page 1 envisat validation workshop – 9 decembre esrin envisat pds status & performance

Download Page 1 Envisat Validation Workshop – 9 Decembre Esrin ENVISAT PDS Status & Performance

If you can't read please download the document

Upload: cleopatra-copeland

Post on 17-Jan-2018

217 views

Category:

Documents


0 download

DESCRIPTION

Page 3 Envisat Validation Workshop – 9 Decembre Esrin PDS system (Kiruna Only) scenario) ENVISAT IndustryRGTIECF AOIPAux dataNSFS X-band data FOS FOCC Kiruna X-band TM/TC X band data E_PAC I_PAC F_PAC D_PAC UK_PAC S_PAC PDCC PDHS-E PDHS-K LRAC PDASUET Fin Co PAC PDS

TRANSCRIPT

Page 1 Envisat Validation Workshop 9 Decembre Esrin ENVISAT PDS Status & Performance Page 2 Envisat Validation Workshop 9 Decembre Esrin PDS Overall Status and Plans: Points to be addressed Operation strategy (the Kiruna-only and Kiruna-Svalbard scenario) Encountered difficulties and progress Objectives for the validation u Stabilisation of the PDS towards a sustained throughput u Consolidation of the data dissemination u ENVISAT Mission to be operational by end 2002 for a subset of products and services Objective for the Operations phase u Initial Operations phase u Evolution of the operation scenario (Kiruna-Artemis) u Progressive opening of the User services and phase in of the Users Page 3 Envisat Validation Workshop 9 Decembre Esrin PDS system (Kiruna Only) scenario) ENVISAT IndustryRGTIECF AOIPAux dataNSFS X-band data FOS FOCC Kiruna X-band TM/TC X band data E_PAC I_PAC F_PAC D_PAC UK_PAC S_PAC PDCC PDHS-E PDHS-K LRAC PDASUET Fin Co PAC PDS Page 4 Envisat Validation Workshop 9 Decembre Esrin PDS Data Flow 1-LR Level 0 Unconsolidated (Doris, Scia) 2- HR Level 0 Unconsolidated 3- Browses 4- RA2/MWT L 1b Uncosolidated 5- LR Level 2 FD Products PDHS PACs LRAC 1-Consolidated level 0 (Doris, Sciamachy) 2- Consolidated LR level 1b 1-LR Unconsolidated level 0 2- ASAR Wave and MR 3- MERIS RR Level 2 PDCC 1-Auxiliary Data 2- HR Calibration and Configuration 3- Monitoring and Control Page 5 Envisat Validation Workshop 9 Decembre Esrin Kiruna Only Scenario data acquisition From Launch to 6 th of November 2002 Kiruna Station Data Reception u Receives the complete global mission data dump 8 orbits are received nominally ( dump of the previous orbit within the Kiruna visibility) 4 to 5 orbits out of visibility are recorded and dumped in the first two orbits of the morning, together with the nominal preceding orbit u Receives all recorded ASAR HR and MERIS FR u Receives ASAR HR and MERIS FR in direct visibility Matera Station Operation u Receives ASAR HR and MERIS FR in direct visibility (2 orbits in the morning, 2 orbits in the evening) u Copies the data on D1 tapes, sent to ESRIN u Processing at ESRIN PDHS-E Page 6 Envisat Validation Workshop 9 Decembre Esrin Kiruna Blind Orbits 5 consecutive blind orbits (marked 1 to 5) recorded on SSR 1 and 2 Dump of the recorded data over Kiruna on the first two orbits of Kiruna (first orbit marked 6 ) Page 7 Envisat Validation Workshop 9 Decembre Esrin Kiruna Only Scenario data processing Global Mission archiving and processing strategy u Generation of all level 0 (recovery of any missing level 0 offline over night) u Processing of all level 1B and 2 for the nominal 9 to 10 orbits per day u Dissemination of level 0, level 1B and level 2 products to Cal/Val users from PDHS (DDS, FTP server, media) u All level 0 copied on NTP tapes for the LRAC, where they are consolidated, processed to level 1b, and circulated to PACs, where they are further processed to level 2. Regional Mission archiving and processing Strategy u All ASAR HR and MERIS FR (Kiruna and Matera) processed to level 0 and sent, on NTP tapes, to the relevant PACs (recovery of any missing level 0 offline over night) u Processing of all level 1B at PACs and dissemination to Cal/Val users (media) Page 8 Envisat Validation Workshop 9 Decembre Esrin Mission Planning Global Mission defined using the RGT ( Reference Ops Mission generation Tool) Regional Mission u ASAR operation and on request processing defined by the Cal/Val coordinator via a USF script u MERIS operation and on request processing defined by the Cal/Val coordinator via a script u Background mission defined by the Mission Manager and entered via the USF u Additional PR images requested