portfolio hmy 2016s

Upload: neindow-hassan-yakubu

Post on 06-Jul-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/16/2019 Portfolio HMY 2016S

    1/26

    1

    PORTFOLIOOF CREATIVE WORKS

    2016Hassan Mohammed Yakubu

  • 8/16/2019 Portfolio HMY 2016S

    2/26

    2Hassan Mohammed YAKUBU

    Nationality : Ghanaian  Date/Place Of Birth : 17/05/1988 at Tamale, Ghana  Email : [email protected]  Mobile : +44 777 821 33 79/+233 504 16 96 64  Online Portfolio : http://be.net/hassanykb  LinkedIn : https://www.linkedin.com/in/hassanykb  Blog : http://www.myh-atelier6.blogspot.com  Facebook : http://www.facebook.com/hassanykb

    LANGUAGES

    EnglishFrenchSpanish

    PROFILEI am an articulate, open-minded person with an eye ordetail, clarity o thought and a good sense o humour. Asa constant learner, my greatest strengths are my research,creative and writing skills that make me easily adaptableand effective as a team player.CAREER OBJECIVEA qualified entry-level architect/urban designer seekinga challenging position in a orward-looking organisationthat values creativity, originality, research and teamwork.

    2009/2010  Ghanaian Students’ Association in Morocco  General Secretary2009-2011  Ghanaian Students’ Association in Morocco

      Member,National Steering CommitteeAugust 2011-July 2013  Ghanaian Students’ Association in Morocco  Electoral Commissioner 

    EXTRA CURRICULAR ACTIVITIES

      Entrepreneurship Design  Innovation Sustainable Development  Education Global Issues  Programming History  Reading-Non Fiction Electronics  Philosophy

    INTERESTS

    October 2015 - June 2016  Wolfson College -University of Cambridge, UK  Mphil Planning, Growth and RegenerationSeptember 2008-June 2014

      Ecole Nationale d’Architecture-Rabat, Morocco  Diplôme d’Architecte(Master of Architecture)September 2007-June 2008  Faculty of Educational Sciences-Rabat, Morocco  FrenchSeptember 2003-July 2006  Ghana Senior High School, Tamale, Ghana  High School Certicate

    EDUCATION

    SKILLS

    Adobe

    (Photoshop,Illustrator   InDesign,After Eects)

    AutoCADRevit ArchitectureRhinoceros 3DTrimble SketchUpGrasshopper ArtlantisVray Render EngineMicrosoft Oce(Word,Excel, Power Point,Project)

    Web Design(HTML,CSS,JQuery, JavaScript)

    Python, Django

    October 2014 - Ocotber 2015  Mawums Ltd - Accra, Ghana

    Junior Architect - National ServiceMay 2013-2014  Arch2o.com - Architecture News Portal  Writer January 2013-Present  Freelance architectAugust 2012  Al Omrane Holding - Rabat,Morocco  Summer InternJuly 2012  Atelier Sens-Espace - Rabat, Morocco  Intern ArchitectJuly 2011  Atelier Sens-Espace - Rabat, Morocco  Intern Architect

    EXPERIENCE

    “The essence of the creative act isto see the familiar as strange.”  Anon

    CV  

    BEGINNER INTERMEDIATE ADVANCED

  • 8/16/2019 Portfolio HMY 2016S

    3/26

    3

    CONENS

    SUDIO WORK ...............................04

    PROFESSIONAL WORK ................19WRIING SAMPLE ........................24GENERAL DESIGN ........................25

  • 8/16/2019 Portfolio HMY 2016S

    4/26

    4

    O   D   A  

    W    R  I   

    V   

    E   

    R  

    Building heightsmaximize views to riverand cultivated fields

    Fields cultivated forcommunity use and sale

    Hand dug ponds for localirrigation of fields

    Constructed wetlands forthe community sewagetreatment

    Sports fields and leisure activities at thecommunity and urban scale.Community gardens shared by parcels of20m2 per houshold

    Serving as aleisure andactivity riverfront

    Parking facilities withcommunity scale urbansquare

    Serving as the community nodecomprising meeting halls,adulteducation centre library and youthcentre

    Free flowing pathspromoting riverfrontactivities

    Develop the existing low-endrecycling industry into acity-wide industry

    Low cost Facility for useby traders from outsidethe city as well asporters

    Riverside Walkway

    NEIGHBOURHOOD PARK AND FIELDS

    PARKING FACILITIES

    MARKET HOSTELRECONSTRUCTEDMARKET

    RECYCLING/REUSE CENTRE

    URBAN AGRICULTURE

    SCHOOL

    COMMUNITY CENTRE

    CIVIC CENTRAL CORE AND PLAZA

    RESIDENTIAL

    CONSTRUCTED WETLANDS

    IRRIGATION PONDS

    Integrated Strategies Plan

    0 2500

    0 2 5 0 0

    Barriers

    Artificial

    and Natural

    0 2 5 0 0

     Vacant PlotsforDevelopment

    0 2 5 0 0

    Noise

    Pollution

    0 2 5 0 0

    PublicSpacesandCourtyards

    0 2 5 0 0

    Routes

     

    0 2 5 0 0

    B

    A

    C

    G

    F

    ED

    H

    My thesis project was centered on desiginging or the urban poor o the slums using theinherent dominant culture o resilience and improvisation to inorm the sustainabilityprinciples that we sought to design in. As a result, the slum had to be studied and analysedto come up with local materials available, the culture o sel-building and the mechanismsaround that as well as the sence o community and very creative ownership, environmentaland material flow systems that had been improvised to meet their daily needs. Tis analysisthen served as a basis to redefine sustainability in the wider sustainale city discourse withthe goal o ormalising the inormal as it were. Te model which eveolved rom this study,the Sustainable Integration Model thereore defined the design response providng or aninteresting way o integrating the inormal into the existing urban system o Accra.

    Analysis o the prevailing Emergent Urban Systems within the slum

    Sustainable Integration o the Inormal - Old Fadama in Accra

    Final Tesis - Architecture School

    Te key spots that were identified as potential sites based onthe already existing landuse pattern

    Te final masterplan or theslum with allthe proposedinterventions

    Te final masterplanshowing key strategiesand services o the renewedurban system

  • 8/16/2019 Portfolio HMY 2016S

    5/26

    5

    Civic Core Public Space

       C  o  m  m  u  n   i   t  y   C  e  n   t  r  e

       C  o  m  m  u  n   i   t  y   H  a   l   l

    NeighbourhoodParksand gardens

          R     e    s

          i       d     e     n     t      i    a    a

          l

          R     e    s

          i       d     e     n     t      i    a    a

          l      R     e    s      i       d     e     n     t      i    a    a      l

    Pond

    Civic Core Organisational Concept

    Te civic core serves as the heart o the project where the wholecommunity congregates to learn, acquire skills and entertainthemselves. Te projects here consisted o a community centre andhall, a clinic and a green area at the scale o the community.

