KEPCO’s CCS Activities KEPCO’s CCS Activities
2013 GCCSI Meeting in Seoul
1KEPCOP’s CCS Projects in Action
Dr. Chong Kul RyuDr. Chong Kul RyuKEPCO RIKEPCO RI
October 11, 2013October 11, 2013
OutlinesOutlines
q Introductionq Post-combustion CO2 Capture Technology
Ø Dry sorbent technologyØ Advanced amine technology
q Solid Sorbent Pre-combustion CO2 Capture Technology
q Chemical Looping Combustionq Summary
2KEPCOP’s CCS Projects in Action
q Introductionq Post-combustion CO2 Capture Technology
Ø Dry sorbent technologyØ Advanced amine technology
q Solid Sorbent Pre-combustion CO2 Capture Technology
q Chemical Looping Combustionq Summary
IntroductionIntroduction
3KEPCOP’s CCS Projects in Action
Electrical Capacity Forecast in Korea (2013(2013--2027)2027)
201281,806 MW (60.6% Fossil fuels)
2027158,502 MW (49.6% Fossil fuels)
Coal 30, 320(26.9%)
Nuclear35,916(31.9%)
20,716,25.3%
23,409,28.6%
1,125,1.4%
20,116,24.6%
4,888,6.0%
4,700,5.7%
4,084,5.0%
2,768,3.4%
35,916,22.7%
44,669,28.2%
725,0.5%
31,794,20.1%
1,249,0.8%
4,700,3.0% 32,014,
20.2%
7,434,4.7%
2027 정격용량(158,502 MW)
원자력
유연탄
무연탄LNG
석유
양수
신재생
집단
20,716,25.3%
23,409,28.6%
1,125,1.4%
20,116,24.6%
4,888,6.0%
4,700,5.7%
4,084,5.0%
2,768,3.4%
2012 정격용량(81,806 MW)
Nuclear
Coal
Anthracite
LNG
Oil
Pumped Hydro.
Renewables
H&P
4KEPCOP’s CCS Projects in Action
q Total capacity additions: 50.9 GW, US$ 64b (2012) Ø Nuclear: 15.2 GW (11 unit)Ø Coal: 21.3 GW (25 unit)Ø NGCC: 11.7 GW (21 unit)Ø FF retirements: about 8.123 GW (30 unit: anthracite, LNG, oil)※ not included Renewables
Coal 30, 320(26.9%)
MOTIE, 2013, 6th Basic Plan of Electricity Supply(2013-2027)
20,716,25.3%
23,409,28.6%
1,125,1.4%
20,116,24.6%
4,888,6.0%
4,700,5.7%
4,084,5.0%
2,768,3.4%
35,916,22.7%
44,669,28.2%
725,0.5%
31,794,20.1%
1,249,0.8%
4,700,3.0% 32,014,
20.2%
7,434,4.7%
2027 정격용량(158,502 MW)
원자력
유연탄
무연탄LNG
석유
양수
신재생
집단
2027: Renewables~NGCC (32 GW)
20,716,25.3%
23,409,28.6%
1,125,1.4%
20,116,24.6%
4,888,6.0%
4,700,5.7%
4,084,5.0%
2,768,3.4%
2012 정격용량(81,806 MW)
Nuclear
Coal
Anthracite
LNG
Oil
Pumped Hydro.
Renewables
H&P
2012 78,483 GW
2027 130,853 GW
Electricity Peak Load Forecast in Korea Electricity Peak Load Forecast in Korea (2013(2013--2027)2027)
20,716,26.4%
23,409,39.8%
1,125,1.4%
20,116,25.6%
4,778,6.1%
4,700,6.0%
1,277,1.6%
2,362,3.0%
35,916,27.4%
44,669,34.1%
725,0.6%
31,794,24.3%
1,139,0.9%
4,700,3.6%
5,837,4.5%
6,071,4.6%
20,716,25.3%
23,409,28.6%
1,125,1.4%
20,116,24.6%
4,888,6.0%
4,700,5.7%
4,084,5.0%
2,768,3.4%
2012 정격용량(81,806 MW)
Nuclear
Coal
Anthracite
LNG
Oil
Pumped Hydro.
