as Elebow, (Left Right, Up Down) Tee, cross redusers. On demand of customers even cable tray with covers are offered.

For the protection of these cable trays against corroesion we offer, painted or Hot dip Galvanized coating, as per demand of our valued customers.

Page 11: Final power point teckno profile

05. TELECOM TOWERS LATTICE / PIPE:

We offer a very wide range to telecom tower approved by SERC. Starting from Microwave, GSM roof top, ground Base (upto 90 mts and Wind speed of 260 KMPH). It is either from steel angles or pipe or even combination of both, as desired by customer.

For the urban locations specially narrow base towers are also offered. Final touch is galvanized and if required followed by specific paint.

Page 12: Final power point teckno profile

06. RAILWAY ELECTRIFICATION STRUCTURES:

Click icon to add picture

We cater to request of steel substation used for Railway electrification. They are mainly the column and Beam manufactured from high quality of steel sourced from the approved Rolling Mills. The final touch is given by our expert work force by way of cutting, drilling, welding e tc.

Finally for a better and long life all structures are Hot dip galvanized for 130 microns.

Page 13: Final power point teckno profile

07. CROSSARMS

crossarms

We have extensive experience in the field of crossarms. We offer excellent competitive rates of crossarms to our customers as per their demand.

We have maintained huge range of products like Tie Brackets, Crossarms for terminal Poles, Cross arms for intermidiate poles, Crossarms for field Isolator, Crossarms for Auto recloser etc.. We follow International code to satisfy our customers spread over the world.

For excellent and long life, the material is Hot Dip Galvanized or Painted as per the requirement of customer.

Page 14: Final power point teckno profile

.

 08. SOLAR POWER PLANT STEEL SUPPORT

STRUCTURES:

06. SOLAR POWER PLANT STEEL SUPPORT STRUCTURES :

The use of renewable energy resources is increasing rapidly to reduce the dependency on fossil fuels. We offer extensive range of Support structures for solar panel PV Module systems.

We offer special steel structures for mounting of solar modules from lattice, pipe ,hollow section, perlins, sigma profiles to meet the specific requirements of photovoltaic modules procured from world wide.

The final touch is given by our expert work force by way of cutting, drilling, welding etc.

Finally for a better and long life all structures are Hot dip galvanized for 86 to 127 microns.

Page 15: Final power point teckno profile

MANUFACTURING FACILITIES •TOTAL AREA : 85,000 SQUARE . FEET

•BUILT UP AREA : 20,000 SQUARE . FEET

•MAN – POWER :10 ENGINEERS 22 OFFICE STAFF

52 SKILLED WORKERS 47 SEMI-SKILLED WORKERS 50 CASUAL WORKERS

•CAPACITY : A) 5000 MT. OF FABRICATION PER MONTH.

B) 6,000 MT. OF GALVANIZING PER MONTH.

CONSIDERING ALL 3 GALVANIZING PLANTS.

•CONNECTED POWER : 500 KVA.

Page 16: Final power point teckno profile

PLANT & MACHINERYSr No.

DESCRIPTION OF MACHINERY

1. Vertical Turret lathe 3000 dia2. Bench lathe 2500 dia3. Angle Cutting Machine, make Aman, Capacity 110mm x 110 mm x

10 mm complete with 5 HP Bharat Bijlee make electric motor & accessories

4. Universal Cutting Machine, make NSIC, Plate cutting 120mm x 12mm , Bar cutting 30mm dia square 28 mm complete with accessories.

5. Power Press, Malra make Capacity 100 Ton, complete with 7.5 H.P local make electric motor & accessories- 02 nos.

6. Power Press, Shailesh make Capacity 60 Ton, complete with 5 H.P local make electric motor & accessories- 01 nos.

7. Power Press, Ambica make Capacity 20 Ton, complete with 5 H.P local make electric motor & accessories- 01 no.

8. Radial Drill Machine, make Maksons, Capacity 40mm, complete with 1 H.P Neophase make electric motor & accessories – 04 nos

9. EOT Crane, make AMT International of 5 M.T capacity with 1 M.T capacity (05 nos) Hoist & accessories

10 Galvanising Plant consisting of 04 Compartments for cleaning, Water, acid & water flushing covering 10m x 6m area each compartment having 1.5 m deep, constructed of Acid proof bricks, Cattle of 8m x 1m x 1.2m water quenching bath, Oil tanks (02 nos) of 1.4m x 7.62m x 1.6m size burners (04 nos), blowers of 24” size each with 5 H.P electric motor – Set

11 Electrical Control Panel

12 Welding Column & Boom Memco make 6m vertical length & 6m Horizontal length, wheel mounted, REMI make electric motor 5 H.P with Elecon make gear box ratio 20:13 set complete with accessories.

13 EOT Crane, make AMT International of 10 MT capacity with auxiliary crane of 3MT capacity complete with accessories-Set

14 Rotators (motorised), make V Weld Equipments with 1HP DC motor Elco make and Ratio Gear Box Elecon make – 10 Set

15 Hydraulic Pre Punching Rolling Machine, make “” capacity 3000mm x 25mm, complete with 25 H.P Bharat Bijlee make electric motor. And inbuilt gear box & accessories

Page 17: Final power point teckno profile

Sr No DESCRIPTION OF MACHINERY

16 Compressor, make Ingersoll- Sr. no: 389. Model : L 40 ASB, 163 cfm, 7Kg/cm2, complete with 40 H.P electric motor & accessories.

17 Weigh Bridge, make Avery Capacity 60 MT

18 Transformer, make Danke, Capacity 315 KVA, with main panel & change over switch.

19 Electrical Contract to M/s Shreeji Elec. Corporaton of entire premise, which includes work of cabling , wiring, street lights, high day fittings etc.

20 Bench Grinder Local make Cap 2 HP with double grinding wheel size10”diax1”thick (2002)

21 Bench Grinder Local make Cap 1 HP with double grinding wheel size 6” dia x 3/4” thick 2 nos (2003)

22 Radial Drill ‘ Sargodha ‘ Ludhiana make Cap 30mm, with Bharat Bijlee make 3HP electric motor 2 nos (2002)

23 Radial Drill ‘ Sargodha ‘ Ludhiana make Cap 50mm, with Bharat Bijlee make 3HP electric motor (2002)

24.Radial Drill ‘ Siddhpura’ make Cap 40mm with Neophase make 3 HP electric Motor 4 no (2002

25. OH Crane AMT Intl. make Cap 12 ton. Long Travel 78MT x Cross Travel 12.5 MT with make 15 HP hoist, 10 HP 2 no, and 5 HP Delhi make inbuilt motors (2002)

26. Radial Drill’ Prabhat’ make Cap 38mm with 3 HP Neophase make electric motor 15 no (2003)

27. Radial Drill’ Prabhat’ make Cap 38mm with 3 HP Neophase make electric motor 15 no (2002)

28. Welding Machine ‘Standard’ make. Cap 400 amp. Air Cooled. Wheel Mounted. 4 nos (2003)

29. Pillar drill ‘SIDDHAPURA’ make . SR. No. S1/3/6/95 Cap 40 MM with 3 hp Neophase Make electric motor 10 nos (2003)

30. Radial Drill ‘Perfect’ make. Mc no 867 Sr. no 35/1000. Cap 40 mm, with 2 HP Megha make electric motors (2003)

Page 18: Final power point teckno profile

31. Radial Drill ‘KMT’ make. Cap 40mm, automatic, with 2 HP Amgo make & 1 HP Megha make electric motor (2003)

32. Welding Boom ‘ Vandana Equipment’ make. Wheel mounted. Vertical boom 3MT cross boom 3 MT with 2 HP local make 2 no, with Gear box Elecon make ratio30:1 with Job Rotator machine, 10HP DC motorinbuilt and 10 HP local make electric motor with Elecon make gear

33. Power Press Malara Punjab make. Cap 50 ton. With 7.5 HP local make electric motor 2 no. (2000)

34. Power Press ‘Mankoo’ make. Cap 40 ton. With 7.5 HP local make electric motor (2000)

35. Shaping Machine ‘Sagar Ludhiana make Sr no 2386, Strike 24’, with 5 HP EIE ‘ make electric motor (2001)

36. Mig Welding Machine ‘ Advani’ make Sr. no 82/763, Model VCG –B31 /51 cap 400 amp with wire reel and stand , Torch , Cable etc, with control panel inbuilt (2001)

37. Mig Welding Machine ‘Quality Engg. ‘ make Mc. No: GCM 4 cap 400 amp. With wire reel and stand Torch, cable etc, with control panel inbuilt (2003)

38. Hyd.Power Press ‘Perfect Engg. ’ make cap 40 ton & 15 ton, with common Power pack Sr. no.9508317. Combined unit inter coneected. (2002)

39. Angle cutting Power Press ‘’ make cap 300 ton. To cut MS Angles 150 mm x 150mm x 20 thick with power pack unit & 7.5 HP make electric motor (2001)

40. Hyd. Power Press cap 300 ton with Power pack & 20 HP Crompton make electric motor. (2001)

41. Hyd. Power Press cap 500 ton with Power pack & 10 HP Crompton make electric motor. (2001)

42. Bore well ‘Lubi’ make Submersible pump cap 12.5 HP, 280 feet deep, housing 200mm dia with necessary fittings (2000)

43. Power Supply system complete.

Sr No DESCRIPTION OF MACHINERY

Page 19: Final power point teckno profile

QUALITY ASSURANCE PLAN FOR STRUCTURE

PARTICULARS CHARACTRISTIC

S CLASSIFIC

ATION QUANTUM

REFERENCE

ACCEP

T NORMS

AGENCY

A] PROCUREMENT      

    

v  STEEL SPECIFICATION MAJOR - AS PER AS PER Q C

 CONFORMATION     SPN. SPN. DEPARTMENT

v  HARDWARE SPECIFICATION MAJOR - AS PER AS PER Q C

  CONFORMATION     SPN. SPN. DEPARTMENT

v  ZINC SPECIFICATION MAJOR - AS PER AS PER Q C

 CONFORMATION     SPN. SPN. DEPARTMENT

v  CHEMICAL SPECIFICATION MAJOR - AS PER AS PER Q C

  CONFORMATION     REQ. REQ. DEPARTMENT

B] INCOMING / STORES          

v  STEELP.O. CONFORMITY MAJOR 1% AS PER AS PER Q C

      P.O. P.O. DEPARTMENT

v  HARDWAREP.O. CONFORMITY MAJOR

1% AS PER AS

PER Q C

      P.O. P.O. DEPARTMENT

v  ZINCP.O. CONFORMITY

MAJOR 1% AS PER AS PER Q C

      P.O. P.O. DEPARTMENT

C] PREPARATION OF SHOP FLOOR DRG.  

D] PROTO ASSEMBLY PROCESS.  

E] PROTO ASSEMBLY INSPECTION.  

F] LOAD TEST OF PROTO MODEL ( IF REQUIRED )  

G] MANUFACTURING PROCESS.  

H] CONFORMITY CHECK WITH PROCESS DRAWING.  

I ] RANDOM INSPECTION BEFORE GALVANIZING.  

J] GALVANIZING PROCESS : DEGREASING/RINSING/ PICKLING/RINSING /PRE-FLUXING/PRE-HEATING/ ZINC COATING/QUENCHING/ DICHROMATING.

K] CONF0RMITY CHECK OF GALVANIZING AS PER THE REQUIREMENT.  L] INSPECTION / TESTING.  M] PACKING/DESPATCH.  DETAILED QAP BEING SUBMITTED SEPARATELY.

  

   

Page 20: Final power point teckno profile

Sr.No.

Component / Operation &

Description of Test

SamplingPlan

Ref. Document &

Acceptance Norm

TestingAgency

Remarks

1.1.1

1.1.1(a)

(b)(c)

RAW MATERIALStructural Steel( Angle Sections, Plates & Bars )Physical PropertiesTest for Ultimate Tensile StrengthTest for Ultimate Tensile StrengthPercentage Elongation Test

One sample for 40 MT or part thereof for each sizeOne sample for 40 MT or part thereof for each sizeOne sample for 40 MT or part thereof for each size

IS : 2062 Grade A / 410 N/mm2 min.IS : 2062 Grade A / < 20 mm thick250 N/mm2 min.20 to 40 mm thick240 N/mm2 min.> 40 mm thick 230 N/mm2 min.IS : 2062 Grade A /23 %

QC Department. /Third Party labQC Department. Third Party labQC Department. /Third Party lab

Steel as per IS : 2062 to be procured from Main ProducersVerification of Manufacturer’s Test Certificate Verification of Manufacturer’s Test Certificate Verification of Manufacturer’s Test Certificate

1.1.2. Chemical Composition

One sample for 40 MT or part thereof for each size

Is : 2062 Grade A/ Carbon 0.23 % max. Manganese 1.5 % max. Sulphur 0.05 % max. Phosphourus .05%.Silicon 0.4% max. Permissible limits of variation in products analysis from limits specified above. Cabon 0.02 % max. Manganese 0.05 % max. Sulphur 0.005 % max. Phophorus 0.005 % max. Silicon 0.05 % max.

ManufactuRers works/ QC Department. / Third party lab.

Verification of Manufacturer’s Test Certificate

SECTION : R MATERIAL INSPECTIONSECTION : RAW MATERIAL INSPECTION

Page 21: Final power point teckno profile

Sr.No.

Component / Operation &

Description of Test

Sampling

Plan

Ref. Document &Acceptance

Norm

Testing

Agency

Remarks

1.1.3.

1.1.4.(a)

1.1.5.

Dimensional checksTolerances for leg length of Angles. Equal anglesUpto 45 mm leg length> 45 to 100 mm leg length> 100 mm leg lengthDiameter Tolerance for Round Bars.

IS 2500, level II, AQL- 1.5 as per Table I enclosedIS 2500 level II AQL 1.5 as per Table I enclosed.IS 2500, level II, AQL- 1.5 as per Table I enclosedIS 2500, level II, AQL- 1.5 as per Table I enclosedIS 2500, level II, AQL- 1.5 as per Table I enclosed

IS 2062, IS 808, IS 1730, IS 1732 + 1.5 mm+ 2.0 mm+ 2.0 mmDifference between leg length of equal angles shall be limited to 75% of total tolerence (plus & minus)IS 2062 Grade A, IS 1732, IS 1852Upto + 0.5 mm25 mm>25 mm + 0.6 mmto 35 mm>35 mm + 0.8 mmto 50 mm> 50 mm + 1.0 mmto 80 mm> 80 mm + 1.3 mmto 100 mm>100 mm + 0.6 %of dia

QC Department. QC Department. QC Department. QC Department. QC Department.

Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.

SECTION : R MATERIAL INSPECTIONSECTION : RAW MATERIAL INSPECTION

Page 22: Final power point teckno profile

Sr.No.

Component / Operation &

Description of Test

SamplingPlan

Ref. Document &Acceptance

Norm

Testing

Agency

Remarks

1.1.6.(a)(b)(c)

1.1.71.2.

1.2.1.1.2.2.

Weight Tolerance-For angle sectionsUpto 3 mm thick More than 3 mm thickWeight Tolerance for PlatesWeight Tolerance for BarsThickness Tolerance for Plates Zinc(To be procured from Hindustan Zinc Ltd. or imported through MMTC or sources approved) Chemical Composition For Zinc IngotChemical Composition for molten Zinc in the bath

One sample for 40 MT/Section or part thereof.One sample for 40 MT/Section or part thereof.One sample for 40 MT/Section or part thereof.IS 2500 level II AQL 1.5 as per Table I enclosed.One sample for 50 MT or part thereof.One sample every fortnightly

IS 2062, IS 808, IS 1730, IS 1852 + 5%+ 5 % & - 3 %Overweight specified in IS 808IS 2062, IS 808, IS 1730, IS 1852,.+5% & -2.5% over weights specified in IS 1730 IS 1732, IS 1852Upto + 7 %10mm> 10 mm + 5 %to 16 mm> 16 mm + 3 %Overweight specified in IS 1730IS 2062 , IS 1730, IS 1852.< 8 mm + 12.5 %, - 5.0 %8 mm to 12 mm+ 7.5 %, - 5.0 %> 12 mm+ 5.0 %IS 209, IS 2629, IS 4699, IS 4759 Zinc required for galvanizing shall be of purity 98.5% as per IS 209.Molten metal in the galvanizing bath shall not contain zinc less than 97% by mass.

QC Department. QC Department. QC Department. QC Department. QC Department. Third party Independ--ent lab.Third party Independ--ent lab.

Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Verification of Manufacturer’s Test Certificate Review of lab test certificate at the time of final inspection.

SECTION : R MATERIAL INSPECTIONSECTION : RAW MATERIAL INSPECTION

Page 23: Final power point teckno profile

Sr.No.

Component / Operation &

Description of Test

SamplingPlan

Ref. Document &Acceptance Norm

TestingAgency

Remarks

1.1.6.(a)(b)(c)

1.1.71.2.

1.2.1.1.2.2.