    MASER PLAN

  • 8/16/2019 Portfolio HMY 2016S

    6/26

    6

    CivicCore PublicSpace

       C  o  m  m  u  n   i   t  y   C  e  n   t  r  e

       C  o  m  m  u  n   i   t  y   H  a   l   l

    Neighbourhood

    Parksand gardens

          R     e    s      i       d     e     n     t      i    a    a      l

          R     e    s      i       d     e     n     t      i    a    a      l

          R     e    s      i       d     e     n     t      i    a    a      l

    Pond

    CivicCore OrganisationalConcept

    A number o the Proposed social acilities locatedwithin the Civic Core o the project

  • 8/16/2019 Portfolio HMY 2016S

    7/26

    7

    ENERGYUSE /GENERATION

    Solar cells introduced at blocklevelhelps achieve energy sufficiency vialocallevel energy generation

    PASSIVE STRATEGIES

    Extensive use ofBamboo screens inbuildings reduces direct sunlightimpact while allowing for easyventilation.

    Locally sourced materials like earthenbricks , bamboo and wood areencouraged for use in construction tokeep costs as low as possible

    Courtyard systemof housing units allows forconstant renewalof air

    DRAINAGE AND RUNOFF FILTRATION

    ENERGY USE /GENERATION

    WATER MANAGEMENT

    LOCAL MATERIALS

    PASSIVE STRATEGIES

    PASSIVE STRATEGIES

    Building Orientation to minimizedirect exposure and maximize naturalventilation

    Cobble stone covered flooring allows foreasy runoff infiltration to replenish watertable and thus the river.Bioswales running along major pathwaysserve as neighbourhood level sewagesystem .

    Bioswales

    Rainwater collected via tilted roofingsystem is channelled into buildingintegrated water reservoirs forhousehold use

    Locally sourced materials like earthenbricks , bamboo and wood areencouraged for use in construction tokeep costs as low as possible

    Extensive use of Bamboo screens inbuildings reduces direct sunlightimpact while allowing for easyventilation.

    Bamboo Screens

    Solar cells introduced at block levelhelps achieve energy sufficiency vialocal level energy generation

    Courtyardsystem ofhousing unitsallows for

    constantrenewal of air

    N

    W

    E

    S

      S   U  N  S

      E   T

      S   U  N  R

      I  S  E

      S   U  N  R

      I  S  E

      S   U  N  S

      E   T

    Primary WindsNorth Easy Trade Winds

    Dry Humid occuring in theDry Season

    Primary WindsSouth West Monsoon Winds

    Building orientation breakthe prevailing winds andallow light breezes throughthe streets

    Secondary WindsSea Breeze from the Atlantic

    Coast

    Tis shows a number o the key sustainiability strategies and systemsproposed in the designs.

  • 8/16/2019 Portfolio HMY 2016S

    8/26

    8

    1

    A107

    17

    B B

    C C

    D D

    A A

    9.29m²

    CageEscalier

    51.67m²

    CONSEIL/ORIENTATION

    158.16m²

    RESTAURANT

    113.97m²

    ACCUEIL

    12.48m²

    ESCALIERDESECOURS

    199.48m²

    GUICHETUNIQUE

    14.13m²

    WCM

    14.12m²

    WCF

    3.00m²

    LT

            1

            9

            5  .

            0        9

            4  .

            0        8

            4  .

            8        4

            5        5

    1...7....1

    1

    1

    17

    . ²

     

    . ²

     

    . ²

     

    . ²

     . ²

     

    . ²

     

    . ²

     

    . ²

    1

    1

      1 1 

    Each year close to 16% o graduates rom Moroccan Universities are hurled into the unemployedclasses o the population. In Te ace o this growing menace,many graduates tend to just makedo with whichever job they can lay their hands on .  It is our ervent believe that these graduates i well equipped via entrepreneurialtraining during and afer their school-days can help solve not only this problem but societalproblems as a whole. With Te already cast array o theoretical skills they are equipped with ,anadded beefing up in entrepreneurial spirit will go a long way to change their mindset and theirapproach to society and the world as a whole. Te likes o the Silicon Valley,Stanord UniversityEntrepreneurship centres and many others around the world give credence to the positivityand the change effect associated with such a king o establishment.  In view o this,our proposal or an entrepreneurial training centre in the heart o theeducational quarter o Rabat will not only bring entrepreneurial training to the door step ostudents but will likewise serve the greater Rabat Sale Region. Proposals For the centre willinclude a multi-purpose amphitheatre, a block o hostels ,offices or start-ups,laboratories andworking spaces. Courses Will be organized year round ,the centre will equally be opened orstart-up teams to work on their various projects. As a centre o excellence sustainable designprinciples like use o runoff,photovoltaic,natural ventilation and green roos were employed.

    5th Year Studio Project

  • 8/16/2019 Portfolio HMY 2016S

    9/26

    9

    Photovoltaic panels

    installed on the roofscovering a surfacearea of around4200m².

    A biogas systeminstalled to

    demonstrateto architects

    its mode offunctioning.

    Atrium serving asheating corridor

    for studios

    A centralisedsystem of control togive feedback on

    amount of energyused,generated andconserved

    Proposed

    amphitheatrefor students

    PPV

    ELECTRICITEALIMENTEL ES ATELIERS

    ELECTRICITEALIMENTE LES ATELIERS

    CANALISATIONS POUR ALIMENTER

    JARDINIERES

    STOCKAGEPOUR ARROSAGE

    t u r s l i r i r

    l ’ i r h u i n j t n s l s t l i r s

    DES ECHAPPATOIRES POUR DEGAGER L’AIR CHAUD

    JARDINIERES POUR OXYGENER L’AIR

    capteur solaireà air

    l’air chaud injectédans les ateliers

    E S E PPT I R E S PU R E E R L ’ I R U

    JR I I E R ES PU R X Y E E R L ’ I R

    Te National School o Architecture was built in the early 2000’s around a time when theneeded or incorporating sustainable design principles in architecture was not pressing.Existing structures do not thereore ully comply with sustainability best practices. Our proposalor this project was to make projections o eatures which could be added or modified in otherto improve upon the sustainable nature o an architecture school .Aside the environmental and cost benefits,one other crucial good is the act that studentarchitects will observe and use at first hand eatures they learn in a theoretical manner inclasses.Concentrating mainly on the semi circular studios block,our proposal seeks to generateelectricity orm solar panels and correct the greenhouse effect as a result o the plexiglasscovered inner atrium. We introduced suspended plantings in the atrium which will serve tooxygenate the hot air thereby cooling inner temperatures.Most o the studios were redesigned using state o the art renewable materials to increaseacoustic and thermal comort. A biogas system was also proposed to make use o paper andhuman waste on site.

