¿ Ru les Pfw Work with a valid work permit (PTW) required by the job Verify energy isolation before starting work Obtain authorisation before overriding or disabling safety critical equipment Obtain authorisation before entering a confined space Protect yourself against a fall when working at height €, Use the correct personal protective equipment (PPE) Ef when handling hazardous chemicals \J llliinr"thorisation before excavarion or entering Do not position yourself under a suspended load Do not smoke outside designated areas or bring potential ignition sources into process areas without authorisation Do not use your mobile phone/walkie-talkie while driving, follow the speed limit and use your seat belt #,w Rules /

Upload: ramlidisa

Post on 23-Oct-2015

15.451 views

Category:

Documents


691 download

DESCRIPTION

A brief presentation on Petronas 10 Zero Tolerant Rules that is used by Petronas Carigali Malaysia.

TRANSCRIPT

¿ Ru les

Pfw

Work with a valid work permit (PTW) required by the job

Verify energy isolation before starting work

Obtain authorisation before overriding or disablingsafety critical equipment

Obtain authorisation before entering a confinedspace

Protect yourself against a fall when working atheight

€, Use the correct personal protective equipment (PPE)

Ef when handling hazardous chemicals

\J llliinr"thorisation before excavarion or entering

Do not position yourself under a suspended load

Do not smoke outside designated areas or bringpotential ignition sources into process areas withoutauthorisation

Do not use your mobile phone/walkie-talkie whiledriving, follow the speed limit and use your seatbelt

#,w

Rules

/

DãltrËWork with a valid work permit (PTW) required bythe job rw

Have you:

¡ Been. briefed ÞV, y.oyr^ supervisor on the safetyrequrrements ol the lobl

7 Ensured compliance to all requirements of the PTW?

Been trained and are competent to carry out the jobsafely?

ldentified the hazards and assessed the risks?

ur Putin place appropriate control and recovery measures?

7 Communicated the permit and certificate requirements' to your team members?

ut Displayed the permit and certificate at the place of work?

u/ Obtained the right too.ls.and equipment and ensuredthey are rn good condrtlonl

,r/ Obtained the correct PPE for the job?

.,/ Been briefed on the emergency procedures?

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

PTW is a written and signed statement by an authorised person for workto be carried out under stated precautions.Reference: PTS 60.2001 - PETRONAS Croup Cuidelines for Permil toWork System

ZTGIIÑVerify energy isolation before starting work

Have you:

¿ Been briefed by your supervisor on the safetyv requirements of ihe job?

Checked that the PTW and relevant certificates suchas physical isolation certificate, electrical isolationcertificate and radiatior certificate have beenapproved?

Checked that the risht piece of eouioment ormachinery has been iölated, locked arid iagged?

Secured any, movable equipment or machinery thatyou are working on?

Confirmed that all stored energy has been safelyreleased?

Secured an individual or department lock at therelevant lockout box?

7 Ensured that all guards a,nd s.afety systems are putback when wor[< rs completedl

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

lsolation of energy systems including mechanical, electrical, hydraulic,thermal, chemical, pneumatic and ionising radiation.Refêrence: PTS 60.2117 - Energy lsolatiot-t Standard

,/

,/

,/

,/

Obtain authorisation before overriding or disablingsafety critical equipment

Have you:

,/ Been briefed þy y.oyl supervisor on the safetyrequrrements ol the Jobl

..r/ Checked whether the risk assessment has been' conducted and approved?

./ Obtained an approved certificate and valid PTW' before overridiñg or disabling safety critical

equipment?

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

Refèrence; PTS 60.2212 - Bypassing of Safety Critical Equipment

Obtain authorisation before entering a confinedspace

Have you:

u/ Been briefed Þy your supervisor on the safetyrequirements of the job?

¿ åJTtt,{39

confined space entry training and been

_7 Been certified medically fit for confined spacev entry?

¿ Obtained..g PTW go.mp[e,!e with confined space' entry certificate and checklist?

¡ Been briefed on entry requirements?

.r/ Ensured ga.s tests are carried out prior to entry and' as requiréd by the PTW?

Registered with a competent stand-by person at theentry porntl

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

Confined space is a space that is large enough for personnel to enter,has limited'or restricted means of entl and is áot deiigned for normal orcontinuous occuDancv.Reference: PTS 60.2tbS - fntry lnto Confined Spaces

Âq

Protect yourself against a fall when working at height Use the correct personal protective equipment (PPE) øwhen handling hazardous chemicats f

Have you:

.7 Been briefed by your supervisor on the safetyv requirements of ihe';ob? '¡

/ |n"Så,Jjti"o and are competent to handle

-/ Understood the safety data sheet (SDS), chemical' gafgll^data sheet (CSDS) or material safety data sheet(MSDS) of the chemicals?

uz Read ald understood the procedure for safe' chemical handling?