Weight Tolerance-For angle sectionsUpto 3 mm thick More than 3 mm thickWeight Tolerance for PlatesWeight Tolerance for BarsThickness Tolerance for Plates Zinc(To be procured from Hindustan Zinc Ltd. or imported through MMTC or sources approved) Chemical Composition For Zinc IngotChemical Composition for molten Zinc in the bath

One sample for 40 MT/Section or part thereof.One sample for 40 MT/Section or part thereof.One sample for 40 MT/Section or part thereof.IS 2500 level II AQL 1.5 as per Table I enclosed.One sample for 50 MT or part thereof.One sample every fortnightly

IS 2062, IS 808, IS 1730, IS 1852 + 5%+ 5 % & - 3 %Overweight specified in IS 808IS 2062, IS 808, IS 1730, IS 1852,.+5% & -2.5% over weights specified in IS 1730 IS 1732, IS 1852Upto + 7 %10mm> 10 mm + 5 %to 16 mm> 16 mm + 3 %Overweight specified in IS 1730IS 2062 , IS 1730, IS 1852.< 8 mm + 12.5 %, - 5.0 %8 mm to 12 mm+ 7.5 %, - 5.0 %> 12 mm+ 5.0 %IS 209, IS 2629, IS 4699, IS 4759 Zinc required for galvanizing shall be of purity 98.5% as per IS 209.Molten metal in the galvanizing bath shall not contain zinc less than 97% by mass.

QC Department

. QC

Department. QC

Department. QC

Department. QC

Department.

Third party Independ--ent lab.

Third party Independ--ent lab.

Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Verification of Manufacturer’s Test Certificate Review of lab test certificate at the time of final inspection

SECTION : INPROCESS INSPECTION

Page 24: Final power point teckno profile

Sr.No.

Component / Operation &

Description of Test

SamplingPlan

Ref. Document &Acceptance Norm

TestingAgency Remarks

2.02.1.

2.1.1.2.1.2.2.1.3.2.1.4.2.1.5.

(a)(b)(c)(d)

2.1.6

INPROCESS INSPECTIONFabrication of structure partsStraighteningCropping (Cutting)StampingPunching / DrillingEdge SecurityFor 13.5 mm dia holeFor 17.5 mm dia holeFor 21.5 mm dia holeFor 25 mm dia holeDrilling & Punching HoleTo Hole distance.

100 %1st piece & every 50th piece.1st piece & every 50th piece.1st piece & every 50th piece.1st piece & every 50th piece.1st piece & every 50th piece.

IS 802 Part II, IS 7215,shop sketches. - Length tolerance + 2 mm. The cut surface to be clean, reasonably square & free from distoration.Letter size Punching to be done for thickness upto 12 mm & drilling to be done for thickness above 12 mm. Holes near bends to bePunched/drilled after bending. Holes should be prependicular to surface &difference in dia on both sides of flange should not be more than 0.8 mm.IS 802 Part – II /Power Grid Specs.Sheared 20mm minRolled 16 mm min.Sheared 23mm minRolled 20 mm min.Sheared 28mm minRolled 25 mm min.Sheared 38mm minRolled 33 mm min.Tolerence cumula-tive & between consecutive holes shall be with +2 mm & +2 mm, respectively.

QC Departm

ent QC

DepartmentQC

Department. QC

Department.

QC Departm

ent. QC

Department.

Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.

SECTION : INPROCESS INSPECTION

Page 25: Final power point teckno profile

Sr.No.

Component / Operation &

Description of Test

SamplingPlan

Ref. Document &

Acceptance Norm

TestingAgency

Remarks

2.1.7.2.1.8.2.1.9.

(a)(b)

2.1.10

(a)(b)(c)

2.1.11

Notching, Flange cut, Corner Cut , Bevel Cut.Heel GrindingBendingMS SectionsMS PlatesWeldingWelding procedure including type of electrode usedWelders’ qualificationVisual ExaminationFinal inspection of Fabricated parts.

1st piece & every 50th piece.1st piece & every 50th piece.10 % pieces10 % pieces10 % pieces - -100 % Random basis

+ 5 mm on specified length of cut operation by shearing upto 8mm thick & by gas cutting for material above 8 mm.For members >12mm thick,gas cutting to be adopted followed by gridingIS 802 Part – II,IS 7215, shop sketches ProcessColdColdHotHotColdHotAs per specificationAs per specificationAs per specificationAll parameters from 2.1.1. to 2.1.10 above are checked &records maintained beforereleasing materials for galvanizing.

QC Department QC Department QC Department Section upto 75x6 upto 100x8above 75x6above100x8upto 12 mm thick othersQC Department QC Department QC DepartmentQC Department

Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.AngleUpto 10o

Upto 5o

Above 10o

Above 5o Upto 15o .Records review at the time of final inspection. CIP on random basis at black stage.Records review at the time of final inspection.

SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION

Page 26: Final power point teckno profile

Sr.No.

Component / Operation &

Description of Test

SamplingPlan

Ref. Document &

Acceptance Norm

TestingAgency

Remarks

3.04.0.4.1.

4.1.1.

4.1.1.

(a)(b)

4.1.2.

4.1.3.

4.2.4.2.1

.

Prototype (Model ) Assembly as per requirements of CustomerGalvanizingProcess ControlDegreasing in Hydrochloric Acid solution.Pickling Inhibitor to be added to prevent over pickling.Acid contentIron contentRinsingPre HeatingDipping ( Galvanizing )Zinc bath temperature continuous monitory

One structure of each type.One sample dailyOne sample daily.One sample daily.One sample daily. -Hourly checks

To be assembled & checked for dimension angle size to verify Interchangability of members etc.IS 2629, plant standards. Strength of solution between 4 to 12%.IS 2629, plant standards. 40-180 gms/litre. IS 2629, plant standards. 120 gms/litre max.IS 2629, plant standards. PH value shall be between 5 & 9.IS 2629, plant standards. 700 C to 1100 CIS 2629, plant standards. 445 to 465o C.

QC Department QC Department QC Department QC Department QC Department QC Department QC Department

Records review at the time of final inspection.Records review at the time of final inspection. Records review at the time of final inspection.Records review at the time of final inspection. -Records review at the time of final inspection.

SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION

Page 27: Final power point teckno profile

Sr.No.

Component / Operation &

Description of Test

SamplingPlan

Ref. Document &Acceptance Norm

TestingAgency

Remarks

4.2.2.

4.2.3.

4.2.4.

4.3.4.3.1

.4.3.2

.

Immersion time & withdrawal time.Quenching in Running WaterDichromating For ExportsGalvanizing ChecksVisual ChecksThickness of zinc coating (i) For Angle Sections & Plates.

--

One sample daily.100 % 3 samples /shift

IS 2629, plant standards. Articales to be immersed till the reaction takes place which is indicated by stoppage of bubbling. Withdrawal to be controlled so that zinc drains freely.

-IS 2629, plant standards. Standard strength of solution to be maintained at 1% of Sodium Dichromate & 0.5% of Sulphuric Acid.IS 2629, IS 1367, IS 4218, Surface to be free from defects like bare/black spots, (except when small & suitable for patching) heavy ash & flux inclusions, lumps, pimples, runs etc. For foundation bolts visualExamination shall be carried out by thread guage. Galvanized external threads shall not be recut. IS 2629, IS 4759, Min. 65 microns for thickness < 5 mm & Min. 86 microns for thickness > 5 mm.

QC Department

-QC Department QC Department QC Department

Records review at the time of final inspection.

-Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.

SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION

Page 28: Final power point teckno profile

Sr.No.

Component / Operation &

Description of Test

SamplingPlan

Ref. Document &Acceptance Norm

TestingAgency Remarks

4.3.3.4.3.4.4.3.5.

Weight of zinc coating for Angle sections, Plates & Anchor Bolts.Uniformity of zinc coatingAdhesion test of zinc coating (Pivot Hammer Test)

samples /shiftsamples /shift3 samples /shift

IS 2629, IS 4759, IS 6745, IS 2629, IS 2633, Material to withstand 4 dips of one minute each without showing signs of copper depositsIS 2629, IS 2633, No removal or lifting of coating in areas between hammer impressions.

QC Department QC Department QC Department

Records review at the time of final inspection.Records review at the time of final inspection.Records review at the time of final inspection.

SECTION : RAW MATERIAL INSPECTIONSECTION : INPROCESS INSPECTION

Note: In the event of Export orders the respective codes will get replace with BS Standards.

Page 29: Final power point teckno profile

GALVANISING PLANT AND PROCESS

[A] GALVANISING SHOP:1. Degreasing Tank2. Rinsing Tank.3. Pickling Tank4. Pre-Fluxing Tank5. Washing Tank6. Hot Plate System7. Zinc Baths 8. Quenching Tank9. Dichromating Tank

[B] HOT DIP GALVANISING PROCESS : 1.Degreasing

2. Pickling3.Rinsing4.Pre-Fluxing5.Pre-Heating6.Dipping in molten ZINC7.Quenching8.Dichromating

Page 30: Final power point teckno profile

A LIST OF IN - HOUSE TESTING FACILITY

1.0.DIMENSIONAL CHECKING OF PHYSICAL PROPERTIES : Vernier,

Micrometer, Gauge etc.

2.0.GALVANISATION TEST FACILITY

2.1.STRIPPING TEST: For Zinc Coating Thickness as

per the procedure IS – 4759

AND IS – 6745.

2.2.UNIFORMITY OF ZINC COATING TEST: As per the

procedure of IS-2633

2.3.ADHESION TEST: As per the procedure of IS-2629

If Purchase desire, third Party Test Report, M/S. E. R. D. A. and M/S. MET HEAT ENGINEERS approved and Standard Laboratories located very near to our workshop.

• Physical & Chemical properties are checked at third party Laboratory.

Page 31: Final power point teckno profile

OUR INDIAN SATISFIED CUSTOMERS :

Page 32: Final power point teckno profile

OUR ABROAD SATISFIED CUSTOMERS

Page 33: Final power point teckno profile

A LIST OF ABROAD CUSTOMERS :1. MINISTRY OF ELECTRICITY & WATER, (DUBAI)

2. STRUTHERS WELLS CORPORATION WARREN PENNA

(U.S.A.)

3. DULMISON (AUSTRALIA)

4. GENERAL ELECTRONICS & TRADING CO. (OMAN)

5. ABB (U S S R)

6. GHANA ELECTRICITY CO. (GHANA)

7. GOLDEN INTERNATIONAL EST. L.L.C.

8. ALSTOM EXPORT (FRANCE)

9. SEA HAWK CARGO CARRIERS PVT. LTD., (JAPAN)

10.EC EOTECNIA (SPAIN)

11.BONUS (DENMARK)

12.SUDWIND (GERMENY)

13.VESTAS (DENMARK)

14.AL – HASSAN TRADING & CONTRACTING CO. L.L.C.

(OMAN)

15.AL – HASSAN ELECTRICAL CO. L.L.C. (OMAN)

16.BLUE STAR ENTERPRISES L.L.C.

17.MASHIRA ELECTRICALS (U.A.E.)

18.MAM INT’L GENERAL TRADING (U.A.E.)

19.NICO INTERNATIONAL FUJAIRAH

  

Page 34: Final power point teckno profile

A LIST OF ABROAD CUSTOMERS :

  20.CEYLON AMBUJA CEMENTS (SRILANKA)

21.SCIENTECHNIC (U.A.E.)

22.SCAN ELECTROMECHANICAL CONT. CO. L.L.C.

23.SKYLIGHT ELECTRIC WARE TRADING LLC

24.AL-HASSAN ENGINEERING CO. S.A.O.G. [OMAN].

25.CIVIL CONTRACTING CO. LLC [OMAN].

26.LARSEN & TOUBRO ELECTROMECH LLC [OMAN].

27.GALFAR ENGINEERING & CONTRACTING L .L. C.

28.LARSEN & TOUBRO [OMAN] L.L.C.

29.SHEIDA INTERNATIONAL LLC [OMAN].

30.AL FALAHY COMPANY LLC.

31.ARABIAN INDUSTRIES LLC.

32.GLOBAL CORP ENTERPRISE LLC.

33.POWERTECH ENGINEERING LLC.

34.SAUDI NATIONAL CONTRACTING CO. LTD.

Page 35: Final power point teckno profile

A LIST OF ORDERS SUCCESSFULLY EXECUTED FOR EXPORTS

SRNO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

1. MAM INT’L GENERAL TRADING U.A.E.)

112DT. : 25.07.98

32,800=00 CROSSARM & OVERHEAD LINE MATERIAL

2. MAM INT’L GENERAL TRADING (U.A.E.)

114DT. : 05.12.98

1,320=00 CROSSARM & OVERHEAD LINE MATERIAL

3. MAM INT’L GENERAL TRADING (U.A.E.)

115DT. : 15.12.98

9,174=00 CROSSARM & OVERHEAD LINE MATERIAL

4. GENERAL ELECTRONICS (OMAN)

GET/98079/BMEDT. : 08.12.98

39,455=32 33 KV SUB STATION STRUCTURE

5. GENERAL ELECTRONICS(OMAN)

GET/99009/BMEDT. : 20.02.98

10,200=00 33 KV SUB STATION STRUCTURE

6. GENERAL ELECTRONICS(OMAN)

GET/99012/BMEDT. : 01.03.99

14,560=00 33 KV SUB STATION STRUCTURE

7. GENERAL ELECTRONICS(OMAN)

GET/99013/BMEDT. : 04.03.99

1,945=00 33 KV SUB STATION STRUCTURE

8. A.B.B. LIMITED (OMAN)

BL/43170DT. : 03.07.98

16,000=00 132 KV SUBSTATION STRUCTURE

9. CROMPTON LIMITED (OMAN)

13495DT. : 04.06.99

1,40,624=00 132 KV SUBSTATION STRUCTURE

10. CROMPTON LIMITED (OMAN)

13499DT. : 04.06.99

30,450=00 132 KV SUBSTATION STRUCTURE

11 AL – HASSAN TRADING (OMAN)

AHC/B 123/PO-21DT. : 08.12.99

20,839=00 33 KV SUBSTATION STRUCTURE

12 AL – HASSAN TRADING(OMAN)

AHC/B 124/PO-20DT. : 08.12.99

17,830=00 33 KV SUBSTATION STRUCTURE

13. MAM INT’L GENERAL TRADING (U.A.E.)

1008DT. : 06.12.99

5,596=00 GANTRY STRUCTURE

14. AL – HASSAN TRADING (OMAN)

AHC/B 124/PO-27DT. : 20.01.2000

2,11,000=00 132 KV SUBSTATION STRUCTURE

15. AL – HASSAN TRADING (OMAN)

AHC/B 123/PO-25DT. : 19.12.2000

4,250=00 SWITCHYARD STRUCTURE

16. AL– HASSAN ELECTRICAL (OMAN)

786/LC 3369/AHE/98DT. : 07.03.2000

39,072=05 33 KV SUBSTATION STRUCTURE

17. MASHIRA ELECTRICAL(U.A.E.)

METCO/SKS/6269-B/00

DT. : 19.04.2000

14,799=15 CROSSARM & OVERHEAD LINE MATERIAL

18. MASHIRA ELECTRICAL(U.A.E.)

ME/BMEI/246DT. : 08.06.2000

20,833=00 11/ 33 KV SUBSTATION STRUCTURE

Page 36: Final power point teckno profile

SRNO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

19. MASHIRA ELECTRICAL (U.A.E.)

ME/BMEI/290DT. : 30.08.2000

16,843=00

11/ 33 KV SUBSTATION STRUCTURE

20. AL– HASSAN ELECTRICAL (OMAN)

AHE/RKH/OC – 011DT. : 18.09.2000

64,943=00

HARDWARE

21. AL – HASSAN ELECTRICAL

786/LC 3432/AHE/00

DT. : 05.10.2000

62,594=00

TANSMISSION LINE TOWER & PARTS 

22. Al– HASSAN ELECTRICAL(OMAN)

434DT. : 10.10.2000

30,165=00

33 KV SUBSTATION STRUCTURE

23. Al– HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO – 017

DT. : 31.10.2000

3,32,940=00

132/33/11 KV SUB STATION STRUCTURE

24. AL – HASSAN ENGINEERING CO. S.A.O.G.

786/CAD-1588/AHE/00

DT. : 11.11.2000

15,048=50

33 KV SUBSTATION STRUCTURE

25. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHC 117198DT. 21.12.2000

1,620=00 FOUNDATION BOLT

26. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/MUK/B127/PO-04/01

DT. : 25.02.2001

29,173=00

FOUNDATION BOLT / HARDWARE

27. AL – HASSAN ENGINEERING CO. S.A.O.G.

786/CAD-1624/AHE/01

DT. : 26.03.2001

857=50 SUPPORT CHANNEL

28. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO-062

DT. : 04.07.2001

12,982=00

SUPPORT STRUCTURE DULY GALVANISED

29. MASHIRA ELECTRICAL(U.A.E.)

METCO/ES/6347/01DT. : 10.07.2001

1,942=50 FIXING PLATE

30. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO-062

DT. : 15.07.2001

26,723=00

SUPPORT STRUCTURE DULY GALVANISED

31. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO-065

DT. : 30.07.2001

1,57,500=00

SUBSTATION GANTRY & EQUIPMENT SUPPORT STRUCTURE FOR 132 KV S/S.

32. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO-085

DT. : 15.09.2001

1,354=00 FOUNDATION BOLT & GI COVER FOR CABLE TRAY FOR 33 KV S/S.

33. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO-091

DT. : 23.10.2001

22,500=00

SUBSTATION GANTRY & EQUIPMENT SUPPORT STRUCTURE FOR 33 KV S/S.

34. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO-092

DT. : 27.10.2001

20,796=00

MS CABLE TRAYS.

Page 37: Final power point teckno profile

SRNO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

35. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO-095DT. : 08.11.2001

30,235=00 MS CABLE TRAYS DULY GALVANIZED

36. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO-106DT. : 22.12.2001

13,762=00 MS CABLE TRAYS DULY GALVANIZED

37. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO-091 (AMMENDMENT)DT. : 23.01.2002

10,465=00 SUBSTATION GANTRY & EQUIPMENT SUPPORT STRUCTURE FOR 33 KV S/S.

38. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B126/PO-26 DT. : 26.01.2002

4,420=00 SUBSTATION GANTRY & EQUIPMENT SUPPORT STRUCTURE FOR 33 KV S/S.

39. BIAX METALS [U.K.] BM/JL/2083/01-02DT. 26.09.01

15,000=00 FIDDER PILLARS

40. BIAX METALS [U.K.] BM/TL/155/02-03DT. 27.07.02

40,000=00 FIDDER PILLARS

41. BIAX METALS [U.K.] BM/TL/280/03-04DT. 02.05.03

10,000=00 FIDDER PILLARS

42. AMBUJA CEMENTS (SRILANKA)

CACPL/KALINA/FJA/0301/6765 DT. 16.04.03

22,958=00

SUPPLY OF SPARES FOR CEMENT STORAGE & BAGGING FACILITY AT , - SRILANKA

43. SCIENTCHNIC [U.A.E.]

OBD 83/02 42,000=00 CROSSARMS

44. SCIENTCHNIC [U.A.E.]

OBD 77/02 5,607=00 CROSSARMS

45.SCAN ELECTROMECHANICAL CONT. CO. L.L.C

1894DTD: 19.12.2004

30,500=00 GI STRUCUTE FOR TRANSMISSON

46.

MOHAN EXPORTS [INDIA] PVT. LTD [ELECTRICITY CO. OF GANA]

PD/GH/14DTD: 27.11.2004 4,54,863=00 CROSSARMS

47.AL – HASSAN ENGINEERING CO. S.A.O.G

AHEC/BSM/B168/PO-35 DTD: 24.04.2005

1,36,500=00 220KV OVERHEAD LINE STRUCTURES

48. AL-HASSAN ENGG. CO. S.A.O.G.

AHEC/BSM/B171/PO-0023 DTD:16.05.2005

28,887=50 132 KV OVERHEAD LINE STRUCTURES

49.AL-HASSAN ENGG. CO. S.A.O.G.

AHEC/BSM/B179/PO-0011 DTD:08.01.2006

7,25,500=00132 KV OVERHEAD LINE STRUCTURES

Page 38: Final power point teckno profile

SRNO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

50. CIVIL CONTRACTING CO. LLC [OMAN]

C-031/0708/CIV-BME/L/001/06 DTD: 12.08.06

40,750=00 132 KV OVERHEAD LINE STRUCTURES

51.LARSEN & TOUBRO ELECTROMECH LLC, [OMAN]

335/ 2110 / KM / RBM DTD: 16.07.06

2,00,000=00 SUBSTATON STRUCTURES

52. LARSEN & TOUBRO [OMAN] LLC

LTO/PTD/193/SSSRM/PO/019DTD:25.12.06

16,800=00132/33 KV OVERHEAD LINE STRUCTURES

53.

GALFAR ENGINEERING & CONTRACTIONG LLC [OMAN]

010077DTD: 13.12.06

4,92,551=43CROSSARM & OVERHEAD LINE MATERIAL

54.GALFAR ENGINEERING & CONTRACTIONG LLC

010139DTD: 06.01.07

44,353=74 STAY ANCHOR

55.SHEIDA INTERNATIONAL CO. LLC [OMAN]

SI/PO-BME/07DTD:21.03.07

36,249=50CROSSARM & OVERHEAD LINE MATERIAL

56.GALFAR ENGINEERING & CONTRACTIONG LLC

010634DTD: 18.04.07

1,02,000=00 132 KV SUBSTATON STRUCTURES

57.SHEIDA INTERNATIONAL CO. LLC [OMAN]

SI/PO-BME/17DTD:30.05.07 1,72,227=00

CROSSARM & OVERHEAD LINE MATERIAL

58. LARSEN & TOUBRO [OMAN] LLC,

LTO/PTD/204-A /PO/014 DTD:25.04.07

42,500=00132/33 KV OUTDOOR SWITCHYARD STRUCTURES

59. CIVIL CONTRACTING CO. LLC [OMAN]

PDO CONTRACT C310708DTD: 14.07.07

8,601=00 132 KV SUBSTATON STRUCTURES

60.LARSEN & TOUBRO [OMAN] LLC,

LTO/PTD/203/OMIFCO/PO/042-A-1DTD:21.08.07

82,950=00132 KV SUBSTATON STRUCTURES

61 GLOBAL CORP LLC [OMAN]

GEC/OR/09-03/PTE/BM DTD. 19.09.2009

7772.00 POLE BAND

62 GLOBAL CORP LLC [OMAN]

GCE/OR/10-43/BM DTD. 31.10.2009

16719.50 CROSS ARMS

63POWERTECH ENGINEERING LLC [OMAN]

PTE/TECKNO/FO/059/2009/12 DTD. 10.12.2009

470000.00 HARDWARE / FASTENERS

64GLOBAL CORP LLC [OMAN]

GCE/OR/10-41/TECKNO/AL TURKI DTD. 28.01.2009

4531.20CROSS ARMS & ACCESSORIES

Page 39: Final power point teckno profile

SRNO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

65 GLOBAL CORP LLC [OMAN]

GEC/OR/10-48/TECKNO/AL DTD. 06.02.2010

6512.00 POLE BAND

66GLOBAL CORP LLC [OMAN]

GCE/OR/10-49A/TECKNO/IECC DTD. 20.02.2010

14423.68CROSS ARMS & ACCESSORIES

67 GLOBAL CORP LLC [OMAN]

GCE/OR/10-158/TECKNO/IECC REV 1 DTD. 20.05.2010

52714.97 CONCRETE POLE ACCESSORIES

68AL HASSAN ENGINEERING CO S.A.O.G [OMAN]

AHEC/PROC/B195/PO-44 DTD. 24.05.2010

62000.00 SUPPLY OF GANTRIES

69 GLOBAL CORP LLC [OMAN]

GCE/OR/10-169/TECKNO/AL TURKI DTD. 27.05.2010

6836.70 CROSS ARMS & CHANNEL

70GLOBAL CORP LLC [OMAN]

GCE/OR/10-185/TK/IECC DTD. 26.06.2010

18773.66 OHLACCESSORIES

71GLOBAL CORP LLC [OMAN]

GCE/OR/10-186/TK/IECC DTD. 26.06.2010

4968.98 OHL ACCESSORIES

72GLOBAL CORP LLC [OMAN]

GCE/OR/10-205/TECKNO/AL TURKI DTD. 18.07.2010

23317.00CROSS ARMS, POLE BAND & OTHER ACCESSORIES

73GLOBAL CORP LLC [OMAN]

GCE/OR/10-211/TECKNO/IECC DTD. 25.07.2010

4794.77 OHL ACCESSORIES

74GLOBAL CORP LLC [OMAN]

GCE/OR/10-218/TK/WAPI-Rev 1 DTD. 31.07.2010

75872.50 OHL ACCESSORIES

75GLOBAL CORP LLC [OMAN]

GCE/OR/10-219/Teckno/IECC DTD. 01.08.2010

87947.24 OHL ACCESSORIES

76 GLOBAL CORP LLC [OMAN]

GCE/OR/10-237/Teckno/LNT DTD. 21.08.2010

7019.80 OHL ACCESSORIES

77

GALFAR ENGINEERING & CONTRACTING SAOG [OMAN]

VP/MMU/3888/10 DTD. 15.09.2010

7150.00SUPPLY OF SUPPORTING STEEL STRUCTURE

Page 40: Final power point teckno profile

SRNO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

78NATIONAL CONTRACTING CO. LTD

NCC/OMAN/OETC/329/2010/PO/10 DTD. 05.10.2010

17,964.00132KV GANTRY & CABLE SEALING END STRUCTURE

79 GLOBAL CORP LLC [OMAN]

GCE/OR/10-283/TK DTD. 24.10.2010

87,86.00 OHL ACCESSORIES

80 GLOBAL CORP LLC [OMAN]

GCE/OR/10-303/TK/ DTD. 13.11.2010

95,877.73OHL ACCESSORIES

81 GLOBAL CORP LLC [OMAN]

GCE/OR/10-304/TK/IECC DTD. 23.11.2010

2,885.34 OHL ACCESSORIES

82AL HASSAN ENGINEERING CO. S.A.O.G [OMAN]

AHEC/PROC/B198/PO11 DTD. 14.12.2010

74,000.00GANTRIES & EQUIPMENT STRUCTURE

83 LARSEN & TOUBRO (OMAN) LLC

002830/EPR00072 DTD. 14.12.2010

2,24,246.20 OHLHARDWARE ACCESSORIES

84 GLOBAL CORP LLC [OMAN]

GCE/OR/10-330/TK/PTE DTD. 20.12.2010

1,220.00 OHL ACCESSORIES

85POWERTECH ENGINEERING LLC [OMAN]

PTE/TECKNO/FO/089/2010/01-REV-1 DTD. 29.12.2010

67,581.38 CROSS ARMS & ACCESSORIES

86GLOBAL CORP LLC [OMAN]

GCE/OR/10-330/TK/PTE DTD. 20.12.2010

1,220.00 OHL ACCESSORIES

87 LARSEN & TOUBRO [OMAN] LLC

002830/EPR00082 DTD. 01.01.2011

3,078.27 TIE STRUCTURES

88GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/11-001/TK/PTE DTD. 02.01.2011

1,876.80 ANGLES & PLATES

89 LARSEN & TOUBRO [OMAN] LLC

002830/EPR00083 DTD. 02.01.2011

3,85,626.03 CROSS ARMS

90GLOBAL CORP LLC [OMAN]

GCE/OR/11-009/TK/Stk-REV2 DTD. 05.01.2011

41,522.07 ANGLES & PLATES

Page 41: Final power point teckno profile

SR. NO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

91 GLOBAL CORP LLC [OMAN]

GCE/OR/11-041/TK DTD. 02.02.2011

4,050.00 GRID GAIN

92 GLOBAL CORP LLC [OMAN]

GCE/OR/11-044/TK DTD. 08.02.2011

47,500.00 33KV SAND ROCK ANCHOR.

93

GALFAR ENGINEERING & CONTRACTING SAOG [OMAN]

4409295 DTD. 14.02.2011

7,150.00 SUPPORTING STRUCTURES

94

GALFAR ENGINEERING & CONTRACTING SAOG

4409294 DTD. 14.02.2011

17,400.00 SUPPORTING STRUCTURES

95 GLOBAL CORP LLC [OMAN]

GCE/OR/11-059/TK/L&T-Rev 1 DTD. 16.02.2011

28,784.63 HARDWARE

96 GLOBAL CORP LLC [OMAN]

GCE/OR/11-060/TK /UEP DTD. 20.02.2011

7,236.00 SUPPORTING STRUCTURES

97NATIONAL CONTRACTING CO. LTD [OMAN]

NCC/OMAN/OETC/329/2010/PO/10/02 DTD. 05.03.2011

30,858.00GANTRY & CABLE SEALING END STRUCTURE

98 GLOBAL CORP LLC [OMAN]

GCE/OR/11-041/TK-Rev 1DTD. 09.03.2011

6,250.00 GRID GAIN

99GLOBAL CORP LLC [OMAN]

GCE/OR/11-084/TK DTD. 12.03.2011 2,472.08 CROSS ARMS

100 GLOBAL CORP LLC [OMAN]

GCE/OR/11-097/TK DTD. 27.03.2011

38,516.37 OHL ACCESSORIES

101AL FALAHY COMPANY LLC [OMAN]

3414 DTD. 28.03.2011

53,000.00 33KV

102GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/11-102/TK/PTE DTD. 29.03.2011

12,047.75EQUIPMENT & SUPPORT STRUCTURES

103POWERTECH ENGINEERING LLC [OMAN]

PTE/096/PDO/LOI/2011 DTD. 25.04.2011

51,762.50GANTRY & SWITCHYARD STRUCTURE

Page 42: Final power point teckno profile

SR. NO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

103POWERTECH ENGINEERING LLC [OMAN]

PTE/096/PDO/LOI/2011 DTD. 25.04.2011

51,762.50GANTRY & SWITCHYARD STRUCTURE

104POWERTECH ENGINEERING LLC [OMAN]

1100001605 DTD. 12.05.2011 36,400.00 POLE BANDS

105GLOBAL CORP LLC [OMAN]]

GCE/OR/11-040/TK/CIVILCO-REV2 DTD. 26.05.2011

2,60,913.30GANTRY & EQUIPMENT STRUCTURES

106GLOBAL CORP LLC [OMAN]

GCE/OR/11-165/TK/Stk DTD. 28.05.2011

15,000.00 EARTH PIT

107GLOBAL CORP LLC [OMAN]

GCE/OR/11-178/TK/Stk DTD. 15.06.2011

49,194.01CONCRETE POLE ACCESSORIES

108GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/11-189/TK/STK DTD. 29.06.2011

1,474.00 POLE BAND

109SAUDI NATIONAL CONTRACTING COMPANY LLC

NCC/OMAN/OETC/85/2010/PO/16 DTD. 05.07.2011

8,26,20.00

GANTRY & EQUIPMENT SUBSTATION STRUCTURE

110SAUDI NATIONAL CONTRACTING COMPANY LLC

NCC/OMAN/OETC/74/2010/PO/035 DTD. 12.07.2011

1,44,112.50

GANTRY & EQUIPMENT SUBSTATION STRUCTURE

111GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/11-207/TK/PDO DTD. 16.08.2011

78,692.80CROSS ARMS & SAND ANCHORS

112AL HASSAN ENGINEERING CO S.A.O.G [OMAN]

AHEC/PROC/B200/2011/OPR-2973 DTD. 22.10.2011

17,615.00SUPPLY OF 132KV GI SUPPORT STRUCTURE

113GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/11-269/Teckno/Galfar DTD. 01.11.2011

41,200.00SUPPLY OF COWSLIP CONDUCTOR

114GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/11-304/TK DTD. 22.12.2011

22,215.00 SUPPLY OF CROSS ARM

115GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12/016/TK DTD. 12.01.2012

9,200.00 SUPPLY OF GI SIGN BOARD

Page 43: Final power point teckno profile

SR. NO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

116GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-022/TK DTD. 14.01.2012 5445.94

SUPPLY OF CROSS ARM & SWITCHRACK

117GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-021/TK DTD. 14.01.2012 23764.95

SUPPLY OF GI STEEL STRUCTURE

118GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-034/TK DTD. 29.01.2012 53674.80

SUPPLY OF CONCRETE POLE ACCESSORIES

119POWERTECH ENGINEERING LLC [OMAN]

PTE/117/TECKNO/PO/2011/16 DTD. 18.02.2012

42,567.00SUPPLY OF HARDWARE

120GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-049/Teckno DTD. 15.02.2012

95,850.00METAL HOUSING EARTH PIT WITH COVER

121 LARSEN & TOUBRO [OMAN] LLC

003020/EPR00406 DTD. 15.02.2012

8236.05SUPPLY OF EQUIPMENT STRUCTURE

123 LARSEN & TOUBRO [OMAN] LLC

003020/EPR00407 DTD. 15.02.2012

5994.00SUPPLY OF EQUIPMENT STRUCTURE

124BLUE STAR ENTERPRISES LLC [OMAN]

20122 DTD. 21.02.2012 50,560.00

SUPPLY OF STRUCTURE

125GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-067/TK DTD. 27.02.2012 58,252.00

SUPPLY OF CONCRETE POLE ACCESSORIES

126GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-077/TK DTD. 03.03.2012

18,798.50 SUPPLY OF CONCRETE POLE

127GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-099/TK DTD. 17.03.2012 2,030.50

SUPPLY OF CONCRETE POLE ACCESSORIES

128GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-121/TK DTD. 26.03.2012 8,320.50

SUPPLY OF CONCRETE POLE ACCESSORIES & COVER PLATE

129GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-134/TK DTD. 14.04.2011

29,820.00METAL HOUSING EARTH PIT WITH COVER

Page 44: Final power point teckno profile

SR. NO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

130GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-140/TK DTD. 19.04.2012 146850.21

SUPPLY OF CONCRETE POLE ACCESSORIES

131GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-149/TK DTD. 24.03.2012 11,031.00

CONCRETE POLE ACCESSORIES & COVER PLATE

132GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-150/TK DTD. 24.04.2012 7,891.65

SUPPLY OF 11/33KV STRUCTURES

133POWERTECH ENGINEERING LLC [OMAN]

PTE/TECKNO/FO/117/2012/21 DTD. 30.04.2012

1,62,000.00SUPPLY OF 132KV GANTRY & SUPPORT STRUCTURE

134GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-159/TK/STK DTD. 03.05.2012

16,400.00SUPPLY OF TINNED COPPER TUBE

135GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-183/TK/STK DTD. 15.05.2012

21,837.00SUPPLY OF CONCRETE POLE ACCESSORIES

136GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-186/TK DTD. 19.05.2012

960.00 SUPPLY OF CROSS ARMS

137GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-201 DTD. 29.05.2012 18,983.64

SUPPLY OF CONCRETE POLE ACCESSORIES

138GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-204/TK DTD. 02.06.2012 19,390.00

SUPPLY OF SUPPORT STRUCTURE

139GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-205/TK DTD 03.06.2012

42,094.70SUPPLY OF CONCRETE POLE ACCESSORIES

140GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-217/TK /Galfar DTD. 06.06.2012

99,919.45SUPPLY OF CONCRETE POLE ACCESSORIES

141GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE//OR/12-256/TK/STK DTD. 30.06.12

88,347.5 SUPPLY OF CROSS ARMS

142GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-267/TK DTD. 07.07.2012

19,390.00 POLE TOP COVER PLATE

Page 45: Final power point teckno profile

SR. NO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

143GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR12-289/TK/PDO/REV1 DTD. 25.07.2012

8,070.00SUPPLY OF CROSS ARMS

144GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-295/TK DTD. 29.07.2012 1,05,120.00

AAC HAWTHORN CONDUCTOR

145GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-296/TK DTD. 29.07.2012 8,600.00

AAC HAWTHORN CONDUCTOR

146GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-319/TK DTD. 08.08.2012 3,646.20.