Renewables
H&P
5KEPCOP’s CCS Projects in Action
Electricity generation: 469,049 GWh 655,305 GWh40% Increase
FF 63% FF 60%
20,716,26.4%
23,409,39.8%
1,125,1.4%
20,116,25.6%
4,778,6.1%
4,700,6.0%
1,277,1.6%
2,362,3.0%
35,916,27.4%
44,669,34.1%
725,0.6%
31,794,24.3%
1,139,0.9%
4,700,3.6%
5,837,4.5%
6,071,4.6%
20,716,25.3%
23,409,28.6%
1,125,1.4%
20,116,24.6%
4,888,6.0%
4,700,5.7%
4,084,5.0%
2,768,3.4%
2012 정격용량(81,806 MW)
Nuclear
Coal
Anthracite
LNG
Oil
Pumped Hydro.
Renewables
H&P
MOTIE, 2013, 6th Basic Plan of Electricity Supply(2013-2027)
Policy and Strategy for CCS in Korea
q Commitment of the 30% GHG reduction below BAU by 2020 (Nov.’09)
q Framework Act on Low Carbon, Green Growth (14 April 2010)Ø Presidential Committee on Green Growth: Major Policies
and Plans including CCSØ Announcement of Korean CCS Master Plan (July 13 2010)
§ Two large-scale integrated CCS demonstrations by 2020§ Established Korea CCS Association in MOTIE, leading by
KEPCO (Nov. 2010)
q Korean ETS is slated on Jan 1, 2015
6KEPCOP’s CCS Projects in Action
q Commitment of the 30% GHG reduction below BAU by 2020 (Nov.’09)
q Framework Act on Low Carbon, Green Growth (14 April 2010)Ø Presidential Committee on Green Growth: Major Policies
and Plans including CCSØ Announcement of Korean CCS Master Plan (July 13 2010)
§ Two large-scale integrated CCS demonstrations by 2020§ Established Korea CCS Association in MOTIE, leading by
KEPCO (Nov. 2010)
q Korean ETS is slated on Jan 1, 2015
Korea CCS Demonstration Plansq Two Large-scale integrated CCS demonstrations by 2020
q Allocated about US $1.74 billion Ø Government: $ 0.74 billion (43%), Private: $ 1 billion (57%)
q New coal-fired power plant with CCS will take about 10-15% share in CO2 reduction by 2030
q KEPCO is leading the development of large scale CCS commercialization technologies
Stage 1. Pilot demo(10-30 MW)
Stage 2. Large-scale demo (100-300 MW)
1st
Demonstration Project(KCCS-1)
2010 2014 2014 2018
2nd
Demonstration Project(KCCS-2)
2012 2016 2016 2020
Post-Combustion(Dry or Wet)Pilot Plant
FEED Demonstration(Link to Storage)
Oxy-fuel or IGCCPilot Plant
Demonstration(Link to Storage)
7KEPCOP’s CCS Projects in Action
q Two Large-scale integrated CCS demonstrations by 2020
q Allocated about US $1.74 billion Ø Government: $ 0.74 billion (43%), Private: $ 1 billion (57%)
q New coal-fired power plant with CCS will take about 10-15% share in CO2 reduction by 2030
q KEPCO is leading the development of large scale CCS commercialization technologies
2nd
Demonstration Project(KCCS-2)
Oxy-fuel or IGCCPilot Plant FEED Demonstration
(Link to Storage)
KEPCO’s CCS R&DD Strategies
CO2 Capture
Post-combustion- Solid sorbent
Oxy-fuel combustion
Pre-combustion- Wet scrubbing
Post-combustion- Adv. amine
KEPCO 2020 Target Tech
Coal/Gas Power Plant
8KEPCOP’s CCS Projects in Action
CCUS
CO2 Storage
Pre-combustion- Wet scrubbing
Pre-combustion- Solid sorbent
Chemical Looping Combustion
