Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners February 13, 2017 CERTIFICATE 26030 RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 787 7th Avenue, southeast corner of West 52nd Street and 7th Avenue, Manhattan, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7278-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

Upload: others

Post on 01-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26030 RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 787 7th Avenue, southeast corner of West 52nd Street and 7th Avenue, Manhattan, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7278-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26031 RESOLVED That the Design Commission, having considered designs for the installation of HVAC equipment, Manhattan Family Court, 60 Lafayette Street, Manhattan, submitted by the Department of Citywide Administrative Services, represented by exhibits 3887-S, T, U & V of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that DCAS will request funding for the conservation and reinstallation of Three Forms (1976) by Roy Gussow, including a new base, within the next fiscal year. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26032 RESOLVED That the Design Commission, having considered designs for the installation of coping, Spuyten Duyvil Branch Library, 650 West 235th Street, Bronx, submitted by the Department of Design and Construction and the New York Public Library, represented by exhibits 3716-L, M, N & O of record in this matter, hereby gives to the same unanimous preliminary and final approval. Commissioner Morgenthau recused herself. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26033 RESOLVED That the Design Commission, having considered designs for the installation of two exhaust fans, 4409 Park Avenue, Bronx, submitted by the Department of Design and Construction, represented by exhibits 7279-A, B, C & D of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26034 RESOLVED That the Design Commission, having considered designs for the construction of the 40th Police Precinct and adjacent site work, East 149th Street and St. Ann’s Avenue, Bronx, submitted by the Department of Design and Construction, represented by exhibits 2169-CM, CN & CO of record in this matter, hereby gives to the same unanimous final approval with the understanding that a conceptual proposal for the two Percent for Art projects will be submitted by October 2017. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26035 RESOLVED That the Design Commission, having considered designs for the rehabilitation of the Jerome Park Reservoir, Goulden Avenue, Sedgwick Avenue, and Reservoir Avenue, Bronx, submitted by the Department of Environmental Protection, represented by exhibits 1537-BG, BH, BI & BJ of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that, after the shutdown of the Delaware Aqueduct is complete, DEP will reevaluate the feasibility of the removal of the buttress wall and repair and repointing of the east basin wall. Final approval is conditioned upon commencement of work before February 13, 2020, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26036 RESOLVED That the Design Commission, having considered designs for the installation of an emergency generator, Eric M. Taylor Center, 10-10 Hazen Street, Rikers Island, East Elmhurst, Queens, submitted by the Department of Correction, represented by exhibits 1554-RE, RF & RG of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26037 RESOLVED That the Design Commission, having considered designs for the construction of a fenced-in planted area, 339 Pacific Street, Brooklyn, submitted by the Department of Transportation, represented by exhibits 7280-A B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26038 RESOLVED That the Design Commission, having considered designs for the construction of stairs and a planted area, 2018 East 7th Street, Brooklyn, submitted by the Department of Transportation, represented by exhibits 7281-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26039 RESOLVED That the Design Commission, having considered designs for the installation of distinctive lighting, World’s Fair lightpoles, Phase I, Jamaica Avenue from Forest Parkway to 98th Street, Jamaica, Queens, submitted by the Department of Transportation, represented by exhibits 5121-BY, BZ & CA of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that DOT will (1) continue to monitor the effectiveness of the lighting under the elevated train and (2) pursue additional pedestrian lightpole designs that are approporiate for the variety of site conditions found througout the city. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26040 RESOLVED That the Design Commission, having considered designs for the construction of an adult fitness area, Inwood Hill Park, Dyckman Street and the Hudson River, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 1835-AS, AT, AU & AV of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon submission of this project for final review and approval before February 13, 2019. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26041 RESOLVED That the Design Commission, having considered designs for the construction of two adult fitness areas, Alley Pond Park, 73rd Road and 224th Street, Union Turnpike and Winchester Boulevard, Oakland Gardens, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 1886-EU, EV & EW of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon submission of this project for final review and approval before February 13, 2019. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26042 RESOLVED That the Design Commission, having considered designs for the installation of an artificial turf field, Crotona Park, Crotona Park North at Prospect Avenue, Bronx, submitted by the Department of Parks & Recreation, represented by exhibits 177-DY, DZ, EA & EB of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon submission of this project for final review and approval before February 13, 2019. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26043 RESOLVED That the Design Commission, having considered designs for the reconstruction of a playground and construction of a sidewalk, Ida Court Park, North Railroad Street, Ida Court (formerly Heenan Avenue), Drumgoole Road East, and Korean War Veterans Parkway, Staten Island, submitted by the Department of Parks & Recreation, represented by exhibits 7282-A & B of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon submission of this project for final review and approval before February 13, 2019. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26044 RESOLVED That the Design Commission, having considered designs for the reconstruction of a playground, Evergreen Park, adjacent to P.S. 68, St. Felix Place, Seneca Avenue, and 75th Avenue, Ridgewood, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 4683-M, N, O & P of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that, in consideration of the Parks Without Borders initiative, replacement of the existing 12’H fence with a lower fence will be included as an add-alternate for the project. Commissioner Nielsen recused herself. Preliminary approval is conditioned upon submission of this project for final review and approval before February 13, 2019. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26045 RESOLVED That the Design Commission, having considered designs for the reconstruction of the East River Esplanade, Phase I, East 88th Street to East 90th Street and East 114th Street to East 115th Street, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 2238-NH, NI & NJ of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that DPR will (1) continue to develop barriers that mitigate noise and provide flood protection, possibly with a polycarbonate attachment; (2) provide optimal conditions for tree growth by incorporating continuous soil trenches with permeable pavers wherever possible; (3) critically examine all existing trees for health and longevity and replace trees that are in decline, particularly the Platanus, which is not salt tolerant; and (4) provide a drawing illustrating the relationship between the barrier and flood elevation with the corresponding storm or regulatory guideline(s) noted. Preliminary approval is conditioned upon submission of this project for final review and approval before February 13, 2019. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26046 RESOLVED That the Design Commission, having considered designs for the rehabilitation of Broadway Malls, West 102nd Street to West 104th Street and West 137th Street to West 139th Street, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 4238-AD, AE & AF of record in this matter, hereby gives to the same unanimous preliminary approval, noting that during construction, the triangular geometry repeated throughout the West 138th Street to West 139th Street mall should be carefully detailed, as it has the potential to create visually unappealing gaps. Commissioner Sheffer recused herself. Preliminary approval is conditioned upon submission of this project for final review and approval before February 13, 2019. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26047 RESOLVED That the Design Commission, having considered a final report for the construction of the Putnam Rail Trail, Van Cortlandt Park, Bronx, submitted by the Department of Parks & Recreation, represented by exhibits 1960-CJ & CK of record in this matter, hereby gives to the same unanimous final approval with the understanding that (1) additional sections of the concrete boardwalk will be included as the first add-alternate and (2) before this project can be constructed, coverage under NYS Department of Environmental Conservation’s SPDES General Construction Permit must be obtained, per standard procedure. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26048 RESOLVED That the Design Commission, having considered a final report for the reconstruction of Astoria Health Playground, 14th Street between 31st Avenue and 31st Road, Astoria, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 1956-AB & AC of record in this matter, hereby gives to the same unanimous final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26049 RESOLVED That the Design Commission, having considered designs for the reconstruction of Bergen Beach playground, adjacent to P.S. 312, Avenue N and East 71st Street, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 3577-S, T, U & V of record in this matter, hereby gives to the same unanimous final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26050 RESOLVED That the Design Commission, having considered designs for the reconstruction of Epiphany Playground, Berry