evsm.com 2000-2013 eVSM Quick Manufacturing Tutorial In this tutorial, you will learn to draw the map shown below, complete with calculations, and a chart Estimate Time: 20 minutes Update: 28-Jun-2013

Upload: vargas-crispin-arnold

Post on 18-Apr-2017

259 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: PDF de Evsm Tutorial

evsm.com 2000-2013

eVSM Quick Manufacturing Tutorial

In this tutorial, you will learn to draw the map shown below, complete with

calculations, and a chart

Estimate Time: 20 minutes

Update: 28-Jun-2013

Page 2: PDF de Evsm Tutorial

Start eVSMStep 1:

On your Desktop, click

the “Start eVSM” icon.

1

Click to enable

macros.

Click this button to

avoid the security

notice in future.

3

4

If you see a message like this,

you must “Enable” macros.

2

evsm.com 2000-2013

Page 3: PDF de Evsm Tutorial

Step 2: Make sure eVSM started OK

Save your drawing file. It’s

a good idea to save the

file in a new empty folder.

2

eVSM Toolbar must be available. If you do not see it,

check help at http://www.evsm.com/v6/nobuttons.

1

Quick eVSM stencils are on

the right. For this tutorial, you

will use the Quick Mfg LT

stencil.

4

This is the main eVSM

stencil, showing the eVSM

version number.

3

Page 4: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

Time Center

Customer

Center

Drag out the two red

icons first. This is

very important!

1

Align all new

shapes to the grid

as you drop them.

2

Enter available hours per day

here. This is actual work hours

after subtracting break time.

3

Enter customer

demand here.

4

When you drop your first shape

from Quick Mfg LT, the

Manufacturing Data shape will

appear automatically.

5

Initiate a Quick Manufacturing mapStep 3:

all

Customer

Customer Demand

ItemDay

100

A020

Page 5: PDF de Evsm Tutorial

Outside

Center

Inventory

Center

Activity

Center

The green shapes are called

“Centers”. Use the centers to

represent the flow.

Align all new shapes

to the grid as you

drop them.

Align the Inventory and

Activity centers so the VA and

NVA time shapes form a

continuous stepped timeline.

7

Day

Hr

5

Wk

Day

Draw the FlowStep 4:

1

2

3

all

Customer

Customer Demand

ItemDay

100

A050

1

Process

Activity Lead Time

Dayx.xx

A060

1

Type

Inventory Itemxx

A070

DayAuto

1

Process

Qty Per Cycle Item1

Cycle Time Minx.xx

1

A080

MinAuto

Page 6: PDF de Evsm Tutorial

Complete as shown

below, including

annotation and data

values.

Enter DataStep 5:

7

Day

Hr

5

Wk

Day

1

1

Derby Framemakers

Activity Lead Time

Day2

A100

1

Plain Frames

Inventory Item200

A110

DayAuto

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A120

MinAuto

1

Clean Frames

Inventory Item100

A130

DayAuto

1

Paint

Qty Per Cycle Item20

Cycle Time Day2.00

1

A140

MinAuto

1

Finished Goods

Inventory Item120

A150

DayAuto

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A160

MinAuto

1

Packing Cases

Inventory Item100

A170

DayAuto

all

Customer

Customer Demand

ItemDay

100

A180

If text does not fit, avoid re-

sizing eVSM shapes. Instead,

make the font smaller.

2

Double-click and

change “Min” to “Day”.

3

Do not change any blue

“Auto” values. These will get

calculated automatically later.

4

Page 7: PDF de Evsm Tutorial

Resize PageStep 6:

When you run out of space on

the drawing page, DO NOT

resize eVSM shapes.

1

Instead make the drawing

page bigger. Do not use the

“Page Setup” menu to resize

the page.

Hold the Ctrl key down on the

keyboard and grab/move any

edge of the page to resize it.

2 3

Do not worry about how big

the page gets and do not

worry about printing.

4

evsm.com 2000-2013

Page 8: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A100

1

Plain Frames

Inventory Item200

A110

DayAuto

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A120

MinAuto

1

Clean Frames

Inventory Item100

A130

DayAuto

1

Paint

Qty Per Cycle Item20

Cycle Time Day2.00

1

A140

MinAuto

1

Finished Goods

Inventory Item120

A150

DayAuto

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A160

MinAuto

1

Packing Cases

Inventory Item100

A170

DayAuto

all

Customer

Customer Demand

ItemDay

100

A180

Draw the arrows from the

Main stencil on left

Glue all arrows

at both ends

Use the right mouse button

menu of the arrows to turn

into a “Push” arrow

Add Arrows from main stencilStep 7:

