Form No: QHSEP07/06/07 Port Melville Passage Plan DATE: Vessel: Pilot: Critical Depth Information Mermaid Shoal 8.5m Inner Anchorage A 29.0m Wharf 14.0m Inner Anchorage B 15.9m Passage Details Vessel Information From LOA To Deepest Drafts Fwd Beam Aft GRT Tides Time Height Dynamic UKC Correction Estimated Pitch Estimated Roll Tide @ Estimated Heave Minimum Depth Declared Squat Plus Tide = Total Water Total Correction (B) Minus Max Draft Static UKC (Minimum 1m or 10% of Draft) (A) Dynamic UKC (Minimum 0.5m) (A – B) Current Wind Equipment Checks – All equipment is to be checked iaw PMPC Pilotage Directions, including but not limited to the following items: Steering Engine Ahead / Astern Thrusters (KWa/HP) Anchors Ready Pilot Card Charts Correct Navigation Lights / Shapes Emergency Systems / Drills Gyro Error Monitoring VHF 11/16 Change of Control Fwd U Aft Pilot Ladder. Crew Ready Any other defect which may affect the manoeuvre? The Bridge Team is reminded of its duty to maintain an accurate check of vessel position and of all Bridge Resource Management principles. Any matter of concern is to be brought to the immediate attention of the pilot. The Master and Pilot agree on the passage plan including the berthing plan overleaf Pilot Signature Master Name Master Signature Timings POB First/Last Line/Anchor Down/Anchor Away Pilot Away

Upload: others

Post on 15-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Port%Melville%Passage%Plan%%%%%%%%%%%%%%%%%%%%%%%%%%%%DATE · Form!No:!QHSEP07/11/01! Port%Melville%% Tug%Positions,%Line%Priorities%and%Wharf%Layout% %!! Communications%Information%

!

Form!No:!QHSEP07/06/07!

Port%Melville%Passage%Plan%%%%%%%%%%%%%%%%%%%%%%%%%%%%DATE:%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%Vessel:% Pilot:%

Critical%Depth%Information%Mermaid%Shoal% 8.5m% Inner%Anchorage%A% 29.0m% Wharf% 14.0m%% % Inner%Anchorage%B% 15.9m% % %

Passage%Details% Vessel%Information%From% % LOA% %To% %

Deepest%Drafts%%Fwd% % Beam% %

Aft% % GRT% %

Tides% Time% Height% Dynamic%UKC%Correction%% % % Estimated%Pitch% %% % % Estimated%Roll% %Tide%@% % % Estimated%Heave% %Minimum%Depth%

% Declared%Squat% %

Plus%Tide%=%Total%Water%

%

Total%Correction% (B)%Minus%Max%Draft%

%

Static%UKC%(Minimum%1m%or%10%%of%Draft)%

(A)% Dynamic%UKC%(Minimum%0.5m)% (A%–%B)%

Current% % Wind% %

Equipment%Checks%–%All%equipment%is%to%be%checked%iaw%PMPC%Pilotage%Directions,%including%but%not%limited%to%the%following%items:%

Steering% % Engine%Ahead%/%Astern% % Thrusters%

(KWa/HP)% % Anchors%Ready%

%

Pilot%Card% % Charts%Correct% %

Navigation%Lights%/%Shapes%

%Emergency%Systems%/%Drills%

%

Gyro%Error% % Monitoring%VHF%11/16% %

Change%of%Control%Fwd%U%Aft%

% Pilot%Ladder.%Crew%Ready%

%

Any%other%defect%which%may%affect%the%manoeuvre?%%

The%Bridge%Team%is%reminded%of%its%duty%to%maintain%an%accurate%check%of%vessel%position%and%of%all%Bridge%Resource%Management%principles.%Any%matter%of%concern%is%to%be%brought%to%the%immediate%attention%of%the%pilot.%

The%Master%and%Pilot%agree%on%the%passage%plan%including%the%berthing%plan%overleaf%

Pilot%Signature% Master%Name% Master%Signature%% % %

%Timings%

POB% First/Last%Line/Anchor%Down/Anchor%Away%

Pilot%Away%

% % %!

Page 2: Port%Melville%Passage%Plan%%%%%%%%%%%%%%%%%%%%%%%%%%%%DATE · Form!No:!QHSEP07/11/01! Port%Melville%% Tug%Positions,%Line%Priorities%and%Wharf%Layout% %!! Communications%Information%

!

!"#$#%#$$#$&'()**+#

#$(*#*(',-*.#

#!"#)#%

$$#$,'/&(-+#

$(*#$0'/0(-.##!"#(#%#$$#$/')&)-+#

#$(*#$&'$0)$.#

#!"#0#%#$$#$&'(/$*+#

#$(*#)*',$&(.#

#!"#,#%#$$#)(',*(,+#

#$(*#)(',/$,.#

#!"#/#%#$$#),'$/-,+#

#$(*#)0'&&**.#

#!"#&#%#$$#),'0&-1+#

#$(*#)02-/,).#

Page 3: Port%Melville%Passage%Plan%%%%%%%%%%%%%%%%%%%%%%%%%%%%DATE · Form!No:!QHSEP07/11/01! Port%Melville%% Tug%Positions,%Line%Priorities%and%Wharf%Layout% %!! Communications%Information%

!

Page 4: Port%Melville%Passage%Plan%%%%%%%%%%%%%%%%%%%%%%%%%%%%DATE · Form!No:!QHSEP07/11/01! Port%Melville%% Tug%Positions,%Line%Priorities%and%Wharf%Layout% %!! Communications%Information%

! ! Form!No:!QHSEP07/11/01!

Port%Melville%%Tug%Positions,%Line%Priorities%and%Wharf%Layout%

%

!!

Communications%Information%Port%Operations/Tug%Working%% Ch:$15$ Alternate%Tug:% Ch:$73$

International%Calling%and%Distress:%

Ch:$16$

!

Potential interferenceShip may need to move ahead

to clear piles