palfinger wind – the global expert for innovative and … · pkm – knuckle boom crane hydraulic...
TRANSCRIPT
WIND CRANESLIFETIME EXCELLENCE
PALFINGER WIND – THE GLOBAL EXPERT FOR INNOVATIVE AND HIGH-QUALITY ONSHORE AND OFFSHORE WIND CRANES
2
PALFINGER WIND PRODUCT PORTFOLIO
Hydraulic Nacelle Crane
Electric/Manual Platform Crane
Hydraulic Platform Crane
Hydraulic Marine Crane
3
Hydraulic Davit and Rescue Boat
Electric/Hydraulic Offshore Davit and Life/Rescue Boat
Hydraulic Substation Crane
Hydraulic Jetty Cranes
4
PALFINGER WIND is the expert for lifting solutions designed especially for the wind industry. The company produces cranes for nacelles,
platforms and substation/accommodation platforms as well as launch and recovery systems and boats. PALFINGER WIND guarantees its
customers a strong and reliable partnership with excellent lifetime operation during the entire product life cycle. Professional consultancy,
support with the installation and commissioning plus training for operation and maintenance are further benefits of this package. Customers
can rely on years of experience in the field of wind technology and successes achieved due to the use of PALFINGER wind cranes on many
wind farms. Innovative products that are certified by class societies ensure economic efficiency and maximum performance throughout the
crane’s lifetime. More than 2000 delivered wind cranes speak for themselves.
PALFINGER WIND CRANES
GENERAL FEATURES WIND CRANES
≥ Highest reliability and top-quality≥ Best-in-class surface protection system≥ Crane design life of 25+ years≥ Lifting capacity adjusted to wave height≥ Perfect product mix for a customer-optimised, matched
set of nacelle, platform and supply vessel cranes≥ Minimised downtime for servicing and repair work≥ Localised service and best customer care
5
PALFINGER MARINE is the global leading manufacturer of highly reliable, innovative and customised marine, offshore and wind cranes as
well as launch and recovery systems and boats. User-friendly application and functional design are the key benefits of the product range.
Special coating and high-quality materials guarantee resistance and loading capacity even under tough conditions. The overall concept of
PALFINGER MARINE is characterised by a global retailer network and local distribution and service partners. A worldwide service network
including the supply of spare parts ensures fast and professional on-site support. For detecting new market trends, PALFINGER MARINE
relies on more than 80 years of expert knowledge in the construction of cranes. PALFINGER MARINE is part of the PALFINGER Group, one of
the leading international manufacturers of hydraulic lifting systems in the area of commercial vehicles. Combining excellent products, strong
customer orientation and a highly competent service, PALFINGER MARINE occupies a leading position in the global marine market.
MANUFACTURING AND ASSEMBLY
Cost-efficient manufacturing in state-of-the-art production facilities and the use of high-class materials guarantee our customers a high-
quality product that can be certified by a number of class societies.
CERTIFICATIONS AND REGULATION
To manufacture safe and reliable wind cranes, PALFINGER MARINE pursues international, regional and national regulations and certificates.
PALFINGER MARINE works with internationally acknowledged classification societies. APC (Alternative Product Certification) and MSA
(Manufacturing Survey Arrangement) certification puts PALFINGER MARINE in the position to certify the products without the presence of
a surveyor. This ensures greater time flexibility and more efficiency in product certification. The component manufacturing plants in Austria,
Slovenia and Bulgaria are MCA certified by DNV. The in-house cylinder production is APC certified by GL. Other manufacturing plants hold
certifications like ISO 9001 and EN ISO 3834-2 among others and fulfil multiple rules, regulations and standards.