1

2

3

Page 9: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A120

1

Plain Frames

Inventory Item200

A130

DayAuto

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A140

MinAuto

1

Clean Frames

Inventory Item100

A150

DayAuto

1

Paint

Qty Per Cycle Item20

Cycle Time Day2.00

1

A160

MinAuto

1

Finished Goods

Inventory Item120

A170

DayAuto

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A180

MinAuto

1

Packing Cases

Inventory Item100

A190

DayAuto

all

Customer

Customer Demand

ItemDay

100

A200

Drag out the Time

Summary. Note, all fields

are “Auto”, so they will be

calculated automatically

Glue transport

shape to arrow

Use the right mouse

button menu to turn off

“Framing” and switch into

a “Train” iconTransport

Shapes

Add Transport shapes and the Time SummaryStep 8:

1

2

3

1

Time Summary

Takt TimeMinItem

Auto

Total Value Added

MinAuto

Lead Time DayAuto

Value Added Percent

%Auto

Z010

Transport

Shapes

Time

Summary

Page 10: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A110

1

Plain Frames

Inventory Item200

A120

Day2.00

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A130

Min20.00

1

Clean Frames

Inventory Item100

A140

Day1.00

1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A150

Min840.00

1

Finished Goods

Inventory Item120

A160

Day1.20

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A170

Min8.00

1

Packing Cases

Inventory Item100

A180

Day1.00

all

Customer

Customer Demand

ItemDay

100

A1901

Time Summary

Takt TimeMinItem

4.20

Total Value Added

Min868.00

Lead Time Day9.27

Value Added Percent

%22.30

Z200

Click the “Solve”

button to calculate

When complete, note that

all blue values show

calculated results

Perform CalculationsStep 9:

1

3

If you see any error

messages, please read

and follow instructions

2

Page 11: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A110

1

Plain Frames

Inventory Item200

A120

Day2.00

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A130

Min20.00

1

Clean Frames

Inventory Item100

A140

Day1.00

1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A150

Min840.00

1

Finished Goods

Inventory Item120

A160

Day1.20

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A170

Min8.00

1

Packing Cases

Inventory Item100

A180

Day1.00

all

Customer

Customer Demand

ItemDay

100

A1901

Time Summary

Takt TimeMinItem

4.20

Total Value Added

Min868.00

Lead Time Day9.27

Value Added Percent

%22.30

Z200

Use the right mouse

button menu of chart icon

and select “Plot Chart”

Drag out CT/TT

Chart icon

CT / TT

Chart

1

2

Cycle Time / Takt Time Chart

Min

/Ite

m

0

5

10

15

20

25

30

35

40

45

A130 A150 A170

Cycle Time Per Unit

Legend

Activity Takt Time

Here is the chart. Note how

it shows insufficient

capacity in all activities.

3

Add Cycle Time / Takt Time ChartStep 10:

CT/TT Chart

Page 12: PDF de Evsm Tutorial

Cycle Time / Takt Time Chart

Min

/Ite

m0

1

2

3

4

5

6

7

8

9

A130 A150 A170

Cycle Time Per Unit

Legend

Activity Takt Time

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A110

1

Plain Frames

Inventory Item200

A120

Day2

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

The Preparation team

actually has 3 stations

and works 2 shifts.

A130

Min20

1

Clean Frames

Inventory Item100

A140

Day1

1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A150

Min840

1

Finished Goods

Inventory Item120

A160

Day1.2

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A170

Min8

1

Packing Cases

Inventory Item100

A180

Day1

all

Customer

Customer Demand

ItemDay

100

A190

Step 11: Try Add-on Calculations

Activity

Stations

Activity Time

1

Add an Activity Time add-on

and set it to actual work hours

per day for this activity.

3

Run “Solve” and

note the changes in

the chart.

4

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.20

Total Value Added

Min868.00

Lead Time Day9.27

Value Added Percent

%22.30

Add the Activity Stations add-ons.

Be sure to glue the add-ons to the

Activity Centers.

2

Z010

Page 13: PDF de Evsm Tutorial

Cycle Time / Takt Time Chart

Min

/Ite

m0

1

2

3

4

5

6

7

8

9

A130 A150 A170

Cycle Time Per Unit

Legend

Activity Takt Time

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A110

1

Plain Frames

Inventory Item200

A120

Day2

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A130

Min20

1

Clean Frames

Inventory Item100

A140

Day1

1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A150

Min840

1

Finished Goods

Inventory Item120

A160

Day1.2

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A170

Min8

1

Packing Cases

Inventory Item100

A180

Day1

all

Customer

Customer Demand

ItemDay

100

A190

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.20

Total Value Added

Min868.00

Lead Time Day9.27

Value Added Percent

%22.30

Z200

Note how all these yellow add-on names start

with the word “Activity”. Yellow Add-ons that

follow a green Center can only be used with

that Center. So, these “Activity..” add-ons can

be used only with the Activity Center.

