facility time pro wizard tutorial · calculations, and plot charts using the facility time pro...
TRANSCRIPT
Copyright © 2015 The eVSM Group, All Rights Reserved
This tutorial will guide you through the steps to draw a simple map, perform common
calculations, and plot charts using the Facility Time Pro Wizard.
Facility Time Pro Wizard Tutorial
3
Viewing/printing eVSM Tutorial:
This tutorial is designed for two
page layout. If printing, you will
need double-sided print.
For on-screen viewing, save the PDF
file to your PC and then open it in
Acrobat Reader (not in a web
browser). In the Acrobat menus,
click “View>Page Display", make
sure “Show Cover Page in Two Page
View” is checked and then select
"Two Page View”.
A00
10
A00
20
A00
30
A00
40
A00
50
A00
60
A00
70
A00
90
A01
00
A01
10
A01
20
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Shift 1 Shift 2 Long Shift 1 Long Shift 2
Copyright © 2015 The eVSM Group, All Rights Reserved
On your Desktop, click
the “Start eVSM” icon.
1
Click to enable
macros.Click “Trust all from
publisher” to avoid the
security notice in future.
3
4
If you see a message like this,
you must “Enable” macros.
2
Step 1: Start eVSM
4
Copyright © 2015 The eVSM Group, All Rights Reserved 5
Copyright © 2015 The eVSM Group, All Rights Reserved
Quick_eVSM
Learn eVSM BasicsStep 2:
Avoid re-sizing eVSM shapes. Instead
grow the drawing page when needed.
To resize the page, hold down the “Ctrl”
key, and then drag any page edge to the
required size. This method works on all
four edges of the page.
2
VSM
Save your Visio file and then
insert a new page via the right-
mouse menus on the page-tabs.
5
6
Copyright © 2015 The eVSM Group, All Rights Reserved
Learn eVSM Basics
Blue icons in the main stencil
represent families of shapes. Drag
out the Transport icon.
3
Use the shape’s
right-mouse menus
to turn it into a car
4
7
eVSM Help resources are available in
the Learn module of the toolbar. Hover
over each one to see what they do.
1
Copyright © 2015 The eVSM Group, All Rights Reserved
Click the Open button.
Select Facility Time Pro
in the Wizard column
and click OK.
Initiate the map with Facility Time Pro WizardStep 3:
Facility Time Pro Data
Operational Week Center
8
Open
1 1 1 1A001
0
A002
0
A003
0
A004
0
Monday Tuesday Wednesday Thursday
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Drag out the
red icons first.
This is very
important!
The Facility Time Pro
Wizard stencil will
open on the left.
3
1
2
Copyright © 2015 The eVSM Group, All Rights Reserved
Initiate the map with Facility Time Pro Wizard
9
1 1 1 1A005
0
A006
0
A007
0
A008
0
Friday Saturday Sunday Weekly Summary
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit2
Costing Time HrAuto
Weekly Production Time
HrWkAuto
Weekly Costing Time
HrWkAuto
Copyright © 2015 The eVSM Group, All Rights Reserved
Add Shift CentersStep 4:
Shift Center
10
1 1 1 1
all all
A001
0
A002
0
A003
0
A004
0
A009
0
A010
0
Monday Tuesday Wednesday Thursday
Shift 1 Shift 2
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Shift Start 0_246
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr0
Shift Overtime Break
Hr0
Shift Start 0_2414
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr2
Shift Overtime Break
Hr0
The green shapes are
called “Centers”. Drag out
the necessary amount of
Shift Centers.
1
Copyright © 2015 The eVSM Group, All Rights Reserved
Add Shift Centers
11
1 1 1 1
all all
A005
0
A006
0
A007
0
A008
0
A011
0
A012
0
Friday Saturday Sunday Weekly Summary
Long Shift 1 Long Shift 2
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit2
Costing Time HrAuto
Weekly Production Time
HrWkAuto
Weekly Costing Time
HrWkAuto
Shift Start 0_246
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
Shift Start 0_2418
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
Do not change
any of the “Auto”
fields. These will
calculated later.