KEPCO 2025 Target Tech
IGCC
CO2 Utilization
PostPost--combustion COcombustion CO22 capturecapture-- Solid sorbent technologySolid sorbent technology
Flue gas
Steam
CO2H2O
CO2 free flue gasMHCO3
M2CO3
MHCO3MHCO3
Reg
ener
ator
Car
bon
ator
Solid sorbent
9KEPCOP’s CCS Projects in Action
Schematic of Dry Post-CombustionTechnology
Flue gas
Steam
CO2H2O
CO2 free flue gasMHCO3
M2CO3
MHCO3MHCO3
Reg
ener
ator
Car
bon
ator
Solid sorbent
PostPost--Combustion COCombustion CO22 Capture: Capture: Solid SorbentSolid Sorbent
q Dry Regenerable Sorbent TechnologyØ KEPCO RI’s Solid Sorbent Ø KIER’s Fluidized-Bed (FB) CO2 Capture ProcessØ Process scale-up: 0.5 kW(‘03)→25 kW(‘06)→0.5 MW (‘10)→10 MW(‘13)
q 0.5 MW Test-Bed (’02.10~’11.03), MEST (CDRS), US$ 11.2 MØ Achieved 85% CO2 capture rate from 25 kW BSU (2008)Ø Commissioning 0.5 MW test-bed facility at KOSPO’s Hadong
Thermal Power Station (Unit # 3) on March 2010.Ø Completed Phase 3 with 80% CO2 capture rate from 0.5 MW test-bed
with KEP-CO2P1 sorbent (1600 h)
q 10 MW Pilot Plant (’10.10~’14.09), MOTIE (KETEP), US$ 40 MØ 85±5% removal from 0. 5 MW test-bed with modified sorbent (1200 h)Ø 10 MW site: KOSPO’s Hadong Thermal Power Station (Unit #8)
ü 2012.08.24: Ground-breaking ceremonyü 2013. 3Q: Completing constructionü 2013. 4Q~2014.3Q: Commissioning and long-term operation
10KEPCOP’s CCS Projects in Action
q Dry Regenerable Sorbent TechnologyØ KEPCO RI’s Solid Sorbent Ø KIER’s Fluidized-Bed (FB) CO2 Capture ProcessØ Process scale-up: 0.5 kW(‘03)→25 kW(‘06)→0.5 MW (‘10)→10 MW(‘13)
q 0.5 MW Test-Bed (’02.10~’11.03), MEST (CDRS), US$ 11.2 MØ Achieved 85% CO2 capture rate from 25 kW BSU (2008)Ø Commissioning 0.5 MW test-bed facility at KOSPO’s Hadong
Thermal Power Station (Unit # 3) on March 2010.Ø Completed Phase 3 with 80% CO2 capture rate from 0.5 MW test-bed
with KEP-CO2P1 sorbent (1600 h)
q 10 MW Pilot Plant (’10.10~’14.09), MOTIE (KETEP), US$ 40 MØ 85±5% removal from 0. 5 MW test-bed with modified sorbent (1200 h)Ø 10 MW site: KOSPO’s Hadong Thermal Power Station (Unit #8)
ü 2012.08.24: Ground-breaking ceremonyü 2013. 3Q: Completing constructionü 2013. 4Q~2014.3Q: Commissioning and long-term operation
q Scale: 0.5 MW slip-streamed from 500 MW coal-fired power plant(SC)
q Capacity: 10 tCO2/dq Flue gas: coal-fired boilerq Process: KIER’s Fluidized-bed
Processq Sorbent: KEP-CO2P2 or P3
Ø 85±5% CO2 capture rateØ > 90% CO2 product purity
q Startup: 2010.03.q Pilot plant area: 10 x 6 x 24(H) mq Location: Hadong, Korea.
KOSPO’s Hadong Thermal Power Station (unit #3)
0.5 MW test-bed: Dry regenerable sorbent
11KEPCOP’s CCS Projects in Action
q Scale: 0.5 MW slip-streamed from 500 MW coal-fired power plant(SC)
q Capacity: 10 tCO2/dq Flue gas: coal-fired boilerq Process: KIER’s Fluidized-bed
Processq Sorbent: KEP-CO2P2 or P3
Ø 85±5% CO2 capture rateØ > 90% CO2 product purity
q Startup: 2010.03.q Pilot plant area: 10 x 6 x 24(H) mq Location: Hadong, Korea.
