opening single track lintel fixing - eos facades · opening single track lintel fixing ... jamb...

15
Date: TYPICAL OPENING - SINGLE TRACK LINTEL & CILL CONNECTION DETAIL (S & T) STAGE: Preliminary: Approval: Construction: 261 Drawing No. Revision: Approved By: D EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, County Durham, DL5 6QG Tel : (01325) 303 030 www.eosuk.org Drawn By: Scale: Title: Studs have swaged ends to fit inside the track so that both studs & tracks are the same width to assist in providing as flush a finish as is possible NTS TE Aug 2015 OPENING SINGLE TRAC OPENING SINGLE TRACK LINTEL FIXING LINTEL/CILL TRACK FIXED INTO CRIPPLE TRACK USING 2 No 5.5 x 25mm TEK SCRE (EOS-1005 or similar approved) ONE FIXIN CENTRALLY INTO EACH FLANGE. 100mm LONG SWAGED CRIPPLE TRACK FI JAMB STUD USING 3 No 5.5 x 25mm TEK (EOS-1005 or similar approved) NOTE :- AN ADDITIONAL STUD IS REQUIRED POSITIONED WITHIN 150mm (min) AND 22 (max) EITHER SIDE OF ALL STRUCTURAL OPENINGS FOR A MASONARY FACADE PROJECT FOR BRICK TIE CHANNEL FIXING 100mm LONG SWAGED CRIPPLE TRACK FI JAMB STUD USING 3 No 5.5 x 25mm TEK S (EOS-1005 or similar approved) AH/KB

Upload: truongque

Post on 14-Mar-2019

253 views

Category:

Documents


0 download

TRANSCRIPT

Date:

TYPICAL OPENING - SINGLE TRACK LINTEL & CILL CONNECTION DETAIL

(S & T) STAGE:

Preliminary:

Approval:

Construction:

261

Drawing No. Revision: Approved By:

D

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Aug 2015

OPENING SINGLE TRAC

OPENING SINGLE TRACK LINTEL FIXING

LINTEL/CILL TRACK FIXED INTO CRIPPLE

TRACK USING 2 No 5.5 x 25mm TEK SCRE

(EOS-1005 or similar approved) ONE FIXIN

CENTRALLY INTO EACH FLANGE.

100mm LONG SWAGED CRIPPLE TRACK FI

JAMB STUD USING 3 No 5.5 x 25mm TEK

(EOS-1005 or similar approved)

NOTE:- AN ADDITIONAL STUD IS REQUIRED

POSITIONED WITHIN 150mm (min) AND 22

(max) EITHER SIDE OF ALL STRUCTURAL

OPENINGS FOR A MASONARY FACADE

PROJECT FOR BRICK TIE CHANNEL FIXING

100mm LONG SWAGED CRIPPLE TRACK FI

JAMB STUD USING 3 No 5.5 x 25mm TEK S

(EOS-1005 or similar approved)

AH/KB

Date:

TYPICAL OPENING - SINGLE JAMB & DOUBLE STUD LINTEL & CILL

CONNECTION DETAIL (S & T) STAGE:

Preliminary:

Approval:

Construction:

262

Drawing No. Revision: Approved By:

D

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Aug 2015

D

DOUBLE STUD CILL FIXINGOPENING SINGLE JAMB AND

DOUBLE STUD LINTEL FIXINGOPENING SINGLE JAMB AND

NOTE:- AN ADDITIONAL STUD IS REQUIRED

POSITIONED WITHIN 150mm (min) AND 225mm

(max) EITHER SIDE OF ALL STRUCTURAL

OPENINGS FOR A MASONARY FACADE

PROJECT FOR BRICK TIE CHANNEL FIXING

100mm LONG SWAGED CRIPPLE TRACK FIXED TO

JAMB STUD USING 3 No 5.5 x 25mm TEK SCREW

(EOS-1005 or similar approved)

100mm LONG SWAGED CRIPPLE TRACK FIXED TO

JAMB STUD USING 3 No 5.5 x 25mm TEK SCREW

(EOS-1005 or similar approved)

SWAGED DOUBLE STUD LINTEL / CILL FIXED INT

CRIPPLE TRACK USING 2 No 5.5 x 25mm TEK

SCREWS (EOS-1005 or similar approved) ONE

FIXING CENTRALLY INTO EACH FLANGE.

DOUBLE STUD LINTEL / CILL FIXED TOGETHER USING 5

TEK SCREWS (EOS-1005 or similar approved) 4 FIXING

NOGGIN. DOUBLE STUD LINTEL / CILL FIXED TO LINTE

TRACK USING 5.5 x 25mm TEK SCREWS (EOS-1001 or

approved) @ 600mm CENTRES.