3

To get Help on Quick eVSM

icons, select the icon, then click

the iQ button in the eVSM

toolbar.

1

Step 12: Icon Help

See the pop-up help on the

drawing page. When done,

delete the help pop-up.

2

Page 14: PDF de Evsm Tutorial

Cycle Time / Takt Time Chart

Min

/Ite

m0

1

2

3

4

5

6

7

8

9

A130 A150 A170

Cycle Time Per Unit

Legend

Activity Takt Time

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A110

1

Plain Frames

Inventory Item200

A120

Day2

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A130

Min20

1

Clean Frames

Inventory Item100

A140

Day1

1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A150

Min840

1

Finished Goods

Inventory Item120

A160

Day1.2

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A170

Min8

1

Packing Cases

Inventory Item100

A180

Day1

all

Customer

Customer Demand

ItemDay

100

A190

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.20

Total Value Added

Min868.00

Lead Time Day9.27

Value Added Percent

%22.30

Z200

Step 13: Multi-path Modeling

What if this value stream has

parallel paths, one for painting

and one for enameling?

1

Delete the chart to create space

to draw the parallel path.

2

Page 15: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A130

1

Plain Frames

Inventory Item200

A140

Day2

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A150

Min20

1

Clean Frames

Inventory Item100

A160

Day1

1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A170

Min840

1

Finished Goods

Inventory Item120

A180

Day1.2

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A190

Min8

1

Packing Cases

Inventory Item100

A200

Day1

all

Customer

Customer Demand

ItemDay

100

A210

The time summary is no longer

correct, since it is showing the

sum of both paths.

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min2128.00

Lead Time Day12.77

Value Added Percent

%39.69

Z200

Draw the

“Enamel” path

1

Activity

Center

Inventory

Center

3

These Path Locator tags can be used to specify

paths. You can manually change these. You can

add new ones with copy/paste or from the main

stencil on left. Another way to specify paths is with

Sequence arrows and the Auto Path function. You

can try this in the next step.

4

Activity

Stations

Step 14: Multi-path Modeling

1

Clean Frames

Inventory Item50

A240

Day0.50

1

Enamel

Qty Per Cycle Item15

Cycle Time Day3

1

A250

Min1260.00

Stations Stn3

Change unit to Day

and run Solve

2

Page 16: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A130

1

Plain Frames

Inventory Item200

A140

Day2

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A150

Min20

1

Clean Frames

Inventory Item100

A160

Day1

1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A170

Min840

1

Finished Goods

Inventory Item120

A180

Day1.2

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A190

Min8

1

Packing Cases

Inventory Item100

A200

Day1

all

Customer

Customer Demand

ItemDay

100

A210

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min2128.00

Lead Time Day12.77

Value Added Percent

%39.69

Z2001

Clean Frames

Inventory Item50

A230

Day0.50

1

Enamel

Qty Per Cycle Item15

Cycle Time Day3

1

A240

Min1260.00

Stations Stn3

1

Clean Frames

Day0.50

Inventory Item50

A110

1

Enamel

Min3.00

Qty Per Cycle Item15

Cycle Time Day3

1

A120

Stations Stn3

Hold down the Ctrl key

and select the green

shapes in the order

shown here.

1

A

Click the Sequence

button.

2

BC E G

D F H

I

Step 15: Sequence Arrows

Page 17: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

1

Derby Framemakers

Activity Lead Time

Day2

A130

1

Plain Frames

Inventory Item200

A140

Day2

1

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A150

Min20

1

Clean Frames

Inventory Item100

A160

Day1

1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A170

Min840

1

Finished Goods

Inventory Item120

A180

Day1.2

1

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A190

Min8

1

Packing Cases

Inventory Item100

A200

Day1

all

Customer

Customer Demand

ItemDay

100

A210

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min2128.00

Lead Time Day12.77

Value Added Percent

%39.69

Z2001

Clean Frames

Inventory Item50

A230

Day0.50

1

Enamel

Qty Per Cycle Item15

Cycle Time Day3

1

A240

Min1260.00

Stations Stn3

1

Clean Frames

Day0.50

Inventory Item50

A250

1

Enamel

Min3.00

Qty Per Cycle Item15

Cycle Time Day3

1

A260

Stations Stn3

A

BC

E

GF H

I

For the second path, start again, hold

the Ctrl key and select the green

shapes A to I in the order shown.