    5th Year Studio Project

  • 8/16/2019 Portfolio HMY 2016S

    10/26

    10

    1

    A107

    1

    A107

    TRC

    TRC TRC

    SEJOUR

    TRC

    CHAMBRE

    CHAMBRE

    SDB

    WC

    DEGAGEMENT

    HALLCUISINE

    CUISINE

    SEJOUR

    WC

    C HAMB RE C HAMB RE

    CHAMBRE

          D      E      G      A      G      E      M      E      N      T

    SDB

    WC

    SEJOUR

    CUISINE

    CUISINE

    WC

    SEJOUR

    WC  SDB

    CHAMBRE

    DEGAGEMENT

    CUISINE

    CHAMBRE

    SEJOUR

    WCSDB

    CHAMBRE

    CHAMBRE CUISINE

    DEGAGEMENT

    WC

    SEJOUR

    CUISINE

    XELPUDXELPUDTNEMETRAPPAXELPUDTNEMETRAPPATNEMETRAPPA

    ²m051²m071²m521²m071²m011²m011

    APPARTEMENT

    130m²

          3      3

     .      3      0

          1 .      5

          0

          1      2

     .      1      5

          3 .      0

          5

          5 .      6

          0

          3 .      0

          5

          6 .      1

          5

          1 .      8

          0

    7.70 6.90 2 0 6 .90 8.00

          3      0

          3 .      9

          0

          7      0

          2      5

          2 .      4

          6

          1      0

          1 .      1

          4

          2      5

          2 .      7

          5

          3      0

          6 .      0

          0

          3 .      1

          5

          3      0

          2 .      8

          0

          1 .      1

          3

          2 .      8

          8

          3      0

          1 .      0

          0

    33.30

    1.50 8.05 3.80 6.35 3.75 8.05 1.80

    2.01 1.50 1 .37 1 .50 1.58 1.20 49 3.50 95 5.00 60 3.65 49 1.20 4.45 1.50 51 1.80

          2 .      0

          0

          1 .      5

          0

          4 .      6

          8

          1 .      2

          0

          1 .      6

          3

          1 .      6

          0

          1 .      0

          5

          2 .      8

          0

          1 .      6

          0

          3 .      0

          0

          1 .      5

          3

          2 .      7

          0

          4 .      2

          7

          1 .      5

          0

          2 .      2

          5

          3      3

     .      3      0

          1 .      8

          0

          8 .      6

          0

          3 .      2

          5

          6 .

          3      0

          3 .

          2      5

          8 .      6

          0

          1 .      5

          0

          2 .      0

          0

          1 .      5

          0

          4 .      4

          6

          1 .      2

          0

          9      9

          2 .      9

          0

          1 .      9

          4

          3 .      0

          0

          1 .      6

          6

          3 .      1

          9

          1 .

          0      1

          1 .      5

          0

          4 .      2

          0

          1 .      5

          0

          2 .      2

          5

    33.30

    19.35 4.50 9.45

    1.95 1.50 3.01 1.20 3.54 1.20 2.25 3.50 1.77 3.23 6.40 1.50 2 .25

    1.60 3.91 1.63 89 1.82 30 1.83 5.95 1.93 30 2.39 1.85 10 3.91 10 3.00 30

          3      0

          4 .      4

          2

          1      5

          3 .      4

          3

          1      5

          3 .

          4      5

          2      5

          2 .      7

          5

          2      0

          3 .      0

          5

          2      5

          3 .      0

          0

          2      0

          2 .      8

          0

          1 .      1

          3

          1      5

          4 .

          0      3

    COURSIVE

    PALIER

    SEJOUR

    2

    A107

    2

    A107

          1      2      3      4

          5

          6

          7

          8

          9

          1      0

          1      1

          1      2

          1      3

          1      4

          1      5

          1      6

          1      7

          1      8

    1

    1 7

          3      3

     .      3

     .

     .

          3 .

     .

          3 .

     .

     .

     .

     .

     .

     .

     .      3

     .

     .

     .

     .

          3 .

     .      3

     .

     .

     .

     .

    H

    H

    H

    I IN

    H

    H

    H

    H

    I IN

    N

    H

    H

    HI IN

    N

    H LL

    N

    H LL

    N

          3      3

     .      3

    33.3

    . . 3. .3 . . .

          3      3

     .      3

     .

     .

          3 .

          3 .

     .

          3 .      3

     .

     .

     .

     .

     .      3

     .

     .

     .

     .

          3 .

    . . . . 3. . . . . 3 . . . .3

     .

     .

     .

     .

     .      3

          3 .

     .

     .

     .

     .

     .      3

     .

     .      3

          3

     .

     .

     .

          3

     .

     .

     . .

     .      3

          3 .

          3 .

     .

     .      3

    I

    LI

    IN

    2

    1 7

          1      2      3

          7

          8

          1

          1      1

          1      2

          1      3

          1

          1 1 1      7

          1      8

    Plan R+1 

    Afer an urban analysis o the Sidi Bernousi Industrial area o Casablanca, our research broughtto the ore some needs o the inhabitants. One major issue was with housing or the low and

    middle income classes.We were tasked to make proposals o multi-storey housing or the middle and low classeswhile promoting societal integration o the populace.In due course our proposal or an intermediary housing scheme sought to promote a mixedclass residence by incorporating various types o housing. We proposed studios ,apartments,duplexes and suspended villas to cater or wide needs. In so doing we could have a total responseto all classes whiles conjointly providing activity through the commercial spaces on the groundfloor.In laying out the block plan , the open block system o French architect Christian de Portzamparcwas studied and applied in other to maximize land use and promote effective integration obuilding to site.

    4th Year Studio Project

  • 8/16/2019 Portfolio HMY 2016S

    11/26

    11 N

     

    Façade Principale - Piscine Couverte

    Façade Arrière - Piscine Couverte

    Façade Latérale - Piscine Couverte

    Façade Principale - Salle Omnisport

    Façade Arrière - Salle Omnisport

    Still on the Sidi Bernoussi Industrial area,this project consisted o designing a sports complexto cater or health and social needs. Our Approach was to provide a huge acility which will beaccessible by all inhabitants not only or major events but daily routines.Te most striking element o this project was the use o laminated timber. Tis was due to the very wide spaces needed to be covered.