'r/ Checke.d th" nearest-eye wash, emergency shower' and spill cleaning kit? '

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

Chemical handling is the safe operations of receiving, storing, discharging,transporting and disposing chemicals.Reference: PTS 60.1502 - Chentical Management Program

Have you:

Been briefed by your supervisor on the safetyrequirements of ihe';ob? '

/ 5!:Ël:1Jjtå:|!l" platform has proper guard rails and

Used only approved scaffoldingwith valid inspectiontag(

-7 Secured your tools and equipment to prevent themv from fallihg from height? I I

-/ Ensured three points of contact is maintained at all' times when usÍng the ladder?

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

Working at height means working above 2 metres.Reference; PTS 60.2104 - Working at Height

.lE ',4

Obtain authorisation before excavation or entering L/a trench

Have you:

u/ Been. briefed ÞV. ygyr supervisor on the safetyrequrrements o1 the .¡obl

Checked for buried services and

Checked that the issued PTWexcavation certificate?

Ensured eme.rgency plans andbeen put in plate?

position yourself under a suspended load

Have you:

/ Been briefed by your supervisor on therequirements of the job?

uz Checked that all lifting equipment have been testedand certified by authorities?

Obtained a PTW and lifting certificate?

Ensured that th.e operator, rigger and signal man arecompetent and ceh¡fied?

Ensured a lifting plan has been prepared and thel!ft. is .assessed 6y a competent þers'on for criticallifting?

Checked that the load is within the safe workingload of the lifting equipment?

Checked that the tagline is attached to the load?

Barricaded the area?

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

Lifting operations .are lifts. utilising all mechanical lifting devices such ascranes, hoists and chain blocks. -

Re-f-ere,-nce: Pl-S 60.2103 - Litting Ope:rations

t

safety

other hazards?

is complete with

procedures have

Excavated manually usinq spades with woodenhandles to. expose' burieð services before usingmechanical eqüipment?

Ensured a correct shoring system is put in place withappropriate underground þrotectioil meaöures?

Erected. rigid signs and barriers around theexcavat¡onl

Provided safe access and egress to excavationtrenches?

Ensured confined space entry procedures area.pplied for excavatión of morê than ,l.5

metresdeepl

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

Excavation ìs work that involves a man-made cut, cavitv, trench ordepression in the earth's surface formed by earth removal'. Trench is anarrow excavation made below the surface of the ground.Rerferenc.e: PTS 60.21 l6 - f xcattation

,/

,/

,/

,/

,to t1

Rules

Do not smoke outside designatedpotential ignition sources intowithout authorisation

Do not use your mobile phone/walkie-talkie whiledriving, follow the speed limit and use your seatbelt

Have you:

,/ Been authorised to operate the vehicle and have avalid driving licence?'

,r/ Completed the specified daily checks and ensuredthe vêhicle can be operated sáfely?

,r/ Checked that seat belts are available and worn by alloccupants?

.,,/ Secured all materials and equipment carried by thevehicle?

uz Adhered to all traffic regulations?

{ Ensured that the vehicle is used for its intendedpurpose?

/ Ensured IheI your vehicle's engine is not left runningunattended?

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

Driving is the operation of all types of roaowned, leased and hired vehicles and thoseReterevrcer; PTS 60.2401 - LandTransportatNlinintum Star¡darcls ancJ Key Perforntance

areas orprocess

bringareas

Have you:

,/ Been briefed ÞV. your supervisor on the safetyrequirements of the job?

,,/ Rectified or eliminated leaks immediately?

u/ Ensured hot work permit is obtaìned and gas testsdone betore carrying out hot work?

.,r/ Obtained hot work permit before using engine-driven equipment, vehicles and any otheapotentialignition sources in process areas?

lf you are facing difficulty with any of the requirements, consultyour supervisor before starting a job.

lgnition sources ìnclude mechanical sparks, fire, hot surfaces, auto¡gnit¡on, pyrophoric materials, mechanical impact, friction, electricaleq u i p me nt an d e I ectrostatic.Re/þrence: PTS 60.2123 - lgnitìon -9o¿r¡ce Control

4E