6th Plenary Meeting ( #17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03 /03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting (#17) Jérôme Benveniste ENVISAT RA-2/MWR Cross-Calibration and Validation Team Coordinator European Space Agency, Earth Observation Applications Department ESRIN, Via Galileo Galilei, I-00044, Frascati (RM), Italy, (e-mail: [email protected])

Upload: amarion-dewhirst

Post on 01-Apr-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

Sixth Plenary

ENVISAT RADAR ALTIMETRY

CROSS-CALIBRATION and VALIDATION TEAM

Meeting (#17)

Jérôme Benveniste

ENVISAT RA-2/MWR Cross-Calibration andValidation Team Coordinator

European Space Agency,

Earth Observation Applications Department

ESRIN, Via Galileo Galilei, I-00044, Frascati (RM), Italy,

(e-mail: [email protected])

Page 2: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

Before recalling the objectives of the meeting, a few important matters that need immediate dealing with….

Welcome to ESRIN !

Page 3: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

Participants to tonight’s dinner please sign up!

How many of us have a car?

Do you want to go to the same one than last time?

Page 4: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

You are invited to a welcome cocktail

at 17h30 in the Canteen

Page 5: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

Meeting Logistics

• Coffee breaks at 10:30 and 15:30 • Lunch break at 13:00 • On the floor below:

– Self service canteen– Travel office

» Taxi reservation forms to fill out (leave 2 hours before take-off)

– Bank, ATM• A complimentary shuttle leaves the Frascati Piazza Roma

(newspaper stand) at 8:05 and 8:20 and back at 17:15 and 18:15

Page 6: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

Objectives of the Meeting

• Present results obtained on nearly three cycles of GDRs and two cycles of SGDRs

• Discuss cross-calibration results and validation status

• Make recommendations for future evolutions

• Prepare for publication at EGS-AGU-EUG & IGARSS

• Prepare for Final Report

Page 7: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

• L=1 March 2002, SO=12 March 2002• (L+1m) First data report (on S-O day 12/03)• (L+2m) Preliminary report from Esrin in house verif (10 may)• (L+2m) CCVT splinter meeting on products and algorithm verification• (L+3m) Data release to CCVTeam (15 June)• (L+4m) Interim Report (prod val, l2 verif, prel x-cal)• (L+6m) End comm ph Cross-cal and Val full report• (L+6m) RA-2/MWR CCVT plenary meeting (9-10 Sept)• (L+6m) Calibration review (10-13 Sept)• (L+9m) Validation Workshop (report+ presentation) (10-13/ Dec)• (L+10m) Final RA-2/MWR CCVT meeting (9-10/12 or 14-15/01/03)• (L+12m) Final report on Cross-cal• (L+12m) end of RA-2/MWR CCVT project

Original Schedule

15 August for FDMAR9 November for GDR etc.

Preliminary product validation

skipped

Extended schedule…

Jan-Feb-Mar/03 Processing of 3 cycles

Page 8: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

• (L+9m) Validation Workshop (report+ presentation) (10-13/ Dec)

• (L+10m) Acquisition and processing of three cycles until 17 Jan 03

• (L+13m) Sixth RA-2/MWR CCVT meeting (25-27 March 03)

• (L+14m) EGS/AGU/EUG Special session Geodesy-13 “Impact of new and planned mission” , Nice (F) (7-11 April 03)

• (L+15 m) Final report on Cross-calibration and Validation (May 03)

• (L+15m) end of RA-2/MWR CCVT project (end May 03)

• IGARSS Special Session, Toulouse (F) (July 03)

Extended Schedule

Page 9: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

Agenda

Page 10: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

ENVISAT MISSION STATUS

By Henri Laur, ENVISAT Mission Manager

Page 11: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

Data Availability

• Presented by Nicolas Picot, CNES (F-PAC)

Page 12: 6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

6th Plenary Meeting (#17) RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03

Agenda