Complete as shown
below, including
annotation and data
values.
3
2
Copyright © 2015 The eVSM Group, All Rights Reserved
Sequencing Using Pipe Arrows Step 5:
12
1 1 1 1
all all
A001
0
A002
0
A003
0
A004
0
A009
0
A010
0
Monday Tuesday Wednesday Thursday
Shift 1 Shift 2
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Shift Start 0_246
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr0
Shift Overtime Break
Hr0
Shift Start 0_2414
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr2
Shift Overtime Break
Hr0
Each Shift Centers must be
connected to the day(s) of the week
it appears in with Pipe Arrows. Hold
down the SHIFT key and select the
shapes in the order shown here.
1
A
B C D E
Copyright © 2015 The eVSM Group, All Rights Reserved
Click the Auto Pipe button
in the toolbar.
Sequencing Using Pipe Arrows
13
Auto Pipe
1 1 1 1
all all
A005
0
A006
0
A007
0
A008
0
A011
0
A012
0
Friday Saturday Sunday Weekly Summary
Long Shift 1 Long Shift 2
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit2
Costing Time HrAuto
Weekly Production Time
HrWkAuto
Weekly Costing Time
HrWkAuto
Shift Start 0_246
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
Shift Start 0_2418
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
2
F
Copyright © 2015 The eVSM Group, All Rights Reserved
Sequencing Shift 2Step 6:
14
1 1 1 1
all all
A001
0
A002
0
A003
0
A004
0
A009
0
A010
0
Monday Tuesday Wednesday Thursday
Shift 1 Shift 2
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Shift Start 0_246
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr0
Shift Overtime Break
Hr0
Shift Start 0_2414
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr2
Shift Overtime Break
Hr0
Repeat the steps
for Shift 2.
Pipe arrows have been
added from Shift 1 to
the days of the week
that it is running.
2
1
A
B C D E
Copyright © 2015 The eVSM Group, All Rights Reserved
Click the Auto Pipe button
in the toolbar.
Sequencing Shift 2
15
Auto Pipe
1 1 1 1
all all
A005
0
A006
0
A007
0
A008
0
A011
0
A012
0
Friday Saturday Sunday Weekly Summary
Long Shift 1 Long Shift 2
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit2
Costing Time HrAuto
Weekly Production Time
HrWkAuto
Weekly Costing Time
HrWkAuto
Shift Start 0_246
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
Shift Start 0_2418
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
3
F
Copyright © 2015 The eVSM Group, All Rights Reserved
Sequencing the Long ShiftsStep 7:
16
1 1 1 1
all all
A001
0
A002
0
A003
0
A004
0
A009
0
A010
0
Monday Tuesday Wednesday Thursday
Shift 1 Shift 2
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Shift Start 0_246
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr0
Shift Overtime Break
Hr0
Shift Start 0_2414
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr2
Shift Overtime Break
Hr0
Copyright © 2015 The eVSM Group, All Rights Reserved
Sequencing the Long Shifts
17
1 1 1 1
all all
A005
0
A006
0
A007
0
A008
0
A011
0
A012
0
Friday Saturday Sunday Weekly Summary
Long Shift 1 Long Shift 2
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time HrAuto
Daily Production Time HrAuto
Regular Time HrAuto
Regular Break Time
HrAuto
Overtime HrAuto
Overtime Break Time
HrAuto
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit2
Costing Time HrAuto
Weekly Production Time
HrWkAuto
Weekly Costing Time
HrWkAuto
Shift Start 0_246
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
Shift Start 0_2418
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
The Long Shifts only run on
Saturday and Sunday.
Connect Pipe Arrows from
each Long Shift to both
Saturday and Sunday.