COMPANY PROFILE PALFINGER MARINE
6
PRODUCTOVERVIEW
PLATFORM CRANES
PF – Fixed Boom CranePS/PSM – Stiff Boom Crane
≥ Safe and fast unloading of supply vessels at main or auxiliary boat landing
≥ Flexible material handling on the platform≥ Customised to accommodate any sea
state (SWH)
NACELLE CRANES
PC – Compact Telescopic CranePK – Foldable Knuckle Boom Crane
≥ Safe and fast lifting from the platform to the nacelle
≥ Lifting from heli-deck into the nacelle≥ Handling within the nacelle≥ Optional man-riding
SUBSTATION / ACCOMODATION PLATFORM CRANES
PF – Fixed Boom CranePSM – Stiff Boom CranePKM – Knuckle Boom Crane
≥ Safe and fast loading and unloading of supply vessels at main boat landing
≥ Flexible material handling, servicing and handling of other equipment (e.g. gen-set parts, transformer parts ...) on the platform
≥ Customised to accommodate any sea state (SWH)≥ Optional features for extra functionality and safe operation
7
PLATFORM CRANES
PALFINGER WIND platform cranes are experts for flexible material handling to the platform. Platform cranes are customised to unload
supply vessels rapidly and safely under any marine conditions at sea. A special surface coating and processing of high-quality materials
protects PALFINGER WIND platform cranes against corrosion.
MAIN BOAT LANDING
PF – Fixed Boom Crane electric
≥ 0.5 mt to 4 mt≥ Simple design available with electric or
hydraulic drives
PS/PSM - Stiff Boom Crane hydraulic
≥ 10 mt to 183 mt≥ Simple and safe handling with variable
outreach
AUXILIARY BOAT LANDING
PF – Fixed Boom Crane manualPF – Fixed Boom Crane electric
≥ 0.5 mt to 4 mt≥ Typically paired with a compact telescopic
crane (PC) in the nacelle≥ Simple design available with electric or
hydraulic drives
8
SUBSTATION/ACCOMODATIONPLATFORM CRANES
PALFINGER WIND substation and accommodation platform cranes are customised to withstand harsh marine conditions at sea. Flexible
material handling allows safe and fast loading and unloading of supply vessels. With PALFINGER WIND substation and accommodation
platform cranes , the platform is executed with a versatile, reliable and low maintenance cargo handling tool to last for a lifetime. Optional
the PALFINGER WIND accommodation and platform cranes can be customised to different rules, legislation and incorporate features like
man-riding, constant tension as well as safety features like monitoring loads, warning systems and manual and automatic overload protection
systems.
MAIN BOAT LANDING
PS/PSM - Stiff Boom Crane hydraulic
≥ 10 mt to 300 mt≥ Simple handling with variable outreach
PKM – Knuckle Boom Crane hydraulic
≥ 20 mt to 280 mt≥ Easy handling with fixed safe working load
at every position
AUXILIARY BOAT LANDING
PF – Fixed Boom Crane manualPF – Fixed Boom Crane electric
≥ 0.5 mt to 4 mt≥ Simple design available with electric or hydraulic motor and
manual or electric slewing
9
NACELLE CRANES
Nacelle cranes feature compact design and an ideal weighting and performance ratio. Reliable operation is guaranteed even in tight spaces.
PALFINGER WIND nacelle cranes enable safe and fast lifting from the platform to the nacelle and from the heli-deck into the nacelle.
Passenger transportation, blade and tower inspections are also simplified and available for several crane types.