AH/KB

Date:

TYPICAL OPENING - DOUBLE STUD JAMB & DOUBLE STUD LINTEL & CILL

CONNECTION DETAIL (S & T) STAGE:

Preliminary:

Approval:

Construction:

263

Drawing No. Revision: Approved By:

D

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Aug 2015

DOUBLE STUD CILL FIXINGOPENING DOUBLE JAMB AND

DOUBLE STUD LINTEL FIXINGOPENING DOUBLE JAMB AND

ED

NOTE:- DOUBLE STUDS ARE MANUFACTURED AT 100mm W

AS STANDARD, HOWEVER THEY CAN BE MANUFACTURED W

TO ENCAPSULATE THE ADDITIONAL STUD AS REQUIRED TO

POSITIONED WITHIN 150mm (min) AND 225mm (max) EIT

SIDE OF ALL STRUCTURAL OPENINGS FOR A MASONARY FA

PROJECT FOR BRICK TIE CHANNEL FIXING

SWAGED DOUBLE STUD LINTEL / CILL FIXED INTO

CRIPPLE TRACK USING 2 No 5.5 x 25mm TEK

SCREWS (EOS-1005 or similar approved) ONE

FIXING CENTRALLY INTO EACH FLANGE.

DOUBLE STUD LINTEL / CILL FIXED TOGETHER USING

5.5 x 25mm TEK SCREWS (EOS-1001 or similar

approved) 4 FIXINGS PER NOGGIN. DOUBLE STUD

LINTEL / CILL FIXED TO LINTEL & CILL TRACK USING

5.5 x 25mm TEK SCREWS (EOS-1001 or similar

approved) @ 600mm CENTRES.

DOUBLE STUD JAMBS / DOUBLE STUD LINTELS /

CILLS MANUFACTURED OFFSITE IN EOS FACTORY

AH/KB

Date:

TYPICAL DOUBLE STUD CONNECTION DETAIL (S & T) STAGE:

Preliminary:

Approval:

Construction:

265

Drawing No. Revision: Approved By:

D

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Aug 2015

DEFLECTION HEAD FIXING

DOUBLE STUD JAMBS MANUFACTURED

OFFSITE IN EOS FACTORY.

DOUBLE STUDS CONNECTED

FIXED WITH 4 No. 5.5 x 25m

(EOS-1001 or similar approv

600mm CENTRES.

NOTE:- DOUBLE STUDS ARE MANUFACTURED AT 100mm

WIDE AS STANDARD, HOWEVER THEY CAN BE

MANUFACTURED WIDER TO ENCAPSULATE THE

ADDITIONAL STUD AS REQUIRED TO BE POSITIONED

WITHIN 150mm (min) AND 225mm (max) EITHER SIDE O

ALL STRUCTURAL OPENINGS FOR A MASONARY FACADE

PROJECT FOR BRICK TIE CHANNEL FIXING

AH/KB

Date:

TYPICAL LATTICE LINTEL DETAIL (S & T) STAGE:

Preliminary:

Approval:

Construction:

266

Drawing No. Revision: Approved By:

C

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Aug 2015

AD OF O

PENING

roved)

K SCREWS

LATTICE FIXED TO DOUBLE

STUD USING 4 No 5.5 x 25mm

TEK SCREWS (EOS-1002 or similar

approved)

DOUBLE JAMB STUD WITH

SHORTENED INNER STUD

TO PROVIDE BEARING FOR

DOUBLE JAMB STUD AND LATTICE

LINTEL FABRICATED OFFSITE IN

EOS FACTORY

AH/KB

Date:

TYPICAL STUD & TRACK MID-HEIGHT RESTRAINT DETAIL (S & T) STAGE:

Preliminary:

Approval:

Construction:

269

Drawing No. Revision: Approved By:

C

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

NTSTE Aug 2015

PLAN ON TYPICAL CORNER

CRIPPLE TRACK FIXED ONTO THE BACK WEB OF THE VERTICAL STUD.

TRACK THEN CLOAKS THE TWO CRIPPLE TRACKS AND FIXED AS SHOWN

CLOAKING TRACK

50mm x 1mm FLAT STRAP TO RUN ACROSS FULL BAY. 2 No. FIXINGS INTO EACH

STUD. STRAP TO BE FITTED ON INTERNAL FACE OF STUDS AT ALL TIMES.

NOTE: ORIENTATION OF STUDS 2& 3 MUST BE WEB TO WEB FACING

STEP 1 STEP 2 STEP 3

THIS DETAIL IS TO BE USED IN ALL SITUATIONS WHERE A MID-HEIGHT RESTRAINT IS REQUIRED.

LENGTH OF MID-HEIGHT RESTRAINT TO BE SPECIFIED BY ENGINEER.