by ESRIN via the USF All above nominally defined one week ahead of its execution schedule Page 9 Envisat Validation Workshop 9 Decembre Esrin Problems Encountered Lack of robustness of the PDS facilities; Missing/incomplete functionalities (e.g. concatenation of product slices to make complete instrument operation segments, incomplete follow up and reporting of orders, recovery of failed orders, etc); Misfit between the installed Kiruna configuration and the Kiruna only scenario Very poor reporting capabilities Irregular production throughput at PDHS and LRAC Weakness of the data dissemination scenario mainly linked to the Archiving Facility architecture and the dissemination scenario To be noted: The Kiruna Only scenario is much more demanding for this station than any future nominal scenario Testing of the operation, pre-launch, was very much constrained by the limited set of satellite simulated data available ( 2 orbits) Page 10 Envisat Validation Workshop 9 Decembre Esrin Corrective Actions Implemented PDCC ( mission planning): problems circumvented and planning loop stabilised PDHS configuration substantially upgraded ( processing facility, archiving facility) Dissemination scenario (electronic and media) optimised in view of the new configuration, in particular to minimise tape access Procedures and scripts put in place to recover failures and missing products Instrument Processors corrected to reflect current Cal/Val status and Kiruna Svalbard scenario implemented and active on 6 th of November 2002 Page 11 Envisat Validation Workshop 9 Decembre Esrin PDS system (Kiruna-Svalbard) scenario) ENVISAT IndustryRGTIECF AOIPAux dataNSFS X-band data FOS FOCC Kiruna X-band TM/TC X band data E_PAC I_PAC F_PAC D_PAC UK_PAC S_PAC PDCC PDHS-E PDHS-K LRAC PDASUET Fin Co PAC PDS Svalbard X-band data ISPs Page 12 Envisat Validation Workshop 9 Decembre Esrin Kiruna-Svalbard Scenario data processing Global Mission archiving and processing strategy u Generation of all level 0, 1B and 2 for the orbits recovered in Kiruna (9/10) within 3 hours from sensing (recovery plan during the night) u Generation ay PDHS-E of all level 0, 1B and 2 for the orbits recovered in Svalbard (4/5), after transmission to ESRIN via DDS, i.e. within 12 hours from sensing u Dissemination of level 0, level 1B and level 2 products to Cal/Val users from PDHS-K (DDS, FTP server, media) and PDHS-E (FTP server, media) u All level 0 copied on NTP tapes for the LRAC, where they are consolidated, processed to level 1b, and circulated to PACs, where they are processed to level 2 (1 week delay wrt Kiruna only scenario). Regional Mission archiving and processing Strategy u All ASAR HR and MERIS FR processed to level 0 and sent, on NTP tapes, to the relevant PACs (recovery of any missing level 0 offline over night). Kiruna within 3 hours, Matera within 5 days, Svalbard within 2 weeks (sent to ESRIN via DLT) u Processing of all level 1B at PACs and dissemination to Cal/Val users (media) Page 13 Envisat Validation Workshop 9 Decembre Esrin Data Distribution Current Status Global Mission Data Products u Meteo products on FTP server u Media copying at PDHS-K of level 1B and 2 products for distribution to Cal/Val PIs u Product dissemination via DDS and FTP server u Electronic dissemination enhanced through upgrade of disk space, change in subscription strategy and data-driven implementation for systematic dissemination Regional Mission Data Products u ASAR and MERIS FR images produced at PACs u NRT production at PDHS-K has started Page 14 Envisat Validation Workshop 9 Decembre Esrin Acquisition Planning Operational Status at 1st Dec. u Operated in manual mode no planning on week-ends & holidays u ASAR/MERIS HR planned as per user requests (Cal/Val, PIs, DEs), 20% rejections of Cat1 requests due to higher priority Cal/Val requests u Background Regional Mission progressively implemented as per HLOP requirements u All confirmed requests are scheduled no deletion after confirmation of planning Performances u Nominal planning accepted up to 10 working days before acquisition u Late planning accepted up to 4 working days before acquisition u Emergency planning only exceptionally up to 2 working days u No On-call service during the weekends u Acquisition reporting required to confirm successful acquisition