PC – Compact Telescopic Crane
≥ 1.5 mt to 6.6 mt≥ Typically used for handling tool kits
and spare parts≥ Light weight combined with high
performance
PK – Foldable Knuckle Boom Crane
≥ 4 mt to 117 mt≥ Typically used for handling of heavy loads such as generator parts, drives or electric
motors≥ Compact storage combined with highest
flexibility≥ Optional man-riding
10
CRANE FEATURES
1
1
4
4
75
5
2
2
THIRD-PARTY APPROVAL≥ Production-accompanying approval
through class societies (e.g. DNV, GL, etc.)≥ Design verification report (e.g. EN13852-1, ...)≥ PE stamping
OVERLOAD PROTECTION ≥ PALFINGER-specific Overload
Protection System (PALOPS)≥ Operated manually and/or
automatically and combines the (MOPS/AOPS) function
MAN-RIDING≥ For emergency evacuation≥ Easy blade, hub and tower inspection≥ Personnel handling from supply ship to
transition piece or platform
INCORPORATED POWER PACK≥ Hydraulic Power Unit (HPU) installed
inside the cranes mounting base
REMOTE CONTROL≥ Cable≥ Radio≥ Combined
CERTIFIED HOOK-ON POINTS≥ For external lifting devices ≥ Anchor point for emergency descent
equipment≥ Acc. to EN 50308 (1 person)
ADDITIONAL FEATURES≥ Biodegredable hydraulic oil≥ Lightning protection for over voltage≥ Helicopter warning light≥ Working light
CORROSION PROTECTION≥ Long-life & UV-resistant surface
protection≥ 3-layer paint system acc. to
ISO 12944-2-C5-M very high (marine)≥ NORSOK M501 System A1≥ Spray galvanisation surface treatment
EMERGENCY OPERATION≥ Emergency power pack with external
power supply e.g. generator, battery pack or supply ship
≥ Emergency control valve mounted on crane-column
OFFSHORE RESISTANCE≥ Multiple stainless steel components
(e.g. pipes, fittings, hoses, covers, etc.)≥ Bird protection≥ Ceramic coated piston rods (optional)≥ Stainless steel piston rods (optional)
BLADE COLLISION PREVENTION≥ Boom topping limitation≥ Interaction with turbine≥ Override function available
(optional)
3
3
6TURNKEY SOLUTIONS≥ Delivery ≥ Assembly≥ Installation≥ Commissioning
ADDITIONAL FEATURES PLATFORM CRANES /SUBSTATION CRANES
11
3
3
6
JETTY CRANES
Jetty cranes are in use at docks and in ports for the safe loading and hoisting of materials. Jetty cranes from PALFINGER WIND feature
zone- classed and ATEX- approved electrical components when needed. Electric motors and hydraulic pumps all are fully integrated within
the crane pedestal and column, and stainless steel cylinder rods give even greater protection to the elements.
PSM – Stiff Boom Crane hydraulic
≥ 20 mt to 180 mt≥ Fully CE marked and fitted with the latest
safety devices≥ Radio remote controls giving the operator
complete control from all angles and positions when operating the crane
PTM – Telescopic Boom Crane hydraulic
≥ 20 mt to 180 mt≥ Fully CE marked and fitted with the latest
safety devices≥ Radio remote controls giving the operator
complete control from all angles and positions when operating the crane
≥ Variable outreach
12
PALFINGER WIND offers best available customer service. A growing network of service partners specially focussed on offshore wind business
ensures responsive, reliable and cost efficient service. A comprehensive range of service is provided to ensure highly reliable operation during
the entire product life cycle.