    4th Year Studio Project

  • 8/16/2019 Portfolio HMY 2016S

    12/26

    12

    Tis project done in collaboration with colleagues,sought to make proposals or a wide expanseo land situated in between two major avenues.One major issue was the narrow but lengthy nature o the land as well as the noise pollutiondue to the vehicular movement.Inspired by the sinusoidal nature o sound waves our response was to work on the landscape inthe orm o waves which in certain places quite down to orm playing fields and at others riseto provide shelter or commercial spaces.Te whole length was divided into 3 main sections to acilitate working on the project.

    4th Year Landscape Design Studio

  • 8/16/2019 Portfolio HMY 2016S

    13/26

    13

    Tis project was undertaken in conjunction with two other students within a team o 8 selectedstudents rom the National School o Architecture and the echnical University o Berlin.Dubbed Urban Agriculture Casablanca, the project is a German-Moroccan research project othe German Federal Ministry o Education and Research (BMBF) within the megacity researchprogramme “Research or the Sustainable Development o Megacities o omorrow, Focus:Energy- and climate-efficient structures in urban growth centres”.Te Medouina urban agriculture project was the last workshop organised under the researchin Casablanca.the challenge was to come up with innovative urban agriculture scenarios that would fit withinthe larger interventionguidelines o the research project.My team proposed a cooperative scenario were the city and rural came into strong relations aswell as armers, inhabitants, and industry.

    Medouina Urban Agriculture InternationalWorkshop

    LEVELSOFCOOPERAION

    CONCEP FORHE GRAND

    CASABLANCAAREA

    AGROSCAPE CORRIDOR 

    COOPERAIVE AGROSCAPES

    DEAILDESIGN

    DESIGNINGEFFICIENURBAN-RURALCYCLES

  • 8/16/2019 Portfolio HMY 2016S

    14/26

    14

  • 8/16/2019 Portfolio HMY 2016S

    15/26

    15

  • 8/16/2019 Portfolio HMY 2016S

    16/26

    16

    As part o my duties during a one month internship we were tasked to make proposals or arenovation o an old agricultural extension block.Te spaces had to be redesigned and t he interior court previously uncovered was covered toallow or shading or visitors seated around waiting their turn

    Internship - Interior design and detailing

  • 8/16/2019 Portfolio HMY 2016S

    17/26

    17

    His was also a renovation work we did during an internship.Te Client needed to renovatehis old residence while adding a swimming pool and exterior greenery.

    Internship - Renovation

    18

  • 8/16/2019 Portfolio HMY 2016S

    18/26

    18

    1  9 '  - 8 "  

     G Y  M 

          S     T     O     R     E

         L     A     U     N     D     R     Y

         B     A     R

       S   W   I   M   M   I   N   G   P   O   O   L

         O     F     F      I     C     E

      E  N  T  R  Y

         O     F     F      I     C     E    -     M     A     N     A     G     E     R

         W     C     M      W

         C     F

         P     E     R      S     O     N     N     E     L     M

         K      I     T     C     H     E     N

         B     A     T     H      W     C

       O   U   T   D   O   O   R   H   U   T

       O   U   T   D   O   O   R   H   U   T

       6   8   '  -   3   "

      2  1 ' -  1  0 "

       5   '  -   1   1   "

      1  7 ' -  2  1  /  2 "

      1  2 ' -  7  1  /  2 "   8   '  -   0   1   /   2   "

       3   '  -   1   1   "

       1   1   '  -   9   1   /   2   "

         P     E     R      S     O     N     N     E     L     F

         W     C

         B     A     T     H

         R     E      S     T     A     U     R     A     N     T

       1   0   '  -   2   "

       2   6   '  -   9   "

      1  7 ' -  2  1  /  2 "

      1  7 ' -  2  1  /  2 "

         B     O     A     R     D     R     O     O     M

         B     O     A     R     D     R     O     O     M

         L     O     U     N     G     E

      4 ' -  8  1  /  2 "

      R  E  C  E  P  T I   O  N

         R     E     C     E     P     T      I     O     N     /     B     R     E     A     K     O     U     T     A     R     E     A

         C     O     N     F     E     R     E     N     C     E     H     A     L     L

       1   9   '  -   8   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       3   '  -   3   1   /   2   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       3   '  -   3   1   /   2   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

      1  8 ' -  0  1  /  2 "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

      1  8 ' -  0  1  /  2 "

       P   A   R   K   I   N   G   (   2   0   )

       P   A   R   K   I   N   G   (   2   0   )

        S     T    R    E    E     T

           S      T      R      E      E      T

      S  T  R  E  E  T

          F      U      T      U     R      E      E      X      T      E      N      S     I      O      N

       S   K   Y   L   I   G   H   T

       S   K   Y   L   I   G   H   T

      1  5  0  S  E  A  T I  N   G 1  5  0  S  E  A  T I  N   G

       S   T   O   R   E

       L   A   U   N   D   R   Y

       B   A   R

       S   W   I   M   M   I   N   G   P   O   O   L

       O   F   F   I   C   E

      E  N  T  R  Y

       O   F   F   I   C   E  -   M   A   N   A   G   E   R

       W   C   M    W

       C   F

       P   E   R   S   O   N   N   E   L   M

       K   I   T   C   H   E   N

       B   A   T   H

       W   C

       O   U   T   D   O   O   R   H   U   T

       O   U   T   D   O   O   R   H   U   T

       6   8   '  -   3   "

      2  1 ' -  1  0 "

       5   '  -   1   1   "

      1  7 ' -  2  1  /  2 "

      1  2 ' -  7  1  /  2 "   8   '  -   0   1   /   2   "

       3   '  -   1   1   "

       1   1   '  -   9   1   /   2   "

       P   E   R   S   O   N   N   E   L   F

       W   C

       B   A   T   H

       R   E   S   T   A   U   R   A   N   T

       1   0   '  -   2   "

       2   6   '  -   9   "

      1  7 ' -  2  1  /  2 "

      1  7 ' -  2  1  /  2 "

       B   O   A   R   D   R   O   O   M

       B   O   A   R   D   R   O   O   M

       L   O   U   N   G   E

      4 ' -  8  1  /  2 "

      R  E  C  E  P  T I   O  N

       R   E   C   E   P   T   I   O   N   /   B   R   E   A   K   O   U   T   A   R   E   A

       C   O   N   F   E   R   E   N   C   E   H   A   L   L

       1   9   '  -   8   "

       8   '  -   6   "

       8   '  -   6   "

       8   '  -   6   "

       3   '  -   3   1   /   2   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       3   '  -   3   1   /   2   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -

       6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

      1 ' -  1  /  2 "

       '  -   6   "

       '  -   6   "

       '  -

       6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

       '  -   6   "

      1 ' -  1  /  2 "

     

       S   K   Y   L   I   G   H   T

       S   K   Y   L   I   G   H   T

      1  5  0  S  E  A  T I  N   G 1  5  0  S  E  A  T I  N   G

    Te proposal was or a 30-bed Hotel andconerence acility with the possibility o utureextension in the outskirts o amale in Ghana.Te design response used the wet areas as the visual markers or the acade detailing them witha capped roo and stripes o wood to give it astrong appeal.