Street between South 9th Street and South 10th Street, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 7241-E & F of record in this matter, hereby gives to the same unanimous final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26051 RESOLVED That the Design Commission, having considered designs for the reconstruction of Newport Playground, including a comfort station, adjacent to P.S. 41, Riverdale Avenue between Thatford Avenue and Osborn Street, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 3657-G, H, I, J & K of record in this matter, hereby gives to the same unanimous final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26052 RESOLVED That the Design Commission, having considered designs for the reconstruction of Playground 35 XXXV, Steinway Street and 35th Avenue, Long Island City, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 7240-E & F of record in this matter, hereby gives to the same unanimous final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26053 RESOLVED That the Design Commission, having considered designs for the construction of flood resiliency infrastructure, New York Aquarium, Coney Island Boardwalk, West 5th Street, Surf Avenue, and West 8th Street, Brooklyn, submitted by the Department of Parks & Recreation, the Department of Cultural Affairs, and the Wildlife Conservation Society, represented by exhibits 2587-GM, GN, GO & GP of record in this matter, hereby gives to the same unanimous preliminary approval. Preliminary approval is conditioned upon submission of this project for final review and approval before February 13, 2019. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26054 RESOLVED That the Design Commission, having considered designs for the installation of signage, Bronx Terminal Market, 700 Exterior Street, Bronx, submitted by the Economic Development Corporation, represented by exhibits 1272-CF, CG & CH of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26055 RESOLVED That the Design Commission, having considered a final report for the Removal and conservation of Abstraction (1942) by Ilya Bolotowsky, Day Room B-11, Coler-Goldwater Specialty Care Hospital and Nursing Facility, Roosevelt Island, Manhattan, submitted by the Economic Development Corporation, represented by exhibits 2034-DX, DY & DZ of record in this matter, hereby gives to the same unanimous final approval with the understanding that a proposal for the reinstallation procedures will be submitted for review and approval by June 2017. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26056 RESOLVED That the Design Commission, having considered designs for the installation of interim flood protection measures, 44-36 Vernon Boulevard, 5-40 44th Drive, Long Island City, Queens, submitted by the Emergency Management Department, the Department of Citywide Administrative Services, and the Department of Transportation, represented by exhibits 7228-E, F & G of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26057 RESOLVED That the Design Commission, having considered designs for the installation of interim flood protection measures, Rockaway Water Pollution Control Plant, Beach Channel Drive between Beach 104th Street and Beach 108th Street, Rockaway Park, Queens, submitted by the Emergency Management Department and the Department of Environmental Protection, represented by exhibits 2475-BI & BJ of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26058 RESOLVED That the Design Commission, having considered designs for the installation of interim flood protection measures, Astoria Houses, 4-21 Astoria Boulevard, Astoria, Queens, submitted by Emergency Management Department, the Department of Parks & Recreation, and the Department of Transportation, represented by exhibits 2707-M, N & O of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26059 RESOLVED That the Design Commission, having considered designs for the installation of Wi-Fi equipment, Phase II, One Police Plaza, Manhattan, submitted by the New York City Police Department, represented by exhibits 3747-BZ, CA, CB & CC of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26060 RESOLVED That the Design Commission, having considered designs for the installation of rooftop equipment, Queens Central Library, 89-11 Merrick Boulevard, Jamaica, Queens, submitted by the Queens Library, represented by exhibits 3393-AJ, AK, AL, AM & AN of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director

  • Philip Aarons, Laurie Hawkinson, Richard Moore, Susan Morgenthau, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners

    February 13, 2017 CERTIFICATE 26061 RESOLVED That the Design Commission, having considered designs for the construction of two mixed-use residential towers and adjacent site work, Pier 6, Brooklyn Bridge Park, Furman Street, Atlantic Avenue, and Bridge Park Drive, Brooklyn submitted by the Brooklyn Bridge Park Development Corporation, represented by exhibits 6266-BZ, CA, CB, CC, CD, CE & CF of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that the windows fronting the BQE will be designed for sound attenuation and that the depth of the framing setbacks will be no less than 2’-7”. Final approval is conditioned upon commencement of work before February 13, 2019, and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on February 13, 2017. Justin Garrett Moore Executive Director