AFTER SALES AND SERVICE
BEST AVAILABLE SERVICE≥ Installation and installation support≥ Commissioning supervision (onshore and offshore)≥ Annual service and inspection/maintenance≥ Technical support≥ Service management database for technical documentation,
service history and maintenance information≥ Always in compliance with the latest regulations ≥ Single point of contact
TRAINING≥ Operator and Maintenance Training ≥ On-site training: basic, advanced, troubleshooting≥ Detailed training documents and certificates≥ Different crane models and main components available
in PALFINGER training centre≥ Online e-learning courses and training material
SERVICE AGREEMENTS ≥ Custom-made package for wind park owners and
operators≥ Maintenance planning, original spares and service crews ≥ Packages for inspection, support, parts management
and maintenace
SPAREPARTS ≥ Global delivery≥ PALFINGER and OEM spare parts≥ Life cycle supply of spare parts
13
8
119
10
7
6
4
5
3 2 1
Odense, DenmarkSales O�cePalle AndersenT +45 [email protected]
1
Falkirk, United KingdomOutreach Ltd., PALFINGER WIND PartnerStuart GilliganT +44 1324 [email protected]
3 White Salmon, Washington, USASales O�ceJohn AdamsT +1 509 637 [email protected]
6
Houston, Texas, USASales O�ceLouis LeBourgeoisT +1 832 622 [email protected]
7
Cuxhaven, GermanyBesco GmbH, PALFINGER WIND PartnerBernd SchulzT +49 4721 508008 [email protected]
2
Madrid, SpainMycsa Mulder y Co., PALFINGER WIND PartnerDaniel BenitezT +34 91 [email protected]
4
Etoile Sur Rhone, FrancePalfinger France, PALFINGER WIND PartnerGilles AndreT +33 4 [email protected]
5 Rio de Janeiro, BrasilSales O�ceSuzana BarrosT +55 21 [email protected]
8
Busan, KoreaSales O�ceCB SeoT +82 55 314 [email protected]
9
SingaporeSales O�ceFranz SchnöllT +65 6861 2009 [email protected]
10
11 Sekigahara, JapanSekigahara Seisakusho Ltd.,PALFINGER WIND PartnerMasashi FujiiT +81 584 43 [email protected]
PALFINGER WIND SALES OFFICES:
Headquarter:
Salzburg, AustriaT +43 662 [email protected]
3
5
4
2 1
SALES NETWORK
14
1
5
14
7819
2328
17
29
24
13
15
1621
20
22
12
624
25
103
18
27269
11
WIND FARMS EQUIPPED WITH PALFINGER WIND CRANES
UK46 - Beatrice Demonstration – (10MW)Senvion 5M2 o� PK40002MD inside Nacelle
DE01 - Alpha Ventus - (60MW)AREVA M5000-1166 o� PK10000MB inside Nacelle6 o� PS15500-5 on PlatformSenvion 5M6 o� PK40002MD inside Nacelle6 o� PSM580-12 on Platform
BE01 - Thornton Bank Phase I – (30MW)Senvion 5M6 o� PK40002MD inside Nacelle6 o� PSM580-8 on Platform
DE27 - Borkum Phase 1 – (200MW)AREVA M5000-11622 o� PK10000MB inside Nacelle18 o� PK11001MB inside Nacelle40 o� PS15500-5 on Platform40 o� SCM2,5kN-2,6m on Platform
UK17 - Ormonde – (150MW)Senvion 5M30 o� PK40002MD inside Nacelle30 o� PSM400-10 on Platform1 o� PSM400-10 on Substation
UK62 - Galloper Wind Farm – (504MW)1 o� PSM1200-20 on Substation
UK31 - Walney Phase 1 – (183,6MW)Siemens SWT-3.6-12051 o� PCWM3300 inside Nacelle2 o� PK90002MG on Substation2 o� PK23500MD on Substation