1
A
B C
Copyright © 2015 The eVSM Group, All Rights Reserved
Click the “Solve” button
to calculate
Click the “Check” and
button fix any problems
flagged
Perform CalculationsStep 8:
18
21
Check
Solve
1 1 1 1
all all
A001
0
A002
0
A003
0
A004
0
A009
0
A010
0
Monday Tuesday Wednesday Thursday
Shift 1 Shift 2
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Shift Start 0_246
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr0
Shift Overtime Break
Hr0
Shift Start 0_2414
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr2
Shift Overtime Break
Hr0
Copyright © 2015 The eVSM Group, All Rights Reserved
Perform Calculations
19
1 1 1 1
all all
A005
0
A006
0
A007
0
A008
0
A011
0
A012
0
Friday Saturday Sunday Weekly Summary
Long Shift 1 Long Shift 2
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Daily Production Time Hr22.00
Regular Time Hr0.00
Regular Break Time
Hr0.00
Overtime Hr24.00
Overtime Break Time
Hr2.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr36.00
Daily Production Time Hr22.00
Regular Time Hr0.00
Regular Break Time
Hr0.00
Overtime Hr24.00
Overtime Break Time
Hr2.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit2
Costing Time Hr48.00
Weekly Production Time
HrWk129.00
Weekly Costing Time
HrWk179.00
Shift Start 0_246
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
Shift Start 0_2418
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
Copyright © 2015 The eVSM Group, All Rights Reserved
Visualize with ChartsStep 9:
Production Time
Shift Profiles
Costing Times
20
A001
0
A002
0
A003
0
A004
0
A009
0
A010
0
Monday Tuesday Wednesday Thursday
Shift 1 Shift 2
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Shift Start 0_246
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr0
Shift Overtime Break
Hr0
Shift Start 0_2414
Shift Duration Hr8
Shift Break Hr0.5
Shift Overtime Hr2
Shift Overtime Break
Hr0
Prodtn.
Time
Shift
Profiles
Costing
Time
Weekly Production Hours
Hr0 5 10 15 20 25
Monday : A0010
Tuesday : A0020
Wednesday : A0030
Thursday : A0040
Friday : A0050
Saturday : A0060
Sunday : A0070
Overtime
Legend
Regular Time
Daily Production Time
Drag out each chart
shape and right-click
to Plot Chart.
1
Copyright © 2015 The eVSM Group, All Rights Reserved
Visualize with Charts
21
A005
0
A006
0
A007
0
A008
0
A011
0
A012
0
Friday Saturday Sunday Weekly Summary
Long Shift 1 Long Shift 2
Daily Production Time Hr17.00
Regular Time Hr16.00
Regular Break Time
Hr1.00
Overtime Hr2.00
Overtime Break Time
Hr0.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr19.00
Daily Production Time Hr22.00
Regular Time Hr0.00
Regular Break Time
Hr0.00
Overtime Hr24.00
Overtime Break Time
Hr2.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit1.5
Costing Time Hr36.00
Daily Production Time Hr22.00
Regular Time Hr0.00
Regular Break Time
Hr0.00
Overtime Hr24.00
Overtime Break Time
Hr2.00
Regular Rate Multiplier
Unit1
Overtime Rate Multiplier
Unit2
Costing Time Hr48.00
Weekly Production Time
HrWk129.00
Weekly Costing Time
HrWk179.00
Shift Start 0_246
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
Shift Start 0_2418
Shift Duration Hr0
Shift Break Hr0
Shift Overtime Hr12
Shift Overtime Break
Hr1
Shift profiles
0_240 5 10 15 20 25 30
Shift 1 : A0090
Shift 2 : A0100
Long Shift 1 : A0110
Long Shift 2 : A0120
Shift Duration
Legend
Shift Overtime
Shift Start
Costing Time
Hr0 5 10 15 20 25 30 35 40 45 50
Monday : A0010
Tuesday : A0020
Wednesday : A0030
Thursday : A0040
Friday : A0050
Saturday : A0060
Sunday : A0070
Costing Time
Legend
20150512