SUPPLY OF GANTRY & SUPPORT STRUCTURES

147GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-322/TK DTD. 08.08.2012 16,868.00 DISTANCE PLATE

148GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-337/TK DTD. 12.08.2012

33,485.00SUPPLY OF COVER PLATE & DISTANCE PLATE

149GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-349/TK dtd. 28.08.2012

16,050.00SUPPLY OF SINGLE LINK & VERNIER PLATE

150GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12/359/TK/PTE Dtd. 05.09.2012

44,562.32SUPPLY OF CONCRETE POLE ACCESSORIES

151GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-398/TK/ GCM DTD. 29.09.2012

22,865.1811/33KV GANTRY & SUPPORT STRUCTURES

152GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-408/TK dtd. 04.10.2012

9,295.00 SUPPLY OF STEEL PLATE

153GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-430/TK DTD. 15.10.2012 2,83,390.97

SUPPLY OF CONCRETE POLE & ACCESSORIES

154GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-445/TK DTD. 22.10.2012

58459.45SUPPLY OF CONCRETE POLE & ACCESSORIES

155GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-446/TK DTD. 22.10.2012

75,000.00SUPPLY OF CONCRETE POLE ACCESSORIES

Page 46: Final power point teckno profile

SR. NO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

156POWERTECH ENGINEERING LLC [OMAN]

1100007542 & 1100007587 DTD. 13.11.2012

30,217.00

SUPPLY OF GANTRY & EQUIPMENT SUPPORT STRUCTURES

157GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-460/TK – REV1 DTD 04.11.2012

58,397.67SUPPLY OF CONCRETE POLE ACCESSORIES

158GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-464 DTD. 06.11.2012 28,350.00

SUPPLY OF METAL HOUSING EARTH PIT WITH COVER

159GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-466/TK DTD. 06.11.2012 895.41

SUPPLY OF ANGLE STEEL

160GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-479/TK DTD. 12.11.2012 26431.20

SUPPLY OF ANGLE & CLAMP OF CABLE STANDOFF BRACKET

161GLOBAL CORP ENTERPRISE LLC [OMAN]

GEC/OR/12-494/TK/OXY-REV2 DTD. 24.11.2012

17,289.78 33KV SUPPORT STRUCTURE

162GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-498/TK/MHEW/Stk DTD. 25.11.2012

39,283.00 SUPPLY OF CROSS ARMS

163GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-506/TK-Rev1 DTD. 27.11.2012

4,990.00SUPPLY OF ANGLE & CLAMP OF CABLE STANDOFF BRACKET

164GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-536/TK DTD. 11.12.2012 58397.67

SUPPLY OF CONCRETE POLE & ACCESSORIES

165GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-477/TK-REV-3 DTD. 11.12.2012

65,503.00

SUPPLY OF GANTRY & EQUIPMENT SUPPORT STRUCTURE

166GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-544/TK DTD. 12.12.2012 23,500.00

CLAMP OF CABLE STAND OF BRACKET

167GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-552/TK/Ray DTD. 17.12.2012

1,12,392.51 SUPPLY OF WOODEN POLE ACCESSORIES

168GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-551/TK/Ray DTD. 17.12.2012

19,405.70 SUPPLY OF POLE BAND & GRID GAIN

Page 47: Final power point teckno profile

SR. NO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

169GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-555/TK/Stk DTD. 18.12.2012

65,085.80SUPPLY OF CONCRETE POLE & ACCESSORIES

170GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-560/TK/L&T DTD. 18.12.2013

4,192.44 132KV STRUCTURES

171GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-568/TK DTD.22.12.2012 8,500.00

SUPPLY OF VERNIER PLATE

172GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-038/TK DTD. 04.01.2013 21,440.00

SUPPLY OF 33KV STEEL TOWER

173GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-027/TK DTD. 08.01.2013 16,962.82

SUPPLY OF UNIVERSAL CROSS ARMS

174GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-041/TK/RAY DTD. 15.01.2013

6,849.78 SUPPLY OF CROSS ARMS

175GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-065/TK DTD. 30.01.2013

235.00CLAM OF CABLESTAND OFF BRACKET

176GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-069/TK DTD. 03.02.2013 72,679.06

SUPPLY OF CONCRETE POLE & ACCESSORIES

177GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-092/TK DTD. 16.02.2013 85,437.30

SUPPLY OF CONCRETE POLE & ACCESSORIES

178GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-127/TK DTD. 10.03.2013

9,914.00SUPPLY OF WOODEN POLE CROSS ARMS & VERNIER PLATE

179GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-130/TK DTD. 12.03.2013 8,200.00

SUPPLY OF CABLE GUARD & ANTI CLIMBING

180GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-156/TK DTD. 26.03.2013

35,200.00 EARTH PIT

181GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-183/TKDTD. 13.04.2013

34,680.00 SUPPLY OF MHEW CROSS ARMS

182GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-213/TK DTD. 29.04.2013 79,449.30

SUPPLY OF CONCRETE POLE & ACCESSORIES

Page 48: Final power point teckno profile

SR. NO

PARTY’S NAME P.O.NO. & DATEVALUE IN

US $ITEM DESCRIPTION

183

GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-228/TK DTD. 08.05.2013 17,659.00

SUPPLY OF POLE TOP COVER PLATE & DISTANCE PLATE

184

GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-237/TK DTD. 13.05.2013 63,682.50

SUPPLY OF CONCRETE POLE & ACCESSORIES

185

GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-245/TK DTD. 19.05.2013 5,920.00

11KV  INTERMEDIATE CROSS ARMS

186

GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/13-289/TK DTD. 11.06.2013 1,946.16

SUPPLY OF CROSS ARMS

Page 49: Final power point teckno profile

LIST OF ORDERS SUCCESSFULLY EXECUTED FOR EXPORTS FOR DESIGN CALCULATION & DRAWING

 SR.NO

PARTY’S NAME P.O.NO. & DATE VALUE IN US $

ITEM DESCRIPTION

1. AL – HASSAN TRADING & CONTRACTING L.L.C.

AHC / B 124 / – 27DT. : 07.02.2000

12,000=00 132 KV SUBSTATION STRUCTURE

2. AL – HASSAN TRADING & CONTRACTING L.L.C.

AHC / B 123 / – 26DT. : 07.02.2000

4,000=00 33 KV SUBSTATION STRUCTURE

3. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/B127/PO – 018

DT. : 31.10.2000

24,000=00 132/33/11 KV SUB STATION STRUCTURE

4. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHEC/TKN/B127/PO-03/01

DT. : 25.02.2001

13,500=00 132/33/11 KV SUB STATION STRUCTURE

5. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHC/B146/PO-22DT. : 30.12.2001

5,000=00 132/33/11 KV SUB STATION STRUCTURE

6. SCAN ELECTROMECHANICAL CONT. CO. L.L.C

1895DTD: 19.12.2004

4,750=00 GI STRUCTURE FOR TRANSMISSON

7. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHC/BSM/B168/LOA-34

DT. : 24.04.2005

4,500=00 132/33/11 KV SUB STATION STRUCTURE

8. AL – HASSAN ENGINEERING CO. S.A.O.G.

AHC/BSM/B179/PO-0011

DT. : 08.01.2006

4,500=00 LATTICE AND TUBULAR TYPE SUB STATION STRUCTURE

9. CIVIL CONTRACTING LLC C-031/0708/CIV-BME/L/001/06DT: 12.08.06

25,00=00 132 KV SUBSTATION STRUCTURE

10. LARSEN & TOUBRO ELECTROMECH LLC

335/2110/KM/RBMDT: 16.07.06

5,500=00 132 KV SUBSTATION STRUCTURE

11. AL- FALAHY CO. LLC 2595DTD. 11.09.07

RO. 9,100=00 33 KV

12. ARABIAN INDUSTRIES LLC 2008-12-0302 DTD. 21.12.2008 95,568=73

132 KV CROSS ARMS

13. POWERTECH ENGINEERING 2010-03-0040 DTD. 02.03.2010 8,423=70

132 KV EQUIPMENT SUPPORT STRUCTURE

14.AL HASSAN ENGINEERING CO S.A.O.G

AHEC/PROC/B195/PO-44 DTD. 24.05.2010

6,000.00 SUPPLY OF GANTRIES

15 GLOBAL CORP LLC GCE/OR/10-218/

TK/WAPI-REV1 DTD. 31.07.2010

13,623.75SUPPLY OF OHL ACCESSORIES

16GALFAR ENGINEERING & CONTRACTING SAOG

VP/MMU/3888/10 DTD. 15.09.2010 700.00

SUPPLY OF SUPPORTING STEEL STRUCTURE

17GLOBAL CORP ENTERPRISE LLC (OMAN)

GCE/OR/11-060/TK/UEP DTD. 20.02.2011

7,236.00SUPPORT STRUCTURE

18NATIONAL CONTRACTING CO. LTD

NCC/OMAN/OETC/329/2010/PO/10/02 DTD. 05.03.2011

30,858.00GANTRY & CABLE SEALING END STRUCTURE

19 AL FALAHY COMPANY LLC 3414 DTD. 28.03.2011

53,000.00 33KV STEEL TOWERS

Page 50: Final power point teckno profile

 

SR.NO

PARTY’S NAME P.O.NO. & DATE VALUE IN US $

ITEM DESCRIPTION

20 GLOBAL CORP ENTERPRISE LLC (OMAN)

GCE/OR/11-040/TK/CIVILCO-REV 2 DTD. 26.05.2011

50,091.78 GANTRY & EQUIPMENTS

21 GLOBAL CORP ENTERPRISE LLC (OMAN)

GCE/OR/11-265/Teckno/Galfar/R2 DTD. 31.10.2011

26,000.00132KV GANTRY & EQUIPMENTS

22 LARSEN & TOUBRO (OMAN)LLC

O03020/EPR00406 DTD. 15.02.2012

8,263.05EQUIPMENT SUPPORT STRUCTURE

23 LARSEN & TOUBRO (OMAN)LLC

O03020/EPR00407 DTD. 15.02.2012

5,994.00EQUIPMENT SUPPORT STRUCTURE

24 SAUDI NATIONAL CONTRACTING CO. LTD.

NCC/OMAN/OETC/85/2010/PO/16

DTD. 05.07.201210,710.00

GANTRY & SUBSTATION EQUIPMENT STRUCTURE

25 SAUDI NATIONAL CONTRACTING CO. LTD.

NCC/OMAN/OETC/74/2010/PO/035 DTD. 12.07.2012

18,681.25

GANTRY & SUBSTATION EQUIPMENT STRUCTURE

26 GLOBAL CORP ENTERPRISE LLC [OMAN]

GCE/OR/12-440/TK DTD. 18.10.2012

20,000.00 SUPPLY OF 33KV STEEL TOWER

Page 51: Final power point teckno profile

A LIST OF INDIAN CUSTOMERS :

1. ASEA BROWN BOVERI LTD., 2. ALSTHOM 3. ABLETECH ELECTRO ENGINEERS PVT LTD., 4. AMBUJA CEMENTS LTD., 5. AREVA T&D INDIA LTD. 6. BAJAJ ELECTRICALS LTD., 7. BIAX ELECTRIC & CONTROLS PVT. LTD. 8. BHARAT BIJLEE LTD., 9. BHARAT HEAVY PLATE & VESSELS LTD.,10. BHARAT PETROLIUM CORPORATION LTD.,11. BHARAT SANCHAR NIGAM LTD.,12. BEST & CROMPTON LTD.,13. BOMBAY SUBARBAN ELECTRIC SUPPLY 14. BLUE STAR15. BRIGADE GROUP16. COCHIN REFINARY17. CROMPTON GREAVES LTD.,18. CHIRANJJEEVI ENERGY LTD19. DASLAGER WAYS20. ESSAR STEEL LTD.,21. ELECON ENGINEERING CO.22. FOUR EF CONSTRUCTIONS [FIZA DEVELOPERS]23. GE PLASTIC INDIA LTD.,24. GET ENGG. & CONST. LTD.,25. GUJARAT COMMUNICATION & ELECTRONICS LTD.,26. GUJARAT AMBUJA CEMENT LTD.,27. GUJARAT ELECTRICITY BOARD28. GUJARAT NARMADA VALLEY FERTILIZERS LTD.,29. GUJARAT STATE FERTILIZERS & CHEMICAL LTD.,30. GTL LTD.,31. HITECH ENGINEERS & CONTRACTORS.,32. INDIAN OIL CORPORATION LTD.,33. INDIAN PETROCHEMICALS LTD.,34. INDIA WIND POWER35. JYOTI LTD.,36. JUWI INDIA RENEWABLE ENERGIES PVT LTD., 37. KIRLOSKAR ELECTRIC CO. LTD.,

  

Page 52: Final power point teckno profile

A LIST OF INDIAN CUSTOMERS :

38. KVAERNER CEMETATION INDIA.39. LARSEN & TOUBRO LTD.,40. LINDE PROCESS TECHNO-LOGIES INDIA LTD.,41. LANCO SOLAR ENERGY PVT LTD.,42. MADRAS REFINARY43. MAHAVEER ELECTROMECH PVT LTD.,44. MOHAN EXPORTS INDIA PVT. LTD.,45. MAHAVEER ELECTRICALS46. MADHAV INFRA PROJECTS PVT LTD.,47. NATIONAL THEMAL POWER CORPORATION LTD.,48. NICCO CORPORATION LTD.,49. NUCLEAR POWER CORPORATION OF INDIA.,50. OMICRON POWER ENGINEERS PVT LTD.,51. PC INDIA LTD.,52. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,53. PIONEER WINCON PVT. LTD54. PROJECT & DEVELOPMENT INDIA LTD.,55. PUNJLLOYD LIMITED56. PADMASHREE ELECTRICALS57. RELIANCE ENERGY LTD.,58. RELIANCE INFOCOM LTD.,59. RUBAMIN LTD.,60. SIEMENS LTD.,61. SPIC-SMO62. SCHALTECH SYSTEMS [INDIA] PVT LTD.,63. SREE VENKATESHA ELECT. INDS. LTD.,64. SKILLTECH ENGINEERS & CONTRACTORS PVT. LTD.,65. TATA CHEMICALS LTD.,66. THE AHMEDABAD ELECTRICITY CO. LTD.,67. THE SURAT ELECTRICITY CO. LTD.,68. TTG INDUSTRIES LTD.,69. TYCO ELECTRONICS SYSTEMS INDIA PVT LTD.,70. TORRENT POWER LTD.,71. UB ENGINEERING LTD.72. VATECH REYROLLE LTD.,73. YOKOGAWA BLUE STAR LTD., 

  

Page 53: Final power point teckno profile

A LIST OF MAJOR ORDER FOR STRUCTURES SUCCESSFULLY EXECUTED

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY (M.T.)

INSPECTION

O1. THE AHMEDABAD ELEC. BOARD, MATERIALS DEPT., JUBILEE HOUSE, AHMEDABAD.

B69/4/4286DATED : 12.02.86

LATTICE STRUCTURE

01.00 A.E.C.

02. THE SURAT ELECT-RICITY CO. LTD., TILAK MAIDAN, 395 005

CE 731 DATED : 25.10.90

66 KV STRUCUTRE 15.00 S.E.C.

03. ELEC. BOARDKABILPOR-396 424.NAVSARI [GUJ.]

TCNS/AC/220/3270DT : 14.05.1992

220 KV / 66 KVSUN-STATIONSTRUCTURES

88 G.E.B

04. ELEC. BOARDSUB-STATION,LIMBADI -363 421.

CDL/AB/WORK/505/3093DT : 29.06.1992

220 KV D/C TOWER STRUCTURE

226 G.E.B.

05. ELEC. BOARD, SUB-STATION,LIMBADI -363 421.

CDL/AB/WORK/504/3092DT : 29.06.1992

132 KV SUB-STATION STURCTURES

270 G.E.B.

06. CROMPTON GREAVES LTD., – 600 001

CMJ/93176/864/13/P-IX/DT : 19.11.1992

132 KV SWITCHSTRUCTURES.

290 G.G.L.

07. THE ELECT. CO. LTD., TILAK MAIDAN– 395 005.

CE/COM/69DT : 28.08.1992

66 KV STRUCTURES 21.00

S.E.C.08. BEST CROMPTON ENGG.

LTD., – 390 005.BRD-21/676DT : 27.07.92 26.00 B & C

09. BEST CROMPTON ENGG. LTD., – 390 005.

BRD-21/676DT : 27.07.92

TOWER STRUCTURES 12.00 B & C

10. BEST CROMPTON ENGG. LTD., – 390 005.

TOWERSSTRUCTURES 35.00 B & C

11. BEST CROMPTON ENGG. LTD.,– 390 005.

TOWERSSTRUCTURES 15.00 B & C

12. ELEC. BOARD – 390 007. SP/5-22/V/FI/86/9134DT : 09.08.1993

66 KV / 132 KV SUB – STATIONSTRUCTURES 107 G.E.B.

13. ELEC. BOARDKABILPORE – 396 424NAVASARI, [GUJ.]

TCNS/AC/220/5470DT : 09.08.1993

66 KV / 132 KVSUB-STATIONSTRUCTURES.

107 G.E.B.

14. CROMPTON GREAVES LTD., – 600 001

CROMPTON GREAVES LTD., – 600 001.