UK32 - Walney Phase 2 – (183,6MW)Siemens SWT-3.6-12051 o� PCWM3300 inside Nacelle
UK13 - Lincs – (270MW)Siemens SWT-3.6-1201 o� PSM1200-18 on Substation
BE09 - Thornton Bank Phase II – (184,5MW)Senvion 6M30 o� PK40002MD inside Nacelle30 o� PSM400-10 on Platform1 o� PSM900-11 on Substation
BE10 - Thornton Bank Phase III – (110,7MW)Senvion 6M18 o� PK40002MD inside Nacelle18 o� PSM400-10 on Platform
DK13 - Anholt – (399,6MW)Siemens SWT-3.6-120111 o� SCM10-2,7SX on Platform
DE09 - Global Tech I – (400MW)AREVA M5000-11680 o� PK11001MB inside Nacelle80 o� PS15500-5 on Platform80 o� SCM2,5kN-3,1 on Platform
UK1E - Fife Energy Park – (7MW)Samsung S7.0-1711 o� PK40002MD inside Nacelle1 o� PSM1200-8 on Platform
DE02 - DanTysk – (288MW)Siemens SWT-3.6-12080 o� SCT10-1,3t – 5,0 on Platform
DE07 - Meerwind Ost/Süd – (288MW)Siemens SWT-3.6-12080 o� SCM20-2,3SX on Platform
UK10 - Humber Gateway – (219MW)V112-3.0 MW Vestas2 o� SCM10-2,6SX on Substation1 o� SCM20-2,3SX on Substation1 o� SCM14-3,5L on Substation
BE02 - Northwind – (216MW)V112-3.0 MW Vestas1 o� PSM900-16 on Substation
UK33 - West of Duddon Sands – (389MW)Siemens SWT-3.6-1201 o� PFM3500D on Substation1 o� PTM600-20 on Quayside
DE52 - EnBW Baltic 2 – (288MW)Siemens SWT-3.6-12080 o� PS23500-5 on Platform
DE06 - Nordsee Ost – (295,2MW)Senvion 6M48 o� PK40002MD inside Nacelle48 o� PSM400-10 on Platform48 o� SCMT 3kN-6,0 on Platform1 o� PSM1800-20 on Substation
DK15 - Avedøre Holme – (10,8MW)Siemens SWT-3.6-1203 o� PCWM3300 inside Nacelle
UK02 - Burbo Bank – (90MW)Siemens SWT-3.6-12025 o� PCWM3300 inside Nacelle
UK05 - Greater Gabbard – (504MW)Siemens SWT-3.6-120140 o� PCWM3300 inside Nacelle
UK07 - Gunfleet Sands I + II – (172,8MW)Siemens SWT-3.6-12048 o� PCWM3300 inside Nacelle
UK11 - Inner Dowsing – (97,2MW)Siemens SWT-3.6-12027 o� PCWM3300 inside Nacelle
UK15 - Lynn – (97,2MW)Siemens SWT-3.6-12027 o� PCWM3300 inside Nacelle
UK19 - Rhyl Flats – (90MW)Siemens SWT-3.6-12025 o� PCWM3300 inside Nacelle
UK27 - Sheringham Shoal – (316,8MW)Siemens SWT-3.6-12088 o� PCWM3300 inside Nacelle
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
WWW.PALFINGERMARINE.COM
Wind Farms equipped with PALFINGER WIND cranes
Other existing Wind Farms
Wind Farms in development
15
1
5
14
7819
2328
17
29
24
13
15
1621
20
22
12
624
25
103
18
27269
11
WIND FARMS EQUIPPED WITH PALFINGER WIND CRANES
UK46 - Beatrice Demonstration – (10MW)Senvion 5M2 o� PK40002MD inside Nacelle
DE01 - Alpha Ventus - (60MW)AREVA M5000-1166 o� PK10000MB inside Nacelle6 o� PS15500-5 on PlatformSenvion 5M6 o� PK40002MD inside Nacelle6 o� PSM580-12 on Platform
BE01 - Thornton Bank Phase I – (30MW)Senvion 5M6 o� PK40002MD inside Nacelle6 o� PSM580-8 on Platform
DE27 - Borkum Phase 1 – (200MW)AREVA M5000-11622 o� PK10000MB inside Nacelle18 o� PK11001MB inside Nacelle40 o� PS15500-5 on Platform40 o� SCM2,5kN-2,6m on Platform
UK17 - Ormonde – (150MW)Senvion 5M30 o� PK40002MD inside Nacelle30 o� PSM400-10 on Platform1 o� PSM400-10 on Substation
