arpitha steel lintel catalogue
TRANSCRIPT
-
7/29/2019 Arpitha Steel Lintel Catalogue
1/6
Introduction :
ARPITHA EXPORTS manufactures of quality innovative building
products. We are committed to excellence in product development
and customer service.
For almost 20 years ARPITHA EXPORTS are manufacturers of
Innovative Building material which has been widely acknowledgedand used by a large number of reputed Builders, Developers and
Architects across the country. Our consistent quality and service
being the reason behind our achievement.
Steel Lintels are manufactured to meet specific design
requirements in the most economical way and may be called off as
required on site against an agreed schedule.
For the fullest information on building products contact our
technical department or appointed sales offices. Also visit
http//:www.arpithaexports.com
Arpitha Steel Lintel a product of :
ARPITHA EXPORTS (AE)# 56/1, 1st A Main, Magadi Main Road,
Kottigepalya, Bangalore 560 091Ph : 080 23586517, 23481143, 23482914
Telefax : 080 23484094E-mail : [email protected]
http://www.arpithaexports.com
-
7/29/2019 Arpitha Steel Lintel Catalogue
2/6
Lintel Type ASL 100/50 ASL 150/50
Sheet
Thickness (mm)3.0 3.0
Length in
Meters
Uniformly distributed
safe working load in (KN)
0.90 1.20 12.4 13.2
1.30 1.50 6.8 7.1
1.60 - 1.80 5.0 5.8
1.90 2.10 3.6 4.0
2.20 3.00 2.7 3.1
The Steel Lintels are made of 3 mm thick Cold Rolled
coil. The coil is duly perforated with 12.0 mm dia
holes to enable good mortar penetration. The
product is finally phosphated for surface treatment
and then Powder Coated to a thickness of 60 to 80
microns for corrosion prevention.
50 mm
200 mm end bearing should be allowedat each side of the clear opening
50 mm
100 mm 150 mm
-
7/29/2019 Arpitha Steel Lintel Catalogue
3/6
Lintel Type ASL 200/50 ASL 225/50
Sheet Thickness (mm) 3.0 3.0
Length in MetersUniformly distributed
safe working load in (KN)
0.90 1.20 12.7 17.0
1.30 1.50 7.2 12.8
1.60 - 1.80 5.9 10.4
1.90 2.10 4.1 9.2
2.20 3.00 3.2 7.0
CodeDimensions (mm) To Suit Lintel
Type
No. & Diameter
of anchorsA B C T
LBR 100 100 150 150 3 ASL 100 3 M 8 x 80
LBR 150 150 150 150 3 ASL 150 4 M 8 x 80
LBR 200 200 200 150 3 ASL 200 3 M 10 x 80
LBR 225 225 225 150 3 ASL 225 4 M 10 x 80
Arpitha Lintel Bracket
50 mm
200200200200 mmmmmmmm 225 mm
-
7/29/2019 Arpitha Steel Lintel Catalogue
4/6
Ideally, installation of an Arpitha Steel Lintel takes only 6 minutes were there are walls on both the sides,
which saves significant time. In cases were brackets are used the time consumed is marginally higher.
But ultimate saving on time, labor and cost is quite obvious and practically achievable.
Were ever the span is more than 1 meter, you have to provide a support(Jack) below the lintel after placing the lintel
at the desired location, before starting the brick / block work. Initially complete the first two course on the first day.
The same procedure may be followed on the second & Third day also. From the Fourth day onwards, the work can
been continued as usual without any restriction until completion. The support(Jack) provided below the lintel may be
removed after the 5th
day. Any span of over 2.25 meters will have at-least one welded joint depending upon the size
ordered, which is unavoidable and inconsequential to the products performance. If the span is more than 2 meters,
the Lintel will have to be anchored to the Roof with 10 mm dia Threaded Rods & Anchor bolts at an interval of every 1
meters depending upon the site conditions. The anchor bolts thus fixed will be fully embedded in the Brick / Blockwall completely once the wall is finished.
INSTALLATION:
The lintel is placed above the open space in the block work fully embedded in the block work cement mortar. Please
ensure that the wall on either side of the clear opening were the Lintel have to be fixed, are in the same level . A layer
of cement mortar is applied on the surface of the lintel and laying of block work is continued as is done in the normal
course. Here is a typical installation of Arpitha steel lintel which abuts to a concrete column.
TYPICAL RCC LINTEL INSTALLATION AT SITE
-
7/29/2019 Arpitha Steel Lintel Catalogue
5/6
-
7/29/2019 Arpitha Steel Lintel Catalogue
6/6