220/132 KV SWITCH YARDSTRUCTURES.

266 G.G.L. /K. P. C. L.

Page 54: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY (M.T.)

INSPECTION

15. CROMPTON GREAVES LTD., – 600 001

CMJ/94184/881/P-VIII DT : 27.10.1993

220 KV SWITCHYARDSTRUCTURES.

468 C.G.L. /K. P. C. L

16. CROMPTON GREAVES LTD., – 600 001

CMJ/94208/893/8/PIX/DT : 08.11.1993

66 KV SUB –STATIONSTRUCTURES

415 C. G. L.

17. CROMPTON GREAVES LTD., – 600 001

CMJ/94192/892/10/P-VIIIDT : 02.10.1993

66 KV SUB-STATIONSTRUCTURES. 470 G.G.L.

18. ROIMAX CONSTRUC-TION PVT. LTD., KADMBAKKAM, – 560 024.

RC/P.17/C-51DATED. : 07.05.1993

220 KV SWITCHYARD STRUCTURES 146 R.P.C.L.

19. KIRLOSKAR ELECTRIC CO. LTD., – 560 055.

CPS/LC/94/0056DT : 07.05.1993

66 / 132 KV SUB–STATION STRUCTURES

226 K.E.C.

20. BEST CROMPTON ENGG. LTD., – 390 005.

BRD-21/832,DT : 26.02.93

TOWER STRUCTURES 33 B & C

21. TECKNO , OLD PO/38 DT: 25.07.93

LATTICE STRUCTURE 107 A.B.B.

22. TECKNO , OLD ALSTHOM 220 KV STRUCTURES. 47 N.T.PC.

23. TECKNO , OLD A/C SIEMENS LTD.,

LATTICE STRUCTURES 500 SIEMENS

24. ELEC. BOARD– 390 007

TR-IV/BMEI/220 KVS/S/STRU/247/2217 DT : 26.04.1994

220 KV / 132 KVSUB-STATIONSTRUCTURES. 130 G.E.B.

25. CROMPTON GREAVES LIMITED., – 600 001.

CMJ/95034/899/P-II DT : 19.05.1994

132 / 66KV SUB –STATION STRUCTURES

150C.G.L. /G.E.B.

26. ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. [GUJ.]

BL/30613/RRCDT : 21.04.1994

LATTIC STRUCTURES 175 A.B.B.

27. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

BL/30554/RRCDT : 21.04.1994

LATTIC STRUCTURES 130 A.B.B.

28. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

THSSS/RRCDT : 05.05.1994

LATTIC STRUCTURES 186 E.I.L.

29. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

BL/30684/RRCDT : 24.11.1994

LATTIC STRUCTURES 126 A.B.B.

30. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

BL/30932/RRCDT : 13.09.1994

LATTIC STRUCTURES 189 A.B.B.

31. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

THSSS/RRCDT : 05.10.1994

LATTIC STRUCTURES 116 A.B.B.

32. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

BL/30685/RRCDT : 24.11.1994

LATTIC STRUCTURES 89 A.B.B.

Page 55: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY

(M.T.)INSPECTION

33. THE ELECT. CO. LTD., 395 005.

CE/COM/60 DT. 23.05.94

66 KV STRUCT.39.00 S.E.C.

34. SIEMENS LTD., LPO/A/4009/SAADATED : 26.10.94 GI STRUCTURES 800.0

0TATA

35. SIEMENS LTD., LPO/A/4010/SAADATED : 26.10.94A/C. TECKNO,

GI STRUCTURES 1500.00

TATA

36. ELEC. BOARD– 390 007

TR-IV/220-132KV/NEW/ 5143/12/10/95

220 KVSUB-STATIONSTRUCTURES.

226 G.E.B.

37. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

BL/30039/PIJDT : 05.03.1995 LATTIC

STRUCTURES126 A.B.B.

38. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

BL/30829/PIJ LATTICE

STRUCTURES

39. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

BL/41103/RRCDT : 10.10.1995 LATTIC

STRUCTURES85 A.B.B.

40. TABS ENGINEERS – 390 010.

TE/BMEI/JUN-GONDAL / 12/95 DT. : 30.04.95

66KV D/C

22.00 GEB

41. TABS ENGINEERS – 390 010.

TE/BMEI/ANJAN/25/95DT. : 10.01.95

132 KV D/C LINE TOWER 30.00

GEB

42. TABS ENGINEERS – 390 010.

TE/BMEI/JYOTI/5/95DT. : 10.04.95

66 KV D/C LINE TOWER FOR PAINTHER CONDUCTOR

100.00

JYOTI

43. TABS ENGINEERS – 390 010.

TE/BMEI/JAMBUA/13/95DT. : 15.06.95

66 KV D/C LINE TOWER 45.00

GEB

44. TABS ENGINEERS – 390 010.

TE/BMEI/ANJAR/16/95DT. : 18.06.95

66 KV D/C LINE TOWER 30.00

GEB

45. TABS ENGINEERS – 390 010.

TE/BMEI/ANJAR/16/95DT. : 18.06.95

132 KV D/C LINE TOWER 32.00

GEB

46. PRAKASH INDUSTRIES LTD., KHANDOLI

GI STRUCTURES 200.00

PI

47. SUBARBAN ELECTIC SUPPLY – 400 093.

CON/PWD/GG/19/97-98DT : 29.07.97

GI STRUCTURES300.0

0

BSES

48. DULMISON W.S. POWER SYSTEM LTD., BANGLORE.

DWS/PO/9-97-48/DATED : 23.09.97

GI STRUCTURES300.0

0

DWS

Page 56: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY

(M.T.)INSPECTION

49. SIEMENS LTD., [GURGAON][CHITRADURGA SITE]

T & P/T-1/SS-109/92 DATED : 14.03.01

G.I. LATTICE STRUCTURE WITH HARDWARE

220.00

KPTCL

50. SIEMENS LTD., [GURGAON][HONNALI SITE]

T & P/T-1/SS-108/82 DATED : 26.02.01

G.I. LATTICE STRUCTURE WITH HARDWARE

245.00

KPTCL

51. SIEMENS LTD., [GURGAON][MADHUGIRI SITE]

T & P/T-1/SS-107/79 DATED : 26.02.01

G.I. LATTICE STRUCTURE WITH HARDWARE

225.00

KPTCL

52. VA TECH PVT. LTD.,[ SITE]

06P/90351/864 DATED : 29.12.01

G.I. STRUCTURE160.0

0

KPTCL

53. CROMPTON GREAVES LTD,

EPSG/DD – SK (M) – PCGIL (SOUTH)DATED : 31.12.01

PIPE STRUCTURE APPR

X.300

PGCIL

54. BSES LTD., BNG/CON/KPTCL/AVG/01 – 200DATED : 19.02.02

110KV 486.4

80

KPTCL

55. BSES LTD., BNG/CON/KPTCL/AVG/01 – 201DATED : 19.02.02

110KV 486.4

80

KPTCL

56. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

750000022DATED 31.05.02

GI STRUCTURES850.0

0

KPTCL

57. CROMPTON GREAVES LTD,

EPG/SKJ – NV / PCGIL (8)DATED : 01.06.02

MS GALVANIZED LATTICE STRUCTURES TYPE L.M.

APPRX.

150.00

PGCIL

58. CROMPTON GREAVES LTD,

EPG/BS/GMDCDATED 16.07.02

GI STUCTURES 140.00

GMDC

59. BHARAT HEAVY ELECTRICALS LTD.,

4528073DATED :

GI STRUCTURES 286.00

PGCIL

60. CROMPTON GREAVES LTD,

EPG/BS/WBSEBDATED 24.08.02

GI STUCTURES150.0

0

WBSEB

61. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

140005194DATED : 11.09.02

GI STRUCTURES150.0

0

PGCIL

62. ALSTHOM SYN/7129/CS3135 [KATHALGURI

220KV/132KV LATTICE STR. 109.0

0

PGCIL

63 BHARAT HEAVY ELECTRICALS LTD.,

4528107 DATED 16.10.02

GI STRUCTURES435.0

0

WBSEB

64 ABLETECH ELECTRO ENGINEERS P. LTD

AEE/Teckno/PO/125/2003-04DT. 24.05.03

66 KV DC TRANSMISSION LINE & SUB-STATION STR.

40KPTCL

Page 57: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY

(M.T.)INSPECTION

65 SCHALTECH AUTOMATION PVT LTD.

LOI NO: E2/NSSK/SS/02 DTD: 25.05.2003

110 KV TRANSMISSION LINE & SUB-STATION STR.

220RITES

66 GET ENGG. & CONSTRUCTION PVT. LTD

GET/KPTCL/132/PO/003 DTD: 21.08.2003

11 KV/66KV GI STRUCTURES

15KPTCL

67 GET ENGG. & CONSTRUCTION PVT. LTD

GET/DEV/128/PO/001 DTD: 21.08.2003

11 KV/66KV GI STRUCTURES

7KPTCL

68 GET ENGG. & CONSTRUCTION PVT. LTD

GET/KPTCL/133/PO/001 DTD: 01.09.2003

11 KV & 1.1KV GALVANISED CROSS ARM 187

KPTCL

69 SREE VENKATESHA ELECTRICAL INDUS. PVT. LTD

153/03-04 DTD: 23.09.2003

GI STRUCTURE

33RITES

70. SIEMENS LTD [MUMBAI PROJECT – BALCO KORBA

45242488DTD. 11.12.03

GI STRUCTURE 400

SIEMENS

71 SIEMENS LTD [MUMBAI PROJECT-JIJU-SOGI

45258297DTD. 24.03.2004

GI STRUCTURE 40

SIEMENS

72 SIEMENS LTD [CHENNAI] PROJECT –KITCO

45277877DTD:26.07.2004

GI STRUCTURE30

SIEMENS

73 SIEMENS LTD [MUMBAI]PROJECT- GEB

45285969DTD: 16.09.2004

GI STRUCTURE30

SIEMENS

74 BHARAT BIJLEE LTD 73454/IGLDTD: 30.12.2004

GI STRUCTURES15

BHARAT BIJLEE

75 SIEMENS LTD [MUMBAI] PROJECT – SUZLON-DHULE

45319035DTD: 24.03.2005

GI STRUCTURE

400

SIEMENS

76 SIEMENS LTD [MUMBAI] PROJECT –LANJIGARH

4500430842DTD:24.05.2005

GI STRUCTURE 80

SIEMENS

77 FOUR EF CONSTURCTIONS[FIZA DEVELOPERS]

FEF/TECKNO/SS-GAL-STRU/SPLY/05-06DT: 29.07.2005

GISTRUCTURE

30

FIZA DEVELOPE

RS

78 BRIGADE GROUP BG/BEPL/E/BM/WO/664/05 DTD: 12.09.2005

GI STRUCTURE70

BRIGADE

79 SCHALTECH AUTOMATION PVT LTD.

NILDTD: 10.09.2005

66 KV TRANSMISSION LINE & SUB-STATION STR

80

SCHALTECH

80 BHARAT BIJLEE LTD 77612/TOYODTD: 22.09.2005

GISTRUCTURES 80

BHARAT BIJLEE

81 ABB LTD., GI CROSSARMS1500

UP ELEC. BOARD

82 ASEA BROWN BOVERI LTD., MANEJA, BARODA PROJECT – ENERCON JAISELMER SITE

500003235 DTD: 19.12.05

LATTIC STRUCTURES

100 A.B.B.

Page 58: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION QUANTITY (M.T.)