UK62 - Galloper Wind Farm – (504MW)1 o� PSM1200-20 on Substation
UK31 - Walney Phase 1 – (183,6MW)Siemens SWT-3.6-12051 o� PCWM3300 inside Nacelle2 o� PK90002MG on Substation2 o� PK23500MD on Substation
UK32 - Walney Phase 2 – (183,6MW)Siemens SWT-3.6-12051 o� PCWM3300 inside Nacelle
UK13 - Lincs – (270MW)Siemens SWT-3.6-1201 o� PSM1200-18 on Substation
BE09 - Thornton Bank Phase II – (184,5MW)Senvion 6M30 o� PK40002MD inside Nacelle30 o� PSM400-10 on Platform1 o� PSM900-11 on Substation
BE10 - Thornton Bank Phase III – (110,7MW)Senvion 6M18 o� PK40002MD inside Nacelle18 o� PSM400-10 on Platform
DK13 - Anholt – (399,6MW)Siemens SWT-3.6-120111 o� SCM10-2,7SX on Platform
DE09 - Global Tech I – (400MW)AREVA M5000-11680 o� PK11001MB inside Nacelle80 o� PS15500-5 on Platform80 o� SCM2,5kN-3,1 on Platform
UK1E - Fife Energy Park – (7MW)Samsung S7.0-1711 o� PK40002MD inside Nacelle1 o� PSM1200-8 on Platform
DE02 - DanTysk – (288MW)Siemens SWT-3.6-12080 o� SCT10-1,3t – 5,0 on Platform
DE07 - Meerwind Ost/Süd – (288MW)Siemens SWT-3.6-12080 o� SCM20-2,3SX on Platform
UK10 - Humber Gateway – (219MW)V112-3.0 MW Vestas2 o� SCM10-2,6SX on Substation1 o� SCM20-2,3SX on Substation1 o� SCM14-3,5L on Substation
BE02 - Northwind – (216MW)V112-3.0 MW Vestas1 o� PSM900-16 on Substation
UK33 - West of Duddon Sands – (389MW)Siemens SWT-3.6-1201 o� PFM3500D on Substation1 o� PTM600-20 on Quayside
DE52 - EnBW Baltic 2 – (288MW)Siemens SWT-3.6-12080 o� PS23500-5 on Platform
DE06 - Nordsee Ost – (295,2MW)Senvion 6M48 o� PK40002MD inside Nacelle48 o� PSM400-10 on Platform48 o� SCMT 3kN-6,0 on Platform1 o� PSM1800-20 on Substation
DK15 - Avedøre Holme – (10,8MW)Siemens SWT-3.6-1203 o� PCWM3300 inside Nacelle
UK02 - Burbo Bank – (90MW)Siemens SWT-3.6-12025 o� PCWM3300 inside Nacelle
UK05 - Greater Gabbard – (504MW)Siemens SWT-3.6-120140 o� PCWM3300 inside Nacelle
UK07 - Gunfleet Sands I + II – (172,8MW)Siemens SWT-3.6-12048 o� PCWM3300 inside Nacelle
UK11 - Inner Dowsing – (97,2MW)Siemens SWT-3.6-12027 o� PCWM3300 inside Nacelle
UK15 - Lynn – (97,2MW)Siemens SWT-3.6-12027 o� PCWM3300 inside Nacelle
UK19 - Rhyl Flats – (90MW)Siemens SWT-3.6-12025 o� PCWM3300 inside Nacelle
UK27 - Sheringham Shoal – (316,8MW)Siemens SWT-3.6-12088 o� PCWM3300 inside Nacelle
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
WWW.PALFINGERMARINE.COM
Wind Farms equipped with PALFINGER WIND cranes
Other existing Wind Farms
Wind Farms in development
KP-
WIN
DM
2+E
/ E 0
8 / 1
4, K
08
/ 14,
D 0
8 / 1
4
We reserve the right to change design and specification without prior notice. Applications shown in the leaflet do not always correspond to the standard specifications. Country-specific regulations must be considered for the crane installation. Dimensions may vary. Subject to technical changes, errors and translation mistakes.
WWW.PALFINGERMARINE.COM
Palfinger Marine- und Beteiligungs-GmbHF.-W.-Scherer-Straße 24 | 5020 SalzburgAustria
T +43 662 [email protected]