    A Hotel at the edge o own...

    19

  • 8/16/2019 Portfolio HMY 2016S

    19/26

    19

    Tis proposal was or a 8-storey hotel and conerence acility in the heart o amale. Te design briedemanded a high-end class hotel that could easily be replicated in other cities o Ghana to create ahotel ranchise. Te size and nature o the plot demanded careul design so as to account or all theessential acilities needed or a smooth unctioning o the hotel. As a result, basement parking wasproposed with a raised deck swimming pool that is almost halway the groundfloor. Te sky loungeand bar provides a convenient open-air space or relaxation and enjoyment o the views. Te lastfloor will serve as the executive and business suites with swiming and catering acilities envisagedon the roo, the first o its king in the city. Te signature acade and irregular rectangular incisionsallow to break the otherwise monotonous look typical o hotels while allowing or shielding romthe exccessive sunshine in these parts o the country. In all, t he intricate use o space and the volumeprovide a pearl worthy o the standard and a project to look out or in amale.

    A High-end Hotel or amale

    Ground Floor

    First Floor showingBusiness acilities

    Second Floor showing room layoutand sky-restaurant

    20

  • 8/16/2019 Portfolio HMY 2016S

    20/26

    20

    A library or them - CSR 

        4     5

    ReadingRoom

    EntryLobby

    StoreWCFWCM

    ReadingRoom

    ComputerRoom

    OUTDOORSITTINGAREA

       W   A   T   E   R   D   I   S   P   E   N   S   E   R

    COUNTER

    S  E  A T  

    S  E  A T  

    ReadingRoom

    ComputerRoom

    ReadingRoom

    Store

    WCFWCM

    VIEWONGROUNDFLOOR

       W   A   T   E   R   D   I   S   P   E   N   S   E   R

    SEATS

    S  E  A T  

    S  E  A T  

    As part o Coperate Social Responsibility(CSR) programmes undertaken byMawums Ltd. , this project consisted o designing an educational complex orthe people o Ligbing , a village in the Northern Region o Ghana. Te brie wasto design a Library, Junior and Senior High Schools and eachers’ quarters. Teproject inset is the library which was designed with a post-modernist using localrocks as decoration or the base level o the building. Pockets o exterior seatinginspired by the local culture o sitting under trees to discuss was incoporatedaround the building as exterior reading and talking areas.

    21

  • 8/16/2019 Portfolio HMY 2016S

    21/26

    21

    Office Matron Store room

    Bulk Storeroom

    KitchenLobby

    Male DinningHall

    FemaleDinning Hall

    1

    1

    2

    2

    3

    3

    6

    6

    5

    5

    4

    4

    4000 4000 3300 4000 4000

     A A

    B B

    C C

    D D

    E E

    F F

         1     1     5     0

         1     2     0     0

         2     2     2     5

         1     5     0     0

         1     6     5

         0

         1     0     0     0

         3     0     0

         1     5     0     0

         6     3     8

         2     2     2     5

         1     2     7     5

         2     2     2     5

         1     2     7     5

         3     0     0     0

         7     8     8

         3     5     7     5

         5     1     5     0

         5     1     5     0

         3     5     0     0

         4     2     7     5

         2     1     9     5     0

    1A

    1A

    5A

    5A

    1

    A105

    650 1000 850 1000 1300 1000 850 1000 650 3000 650 1000 850 1000 1300 1000 850 1000 650

    8300 3000 8300

    19600

         7     8     8

         3     0     0     0

         1     2     7     5

         2     2     2     5

         1     2     7     5

         2     2     2     5

         6     3     8

         1     8     0     0

         1     0     0     0

         1     8     3     8

         1     2     0     0

         1     9     2     5

         1     2     0     0

         1     5     6     3

         3     5     7     5

         5     1     5     0

         5     1     5     0

         3     5     0     0

         4     2     7     5

         2     1     9     5     0

    8300 7600 3700

    3475 525 4000 3300 4000 505 3495

    19600

         3     5     0     0

         1     5     0

         3     0     5     0

         1     5     0

         1     8     0     0

         1     5     0

         1     2     8     5     0

    3400 150 12200 150 3400

    3400 150 4450 150 7600 150 3400

         6     7     0     0

         5     0     0     0

    3001000400 1000300

    1

    A106

    2

    A105

         7     5

         1     5     0     0

         6     3     8

         2     2     2     5

         4     8     8

         3     0     0

         4     8     8

         2     2     2     5

         4     8     8

         3     0     0

         4     8     8

         3     0     0     0

         6     3     8

    Ramp Ramp RampRamp

         R    a    m    p

    1250 1200 1750 1200 750 1200 1650 1500 1581 3338 1731 1200 1250

    D2 D2

         D     2

    D2

    D1

         D     2

         D     2

         D     2

    D1

         D     2

         D     2

         D     2

    D1

       W   1

       W   4

       W   4

    W4W4W4

       W   4

    W5

       W   5

       W   1

    W1 W1 W1 W1 W1 W1 W1 W1

         W     2

         W     3

         W     3

         W     2

         W     3

         W     3

    W6 W6

         W     2

         W     3

         W     3

         W     2

         W     3

         W     3

         1     4     0     0

         1     2     0     0

         9     0     0

    In response to a brie by an Islamic school or a dining hall complex, the design responsewas to ollow the strict seperation o male and emale eating areas with a common kitchenbut the possibility o raternizing outside o the hall. Te accessibility to the halls is designed

    to cater or the needs persons with reduced mobility through the integration o ramps andrailing or supports. Local material in the orm o stone veneer to the base o the exteriorserve as a signature mark or the halls.

