Plani Editing Ongoing Plani Editing Goals: • Update some Plani features at an increased frequency. • Update more extent of Plani (more than 50 square miles). • Use available sources of information to do “smart” updates.

Upload: sun

Post on 12-Jan-2016

51 views

Category:

Documents


0 download

DESCRIPTION

Ongoing Plani Editing. Goals: Update some Plani features at an increased frequency. Update more extent of Plani (more than 50 square miles). Use available sources of information to do “smart” updates. Plani. Results: Some Plani will be “dynamic” (i.e. bldg, edge, obld, veg?) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Ongoing Plani Editing

Plani Editing

Ongoing Plani Editing

Goals:

• Update some Plani features at an increased frequency.

• Update more extent of Plani (more than 50 square miles).

• Use available sources of information to do “smart” updates.

Page 2: Ongoing Plani Editing

Plani Editing

Plani

Results:

• Some Plani will be “dynamic” (i.e. bldg, edge, obld, veg?)

• New features will be less accurate.

• New features may still need to be replaced with accurate inventories at a later date depending on needs.

Page 3: Ongoing Plani Editing

Plani Editing

Plani

3 Current Tests:

• Capture bldg for pilot area in De Soto.

• Capture bldg for part of a tile that Harden is delivering (J13) and compare.

• Automate building permit point file and create “dummy” bldgs.

Page 4: Ongoing Plani Editing

Plani Editing

Plani

Pilot Area:

• 8 square miles.

• Estimated 256 building permits from 1998 to 2002.

• 342 changes. 311 buildings added, 31 updated. Approximately 79 deletes.

Page 5: Ongoing Plani Editing

Plani Editing

Plani

Page 6: Ongoing Plani Editing

Plani Editing

Plani

Examples of edits:• New Buildings

Page 7: Ongoing Plani Editing

Plani Editing

Plani

Examples of edits:• Building Expansions

Page 8: Ongoing Plani Editing

Plani Editing

Plani

Examples of edits:• Building Changes

Page 9: Ongoing Plani Editing

Plani Editing

Plani

Examples of edits:• Building Deletions

Page 10: Ongoing Plani Editing

Plani Editing

Plani

Complications of editing:

• Ground noise

Page 11: Ongoing Plani Editing

Plani Editing

Plani

Complications of editing:

• Photo parallax

Page 12: Ongoing Plani Editing

Plani Editing

Plani

Complications of editing:

• Photo parallax

98-2000 Ortho

2003 Ortho

Page 13: Ongoing Plani Editing

Plani Editing

Plani

Complications of editing:

• Tree cover

Page 14: Ongoing Plani Editing

Plani Editing

Plani

Complications of editing:

• Small buildings

Page 15: Ongoing Plani Editing

Plani Editing

Plani

It’s Not All Bad!

Page 16: Ongoing Plani Editing

Plani Editing

Plani

Challenges:

• Exporting back to tiled covs for legacy apps.– Added SectID field.– Problem with layerexport on large extent.

• Exporting to DXF with attributes retained.– Rebuild AAT on conversion.– Export new/edited data to separate file.

Page 17: Ongoing Plani Editing

Plani Editing

Plani

Practical Implications:

• Will a mix of feature types be helpful?

• Will AAT drop cause any problems?

• Will this method of update be worthwhile?

• Will mixing sources cause problems?

• Could maintenance be distributed?

• How do you place “dummy points”?