KOSPO’s Hadong Thermal Power Station (unit #3)
0.5 MW test-bed at KOSPO’s Hadongcoal-fired power plant,
10 MW Pilot plant: Dry regenerable sorbent
q 3D-view
10MW Pilot PlantHadong Power Plant, unit #8
Algae fond0.5 MW Test-Bed
Hadong Power Plant, unit #3
q Scale: 10 MW slip-streamed from 500 MW coal-fired power plant(SC)
q Capacity: 200 tCO2/dq Flue gas: coal-fired boilerq Sorbent: KEP-CO2P2q Targets:
Ø > 80% CO2 capture rateØ > 95% CO2 purityØ > 1000 h continuous operationØ US$ 30/tCO2
q Startup: October, 2013q Main plot area: 34 m(L)x15 m(W)x59 m(H) q Location: Hadong, Korea. KOSPO’s
Hadong Thermal Power Station (unit #8)
12KEPCOP’s CCS Projects in Action
q Scale: 10 MW slip-streamed from 500 MW coal-fired power plant(SC)
q Capacity: 200 tCO2/dq Flue gas: coal-fired boilerq Sorbent: KEP-CO2P2q Targets:
Ø > 80% CO2 capture rateØ > 95% CO2 purityØ > 1000 h continuous operationØ US$ 30/tCO2
q Startup: October, 2013q Main plot area: 34 m(L)x15 m(W)x59 m(H) q Location: Hadong, Korea. KOSPO’s
Hadong Thermal Power Station (unit #8)
PostPost--combustion COcombustion CO22 capturecapture-- Advanced amine technology Advanced amine technology
13KEPCOP’s CCS Projects in Action
PostPost--Combustion COCombustion CO22 Capture: Capture: Advanced Solvent
q Advanced Amine Solvent TechnologyØ KEPCO’s Wet Solvent (KoSol)Ø KEPCO’s KoSol Solvent CO2 Capture Process
q 0.1 MW Test-Bed, (`08. 11 ~`11. 10) MOTIE (KETEP), US$ 8 MØ Commissioning 0.1 MW test bed facility at KOMIPO’s Boryeong Thermal
Power Station(Unit#8) on Oct. 2010Ø Completed Campaign#1~#5 with KoSol-4 solvent (3,000 h)Ø Achieved over 90% CO2 capture rate and 3.0~3.1 GJ/ton-CO2 regeneration
energy
q 10 MW Pilot Plant, (`10. 10~`14. 9) MOVIE (KETEP), US$ 42 MØ 10 MW site : KOMIPO’s Boryeong Thermal Power Station(Unit #8)Ø 2013. 5. 24 : Completing constructionØ 2013. 9. : Achieved > 90% CO2 capture rate in the early test-runØ 2013. 10. ~ 12. : Variable tests for optimum operation conditionØ 2013. 12. ~ : Long-term operation
14KEPCOP’s CCS Projects in Action
q Advanced Amine Solvent TechnologyØ KEPCO’s Wet Solvent (KoSol)Ø KEPCO’s KoSol Solvent CO2 Capture Process
q 0.1 MW Test-Bed, (`08. 11 ~`11. 10) MOTIE (KETEP), US$ 8 MØ Commissioning 0.1 MW test bed facility at KOMIPO’s Boryeong Thermal
Power Station(Unit#8) on Oct. 2010Ø Completed Campaign#1~#5 with KoSol-4 solvent (3,000 h)Ø Achieved over 90% CO2 capture rate and 3.0~3.1 GJ/ton-CO2 regeneration
energy
q 10 MW Pilot Plant, (`10. 10~`14. 9) MOVIE (KETEP), US$ 42 MØ 10 MW site : KOMIPO’s Boryeong Thermal Power Station(Unit #8)Ø 2013. 5. 24 : Completing constructionØ 2013. 9. : Achieved > 90% CO2 capture rate in the early test-runØ 2013. 10. ~ 12. : Variable tests for optimum operation conditionØ 2013. 12. ~ : Long-term operation
0.1 MW Test bed, Advanced amine
q Scale: 0.1 MW slip-streamed from 500 MW coal-fired power plant(SC)
q Capacity: 2 tCO2/dq Flue gas: coal-fired boilerq Solvent: KoSol-4 *
· > 90% CO2 capture· > 99% CO2 product purity· 3.0~3.1 GJ/tCO2 regeneration energy(on conventional wet scrubbing process)
q Plot area: LxWxH =12m x 7m x 25m q Startup: Oct, 2010q Location: city of Boryeong, Korea.
KOMIPO’s Boryeong Thermal Power Station (unit #8)
Absorber Stripper
15KEPCOP’s CCS Projects in Action 15/26
q Scale: 0.1 MW slip-streamed from 500 MW coal-fired power plant(SC)
q Capacity: 2 tCO2/dq Flue gas: coal-fired boilerq Solvent: KoSol-4 *
· > 90% CO2 capture· > 99% CO2 product purity· 3.0~3.1 GJ/tCO2 regeneration energy(on conventional wet scrubbing process)
q Plot area: LxWxH =12m x 7m x 25m q Startup: Oct, 2010q Location: city of Boryeong, Korea.