    All inclusive - Dining together

    22

  • 8/16/2019 Portfolio HMY 2016S

    22/26

    22

    Bedr oom Bed room

    Bath

    Bedroom

    Kitchen

    Livingarea

    MasterBedroom

    WalkinCloset

    Corridor

    Verandah

    D4

    D1

    D3

    D3D3

    D3

    D1

         D     2

       W   4

       W   2

       W   2

    W2 W2

    W2

    1

    A106

    2

    A106

    1

    1

    2

    2

    3

    3

    4

    4

    5

    5

     A A

    B B

    D D

    E E

    F F

    C C

    2A

    2A

    Livingarea

    Bedroom

    Bedroom

    Bath

    WcCorridor

    Bath

    WC

    Kitchen

         D     2

    D3

         D     2

    D3

         D     2

         D     2

         D     3

         D     3

    D3

         D     2

         D     1

    Diningarea

    W2

    W2

       W   2

       W   2

    W1 W1 W1

       W   3

       W   5

       W   5

    W5

       W   5

       W   5

    W4

         3     1     5     0

         4     1     5     0

         4     2     0     0

         3     6     5     0

         4     5     5     0

         1     3     0     0

         4     1     5     0

         4     2     0     0

         3     6     5     0

         4     5     5     0

         1     3     0     0

    4350 4200 4150 5150

    4350 4200 4150 51501 50 13 50 1 50 0 1 35 0 1 501 15 8 00 6 80 3 00 0 2 45 1 370 2 45 15 00 24 41 50 8 00 1 50 0 4 00 1 50 0 8 00 1 50

    4500 8200 5300

    18000

    450 6100 450

         4     5     0

         2     9     5     0

         3     0     0     3     0     0

         2     8     0     0

         1     5     0

         2     3     0     0

         9     0     0

         1     5     0     7     5     0

         1     2     0     0

         7     5     0     1     5     0

         8     7     5

         1     5     0     0

         7     7     5     1

         5     0  2     5     0

         8     0     0

         4     0     0

         8     0     0

         1     0     0     0

         1     5     0     0

         1     5     5     0

         2     0     5     0

         1     5     9     5     0

         2     0     5     0

         1     8     0     0     0

         1     4     0     0

         1     5     0     0

         1     4     0     0

         2     2     5

         9     0     0

         5     7     5

         8     0     0

         5     5     0

         8     0     0

         1     3     5     0

         1     5     0     0

         1     1     5     0

         9     0     0

         2     1     5

         8     0     0

         2     6     3     5

         4     3     0     0

         1     3     5     0

         1     1     0     5     0

         1     6     7     0     0

    1500 1500 2775 1500 3700 1500 975 800 1450 2300

    10750 1950 3 000 2300

    18000

         1     5     0

         3     3     5     0

         6     5     0

         1     5     0

         1     3     5     0

         1     5     0

         1     2     0     0

         1     5     0

         1     2     0     0

         1     5     0

         6     5     0

         2     8     5     0

         1     5     0

         1     7     5     0

         2     6     5     0

         1     5     0

    150 2700 150 550 800 150 800 400150 2700 150 4000 150 2850 2150 150

    2420

         4     0     5     0

    4200 150300 900 150 6850 150 1350 150 3500

         1     9     0     0

         3     5     0     0

         1     6     0     0

         7     5     0

         4     0     0

         7     5     0

         6     0     0

         8     0     0

         2     5     0     0

         8     0     0

         1     9     0     0

         1     5     0

         3     2     0     0

    5000

    3500

    2 27 5 1 50 25 75

    800 4200     3     0     0     0

         3     9     5     0

         8     5     0

         7     5     0

         8     5     0     4     5

         0

         7     5     0

         1     5     0

         7     5     0

         4     5     0

    2 45 3 00 0 2 45 13 70 245 1 500 2 44

    800

    350

    1 50 27 00

         D     1

     

    1

     1 11 1

      .

      .

    Tis consisted o a response to a brie that demanded a residence or a amily o 4 andthen a side house or additional amily members given the extended system common

    in Ghana. Te challenge here was to have seperation o both houses in the interiorbut to make them appear on the exterior as one whole unit. In the end, the responseleveraged this to provide an interesting volumetry to the residence giving a central highroo surrounding marking the entrance and common areas flanged by two lower rooscovering the service parts o the residence.

    Double or One

    23

  • 8/16/2019 Portfolio HMY 2016S

    23/26

    23

    UP

    9

    8

    7

    6

    5

    4

    3

    2

    1

    18

    17

    16

    15

    14

    13

    12

    11

    10

    Garage

    Hall  Kitchen

    DinningArea

    Store

    WICloset

    Bedroom

    WICloset  Bath

    WC

    MasterBedroom

    WIClosetWICloset

    FamilyArea

         8 .     2

         3

    Bath

    3

    3

    4

    4

    1

    1

    5

    5

     A A

    B B

    C C

    D D

    E E

    F F

    2

    2

    6

    6

     A1 A1+0.45

    +0.30

    +0.30

    +0.30

    +0.30

    1

    2

    3

    1

    2

    3

    +0.30

    PORCH

    TERRACE

    1

    2

    3

    4

         4 .     5     0

         0 .     1

         5

         0 .     5

         0     1 .     0     0

    D1W1

       W   2

       W   3

    W2 W3

       W   3

       W   3

       W   3

    D3

         D     2

         D     3

    D3

    D3

         D     3

         D     4

         D     2

    D4

         D     2

    D4

    D4

    G1

    1

    A110

    2

    A110

    3

    A110

    Pedestrian Entrance

    2B

    2B

    CarEntrance CarEntrance

    Archway

    3.003.00

    3.50

         0 .     9

         5

         1 .     6

         0

         2 .     9

         5

         1 .     5

         0

         0 .     1

         5

         1 .     5     0

         0 .     1     5     1 .     2

         0

         0 .     6

         0     0 .     1

         5     0 .     6

         1

         4 .     5

         0

         4 .     7

         1

         0 .     1

         5

         2 .     2

         0

         4 .     6

         0

    7.00

    2.00 0.15 2.00

    D1 D1

    5A

    5A

    4A

    4A

    5B

    5B

       W   3

         D     2

    D4

         D     4

    D3

    D3

         3 .     0

         0

         1 .     5     0

         0 .     1

         5

         5 .     6

         5

    W3 W2

    W3W3

       W   3

    Landing

    G1

    3.65 3.65 2.25 5.93 4.14 3.65

    0.69 2. 50 1. 07 2.50 1. 01 1 .50 0 .92 3. 00 0. 71 1. 50 0.71 3.00 1. 79 1. 20 1 .307.45 2.10 4.29 1.64 4.29 3.65