INSPECTION

83 MAHAVEER ELECTRICALS

ME/UP/PO/002/ 05-06 DTD: 24.12.05

GI CROSARMS

200

UP ELEC. BOAR

D84 PADMASHREE

ELECRICALSPA/UP/PO/001/ 05-06 DTD: 26.12.05

GI CROSSARMS

200

UP ELEC. BOAR

D85 SIEMENS LTD [] 4500630203

DTD: 28.12.05G.I. LATTICE STRUCTURE & HARDWARE

175 KPTCL

86 G.E.T. ENGINEERING CONSTRUCTIONS PVT. LTD

GET/REL/05-026/PO-18DTD: 03.02.06

GI CROSSARMS WITH HARDWARE

200

UP ELEC. BOAR

D87 CHIRANJJEEVI WIND

ENERGY LTD145/2005-2006DTD: 09.02.06

G.I. LATTICE STRUCTURE 500

88 SIEMENS LTD [MUMBAI] PROJECT – SUZLON-SUTHRI

4500708384DTD: 22.03.2006

GI STRUCTURE

250

SUZLON

89 SIEMENS LTD [CHENNAI] PROJECT – TAMILNADU

4500719826DTD: 03.04.2006

GI STRUCTURE 4

SIEMENS

90 SIEMENS LTD [CHENNAI] PROJECT – BIAL

4500761023DTD: 15.05.2006

GI STRUCTURE WITH HARDWARE 25

SIEMENS

91 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – ENERCON SAGHALISITE

500003527 DTD: 16.03.06

LATTICE STRUCTURES WITH HARDWARES

125 A.B.B.

92 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – ENERCON NASHIK

500003267 DTD: 27.12.05

LATTICE STRUCTURES WITH HARDWARES

135 A.B.B.

93 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – HINDUSTAN ZINC LTD

500003552 DTD: 21.03.06

LATTICE STRUCTURES WITH HARDWARES

150 A.B.B.

94 BSNLITI LTD.,

LATTICE TYPE TELECOMMUNICATION TOWER STRUCTURES

15000 ITI

95 RELIANCE INFOCOM LTD.,NAVI MUMBAI 400 710

XM5/13097126DTD: 14.06.06

LATTICE TYPE TELECOMMUNICATION TOWER STRUCTURES

400 RIL

96 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – JHALAP, CSEB

500003951 DTD: 08.07.06

LATTICE STRUCTURES WITH HARDWARES

58 A.B.B.

97 SKILLTECH ENGINEERS & CONTRACTORS PVT. LTD.,

SK/KPTCL/TKN/06-07/2202DTD: 23.09.06

LATTICE STRUCTURES, TRANSMISSION LINE TOWERS & HARDWARES

400/500 KPTCL

98 SIEMENS LTD [GURGAON] PROJECT – WBSEB

PTD/HA/3000407506/C15/Bm-0001 DTD: 07.11.06

LATTICE STRUCTURES

124WBSE

B

Page 59: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY

(M.T.)INSPECTION

99 SIEMENS LTD [GURGAON] PROJECT – WBSEB

PTD/HA/3000529647/C15/Bm-0001DTD: 07.11.06

LATTICE STRUCTURES

324 WBSEB

100 SIEMENS LTD [GURGAON] PROJECT – WBSEB

PTD/HA/3000533851/C15/Bm-0001DTD: 07.11.06

LATTICE STRUCTURES

149 WBSEB

101 SIEMENS LTD [GURGAON] PROJECT – WBSEB

PTD/HA/3000533688/C15/Bm-0001DTD: 07.11.06

LATTICE STRUCTURES

137 WBSEB

102 SIEMENS LTD [GURGAON] PROJECT – WBSEB

PTD/HA/3000533951/C15/Bm-0001DTD: 07.11.06

LATTICE STRUCTURES

49 WBSEB

103 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – WELSPUN,

500004557 DTD: 24.11.06

LATTICE STRUCTURES WITH HARDWARES

279 A.B.B.

104 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – KHARASIYA, CSEB

500004782 DTD: 04.01.07

LATTICE STRUCTURES WITH HARDWARES

75 A.B.B.

105 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT –KANAKAPURA, KPTCL

140008504 DTD: 12.04.07

GI PIPE STRUCTURES

38 A.B.B.

106 MAHAVEER ELECTROMECH (P) LTD.

MEMPL/KPTCL-53/PO/074/2006-07DTD: 22.01.07

200 KPTCL

107 ABLETECH ELECTRO ENGINEERS (P) LTD.

AEE/GUJ-TECKNO/1087/2006-07DTD: 25.01.07

GI STRUCTURE

41 ABLETECH

108 SCHALTECH SYSTEMS (INDIA) PVT. LTD.

SSIPL/YVR/072/2006-07DTD: 30.01.07

33/66 KV OHE LINE MATERIAL 41 SCHALTECH

109 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – JAUNPUR, PUVVNL

750006892 DTD: 08.02.07

GI CROSSARMS

37 A.B.B.

110 EXCELL ASSOCIATES EA/TEK/PO/05/2006-07DTD: 14.02.07

33/66 KV OHE LINE MATERIAL 60 EXCELL

111 UNIVERSAL POWER SYSTEMS ENGINEERS & CONTRACTORS

UPS/TEC/GUJRAT/PO/F-03/2006-2007DTD: 19.02.07

33/66 KV OHE LINE MATERIAL

35UNIVERSAL

POWER

112 ABLETECH ELECTRO ENGINEERS (P) LTD.

AEE/GUJ-TECKNO/1168/2006-07DTD: 21.02.07

33/66 KV OHE LINE MATERIAL 76 ABLETECH

Page 60: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY

(M.T.)INSPECTION

113 SCHALTECH SYSTEMS (INDIA) PVT. LTD.

SSIPL/YVR/075/2006-07DTD: 05.03.07

33/66 KV OHE LINE MATERIAL 35 SCHALTECH

114 SIEMENS LTD [INDIA] PROJECT

4500761023DTD: 06.04.07

GI STRUCTURES WITH HARDWARES

5 SIEMENS

115 BEST & CROMPTON ENGG PROJECTS LTD, CHENNAI, PROJECT- WESTERN RAILWAY

LOI-RE/157/6/BM DTD:08.06.07

GI WELDED PARTS, MASTS, PORTALS, STRUCTURES & ACCESSORIES

1000 RITES

116 RUBAMIN LIMITED, CO/PD/2007060146 DTD:12.06.07

LATTICE STRUCTURES WITH HARDWARES

15 RUBAMIN

117 GUJARAT ENERGY TRANSMISSION CORP LTD .

LOI,CE(P)/PROC/1206/IV/BM/3756 DTD: 22.06.07

GI EARTHING STRIPS 150 GETCO

118 GUJARAT ENERGY TRANSMISSION CORP LTD .

LOI-CE(P)/PROC/1220/IV/4213 DTD: 11.07.07

LATTICE STRUCTURES WITH HARDWARES

695 GETCO

119 RUBAMIN LIMITED, CO/PD/2007060163 DTD:17.07.07

LATTICE STRUCTURES WITH HARDWARES

10 RUBAMIN

120 ASEA BROWN BOVERI LTD., MANEJA, BARODA – 13. PROJECT – RAJPAR & DUDHREJ, GETCO

140008801 DTD: 25.07.07

LATTICE STRUCTURES WITH HARDWARES

375 A.B.B.

121 RUBAMIN LIMITED, CO/PD/2007060152 DTD:26.07.07

LATTICE STRUCTURES WITH HARDWARES

13 RUBAMIN

122 HEC INFRA PROJECTS PVT LTD, AHMEDABAD.

HIPPL/PUR/PO/SVK/BMEI-083/07 DTD: 11.08.07

LATTICE STRUCTURES, HARDWARES, GI STRIPS

100 HIPL

123 BEST & CROMPTON ENGG PROJECTS LTD, CHENNAI, PROJECT- HOSPET, KPTCL

SS/HOSPET/07/101 DTD:16.08.07

50 BCEPL

124 TORRENT POWER LIMITED,

20070919 DTD:22.08.07

LATTICE STRUCTURES WITH HARDWARES

35 TORRENT

125 AREVA T&D INDIA LTD.

7700001918DTD. 10.12.07

EQUIPMENT 58 SIEMENS

126 BEST & CROMPTON ENGG PROJECTS LTD, CHENNAI, PROJECT- WEST RAILWAY

32/162/953/07/R-BDTD:10.12.07

GI WELDED SPS & DROP ARMS

182 RITES

Page 61: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY

(M.T.)

INSPECTION

127 BEST & CROMPTON ENGG PROJECTS LTD, CHENNAI, PROJECT- WESTERN RAILWAY

32/163/961/07/E-M DTD:12.12.07

GI WELDED PARTS, MASTS, PORTALS, STRUCTURES

90 RITES

128 SIEMENS LTD(MUMBAI)

LOI DTD. 13.12.07

GI STRUCTURE12 SIEMENS

129 SCHALTECH SYSTEMS (INDIA) PVT. LTD.

LOI REF. E2/DR622DTD: 13.12.07

66 KV OHE LINE MATERIAL 288 SCHALTEC

H

130 SCHALTECH AUTOMATION PVT. LTD.

LOI REF.E2/DR/634/2007-08 DTD: 23.12.2007

66 KV LINE MATERIAL 288

SCHALTECH

132 UB ENGINEERING LTD (DELHI)

UBEL/DEL/REC-080&81/WO-026/08-09/2678 DTD. 16.01.2009

SUB STATION, TOWER, BEAM

HVPNL

133 UB ENGINEERING LTD (DELHI))

UBEL/DEL/REC-080&81/PO-037/09-10/0052

EARTHING MATERIAL 129 HVPNL

134 BIAX ELECTRIC & CONTROLS PVT LTD.

BEC/UN/182/09-10 DTD. 23.09.2009

BRIGHT BAR50

135 UB ENGINEERING LTD (DELHI)

UBEL/DEL/E-144/092/PO-009/09-10/1797 dtd. 14.10.2009

HOT DIP GALVANIZED FOUNDATION BOLT

5044 HPNL

136 UB ENGINEERING LTD (DELHI)

UBEL/DEL/E-143/094ª/PO-009/09-10/1813 dtd. 15.10.2009

HOT DIP GALVANIZED FOUNDATION BOLT

3156 HPNL

137 UB ENGINEERING LTD (INDIA)

UBEL/DEL/E-145/094B/PO-009/09-10/1814 dtd. 15.10.2009

HOT DIP GALVANIZED FOUNDATION BOLT

2216 HPNL

138 UB ENGINEERING LTD (DELHI)

UBEL/DEL/E-140/PO-027/09-10/1832 dtd. 15.10.2009

MS GI FLAT

80 HPNL

139 SIEMENS LTD (CHENNAI)

450294593 DTD. 14.10.2010

GI STEEL STRUCTURE 14.46 STAR

PANEL140 JUWI INDIA

RENEWABLE ENERGIES PVT LTD (BANGALORE)

PO/1011/SCM0004 DTD. 25.02.2011

SUPPORT STRUCTURE (SOLAR PHOTOVOLTAIC)

122.33

JUWI INDIA

RENEWBLE

ENERGIES PVT LTD

141 JUWI INDIA RENEWABLE ENERGIES PVT LTD (BANGALORE)

PO/1011/SCM0052 DTD. 25.04.2011

SIGMA POST FOR SOLAR PHOTOVOLTAIC 171.5

2

JUWI INDIA

RENEWBLE

ENERGIES PVT LTD

142MADHAV INFRA PROJECTS PVT LTD.

MIPPL/2011-12/AUGUST/05 DTD. 09.08.2011

GI EARTHING STRIP

330.00

MADHAV GROUPS

143MADHAV INFRA PROJECTS PVT LTD.

MIPPL/PO/240512/SW005 DTD. 12.08.2011

SUPPLY OF MOUNTING STRUCTURES

150.00

MADHAV GROUPS

Page 62: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY

(M.T.)INSPECTION

144SURYA ENGINEERING CORP

SEC/Teckno/IPL/4/11-12 DTD. 01.11.2011

GI EARTHING MATERIAL

17 MTSURYA ENGINEERING CORP

145 JYOTI LTD2/SR0/T1133/12342/2011-2012 DTD. 21.11.2012

HEAT SHRINKABLE TUBES

117 MTR JYOTI LTD

146SURYA ENGINEERING CORP

SEC/TECKNO/IPL/7/11-12 DTD. 14.12.2011

GI EARTHING MATERIAL

24.6 MT

SURYA ENGINEERING CORP

147 JYOTI LTD

T/T72/T1133/300449/24157/2011-12 DTD. 27.12.2012

33KV TERMINATION KIT

16 NOS JYOTI LTD

148LANCO SOLAR ENERGY PVT LTD

LSEPL/PSG/PO/GSECL/024 TD. 30.12.2012

GI EARTHING STRIPS

4.862 MT

LANCO SOLAR ENERGY PVT LTD

149

OMICRON POWER ENGINEERS PVT LTD

OPEPL/PUR/11-12/115 DTD. 07.01.2012

220KV DC TRANSMISSIO

N LINE TOWERS

33.785 MT GETCO

150 JYOTI LTD

7/T72/T1133/300457/24252/2011-2012 DTD. 17.03.2012

SUPPLY OF EARTHING MATERIAL

1112 MTR

JYOTI LTD

151 JYOTI LTD7/T72/T1133/300446 /24238/2011-2012 DTD. 17.03.2012

SUPPLY OF EARTHING MATERIAL

1112 MTR

JYOTI LTD

152 JYOTI LTD7/T72/T1133/300447 /24239/2011-2012 DTD. 17.03.2012

SUPPLY OF EARTHING MATERIAL

1112 MTR

JYOTI LTD

153 JYOTI LTD

7/T72/T1133/300457/24252/2011-2012 DTD. 23.03.2012

SUPPLY OF EARTHING MATERIAL

6.00 JYOTI LTD

154 JYOTI LTD

7/T72/T1133/300458/24253/2011-2012 DTD. 23.03.2012

SUPPLY OF EARTHING MATERIAL

5.00 JYOTI LTD

155 JYOTI LTD2/SR0/T1133/58214/2012-2013 DTD. 30.06.2012

HEAT SHRINKABLE TUBES

117 MTR JYOTI LTD

156 JYOTI LTD2/SR0/T1133/58338/2012-13 DTD. 29.08.2012

HEAT SHRINKABLE TUBES

180 MTR JYOTI LTD

157HITECH ENGINEERS & CONTRACTORS

09/019-12-2012 DTD. 19.12.2012

220KV D/C TOWERS

172.40 MT

HITECH ENGINEES

& CONTRACT

R

Page 63: Final power point teckno profile

A LIST OF ORDERS SUCCESSFULLY BOOKED AND EXECUTED FOR PGCIL BY MEI GROUP OF

INDUSTRIES

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE& DATE

ITEM DESCRIPTION

QUANTITY (M.T.)

INSPECTION

1. CROMPTON GREAVES LTD,

EPSG/DD/PGCILDT. 31.12.01

PIPE STRUCTURE

325.00 PGCIL

2. CROMPTON GREAVES LTD,

EPSG/DD/PGCIL-A

DT. 31.12.01

LIGHTNING MAST

150.00 PGCIL

3.CROMPTON GREAVES LTD.

EPSG/DD-SK(M)-PGCIL (S)

DT. 04.02.02

EARTHING FLAT

65.00 PGCIL

4. ASEA BROWN BOVERI LTD., MANEJA,BARODA – 13. [GUJ.]

140005194 DT. 11.09.02

PIPE STRUCTRUE,

HIRYUR

130.00 PGCIL

5. BHARAT HEAVY ELECTRICALS LTD.,

4518110 DT. 20.09.01

SUB-STATION STRUCTURE

150.00 PGCIL

6. ALSTHOM SYN/7129/CS3135 [KATHALGURI]

220KV/132KV LATTICE STR.

30.00 PGCIL

7. BHARAT HEAVY ELECTRICALS LTD.,

4528073DT. 20.08.03

GI STRUCTURE

286.00 PGCIL

Page 64: Final power point teckno profile

A LIST OF ORDERS SUCCESSFULLY EXECUTED FOR

WIND MILL TOWER STRUCTURE.SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY (M.T.)

1. GURU VERDAN GV/94/V-27/VESTAS RRB DT. 06.10.94

225 KV WIND MILL TOWER STRUCTURE

545.00

2. MACHINERY PVT. LTD., VERBAL 225 KV WIND MILL TOWER STRUCTURE

300.00

3. ABAN LLOYADS OF SHORES LTD.,

ALCO/WE0/PV/5129 DT. 11.12.94

6 MTRS. SUPPORTING STRUCTURES

126.00

4. REPL ENGINEERING LTD.,

REPL/SYN/PO/95-96/4003 DT. 12.04.95

225 KV WIND MILL TOWER STRUCTURE

264.00

5. REPL ENGINEERING LTD.,

AMMENMENT -1 REPL/SYN/PO/95-96/ 4003 DT. 12.04.95

225 KV WIND MILL TOWER STRUCTURE

300.00

6. REPL ENGINEERING LTD.,

AMMENMENT -1 DT. 27.11.95

225 KV WIND MILL TOWER STRUCTURE

200.00

7. VESTAS RRB INDIA LTD., VRRB/BMEI/95/ PO-1/22 DT. 28.08.95

225 KV WIND MILL TOWER STRUCTURE

350.00

8. SUZLON ENERGY LTD., SEL/PROD/POM/120/96-97 DT. 20.08.95

WIND MILL TOWER STRUCTURE

256.00

9. JMP ECOTECHNIA LTD. JEL/TWR/PO/95-96/001 DT. 23.03.96

WIND MILL TOWER STRUCTURE

560.00

10. REPL ENGINEERING LTD.,

REPL/SYN-PO/95-96/057 DT. 25.07.96

225 KV WIND MILL TOWER STRUCTURE

152.00

11. ABAN LLOYADS OF SHORES LTD.,

15-10419-01DT. 21.02.96

6 MTRS. SUPPORTING STRUCTURE

120.00

12. SUZLON ENERGY LTD., SEL/PROD/POM/044/96-97 DT. 30.01.97

WIND MILL TOWER STRUCTURES

500.00

13. DAS LAGARWAY WINDTURBINES LTD.,

DLWL/PO/AM/97-98/125DT. : 28.07.97

WIND MILL TOWER STRUCTURES

200.00

14. SUZLON ENERGY LTD., SEL/PROD/POM/044/96-97DT. 20.08.97

WIND MILL TOWER STRUCTURES

338.00

15. SUZLON ENERGY LTD., SEL/PROD/POM/159/97-98DT. 20.12.97

WIND MILL TOWER STRUCTURES

200.00

Page 65: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY (M.T.)

16.

DAS LAGARWAY WINDTURBINES LTD.,

616DT. 13.02.98

WIND MILL TOWER STRUCTURES

131.00

17.

VESTAS RRB INDIA LTD., VRRB/PROJ/056/ DT. 13.02.98

225 KV WIND MILL TOWER STRUCTURES

500.00

18.

VESTAS RRB INDIA LTD., VRRB/PROJ/007 DT. 03.06.98

WIND MILL TOWER STRUCTURE

55.00

19.

VESTAS RRB INDIA LTD., VRRB/PROJ/020 DT. 08.08.98

WIND MILL TOWER STRUCTURE

81.00

20.

DAS LAGARWAY WINDTURBINES LTD.,

39DT. 02.09.98

WIND MILL TOWER STRUCTURE

131.00

21.

VESTAS RRB INDIA LTD., VRRB/PROJ/078 DT. 09.08.98

WIND MILL TOWER STRUCTURE

68.00

22.

DAS LAGARWAY WINDTURBINES LTD.,

64/98-99DT. 05.01.99

WIND MILL TOWER STRUCTURE

131.00

23.

VESTAS RRB INDIA LTD., VRRB/PROJ/045DT. 09.01.99

WIND MILL TOWER STRUCTURE

54.00

24.

REPL ENGINEERING LTD.,

REPL/PO/GUJ/1999/04DT. 27.02.99

WIND MILL TOWER STRUCTURE

66.00

25.

REPL ENGINEERING LTD.,

REPL/PO/GUJ/1999/05 DT. 04.03.99

WIND MILL TOWER STRUCTURE

66.00

26.

VESTAS RRB INDIA LTD., VRRB/PROJ/089DT. 27.03.99

WIND MILL TOWER STRUCTURE

27.00

27.

VESTAS RRB INDIA LTD., VRRB/PROJ/009DT. 11.05.99

WIND MILL TOWER STRUCTURE

95.00

28.

VESTAS RRB INDIA LTD., VRRB/PROJ/024DT. 03.06.99

WIND MILL TOWER STRUCTURE

95.00

29.

DAS LAGARWAY WINDTURBINES LTD.,

033DT. 30.08.99

WIND MILL TOWER STRUCTURE

131.00

30.

DAS LAGARWAY WINDTURBINES LTD.,

DLWL/BK/RCI/002 DT. 08.12.99.

WIND MILL TOWER STRUCTURE

65.50

Page 66: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE ITEM DESCRIPTION

QUANTITY (M.T.)

16.

DAS LAGARWAY WINDTURBINES LTD.,

616DT. 13.02.98

WIND MILL TOWER STRUCTURES

131.00

17.

VESTAS RRB INDIA LTD., VRRB/PROJ/056/ DT. 13.02.98

225 KV WIND MILL TOWER STRUCTURES

500.00

18.

VESTAS RRB INDIA LTD., VRRB/PROJ/007 DT. 03.06.98

WIND MILL TOWER STRUCTURE

55.00

19.

VESTAS RRB INDIA LTD., VRRB/PROJ/020 DT. 08.08.98

WIND MILL TOWER STRUCTURE

81.00

20.

DAS LAGARWAY WINDTURBINES LTD.,

39DT. 02.09.98

WIND MILL TOWER STRUCTURE

131.00

21.

VESTAS RRB INDIA LTD., VRRB/PROJ/078 DT. 09.08.98

WIND MILL TOWER STRUCTURE

68.00

22.

DAS LAGARWAY WINDTURBINES LTD.,

64/98-99DT. 05.01.99

WIND MILL TOWER STRUCTURE

131.00

23.

VESTAS RRB INDIA LTD., VRRB/PROJ/045DT. 09.01.99

WIND MILL TOWER STRUCTURE

54.00

24.

REPL ENGINEERING LTD.,

REPL/PO/GUJ/1999/04DT. 27.02.99

WIND MILL TOWER STRUCTURE

66.00

25.

REPL ENGINEERING LTD.,

REPL/PO/GUJ/1999/05 DT. 04.03.99

WIND MILL TOWER STRUCTURE

66.00

26.

VESTAS RRB INDIA LTD., VRRB/PROJ/089DT. 27.03.99

WIND MILL TOWER STRUCTURE

27.00

27.

VESTAS RRB INDIA LTD., VRRB/PROJ/009DT. 11.05.99

WIND MILL TOWER STRUCTURE

95.00

28.

VESTAS RRB INDIA LTD., VRRB/PROJ/024DT. 03.06.99

WIND MILL TOWER STRUCTURE

95.00

29.