KOMIPO’s Boryeong Thermal Power Station (unit #8)
Reboiler
0.1MW Test-bed at Boryeong coal-fired power plant * KoSol: KEPCO’s proprietary solvent
q Scale: 10 MW slip-streamed from 500 MW coal-fired power plant(SC)
q Capacity: 200 tCO2/dq Flue gas: coal-fired boilerq Solvent: KoSol-4 *
• > 90% CO2 capture rate• > 99% CO2 product purity• 3.0~3.1 GJ/tCO2 regeneration energy
(early test results)• Target of regen. energy: <2.8 GJ/tCO2
q Startup: May, 2013q Plot area: LxWxH = 31m x 31m x 48m q Location: City of Boryeong, Korea.
KOMIPO’s Boryeong Thermal Power Station (unit #8)
10 MW Pilot Plant, Advanced amine
16KEPCOP’s CCS Projects in Action 16/26
q Scale: 10 MW slip-streamed from 500 MW coal-fired power plant(SC)
q Capacity: 200 tCO2/dq Flue gas: coal-fired boilerq Solvent: KoSol-4 *
• > 90% CO2 capture rate• > 99% CO2 product purity• 3.0~3.1 GJ/tCO2 regeneration energy
(early test results)• Target of regen. energy: <2.8 GJ/tCO2
q Startup: May, 2013q Plot area: LxWxH = 31m x 31m x 48m q Location: City of Boryeong, Korea.
KOMIPO’s Boryeong Thermal Power Station (unit #8)
PrePre--combustion COcombustion CO22 capturecapture-- Dry sorbent technologyDry sorbent technology
SO2
S free Syngas
MSR
egen
erat
or
Des
ulf
uri
zer
Des
ulf
uri
zer
H2
CO2
17KEPCOP’s CCS Projects in Action
Raw Syngas
Air
MO
MS Reg
ener
ator
Des
ulf
uri
zer
Des
ulf
uri
zer
Warm Gas Clean-up
SEWGS
q Solid Sorbent Pre-Combustion CO2 Capture TechnologyØ Strategic Approach
• Minimize energy penalty and cost for CO2 capture– Maintain high T & P through the whole process
Ø Warm Gas Clean-up • Solid sorbent (KEPCO RI) & FB Process (KIER)
Ø One Loop Process for Pre-combustion CO2 Capture • Solid Sorbents (KEPCO RI) & One-loop FB Process (KIER)
Ø Scale-up Schedule of Process Development• 0.1 MW ('11) → 1~10 MW (‘18) → 300 MW (’18~)
Ø 2nd Phase Fund: US$ 30 M, Oct. 2011~ Sep. 2015
가스화기Combined
Cycle
CoalOxygen
Warm Gas Cleanup
SEWGSBy One Loop Process
Gasifier
CO2 StorageCO2Compression
H2S Sorbent
WGS Catalyst
Pre-Combustion CO2 CaptureSolid Sorbent
18KEPCOP’s CCS Projects in Action
q Solid Sorbent Pre-Combustion CO2 Capture TechnologyØ Strategic Approach
• Minimize energy penalty and cost for CO2 capture– Maintain high T & P through the whole process
Ø Warm Gas Clean-up • Solid sorbent (KEPCO RI) & FB Process (KIER)
Ø One Loop Process for Pre-combustion CO2 Capture • Solid Sorbents (KEPCO RI) & One-loop FB Process (KIER)
Ø Scale-up Schedule of Process Development• 0.1 MW ('11) → 1~10 MW (‘18) → 300 MW (’18~)
Ø 2nd Phase Fund: US$ 30 M, Oct. 2011~ Sep. 2015
가스화기Combined
Cycle
CoalOxygen
Warm Gas Cleanup
SEWGSBy One Loop Process
Gasifier
CO2 StorageCO2Compression
HCl sorbent
CO2Sorbent
ChemicalChemical Looping CombustionLooping Combustionq Intrinsic CO2 separation w/o ASU and CO2 Capture Facilityq 2nd Phase fund: US$ 5.6 M (Sep. 2006-Aug. 2011)q CO2 capture cost: <10~20 $/tCO2 (‘20)q Scale-up
Ø 50 kWth (‘09)→200 kWth (‘11)→1 MWth (‘18)→100 MW (‘18~)q Participants: Process (KIER, Daegu City Gas Co., MEPS, NEXCOM)
Oxygen carrier (KEPCO & its 5 Thermal Power Co.)