    23.42

         2 .     3

         5

         4 .     7

         1

         1 .     8     0

         4 .     5     0

         2 .     5

         0

         2 .     3

         3

         2 .     5

         0

         0 .     8

         0

         0 .     7

         5

         1 .     6

         0

         0 .     7

         5

         1 .     1

         0

         1 .     2     0

         1 .     4

         0

         1 .     2

         0

         2 .     4     0

         1 .     2

         0

         1 .     2

         5

         7 .     3     0

         1 .     5     0

         4 .     8

         6

         2 .     5

         0

         2 .     3

         3

         1     6 .     1     6

    3.65 3.65 2.25 5.93 1.43 2.71 1.59

    2 .9 2 1 .2 0 1. 03 0 .7 5 1 .0 0 0 .7 5 1 .1 5 1. 20 0 .5 8 0 .9 0 0 .4 7 3 .5 0 1 .2 9 0 .7 5 4 .9 8 0 .7 5 0. 4110.55 5.78 1.43 4.45 1.43

    23.63

         1 .     7

         5

         4 .     7

         5

         4 .     7

         1

         1 .     8     0

         4 .     5     0

         6 .     2

         0

         0 .     7

         5

         1 .     0

         6

         1 .     2

         0

         1 .     6

         8

         1 .     2

         0

         0 .     7

         3

         0 .     7

         5

         2 .     3

         8

         0 .     7

         5

         2 .     2

         6

         1 .     1

         5

         7 .     6

         5

         3 .     3

         6

         5 .     0

         5

         1 .     7

         5

         1     8 .     9

         5

         3 .     1     0

         1 .     2

         8

         0 .     8

         0

         1 .     4

         5

         1 .     2

         5

         0 .     5

         0     0 .     1

         5

         2 .     1

         1

         0 .     1

         5

         2 .     3

         0

    5.78

         4 .     2

         6

    2 .81 0 .1 5 1 .8 0

         2 .     0

         1

         4 .     6

         0

    0 .3 0 1 .7 0 0. 15 5 .78

    1.65 0.15 2.55

    0.300.30

    0.30

    0.00

    1.20

    3 .5 0 0 .1 5 3 .5 0 0 .1 5 2. 10 0. 15

    3.99 0.15 1.64 0.15 3.99 3.65 0.15

         1 .     6

         0

    0 .6 4 1. 71 2 .3 1 1 .7 1 0 .64

    5.38 1.62

         3 .     8

         7

         2 .     9

         1

         0 .     5

         3

    2.72

         2 .     5

         5

         1 .     1

         5

    1.00

    2.00 0.15 2.20

         2 .     0

         0

    2.35

       W   2

       W   2

    GW1 GW1

    GW2

    GW2

       W   2

       W   1

    W2

    D3 D3

    . - . .

     

    :

      :

      :

     

    .

    .

    . ²

      . ²

    . ²

      . ²

    . ²

    . ²

    . ²

    . ²

    . ²

    . ²

    . ²

    . ²

    . ²

      . ²

    . ²

    . ²

     

    . ²

    . ²

    . ²

    . ²

    . ²

    . ²

      . ²

    . ²

      . ²

    . ²

    . ²

    . ²

    . ²

    . ²

    . ²

    . ²

    . ²

    UP18

    17

    16

    15

    14

    13

    12

    11

    10

    9

    8

    7

    6

    5

    4

    3

    2

    3

    3

    4

    4

    1

    1

    5

    5

     A A

    B B

    C C

    D D

    E E

    F F

    2

    2

    6

    6

     A1 A1

    1

    A110

    2

    A110

    3

    A110

    2B

    2B

    D1 D1

    5A

    5A

    4A

    4A

    5B

    5B

    D2

    D2

    D2

    D2

    D3

    D3

    D3D3

    D3 D3

    D2

    D2

    D2

    D3

    D2D2

    VIEWONLIVINGAREABELOW

       W   3

       W   2

       W   2

       W   3

       W   3

    W3W3

       W   3

       W   3

    W2W3 W3

       W   3

       W   3

    W2W2

    W2

    Bedroom

    Bedroom

    Study

    Kitchenette

    Store

    Bath

    Bedroom

    WICloset WICloset

    LivingArea

    WICloset

    BathBath

    WICloset

    Balcony

    Balcony

    Balcony

    Balcony

    Landing   W   1

    W3

         2 .     3

         5

         4 .     7

         1

         1 .     8

         0

         4 .     5

         0

         2 .     5

         0

    3.65 3.65 2.25 5.93 1.43 2.71 1.59

         1 .     7

         5

         4 .     7

         5

         4 .     7

         1

         1 .     8

         0

         4 .     5

         0

    3.65 3.65 2.25 5.93 4.14 3.65

    2. 92 1. 20 1. 03 0. 75 1. 00 0. 75 1. 15 1. 20 0. 60 0. 85 5.29 0. 75 4.98 0. 75 0. 41

    16.33 1.43 4.45 1.43

    23.63

         2 .     2

         6

         0 .     7     5

         2 .     3

         8

         0 .     7

         5

         0 .     7

         3

         1 .     2

         0

         1 .     6

         8

         1 .     2

         0

         1 .     0

         6

         0 .     7

         5

         2 .     6

         4

         0 .     8

         5

         1 .     2

         5

         1 .     4

         6

         1     8 .     9

         5

         1 .     7

         5

         5 .     0

         5

         4 .     5     6

         4 .     0     0

         3 .     6     0

    7.30 2.25 10.22 3.65

    1.53 0.75 5.50 1.50 2.23 1.20 3.91 1.20 3.10 1.20 1.30

    23.42

         8 .     4

         0

         0 .     7

         5

         1 .     6

         0

         0 .     7

         5

         3 .     3

         0     2 .     5

         0

         4 .     8     6

         1 .     5

         0

         4 .     8

         0

         1 .     1

         5

         1 .     9

         0

         1 .     8

         5

         1     4 .     8

         1

         2 .     9     5

    6.03

    3 .5 0 0 .1 5 2. 35 0 . 15 1. 00 0. 15 2. 10 0. 15 5 .78 0 .1 5 1 .2 9 0 .6 00 .1 5 2 .7 4 0 .1 4 2 .8 8

         7 .     8

         5

         1 .     5

         0

         0 .     1

         5     1 .     2

         0

         0 .     6

         0     0 .

         1     5     0 .     6

         0

         4 .     5

         1

         2 .     2

         0

         2 .     3

         1

         3 .     7     0

    3.50

         4 .     5     6

         2 .     0

         1

    3.32

    W1

    D3

    . - . .