DAS LAGARWAY WINDTURBINES LTD.,

033DT. 30.08.99

WIND MILL TOWER STRUCTURE

131.00

30.

DAS LAGARWAY WINDTURBINES LTD.,

DLWL/BK/RCI/002 DT. 08.12.99.

WIND MILL TOWER STRUCTURE

65.50

31.

SUZLON ENERGY LTD., SEL/PROD/LC/004/99-2000DT. 20.12.99

WIND MILL TOWER STRUCTURE

1340.00

Page 67: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE ITEM DESCRIPTION

QUANTITY (M.T.)

32.

VESTAS RRB INDIA LTD., VRRB/PROJ/141DT. 28.12.99

30 MTRS. TOWER MATERIALS

35.00

33.

VESTAS RRB INDIA LTD., VRRB/PROJ/145DT. 07.01.2000

50 MTRS. EXTN.TOWER MATERIALS

176.60

34.

DAS LAGARWAY WINDTURBINES LTD.,

DLWL/BK/RCI/030 DT. 20.01.2000

WIND MILL TOWER STRUCTURE

277.20

35.

VESTAS RRB INDIA LTD., VRRB/PROJ/161DT. 25.01.2000

50 MTRS. EXTN.TOWER MATERIALS

67.50

36.

VESTAS RRB INDIA LTD., VRRB/PROJ/183DT. 02.02.2000

50 MTRS. EXTN.TOWER MATERIALS

40.50

37.

VESTAS RRB INDIA LTD., VRRB/PROJ/216DT. 26.02.2000

50 MTRS. EXTN.TOWER MATERIALS

40.50

38.

SUZLON ENERGY LTD., SEL/DMN/LC/PCM02/99-2000DT. 09.03.2000

WIND MILL TOWER STRUCTURE

335.00

39.

SUZLON ENERGY LTD., SEL/DMN/PROD/053/99-2000

3488.00

40 SUZLON ENERGY LTD., SEL/DMN/PROD/080/99-2000DT. 07.04.2000

1670.00

41.

VESTAS RRB INDIA LTD., VRRB/VED/045DT. 18.05.2000

TUBULAR TOWER 4 SETS

42.

VESTAS RRB INDIA LTD., VRRB/PROJ/56DT. 06.06.2000

30 MTRS. TOWER MATERIALS

8.00

43.

VESTAS RRB INDIA LTD., VRRB/PROJ/95DT. 19.07.2000

30 MTRS. TOWER MATERIALS

46.80

44.

VESTAS RRB INDIA LTD., VRRB/PROJ/137DT. 22.08.2000

11 SETS

45.

VESTAS RRB INDIA LTD., VRRB/PROJ/153DT. 30.08.2000

40 MTRS. TOWER MATERIALS

41.20

46.

VESTAS RRB INDIA LTD., VRRB/PROJ/172DT. 14.09.2000

LATTICE TYPE TOWER MATERIALS

286.80

47.

VESTAS RRB INDIA LTD., VRRB/PROJ/335DT. 29.12.2000 STRUCTURE

288 MT

48.

VESTAS RRB INDIA LTD., VRRB/PROJ/245DT. 01.01.2001 STRUCTURE

800 MT

49.

VESTAS RRB INDIA LTD., VRRB/PROJ/351DT. 18.01.2001 STRUCTURE

288 MT

Page 68: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION QUANTITY (M.T.)

50. GOLDEN NON-CONVENTIONAL ENERGY STS. PVT. LTD.,

VERBAL DTD: 22.03.02

WIND MILL TOWER STRUCTURE

175 MT

51. PIONEER WINCON LTD., 007/2002-2003DT. 04.04.2002

WIND MILL TOWER STRUCTURE

560 MT

52. VESTAS RRB INDIA LTD., VRRB/PROJ/038DT. 14.05.2002 STRUCTURE

600 MT

53. SUZLON ENERGY LTD., SEL/DMN/1000/000207/2002-2003DT. : 04.07.2002

STRUCTURE37.50

54. SUZLON ENERGY LTD., SEL/DMN/LC – 1MW/008/2002 – 2003DT. : 04.07.2002

WIND MILL TOWER STRUCTURE

710.00

55. SUZLON ENERGY LTD., SEL/DMN/1250000290/2002 – 2003DT. : 13.07.2002

WIND MILL TOWER STRUCTURE

1200 MT

56. SUZLON ENERGY LTD., SEL/DMN/LC – 1.25MW/002/2002 – 2003, DT. : 17.10.2002

WIND MILL TOWER STRUCTURE

3500 MT

57. VESTAS RRB INDIA LTD., VRRB/PROJ/200212040407, DT. 04.12.2002

STRUCTURE230 MT

58. PIONEER WINCON LTD., 056/2003-2004DT. 02.01.2003

WIND MILL TOWER STRUCTURE

300 MT

59. SUZLON ENERGY LTD., SEL/DMN/LC – 1.25MW/001/2003 – 2004, DT. : 11.04.2003

WIND MILL TOWER STRUCTURE

6766 MT

60. VESTAS RRB INDIA LTD., VRRB/PROJ/053DT. 30.04.2003

WIND MILL TOWER STRUCTURE

2200 MT

61 GOLDEN NON-CONVENTIONAL ENERGY STS. PVT. LTD.,

VERBAL DTD: 06.08.2003

WIND MILL TOWER STRUCTURE

150 MT

62. VESTAS RRB INDIA LTD., VRRB/PROJ/515DT. 09.09.2003

WIND MILL TOWER STRUCTURE

1800 MT

63. GOLDEN NON-CONVENTIONAL ENERGY STS. PVT. LTD.,

VERBAL DTD: 20.02.2004

WIND MILL TOWER STRUCTURE

50 MT

64. VESTAS RRB INDIA LTD., VRRB/PROJ/028DT. 19.04.04

WIND MILL TOWER STRUCTURE

4000 MT

65. SUZLON ENERGY LTD., SEL/DMN/LC/1250/AM/000003/2004-2005DT. 30.04.04

WIND MILL TOWER STRUCTURE

6532 MT

66. NEPC INDIA LTD NEPC/IL/BMEI-LT/PR-SK/3346DT. 15.05.04

WIND MILL TOWER STRUCTURE

6000 MT

67. PIONEER WINCON LTD 43DT. 13.07.04

WIND MILL TOWER STRUCTURE

150 MT

68. VESTAS RRB INDIA LTD., VRRB/PROJ/333DT. 30.07.2004

WIND MILL TOWER STRUCTURE

2000 MT

69. TTG INDUSTRIES LTD WE-PUR 001DTD: 19.04.2005

WIND MILL TOWER STRUCTURE

605 MT

Page 69: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE

ITEM DESCRIPTION

QUANTITY (M.T.)

70.

INDIA WIND POWER LTD IWPL/BME/05-06/1DTD: 01.08.2005

50 MT

71.

VESTAS RRB INDIA LTD VRRB/PROJ/028DTD: 29.04.05

4100 MT

73.

SHRIRAM EPC LTD WE-SEPC-PONDY-0001-A5DTD: 10.04.06

WIND MILL TOWER

STRUCTURE

795 MT

74.

SHRIRAM EPC LTD 200604023DTD: 10.04.06

WIND MILL TOWER

STRUCTURE

685 MT

75.

PIONEER WINCON LTD 072/06-07DT. 26.04.06

WIND MILL TOWER

STRUCTURE

1500 MT

76.

VESTAS RRB INDIA LTD VRRB/PROJ/1023DTD: 12.08.06

6848 MT

77.

VESTAS RRB INDIA LTD VRRB/PROJ/1024DTD: 12.08.06

6420 MT

78.

VESTAS RRB INDIA LTD VRRB/PROJ/1025DTD: 12.08.06

765 MT

79.

VESTAS RRB INDIA LTD VRRB/PROJ/1026DTD: 12.08.06

510 MT

80.

SHRIRAM EPC LTD 200604023 A-3DTD: 27.09.06

WIND MILL TOWER

STRUCTURE

1845 MT

81.

SHRIRAM EPC LTD 200609039DTD: 27.09.06

WIND MILL TOWER

STRUCTURE

1365 MT

82.

PIONEER WINCON LTD 316/06-07DT. 29.12.06

WIND MILL TOWER

STRUCTURE

710 MT

83.

PIONEER WINCON LTD 0708041DT. 19.05.07

WIND MILL TOWER

STRUCTURE

11 MT

84.

SHRIRAM EPC LTD 200705005DTD: 03.05.07

WIND MILL TOWER

STRUCTURE

910 MT

85.

PIONEER WINCON LTD 0708129DT. 27.07.07

WIND MILL TOWER

STRUCTURE

2380 MT

83 CHETTINAD ENERGY PVT. LTD

CHE/026/07-08DT. 02.01.08

WIND MILL TOWER

STRUCTURE

260 MT

84 RRB ENERGY LIMITED 4609100426 DTD. 08.07.2009

125 MT

85 PIONEER WINCON LTD 0910030 DTD. 17.08.2009

596.33 MT

Page 70: Final power point teckno profile

A LIST OF ORDER SUCCESSFULLY EXECUTED FOR CABLE TRAYS & ACCESSORIES

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE INSPECTION

QUANTITY (M.T.)

01. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ]

KSA/FC/GFN/8111-3180DT : 09.01.88 KELTRON 8.50

02. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ]

KSA/FC/VSP/8111-3285DT : 25.05.88 KELTRON 17.50

03. KELTRONCONTROLS DIVN.,AROOR 688 534 [ KERALA ]

KSA/FC/VSP/900-835 DT : 16.08.88

KELTRON 05.06

04. BHARAT HEAVY PLATE & VESSELS LTD.

MM/4/7844-54-016/BG/AEDT : 09.04.88 BHPV 15.75

05. GUJARAT INSTRUMENTS LTD., GANDHINAGAR

G/851414DT : 24.05.1988 GIL 12.00

06. GUJARAT INSTRUMENTS LTD., GANDHINAGAR

G/851653DT : 24.11.1988

GIL NYLON 13.00

07. JYOTI LIMITED.,CONTRACT DIVISION,– 390 009.

H/CONTRACT/600 222/NPC - 142/88DATED : 23.09.88

JYOTI 1.00

08. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,

PPCL/471/94/88/5701DT : 02.11.1988

PPCL/EIL[IPCL-

NAGOTHANE]26.35

09. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,

PPCL/473/93/5884 DT : 07.01.1988 PPCL/EIL

[PETROFILS]2.35

10. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ]

KCA/EC/EMR/900 161DT : 05.01.89 KELTRON 03.33

11. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ]

KCA/EC/EMR/800 227DATED : 06.04.89 KELTRON 05.85

12. KELTRON CONTROLS DIVN.,AROOR 688 534 [ KERALA ]

KCA/EC/ONGC/800 345DATED : 22.09.89 KELTRON 05.60

13. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,

PPCL/471/INST/89/1149DATED : 07.02.89 PPCL/EIL

ONGC8.00

14. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,

PPCL/471/INST/89/4424DATED : 11.08.89 PPCL/EIL

ONGC16.65

15. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,

PPCL/475/INST/93/95/4833 PPCL/EIL 10.95

Page 71: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE INSPECTION

QUANTITY (M.T.)

16. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,.

PPCL/474/97/89/3703DATED : 14.07.89 PPCL/GFC/UDHE 4.00

17. TYLORE INSTRUMENTS CO. LTD.,

E-88720/A30L881DATED : 16.02.89

EIL[ PETROFILES ] 58.85

18. TYLORE INSTRUMENTS CO. LTD.,

E-890 461/ A30L 881 DT : 15.01.89

EIL[ PETROFILES ] 1.50

19.TYLORE INSTRUMENTS CO. LTD.,

E-900247/ A30L 881 DT : 19.07.89

TAYLOR/EIL[ PETROFILES ] 4.65

20.ESSAR STEEL LTD.,HAZIRA.

DATED : 08.06.89L & T 35.00

21. GUJARAT NARMADA VALLEY FERTILIZERS LTD., BHARUCH.

PROJ/MPP/9652/ALV/4320DATED : 04.08.89 GNFC 3.00

22. GUJARAT INSTRUMENTS LTD.,GANDHINAGAR.

G 852 815DATED : 17.04.90

GIL/GEBGANDHINAGAR 2.70

23. GUJARAT INSTRUMENTS LTD., GANDHINAGAR.

G 852 818DATED : 17.04.90

GIL[ IPCL/GOP ] 3.00

24. GUJARAT INSTRUMENTS LTD., GANDHINAGAR.

G 852 820DATED : 17.04.90

GIL[ ONGC ] 3.60

25. GUJARAT INSTRUMENTS LTD., GANDHINAGAR.

G 852 953DATED : 20.04.90

GIL[ GEB KLIPS ] 4.85

26. GUJARAT INSTRUMENTS LTD., GANDHINAGAR.

G 852 630DATED : 20.04.90

GIL[ GEB KLIPS ] 3.75

27. GUJARAT INSTRUMENTS LTD., GANDHINAGAR.

G 852 628DATED : 24.04.90

GILGANDHINAGAR 5.75

28. GUJARAT INSTRUMENTS LTD., GANDHINAGAR.

G 853 021DATED : 01.09.90

GIL[ AECO ] 8.60

29. GUJARAT INSTRUMENTS LTD., GANDHINAGAR.

G 853 025DATED : 01.09.90

GILGEB

GANDHINAGAR4.35

30. GUJARAT INSTRUMENTS LTD., GANDHINAGAR.

G 853 087DATED : 24.09.90

GIL[ ONGC ] 2.00

31. REUNION ENGINEERING CO. LTD., .

BRD/129/SMD/10/90 DT : 24.05.90 1.00

32.CONSTRUCTIONS .

PC/121/94/694DATED : 23.08.90

EIL/PDILONGC

GANDHAR4.95

33. PROJECT & DEVELOPMENT INDIA LTD., .

PDS/2394/20/20/2229DATED : 03.09.90 EIL/PDIL

[ IOCL/HCP ]6.95

34. SPIC – SMO.

SMO/933/I/003DATED : 27.09.90

SPIC/EIL[ IOCL/HCP ] 45.00

35. SPIC – SMO.

SMO/CAP/I/014DATED : 27.09.90

SPIC/EIL[ IOCL/HCP ] 35.00

36. SPIC – SMO SMO/CAP/I/014DATED : 12.12.90 SPIC 1.00

37. LINDE PROCESS TECHNO-LOGIES INDIA LTD., .

HA01/0021/0026DATED : 11.12.90 LPT 7.00

Page 72: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE INSPECTION

QUANTITY (M.T.)

38.

SYSCON ENGINEERS PVT. LTD., .

SEPL/PO/90/500DATED : 17.12.90

EIL[ IOCL-GHP ]

1.75

39.

BHARAT HEAVY PLATE & VESSELS LTD.,

MM/4/1509-41-008/9951DATED : 09.04.91 BHPV 01.70

40.

BHARAT HEAVY PLATE & VESSELS LTD.,

MM/4/5390/CP-42/2231 565 DATED : 20.07.91 BHPV 10.50

41.

BHARAT HEAVY PLATE & VESSELS LTD.,

MM/4/710149 040/CSG/81 / 2331576

BHPV 02.75

42.

BHARAT HEAVY PLATE & VESSELS LTD.,

MM/4/5441/CP42/2231964DATED : 12.10.91 BHPV 04.25

43.

SPIC – SMO SMO/933/1/003DATED : 07.01.91

EIL[ IOCL-GHP ]

8.50

44.

SPIC – SMO SMO/933/1/003DATED : 14.03.91

EIL/SPIC[ IOCL-GHP ] 6.50

45.

SPIC – SMO SMO/933/1/004DATED : 22.07.91

EIL/SPIC[ IOCL-GHP ] 13.50

46.

SPIC – SMO SMO/933/1/003DATED : 08.08.91

EIL/SPIC[ IOCL-GHP ] 2.00

47.

SYSCON ENGINEERS PVT. LTD., .

SEPL/PO/ME/90/263DATED : 24.04.91

EIL[ PETROFILS ] 2.70

48.

THE AHMEDABAD ELECT-RICITY CO. LTD., AHMEDABAD.

B/227/4/4984DATED : 16.02.91 AECO 176.50

49.

THE AHMEDABAD ELECT-RICITY CO. LTD., AHMEDABAD.

B/227/4/4984DATED : 13.06.91 AECO 139.00

50.

THE AHMEDABAD ELECT-RICITY CO. LTD., AHMEDABAD.

B/227/4/2972DATED : 25.09.91 AECO 17.40

51.

STEELWORKS CONSTRUCTION LTD.,

SRV/TVM/242/91/432DATED : 16.07.91

HACL/NM DASTOR

100.00

52.

STEELWORKS CONSTRUCTION LTD.,

SRV/TVM/242/91/712DATED : 19.08.91

HACL/NM DASTOR 10.00

53.

BHARAT HEAVY PLATE & VESSELS LTD.,

MM / 4 / 4004- 41- 016/PP51 / 3131548DATED : 03.08.92

EIL 2.60

54.

BHARAT HEAVY PLATE & VESSELS LTD.,

MM/4/4405/PP91/3131980DATED : 30.10.92 BHPV 2.00

55.

PARAMOUNT POLLUTION CONTROLS PVT. LTD.,

PPCL/483/484/94/92/348DATED : 16.01.92 PPCL

[ JOB ] 2.00

56.

PARAMOUNT POLLUTION CONTROLS PVT. LTD.,.

PPCL/477/INSTRUMANTATION/92/1948DATED : 06.04.92

PPCL 20.00

57.