19KEPCOP’s CCS Projects in Action
Fuel + Air CO2 + H2O
Me
공기반응기(금속연소)
연료반응기(연료연소)
HXR
HXR
발전
Air
Fuel(CH4, Syngas)
Steam
H2
N2
N2+MeO
공기반응기(금속연소)
AirReactor
연료반응기(연료연소)
Fuel Reactor
HXR
HXR
발전Power
2O
CO2
N2+MeO
+ 2+ 2
Oxygen Carrier
200 kW CLC BSU• Scale: 200 kWth slip-streamed
from local H&P• Capacity: 1 tCO2/d (CO2 20 Nm3/h)• Fuel gas: Natural gas• Process: Dual fluidized-bed process
(KIER)• Oxygen carrier (KEPCO RI): batch test
– Fuel conversion >99.7%– CO2 selectivity >99%– 99% CO2 product purity– NOx emission < 10 ppm– CO + H2+CH4 <0.3 %– O2 transfer capacity >12
wt% (AI <15%)• Startup: 2011.03 (100 h)• Pilot plant area: 5 x 5 x 6(H) m• Location: City of Daegu, Korea. Joo-kok
CES H & P plant
Oxidizer Reducer
20KEPCOP’s CCS Projects in Action
• Scale: 200 kWth slip-streamedfrom local H&P
• Capacity: 1 tCO2/d (CO2 20 Nm3/h)• Fuel gas: Natural gas• Process: Dual fluidized-bed process
(KIER)• Oxygen carrier (KEPCO RI): batch test
– Fuel conversion >99.7%– CO2 selectivity >99%– 99% CO2 product purity– NOx emission < 10 ppm– CO + H2+CH4 <0.3 %– O2 transfer capacity >12
wt% (AI <15%)• Startup: 2011.03 (100 h)• Pilot plant area: 5 x 5 x 6(H) m• Location: City of Daegu, Korea. Joo-kok
CES H & P plant
SummarySummary
21KEPCOP’s CCS Projects in Action
SummarySummaryq For energy security and climate change, KEPCO offers the
comprehensible portfolio of CO2 capture technology.q Two 10 MW pilot plants (dry sorbent and adv. amine) scaled-up
based on the results from 0.1- 0.5 MW test-bed runs are under shakedown test, aiming to bring at least one commercial demo project online by 2015~2017.
q The FEED study of the 100 MW oxyfuel combustion project was completed in 2012 and MOTIE was putting the 100 MW prject on hold recently.
q KEPCO RI with others also develops the key technologies of pre-combustion and CLC with solid sorbents for advanced power generation.
q KEPCOs with MOTIE’s support is moving big steps forwarding to commercialize CCS technology by 2020.
q Looking for funding, strategic partners and opportunities to demonstrate our technologies in Korea
22KEPCOP’s CCS Projects in Action
q For energy security and climate change, KEPCO offers the comprehensible portfolio of CO2 capture technology.
q Two 10 MW pilot plants (dry sorbent and adv. amine) scaled-up based on the results from 0.1- 0.5 MW test-bed runs are under shakedown test, aiming to bring at least one commercial demo project online by 2015~2017.
q The FEED study of the 100 MW oxyfuel combustion project was completed in 2012 and MOTIE was putting the 100 MW prject on hold recently.
q KEPCO RI with others also develops the key technologies of pre-combustion and CLC with solid sorbents for advanced power generation.
q KEPCOs with MOTIE’s support is moving big steps forwarding to commercialize CCS technology by 2020.
q Looking for funding, strategic partners and opportunities to demonstrate our technologies in Korea
Demo Sites of CO2 Capture Plants
Youngdong: Oxy-Fuel (‘15, 100 MW)
Taean: IGCC + CCS Solid Sorbent(‘18, 1-10 MW)(‘18~, 300 MW)
23KEPCOP’s CCS Projects in Action
Boryeong: Adv. Amine(’10, 0.1 MW) (‘14, 10 MW)
(’18, 500 MW)
Taean: IGCC + CCS Solid Sorbent(‘18, 1-10 MW)(‘18~, 300 MW)
Hadong: Solid Sorbent (’11, 0.5 MW) (’14, 10 MW)
Samcheok: Solid Sorbent(’18, 300 MW)
COCO22 Storage in KoreaStorage in Korea• MOF: Korea Offshore CO2 Geological Storage Project (‘05-’15) (US$ 66M, 2 Phase ‘11-’15)• MOTIE: Small-scale CO2 injection demonstration project, Phohang Basin (US$ 16.7 M, ‘13-’16)
24
Thank you for your attention!