Operations Responsible: S. Jutz Page 15 Envisat Validation Workshop 9 Decembre Esrin Production Planning Operational Status at 1st Dec. u Operated in semi-manual mode no delta-plans on week-ends & bank holidays u Generating plans for ESA Stations (PDHS-K/E, PDAS-S/F, LRAC), PACs (all), Foreign Stations (Troms, Gatineau, Prince Albert) u Station reporting disabled due to excessive load on the GSP Performances u Fragile database design causes inconsistency with in avg. 1 crash event / month u Production plans generation too long: 4.5 hours in average (PDHS-K: avg. 1.5 hours) Page 16 Envisat Validation Workshop 9 Decembre Esrin Catalogues Status at 1st December u Online catalogues opened for browse of HR data. Other instrument catalogues and online ordering not activated until data quality and data handling chain sufficiently robust to serve demand. u EOLI-Envisat (MUIS) online catalogueopened to all users since Oct for browse of HR data, performance good, does not yet have ordering interface u DESCW offline cataloguemade available to all users in Oct Page 17 Envisat Validation Workshop 9 Decembre Esrin Envisat on-line catalogue (open since mid-October) Page 18 Envisat Validation Workshop 9 Decembre Esrin Envisat on-line catalogue (browse images) Japan 5 Dec ASAR WS Mekong River 26 Oct ASAR IM MERIS AATSR Page 19 Envisat Validation Workshop 9 Decembre Esrin Acquisition performance PDHS-K (Kiruna, X-band) PDAS-F (Matera, X-band) PDAS-S (Svalbard, X-band) TransmittedAcquiredSuccess rate HR % LR % TransmittedAcquiredSuccess rate HR % LR (MERIS FR) % TransmittedAcquiredSuccess rate HR % LR % Page 20 Envisat Validation Workshop 9 Decembre Esrin Production performance ( (*) does not take into account satellite unavailability (*) Page 21 Envisat Validation Workshop 9 Decembre Esrin Circulation and dissemination performance In the last six month, 1600 tapes (NTP) circulated between the various centers, corresponding to products In the last six month, products disseminated to users by media In the last two weeks, products distributed to users via electronic link, (12000 via DDS, via ftp) Page 22 Envisat Validation Workshop 9 Decembre Esrin Maintenance performance On 1st of January 2002, 400 open SPRs On 1st of December 2002, 300 open SPRs During that period, 700 new SPRs opened. Reception and installation of 59 system deliveries corresponding to 106 facilities, and 2000 installations since launch Page 23 Envisat Validation Workshop 9 Decembre Esrin Future Plans Upgrade of the PDCC and PDHS-E HW u PDCC WS (racked) u PDHS-E WS (racked) u PDHS-E processing nodes (to cope with Artemis scenario) u All FEPS (obsolete HW, no further maintenance) Upgrade of the PDS to cope with reprocessing, in particular the dissemination to users Kiruna-Artemis scenario to be tested mid February 2002, operational in March 2003 Page 24 Envisat Validation Workshop 9 Decembre Esrin PDS system (Kiruna-Artemis) scenario) ENVISAT IndustryRGTIECF AOIPAux dataNSFS X-band data FOS FOCC Kiruna X-band TM/TC X band data E_PAC I_PAC F_PAC D_PAC UK_PAC S_PAC PDCC PDHS-E PDHS-K LRAC PDASUET Fin Co PAC PDS Svalbard X-band data ISPs Ka-band dataDRS TM/TC DRS DRS Mission Control center Ka-band data Page 25 Envisat Validation Workshop 9 Decembre Esrin Services to non-Cal/Val users Beyond Commissiong Phase services to Cal/Val teams, progressive access to Envisat products and services to non-Cal/Val users: u started at mid-September, u by staggered groups of users (essentially AO projects), u supported by order desk and help desk, u with reduced set of products and services: ASAR Image Mode and Wide Swath Mode level 1b products, MERIS Full Resolution level 1b products, limited amount of products by projects. Progressive access also granted to Distributing Entities in order to smooth the transition to a fully operational commercial distribution. Page 26 Envisat Validation Workshop 9 Decembre Esrin Conclusion Some of the PDS facilities still require consolidation Substantial progress on consolidating the planning, production and dissemination of products since the Svalbard scenario PDS platform needs to be upgraded to support reprocessing Transition to Initial Operations phase following ORR1 (gradual phase-in of non cal/val projects and commercial users) ORR 2 and full operations expected mid-2003