     

     A B C D A1

    Hall Family Area

    DEPTHLEFTTO ENGINEERS

    1 8 

    +9.91

    50X [email protected]

    RidgeCap

    4

    A110

    D1

         0 .     1

         7

         0 .     1

         8

         1 .     9

         4

         2 .     8

         0

         3 .     0

         0

         0 .     4

         5

     

    + . 1

     .

     .

     .

     .

     .

     :  :

    :  :

    Tis project brie demanded or a 2-storey 6 Bedroomresidence spacious enough to allow or a large amily .Te response envisaged a contemporary hipped roostyle house that incoporates passive ventilation othe roofing system to counter the high temperaturesrecorded in this part o Ghana.

    Te large one...

    24

  • 8/16/2019 Portfolio HMY 2016S

    24/26

    24

    As a ervent believer in the ideal architect as propounded by Vitrivius in his 10 books onarchitecture, i engage in a number o writings on architectue, the city and urban policy.I maintain a blog and contribute to the architecture news portal Arch2.O

    Writing Samples

    Urban Planning in Arica – Could we leaprog?

    Te world as we know it is undergoing undamental change in spatial patterns. Indeed it has been so or a while.

    Settlement patterns are one o the most dynamic acets o the human experience; in act they are, as we know it, a

    reflection o any civilization in space as history is with respect to time.

    In 2007,we passed a landmark in history, where more than hal o the world’s population officially lived in urban areas.

    According to projections rom the United Nations, a dip is nowhere near; urbanisation is set to reach about 85% and

    65% by 2050 in developed and developing countries respectively. By figures that will mean that, population gain in

    urban areas is projected at 2.6 billion, absorbing all population growth expected by 2050 whiles drawing in more people

    rom rural areas.

    Now considering the developing world, Arica is set to see an increase by 0.9 billion. Tis will mean increased pressure

    on urban areas with its attendant effects, high demand in services and acilities.

    Tere is no doubt that the cities in the developing world are the attractors. In Arica, i you want to be in the flow

    o opportunities move to a city! Te rising middle-income class is happening in the cities, the Internet, mobile and

    other technology revolutions are all happening there mainly because inrastructure is existent, acilities are somewhat

    provided and more so political power has is domiciled there.

    Cities are a rich mix o economic, social and cultural dynamics. Like magnets they attract!

    In spite o all these opportunities in the city, challenges persist, planning is a headache, most cities do not have

    urban master plans to control development, they thus move with the wind. In situations were they exist, they are not

    implemented or are ar out-dated with such an increasing urbanisation rate.

    Te conclusion one can easily draw is that to most Arican governments who are plagued with other major problems,urban planning is a “luxury”. It is not too much o a priority; in as much as we can leave the people to make their own

    cities why bother?

    One could imagine that in such a state o affairs everything passes in the city, chaos is the order. Challenges reach new

    heights and sometimes grow out o proportion, compounding issues.

    In the shadow o this absence o planning a lot goes on with the city. Development is by piecemeal. It is more or less like

    a tasteless potpourri made up o bits and pieces, a patchwork to say the least.

    aking my city Accra as a case, over the past decade we have seen the springing up o gated communities to its north-

    eastern part mainly around the current Kotoka International Airport. What has that engendered? A striking dichotomy

    o Accra and Accra, affluent neighbourhoods with major acilities and the less downtown ones with practically nothing.

    Te historic inner core o the city (mainly the majority Ga communities) is deserted with poor acilities. Another pop-

    up eature is the recent so called airport city, with major new developments springing up here and there like an invasion

    somewhat creating a ghetto. Tese are just minor developments, which could have been mastered in the presence o a

    master plan.

    In the light o all these, my view is that i Arica is to develop we should begin to take planning o our cities serious,

    especially with the projections o urbanisation we will see in the coming years. As it were, most o these challenges will

    be captured i we are to plan our cities. Urban sprawl, ghettoization o affluent and poor neighbourhoods, communal

    means o transport, health and educational acilities etc. will all be thought through in a typical master plan, projections

    made and strategies put in place. Aren’t these the same problems our governments have been trying to solve? I am more

    than convinced that to tackle the many ills o the Arican society, we should begin to start planning our cities, and in

    earnest whiles making room or the approaching 0.9 billion!

    Making a case or urban design o our cities brings to light, the issue o which particular model in view o the

    numerous ones the field o urbanism has witnessed through history.

    As a continent, we were able to leaprog to mobile technology .we have done so in other technology fields in

    some ways because or instance there was a lack o inrastructure as in the case o fixed-line telephony. But

    one o the main reasons that gives us this urge is because we lurk behind mostly, that gives us a second-comer

    advantage. We should begin to seriously make the best out o this.

    Now, getting back to which model o urban design I believe we could once again, leap rog to sustainable urban

    design. Most o the models we see and hear o rom Howard’s garden city, to Le Corbusier’s radial city o the

    industrial heights down to post-ordist green urbanism have all been responses in some sort to crisis that

    plagued the human society.

    We in Arica need not relive the same experiences; we have the second-comer advantage to leaprog to

    sustainable urbanism. By this we will be looking at all acets o sustainable development in our planning.Tat

    will mean economic, social and environmental improvement and equity or our population.

    Sustainable urban planning will mean checking urban sprawl through compact cities, being resource efficient,

    providing or communal means o transport, addressing social and economic equity among others.

    Current models o western sustainable urbanism are in most cases more or less “accessorization” o buildings,

    i.e. attaching gadgets to buildings. Some are what I describe as sustainable “upgrading” or “infill” as most o the

    inrastructure exists already.

    Our case with Arican cities is different. Inrastructure is inexistent or below standard. We will have to really

    look at the whole big picture, pick through elements that will have a domino effect o sustainability, an integrated

    systems approach I guess.So, my view is that in aiming at taking urban design seriously we could leap rog to integrating sustainable

    development principles and i n doing that I believe the way to go is through an ecosystem approach o integration.

    Systems, which work like a natural ecosystem, where all is systemised, loops are closed, no waste!

    Above all, we should not orget to contextualise these concepts. Te Arican context should be in no way lef

    out that will bring out our true identity.

    Published on p.53 o AFRIKArchi Magazine Issue #2 2014.

    25

  • 8/16/2019 Portfolio HMY 2016S

    25/26

    Most laptop users preer laying in bed whiles using their computers. One worrying eatureis that these users place the computers on the laps or stomachs,the ensuing heating could beharmul to ones health.Propc is a lightweight support system made o recyclable bamboo or wood which could helpprevent health related issues.

    “Propc”

    2626

  • 8/16/2019 Portfolio HMY 2016S

    26/26

    “I believe in the exitence o a supreme creative mind,we are only drawing rom itwhen we design”

    Hassan Mohammed Yakubu.