SPIC SMO SMO/INST/GHP/BARODA/002 DATED : 29.09.92

EIL/SPIC[ IOCL ] 4.80

Page 73: Final power point teckno profile

SR.NO.

PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE INSPECTION

QUANTITY (M.T.)

58.

SPIC SMO SMO/933/TRAY/003DATED : 29.09.92

EIL/SPIC[ IOCL ]

6.50

59.

SYSCON ENGINEERS PVT. LTD.,

SEPL/BME/PO/92/123DATED : 31.03.92

EIL[ GAIL-LPG ]

21.50

60.

SEA HAWK CARGO CARRIERS PVT. LTD., DATED : 16.02.92

SEA HAWK[ ANPARA-

TPS ]UP-GOVTDESIGN

800.00

61.

THE AHMEDABD ELECTRICITY CO. LTD., AHMEDABD.

IB/227/4/2972DATED : 30.06.92

AEICO[ GEB -

GANDHINAGAR ]

7.50

62.

NUCLEAR POWER CORPN. OF ANUSHAKTI NAGAR,

MEQ/KAIGA 182 2462 / / 330 DATED : 03.06.92

NPC 167.00

63.

BEST & CROMPTON ENGINEE-RING LTD., .

BRD/21/716DATED : 25.08.92

B & C[ ONGC CTF NAVASARI ]

8.60

64.

BEST & CROMPTON ENGINEE-RING LTD., .

BRD/21/759DATED : 21.10.92

B & C[ ONC

NAVAGAM ]4.00

65.

KELTRON CONTROLS DIVN. AROOR

CRL/3/301134DATED : 04.02.93 KELTRON

[ CRL ]12.50

66.

BHARAT HEAVY PLATE & VESSELS LTD., .

MM / 4 / 7112 / CSG / 81 / 4331298 DATED : 10.06.93

BHPV 05.00

67.

BHARAT HEAVY PLATE & VESSELS LTD., .

MM / 4/ 4013 / CSG / 81 / 43317011DATED : 08.09.93

BHPV[ ONGC-

NAVAGAM ]20.00

68.

BHARAT HEAVY PLATE & VESSELS LTD., .

MM/4/5497-41/CP-51 2321925 DATED : 15.10.93

BHPV 10.00

69.

BHARAT HEAVY PLATE & VESSELS LTD., .

MM/4/7143 72 006 /CSG 51 4331932DATED : 18.10.93

BHPV 04.00

70.

ESSAR LIMITED.,HAZIRA [SURAT].

P13/2,102.1/L/207DATED : 05.05.93 ESSAR 150.00

71.

ESSAR LIMITED.,HAZIRA [SURAT].

P13/2,102.1/L/310DATED : 01.09.93 ESSAR 105.00

72.

ESSAR LIMITED.,HAZIRA [SURAT].

P13/3,35.21/L/394DATED : 01.09.93 ESSAR 65.00

73.

ESSAR LIMITED.,HAZIRA [SURAT].

P13/1,58.10/L/398DATED : 03.09.93 ESSAR 300.00

74.

ESSAR LIMITED.,HAZIRA [SURAT].

P13/1,58.10/L/706DATED : 04.12.93 ESSAR 63.00

75.

ESSAR LIMITED.,HAZIRA [SURAT].

P13/2,102.1/L/740DATED : 05.12.93 ESSAR 20.00

76.

ESSAR LIMITED.,HAZIRA [ ].

P13/1,58.10/L/800DATED : 27.12.93 ESSAR 25.00

Page 74: Final power point teckno profile

SR.NO. PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE INSPECTION

QUANTITY (M.T.)

77.

BEST & CROMPTON ENGINEE-RING LTD., .

BRD/21/802DATED : 07.01.93

B & C[ MIDC ]

5.60

78.

BEST & CROMPTON ENGINEE-RING LTD., .

BRD/21/810DATED : 20.01.93

B & C[ STEL CO. ]

50.00

79.

BEST & CROMPTON ENGINEE-RING LTD., .

BRD/21/821DATED : 08.02.93

B & C[ STEL CO. ]

6.00

80.

ARVIND COTSPIN LTD.,[ E.O.U. UNIT ] AHMEDABAD

ACL/ENG/035/SUPPLIMENTARY DATED : 07.01.93

ARVIND 6.25

81.

ARVIND COTSPIN LTD.,[ E.O.U. UNIT ] AHMEDABAD

ACL/ENG/038DATED : 20.01.93 ARVIND 30.00

82.

ARVIND COTSPIN LTD.,[ E.O.U. UNIT ] AHMEDABAD

ACL/ENG/050DATED : 07.04.93 ARVIND 5.00

83.

ARVIND INTEX LTD.,AHMEDABAD.

CAP/ORD/93-43DATED : 13.03.93 ARVIND 25.00

84.

ARVIND MILLS LTD.,AHMEDABAD.

D-BA/215DATED : 27.04.93 ARVIND 6.75

85.

TATA CHEMICAL LTD.,

BOMBAY..WOC/67M274/ELEC/C-4254/9 DATED : 03.11.93

TATA 6.00

86.

BHARAT HEAVY PLATE & VESSELS LTD., VISHAKHAPATNAM.

MM/4/4013/CSG/81/ 4332436 DATED : 09.02.94

BHPV 5.20

87.

BHARAT HEAVY PLATE & VESSELS LTD., VISHAKHAPATNAM.

MM/4/4011/CSG/81/ 4332572DATED : 19.03.94

BHPV 5.60

88.

ESSAR LIMITED.,HAZIRA [ ].

P13/1,61.10/L/955DATED : 04.08.94 ESSAR 6.00

89.

ARVIND COTSPIN LTD.,[ E.O.U. UNIT ] AHMEDABAD

ACL/ENG/0038DATED : 03.01.94 ARVIND 19.00

90.

ARVIND COTSPIN LTD.,[ E.O.U. UNIT ] AHMEDABAD

ACL/ENG/010/94DATED : 25.05.94 ARVIND 20.00

91.

ARVIND COTSPIN LTD.,[ E.O.U. UNIT ] AHMEDABAD

ACL/ENG/065/93-94DATED : 25.01.94 ARVIND 2.00

92.

ARVIND COTSPIN LTD.,[ E.O.U. UNIT ] AHMEDABAD

ACL/K/71DATED : 22.10.94 ARVIND 5.00

93.

ARVIND MILLS LTD.,AHMEDABAD.

D-BA/DDP/3851DATED : 27.01.94 ARVIND 4.00

94.

BHARAT HEAVY PLATE & VESSELS LTD., VISHAKHAPATNAM.

MM/4/40215 4707/CP-51/5232256DATED : 17.01.95

EIL 40.00

95.

BHARAT HEAVY PLATE & VESSELS LTD., VISHAKHAPATNAM.

MM/4/402155030/CP-91 / 5232548DATED : 28.03.95 EIL/BHPV 10.00

Page 75: Final power point teckno profile

SR.NO. PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE INSPECTION

QUANTITY (M.T.)

96. BHARAT HEAVY PLATE & VESSELS LTD., .

MM/4/716459009/CCS-91/ 6231783DATED : 20.09.95

EIL/BHPV 10.00

97. BHARAT HEAVY PLATE & VESSELS LTD., .

MM/4/5517/40002/CP-51/ DATED : 27.10.95

EIL/BHPV 20.00

98. THE AHMEDABD ELECTRICITY CO. LTD., AHMEDABD.

B-227/4/1278DATED : 30.06.95 AEC

5.00

99. THE AHMEDABD ELECTRICITY CO. LTD., AHMEDABD.

B-227/4/2552DATED : 31.08.95 AEC 5.00

100. THE AHMEDABD ELECTRICITY CO. LTD., AHMEDABD.

B-227/4/1278DATED : 11.02.95 AEICO 50.00

101. ARVIND MILLS LTD.,AHMEDABAD.

CG/95/00047DATED : 11.02.95 AML 1.00

102. ARVIND MILLS LTD.,AHMEDABAD.

CG/95/00073DATED : 06.03.95 AML 2.00

103. ARVIND MILLS LTD.,AHMEDABAD.

CG/95/00117DATED : 21.04.95 AML 2.00

104. TATA CHEMICAL LTD.,.

MYPCC/P/851/39M055/INS -3039/C.4862 DT : 11.01.95

TATA 6.00

105. INGERSOLL-RANDAHMEDABAD.

UUB/B0595/287DATED : 09.08.95 INGERSOLL 5.00

106. INGERSOLL-RANDAHMEDABAD.

UUB/B0595/287DATED : 09.08.95 INGERSOLL 2.00

107. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,,RACE COURSE, .

PPCL/AP/328/CABLE TRAY/ 96/741DATED : 25.01.96 PPCL

10.00

108. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,, RACE COURSE, .

PPCL/AP/500/CABLE TRAY/ 96/741DATED : 13.04.96 PPCL

05.00

109. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,, RACE COURSE, .

PPCL/503/CT/ 96/5129DATED : 14.06.96

PPCL10.00

110. TATA CHEMICAL LTD., 769/WOC/GENCAP/71M115/ING20019 C.553DATED : 04.11.96

TATA 5.00

111. PASCHIM PETRO CHEM LTD., .

LOI/PPL/TRAY/96/87DATED : 11.06.96 PPL/EIL 5.00

112. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA,

LAEI/1006/08/863/PUR/113DATED : 29.01.96

ALEI/EIL 75.00

113. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA,

LAEI/1007/08/863/PUR/082DATED : 29.01.96

ALEI/EIL 80.00

114. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA,.

LAEI/1008/07/764/PUR/074DATED : 12.04.96 ALEI/EIL 5.00

Page 76: Final power point teckno profile

SR.NO. PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE INSPECTION

QUANTITY (M.T.)

115. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA,

LAEI/1008/07/764/PUR/074DATED : 12.04.96

ALEI/EIL 5.00

116. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA,

LAEI/011/1008/074/96/7888DATED : 10.05.96

ALEI/EIL 10.00

117. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA,

LAEI/1008/08/863/PUR/096DATED : 28.08.96

ALEI/EIL 10.00

118. SPIC-JEL ENGINEERING CONSTRUCTION LTD., S – 7 THIRUVIKA INDUSTRIAL ESTATE, GUNDY, .

SJCL/BWE/CT/997DATED : 05.03.96

SJCL 10.00

119. SPIC-JEL ENGINEERING CONSTRUCTION LTD., S – 7 THIRUVIKA INDUSTRIAL ESTATE, GUNDY,

SJCL/BWE/CT/1042DATED : 23.03.96

SJCL 5.00

120. STRUTHERS WELLS CORP –ORATION PENNA U. S. A.

95-2830350/619DATED : 16.08.96 SWC/EIL/BHEL 10.00

121. GE PLASTIC INDIA LTD.,PLASTIC AVENUEP. O. JAWAHAR NAGARVADODARA.

GEPI/ED/200/DATED : 10.04.96

GEP 05.00

122. GE PLASTIC INDIA LTD.,PLASTIC AVENUEP. O. JAWAHAR NAGARVADODARA.

GEPI/ED/408/200DATED : 27.05.96

GEP 05.00

123. BHARAT HEAVY PLATE & VESSELS LTD.,

MM/4/7166/SE-81/73311430DATED : 04.05.96

BHPV 20.00

124. PARAMOUNT POLLUTION CONTROLS PVT. LTD.,, RACE COURSE, .

P/0500/P.O./ 510/04/971460DATED : 15.05.97 PPCL

10.00

125. INGERSOLL-RANDAHMEDABAD.

UB/DSK/45128DATED : 05.09.96 INGERSOLL 5.00

126. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA,

ALEI/1013/86300/97-98/3060DATED : 03.12.97

ALEI/EIL 10.00

127. GE PLASTIC INDIA LTD.,PLASTIC AVENUEP. O. JAWAHAR NAGARVADODARA.

GEPI/ED/97/908DATED : 16.01.97

GEP 05.00

128. NICCO CORPORATION LTD., 505, A & B STERLING CENTRE, ALKAPURI, VADODARA.

C-142/P/E/0293DATED : 29.05.97

NICCO 20.00

129. METRO TRANSLEC PVT. LTD., PANCHARATNA, 2ND FLOOR ALKAPURI, VADODARA.

VERBLEDT. 05.10.97

METRO 25.00

Page 77: Final power point teckno profile

SR.NO. PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE INSPECTION

QUANTITY (M.T.)

130. HEUBACH COLOUR PVT. LTD. LANDMARK, 2ND FLOOR ALKAPURI, .

B-007110DATED : 19.09.97 HEUBACH 05.00

131. EMKAY INTERNATIONAL (P) LTD., 55/45, .

EMK/M001/PO/60DATED : 28.03.98 EMKAY 26.00

132. TATA CHEMICALS LTD.,24, FORT, MUMBAI.

2481/WOC/67M376/ELEC/AGS/C10421DATED : 26.02.98

TATA 41.00

133. TATA CHEMICALS LTD.,24, ,FORT, MUMBAI.

2480/WOC/CP-EL-02/ELEC / AGS/C10422XDATED : 26.02.98

TATA 120.00

134. HEUBACH COLOUR PVT. LTD., LANDMARK, 2ND FLOOR, ALKAPURI, .

B-007640DATED : 04.06.98 HEUBACH 5.60

135. LARSEN & TOUBRO LTD.,,P. B. NO. 149, .

BAFD/981754/AKD/DSCDATED : 03.06.98 L & T 1.60

136. LINDE PROCESS TECHNO-LOGIES, 38, NUTAN BHARAT SOCIETY, ALKAPURI, .

16806/JOB REF. NO. HS-054/RPL-JAMNAGARDATED : 05.06.98 LINDE 34.00

137. LARSEN & TOUBRO LTD.,10, P.B. 5247 – 600 002.

LOI NO. MRL/DS/227DATED : 06.11.98 L & T 34.00

138. ASEA BROWN BOVERI LTD.,DEPT. THSSS, MANEJA

BL:43314/RRCDATED : 28.09.98 ABB 49.00

139. TECKNO A-29, RAJLAXMI COMPLEX, OPP.HARIBHAKTI EXTEN.OLD PADRA ROAD, BARODA..

PCMX/591351/SMV/DSCDATED : 12.11.98

TECKNO 13.00

140. AIR LIQUIDE ENGINEERING INDIA LTD., 3-5.874, PLOT NO. 15, HYDERGUDA,HYDERABAD.

ALEI/1018/799006/98-99DATED : 07.10.98 ALEI 4.00

141. LINDE PROCESS TECHNO-LOGIES, 38, NUTAN BHARAT SOCIETY, ALKAPURI, .

17021/JOB NO. HA – 61 / GACLDATED : 05.06.98 LINDE 0.5

142. PUNJ LLOYD LIMITED,RAJNIGANDHA APARTMENT,OLD PADRA ROAD,BARODA.

PL/SRU/(PLNG)/JI-139/14/116DATED : 20.01.99 PUNJ 10.00

143. INGERSOLL RAND () LTD.PLANT-III, PLOT NO. 187,GIDC, ARODA, AHMEDABAD.

AKSRSNB/970070AMENDMENT-001DATED : 27.12.98 INGERSOLL 1.20

144. HEUBACH COLOUR PVT. LTD.,LANDMARK, 2ND FLOOR,ALKAPURI, BARODA..

PO1383DATED : 03.03.99

HEUBACH 0.40

145. PUNJ LLOYD LIMITED,RAJNIGANDHA APARTMENT,OLD PADRA ROAD,BARODA..

PL/SRU/(PLNG)/JI-139/14/116DATED : 20.01.99AMME. 157 DT. 08.03.99AMME. 160 DT. 11.03.99

PUNJ 11.00

Page 78: Final power point teckno profile

SR.NO. PARTY’S NAME & ADDRESS

P.O.REFRENCE & DATE INSPECTION

QUANTITY (M.T.)

146. ESSAR PROJECTS LTD [EOL]

006/PM/05-034DTD: 05.04.2005 ESSAR 400.00

147. ESSAR PROJECTS LTD [EOL]

006/PM/05-053DTD: 22.04.2005 ESSAR 115.00

148 ESSAR PROJECTS LTD [EOL]

CM/05-0465DTD: 19.07.2005 ESSAR 4.00

149 ESSAR PROJECTS LTD [EOL]

006/PM/05-117DTD: 10.08.2005 ESSAR 1200.00

150 ESSAR PROJECTS LTD [EOL]

006/PM/05-126DTD: 24.08.2005 ESSAR 10.00

151 ESSAR PROJECTS LTD [EOL]

006/PM/05-141DTD: 09.09.2005 ESSAR 120.00

152 ESSAR PROJECTS LTD [EOL]

006/PM/05-334DTD: 07.04.2006 ESSAR 460.00

153 GTL LTD, MUMBAI GTL/NE/PUR/1410/07-08/106DTD: 27.07.07

GTL 100.00

154 AMUBUJA CEMENTS LTD.INC/VAL/HO/

612/30086/2270 DTD: 16/05/2008

AMBUJA 200 MTR

155 JYOTI LTD, VADODARA7/T72/

T1133/300429/24062/2011-12 DTD. 07.09.2011

JYOTI 3 MT

156 JYOTI LTD, VADODARA7/T72/

T1133/30042/24103 DTD. 01.11.2011

JYOTI 11 MT

157 JYOTI LTD, VADODARA

7/T72/T1133/300429/24146/20

11-2012 DTD. 17.11.2011

JYOTI 312 MTR

Page 79: Final power point teckno profile

THANK YOU

FOR YOUR KIND ATTENTION