STUD SIZE & SPACING TO BE JOB SPECIFIC SPECIFIED BY EOS.

2 No

TEK

SIM

TEK SCREWS INTO BOTH FLANGES (EOS-1005

OR SIMILAR APPROVED)

x

5mm

E OF

ILAR

TRACK WITH 2 No. 5.5 x

25mm TEK SCREWS

(EOS-1005 OR SIMILAR

APPROVED)

AH/KB

Date:

TYPICAL VENT OPENING CONNECTION DETAIL (S & T) STAGE:

Preliminary:

Approval:

Construction:

270

Drawing No. Revision: Approved By:

B

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Aug 2015

25mm

TYPICAL VENT OPENING

ELEVATION

25mm

RACK CAN BE CUT OUT

T CLASHES WITH THE

VER PLEASE ENSURE THAT

PLACED A 50-100mm

EACH END OF TRACK

JAMB STUD

D INTO CRIPPLE TRACK

mm TEK SCREWS

approved) ONE FIXING

H FLANGE.

TRACK FIXED

25mm TEK

proved)

AH/KB

Date:

TYPICAL HARD FIXED LINTEL CONNECTION (S & T) STAGE:

Preliminary:

Approval:

Construction:

271

Drawing No. Revision: Approved By:

A

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

NTSTE Aug 2015

DEFLECTION BRACKETS OR

DEFLECTION HEAD TRACK IS NOT

REQUIRED ON THE STUDS ABOVE THE

OPENING FOR A HARD FIXED LINTEL -

DEFLECTION IS TO BE ALLOWED FOR

ABOVE THE WINDOW

WINDOW MANUFACTURER TO ALLOW

ADDITIONAL TOLERANCE FOR

MOVEMENT / DEFLECTION ABOVE THE

HEAD OF THE WINDOW

TYPICAL HARD FIXED LINTEL ELEVATION

TYPICAL SECTION

NOTE:- PROJECT SPECIFIC HARD FIXED

LINTEL DETAILS WILL BE PROVIDED

DURING DESIGN REVIEW WITH AN EOS

ENGINEERS AS ADDITIONAL BRACKETRY

OR WINDPOSTS MAY BE REQUIRED FOR

LARGER OPENINGS

DEFLECTION GAP (TYP 25mm)

Head track

(Fixing to suit structure)

WINDOW MANUFACTURER TO ALLOW ADDITIONAL

TOLERANCE FOR MOVEMENT / DEFLECTION ABOVE

THE HEAD OF THE WINDOW

Alternative fixing

position.

Vertical stud

mm minimum.

Lintel track

AH/KB

Date:

TYPICAL PARAPET WIND POST CONNECTION DETAIL (S & T) STAGE:

Preliminary:

Approval:

Construction:

272

Drawing No. Revision: Approved By:

C

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Aug 2015

NOTES1. Fixing provided as required for windloading restraint.

2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs

exceeding the limits highlighted in detail 209

3. Each track length to have fixing 50-100mm from each end.

STRUCTURE AT SSL & PROTRUDES

INTERNALLY PAST THE WALL LINE

Post Double Stud

mm Tek screws

roved)

WIND

MANU

IN EO

ATE - EOS

IRM PROJECT

QUIREMENTS

Wind

Plate

(EOS

EOS base track

using fixings (E

centres to suit

50-100mm from

AH/KB

Date:

TYPICAL DOUBLE STUD CONNECTION DETAIL (S & T)

[DHT - DEFLECTION HEAD TRACK] STAGE:

Preliminary:

Approval:

Construction:

273

Drawing No. Revision: Approved By:

A

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Aug 2015

25

mm

DEFLECTION HEAD

ELEVATION

BASE FI

HEAD FIXING

DOUBLE STUD JAMBS MANUFACTURED

OFFSITE IN EOS FACTORY

DOUBLE STUDS CONNECTED USING NOG

FIXED WITH 4 No. 5.5 x 25mm TEK SCRE

(EOS-1001 or similar approved) - NOGGI

CENTRES.

NOTE:- DOUBLE STUDS ARE MANUFACTURED AT 100mm

WIDE AS STANDARD, HOWEVER THEY CAN BE

MANUFACTURED WIDER TO ENCAPSULATE THE

ADDITIONAL STUD AS REQUIRED TO BE POSITIONED

WITHIN 150mm (min) AND 225mm (max) EITHER SIDE

OF ALL STRUCTURAL OPENINGS FOR A MASONARY

FACADE PROJECT FOR BRICK TIE CHANNEL FIXING

Vertical Double stud fixed to DeflectionHead Track through slotted holes using2 No 5.5 x 25mm tek screws (EOS-1005or similar approved). Screws fixedcentral in slot to allow +/- 12.5mm ofmovement.