Then click the Sequence button.

2

These Sequence

arrows show the

first path.

1

Step 16: Sequence Arrows for Second Path

D

Page 18: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

Derby Framemakers

Activity Lead Time

Day2

A010

Plain Frames

Inventory Item200

A020

Day2

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A030

Min20

Clean Frames

Inventory Item100

A040

Day1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A050

Min840

Finished Goods

Inventory Item120

A080

Day1.2

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A090

Min8

Packing Cases

Inventory Item100

A100

Day1

Customer

Customer Demand

ItemDay

100

A110

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min2128.00

Lead Time Day12.77

Value Added Percent

%39.69

A1401

Clean Frames

Inventory Item50

A150

Day0.50

1

Enamel

Qty Per Cycle Item15

Cycle Time Day3

1

A160

Min1260.00

Stations Stn3

Clean Frames

Day0.50

Inventory Item50

A060

Enamel

Min3.00

Qty Per Cycle Item15

Cycle Time Day3

1

A070

Stations Stn3

Sequence arrow visibility

can be switched On/Off

with this button. Try it.

3

Step 17: Use Auto Path to Generate Path ID’s based on Sequence Arrows

Click Auto Path to

automatically generate

Path Locator tags based

on Sequence arrows.

2

1

1

1

1

1

1

1

1

12

2

2

2

2

2

2

2

2

C

E

GF

D

Both paths are now represented

with Sequence arrows. Note that

you could have achieved the

same result for the second path

by selecting C-D-E-F

1

Page 19: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

Derby Framemakers

Activity Lead Time

Day2

A010

Plain Frames

Inventory Item200

A020

Day2

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A030

Min20

Clean Frames

Inventory Item100

A040

Day1

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A050

Min840

Finished Goods

Inventory Item120

A080

Day1.2

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A090

Min8

Packing Cases

Inventory Item100

A100

Day1

Customer

Customer Demand

ItemDay

100

A110

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min868.00

Lead Time Day9.27

Value Added Percent

%22.30

A1401

Clean Frames

A150

1

Enamel

A160

Clean Frames

A170

Enamel

A180

2

2

Clean Frames

Day0.5

Inventory Item50

A060

Enamel

Min1260

Qty Per Cycle Item15

Cycle Time Day3

1

A070

Stations Stn3Note how some centers

are on path 1 only and

some on both.

1

This summary is

for path 1.

2

Double-click to change

path number to 2 and

click “Solve” button in

toolbar.

4

Drag out a second

Summary Center.

3

Step 18: Time Summary by Path

2

Time Summary

Takt TimeMinItem

4.20

Total Value Added

Min1288.00

Lead Time Day9.77

Value Added Percent

%31.40

A190

1

1

1

1

1

1

1

1

12

2

2

2

2

2

2

2

2

Time

Summary

Page 20: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

Derby Framemakers

Activity Lead Time

Day2

A010

Plain Frames

Inventory Item200

A020

Day2

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A030

Min20

Clean Frames

Inventory Item100

A040

Day1.18

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A050

Min840

Finished Goods

Inventory Item120

A080

Day1.2

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A090

Min8

Packing Cases

Inventory Item100

A100

Day1

Customer

Customer Demand

ItemDay

100

A110

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min868

Lead Time Day9.27

Value Added Percent

%21.89

A1401

Clean Frames

A150

1

Enamel

A160

Clean Frames

A170

Enamel

A180

2

2

Clean Frames

Day3.33

Inventory Item50

A060

Enamel

Min1260

Qty Per Cycle Item15

Cycle Time Day3

1

A070

Stations Stn3

2

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min1288

Lead Time Day9.77

Value Added Percent

%24.34

A190

The totals are still

incorrect. They assume

100% product flow on

both paths.

Activity

Demand %

Inventory

Demand %

Step 19: Demand % for Each Path

1

Solve again and

study the results.

3

Demand Percent

%85

Demand Percent

%85

Demand Percent

%15

Demand Percent

%15

1

1

1

1

1

1

1

1

12

2

2

2

2

2

2

2

Use the Demand % add-

ons to specify actual

demand at each center.

