ANALISA MANUAL PERHITUNGAN
Perhitungan Tower Crane Mataram Mall 2nd Project
8 / 8 / 2007
ANALISA MANUAL PERHITUNGAN
PONDASI TOWER CRANE JIB 30 m
Oleh :
Planing Engineering Structure Architecture
Kontraktor :
PT. ALKONUSA INTI DAYA JAKARTA
Konsultan Perencana - Pengawas :
PT. ARCHI METRIC - SURABAYA
MATARAM MALL 2nd PROJECT
Jalan Panca Usaha - Mataram
Diketahui :
1. Pembebanan
a. Berat Tower crane = 34.000 kg
b. Berat kolom + balok
= 0.6 * 1.8 * 1.8 * 2400= 4.666 kg
c. Berat Plat beton
= 4 * 4 * 1.2 * 2400= 46.080 kg
d. Pondasi tiang sumuran . n = 4
= 0.25 * 3.14 * 0.8 * 4 * 4 * 2400= 19.293 kg
TOTAL ( b + c + d ) = 70.039 kg
Asumsi awal :
Beban TC
Diteruskan
Beban kolom + sloof + plat pondasi
Diteruskan
Pondasi sumuran 80 cm
Diketahui :
1. dimensi kolom = 0.6 * 0.6
2. Tegangan ijin tanah= 270 Kn.m2
3. Beban TC= 340 Kn
Beban Tiap kolom= 340 / 4 = 85 Kn
Luas pondasi = 400 / 2 = 200 cm
=
A
P
W
M
=
)
2
*
2
(
85
2
*
2
*
)
6
/
1
(
*
*
)
12
/
1
(
2
L
P
= 21.25 1.9115
T max = 23.161 Kn.m
T min = 19.338 Kn.m
Syarat: T max T ijin tanah
: 23.25 270 .........................OK!
Kontrol geser
d = 600 50 11
= 539 mm
a= 2000 300 539
= 1161 mm
Vu= a * b * T ijin tanah
= 1161 * 2 * 270
= 626.94 Kn
Vc= *
c
f
'
*
6
1
* 2 * 539
= 0.8 * 0.1667 *
25
* 2 * 539
= 0.8 * 0.1667 * 5 * 2 * 539
= 718.67 Kn
Syarat: Vu Vc
: 626.94 718.67 .........................OK!
Tahanan Pondasi terhadap gaya angkat ke atas ( Up lift)
Diketahui : Gaya angkat maksimal 100 Ton = 1000 Kn ... (Trial)
C = T ijin tanah = 270 Kn.m2
= Sudut geser dalam tanah = 20
tanah = 18 Kn.m3
Cek apakah kuat terhadap gaya angkat (Up lift)
398
.
0
)
4
*
8
.
0
*
14
.
3
(
4
=
=
B
D
5
.
2