AH/KB

Date:

TYPICAL OPENING WIND POST CONNECTION DETAIL

[DEFLECTION HEAD BRACKET] (S & T) STAGE:

Preliminary:

Approval:

Construction:

274

Drawing No. Revision: Approved By:

-

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Sep 2015

NOTES1. Fixing provided as required for windloading restraint.

2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs

exceeding the limits highlighted in detail 209

3. Each track length to have fixing 50-100mm from each end.

NOTE: BASEPLATE C

STRUCTURE AT SSL

INTERNALLY PAST T

WIND POST DOU

MANUFACTURED

IN EOS FACTORY

CT

TS

Wind Post D

Plate using 4

(EOS-1020 o

EOS

using

cent

50-1

WIND POST BASEPLATE - EOS

W

Pl

(E

EOS head track s

using fixings (EO

centres to suit w

50-100mm from

2 No. Def

lintel leve

with 2 No

slot.

AH/KB

Date:

TYPICAL OPENING WIND POST CONNECTION DETAIL

[DEFLECTION HEAD TRACK] (S & T) STAGE:

Preliminary:

Approval:

Construction:

275

Drawing No. Revision: Approved By:

-

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

NTSTE Sep 2015

NOTES1. Fixing provided as re

2. Installer to confirm l

exceeding the limits highlighted in detail 209

3. Each track length to have fixing 50-100mm from each end.

NOTE: BASEPLATE CO

STRUCTURE AT SSL &

INTERNALLY PAST TH

WIND POST DOUB

MANUFACTURED O

IN EOS FACTORY (

Wind Post Do

Plate using 4

(EOS-1020 or

EOS b

using

centre

50-10

Wi

Pla

(EO

EOS deflection he

soffit using fixings

centres to suit win

50-100mm from e

2 No. Defle

lintel level t

with 2 No.

slot.

AH/KB

Date:

TYPICAL DROPPED LINTEL DETAIL (S & T) STAGE:

Preliminary:

Approval:

Construction:

276

Drawing No. Revision: Approved By:

-

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Sep 2015

ng supported on 1 No.

acket each end. Bracket

fixed using 2 No. EOS-1005 to each leg

1 No. Simpson EFIXS100 Bracket to each

vertical stud within the Dropped Lintel to

provide lateral restraint and maintain

deflection allowance. Bracket fixed to

underside of structure using 2 No.

EOS-1007 fixings. Bracket fixed to EOS

studs using 1 No. EOS-1003 large washer

head fixing, fixed centrally in slot.

DEFLECTION HEAD

ELEVATION

15-2

5mm G

ap

Mai

eith

AH/KB

Date:

TYPICAL OPENING INLINE WIND POST CONNECTION DETAIL - FIXING

INTO STEEL ONLY [DEFLECTION HEAD BRACKET] (S & T) STAGE:

Preliminary:

Approval:

Construction:

277

Drawing No. Revision: Approved By:

-

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Sep 2015

NOTES1. Fixing provided as required for windloading restraint.

2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs

exceeding the limits highlighted in detail 209

3. Each track length to have fixing 50-100mm from each end.

WIND POST DOUBLE STUD

MANUFAC

IN EOS FA

T

S

Wind

Plate

(EOS

INLINE WIND POST BASEPLATE - EOS

ENGINEER TO CONFIRM PROJECT

EOS head

using fixin

centres to

50-100mm

2 N

lint

wit

slo

AH/KB

Date:

TYPICAL OPENING INLINE WIND POST CONNECTION DETAIL - FIXING

INTO STEEL ONLY [DEFLECTION HEAD TRACK] (S & T) STAGE:

Preliminary:

Approval:

Construction:

278

Drawing No. Revision: Approved By:

-

EOS Facades Ltd Heighington Lane, Aycliffe Industrial Park, Newton Aycliffe, C

ounty Durham

, DL5 6Q

G Tel : (01325) 303 030 www.eosuk.org

Drawn By: Scale:

Title:

Studs have swaged ends to fit inside the track

so that both studs & tracks are the same width

to assist in providing as flush a finish as is possible

NTSTE Sep 2015

NOTES1. Fixing provided as required for windloading restraint.

2. Installer to confirm line and level of track base prior to fixing and report deviations greater than +/- 15mm, or any overhangs

exceeding the limits highlighted in detail 209

3. Each track length to have fixing 50-100mm from each end.

WIND POST

MANUFACTU

IN EOS FAC

Wind P

Plate us

(EOS-1

WIND POST BASEPLATE - EOS

EOS deflect

soffit using

centres to s

50-100mm

2 No

lintel

with

slot.

AH/KB