2

2

Page 21: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

Derby Framemakers

Activity Lead Time

Day2

A140

Plain Frames

Inventory Item200

A150

Day2

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A160

Min20

Clean Frames

Inventory Item100

A170

Day1.18

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A180

Min840

Finished Goods

Inventory Item120

A190

Day1.2

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A200

Min8

Packing Cases

Inventory Item100

A210

Day1

Customer

Customer Demand

ItemDay

100

A220

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min868

Lead Time Day9.44

Value Added Percent

%21.89

A2301

Clean Frames

A240

1

Enamel

A250

Clean Frames

A260

Enamel

A270

2

2

Clean Frames

Day3.33

Inventory Item50

A280

Enamel

Min1260

Qty Per Cycle Item15

Cycle Time Day3

1

A290

Stations Stn3

2

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min1288

Lead Time Day12.60

Value Added Percent

%24.34

A300

Demand Percent

%85

Demand Percent

%85

Demand Percent

%85

Demand Percent

%15

1

1

1

1

1

1

1

1

12

2

2

2

2

2

2

2

2

Clean Frames

Day3.33

Inventory Item50

A110

Enamel

Min1260.00

Qty Per Cycle Item15

Cycle Time Day3.00

1

A120

Stations Stn3

Demand Percent

%15

Demand Percent

%15

Step 20: Miscellaneous

Explore the right-mouse-button

menus on the Path Locator tags.

Try highlighting all centers on the

selected path.

2

Highlight Path Activities

Remove Path Highlights

Select Path Shapes

Title Block

2

2

Add Title Block

1

DESCRIPTION

Paint Shop Current State

FILENAME

MFGLTTUTORIAL.VSD

REVISED

6/28/2013

TITLE

Deerfield Crafters

DATE

6/28/2013

Built with eVSM Quick Mfg Stencil

Page 22: PDF de Evsm Tutorial

7

Day

Hr

5

Wk

Day

Derby Framemakers

Activity Lead Time

Day2

A140

Plain Frames

Inventory Item200

A150

Day2

Prepare

Qty Per Cycle Item1

Cycle Time Min20

1

A160

Min20

Clean Frames

Inventory Item100

A170

Day1.18

Paint

Qty Per Cycle Item20

Cycle Time Day2

1

A180

Min840

Finished Goods

Inventory Item120

A190

Day1.2

Package

Qty Per Cycle Item1

Cycle Time Min8

1

A200

Min8

Packing Cases

Inventory Item100

A210

Day1

Customer

Customer Demand

ItemDay

100

A220

Stations Stn3 Stations Stn9 Stations Stn2

Activity TimeHr

Day14

1

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min868

Lead Time Day9.44

Value Added Percent

%21.89

A2301

Clean Frames

A240

1

Enamel

A250

Clean Frames

A2602

Clean Frames

Day3.33

Inventory Item50

A280

Qty Per Cycle Item15

Cycle Time Day3

Stations Stn3

2

Time Summary

Takt TimeMinItem

4.2

Total Value Added

Min1288

Lead Time Day12.60

Value Added Percent

%24.34

A300

Demand Percent

%85

Demand Percent

%85

Demand Percent

%15

Demand Percent

%15

1

1

1

1

1

1

1

1

12

2

2

2

2

2

2

2

DESCRIPTION

Paint Shop Current State

FILENAME

MFGLTTUTORIAL.VSD

REVISED

6/28/2013

TITLE

Deerfield Crafters

DATE

6/28/2013

Built with eVSM Quick Mfg Stencil

Use the right mouse button

menu of chart icon and select

“Plot Ladder Chart”

Drag out Lead

Time Chart icon

2

1

Step 21: Plot Lead Time Chart

Here is the Lead Time chart

showing the two paths.

3

Lead Time SummaryDay

0 2 4 6 8 10 12 14

A140

Derby

Framemakers

A150

Plain Frames

A170

Clean Frames

A180

Paint

A190

Finished

Goods

A210

Packing Cases

PATH 1

9.45

A140

Derby

Framemakers

A150

Plain Frames

A190

Finished

Goods

A210

Packing Cases

A280

Clean Frames

A290

Enamel

PATH 2

12.60

Activity Lead Time

Legend

Non Value Added

Value Added

Cycle Time / Takt Time Chart

Min

/Ite

m

0

5

10

15

20

25

30

A160 A180 A200 A250

Cycle Time Per Unit

Legend

Activity Takt TimeHere is the final CT/TT chart.

4

Lead Time

all

Page 23: PDF de Evsm Tutorial

1. Align shapes to the grid

2. Avoid re-sizing eVSM shapes

3. Glue everything possible

4. Do not Group eVSM shapes

5. Re-size page with Ctrl+Drag, not Page Setup

6. Use a mouse, even with a laptop

evsm.com 2000-2013

eVSM Quick Manufacturing Tips

Next Steps...

Explore example maps at http://www.evsm.com/examples