Design and Construction Open House June 22, 2017 On Site OMF East and TOD Vision

Upload: others

Post on 07-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Design and Construction Open House

June 22, 2017

On Site

OMF East and TOD Vision

Page 2: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Jennifer Lemus, Community Outreach, Sound Transit

Tracy Reed, Executive Project Director, Sound Transit

Supriya Kelkar, Sound Transit

Hensel Phelps Team

Tracy Reed, Sound Transit

Jennifer Lemus, Sound Transit

Agenda

Introduction

OMF East Project Background Summary

OMF East Design-Build Proposal Review

Next Steps

Open House 6:30-7:30 PM

Page 3: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Objectives

• Provide background of the Operations & Maintenance

Facility East Project

• Walk through the selected design-build proposal for the

OMF East/TOD masterplan

• Explain next steps in the project’s development and

construction timeline

Page 4: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Project Snapshot

• Initial Baseline: July 2016

• Budget: $449.2 million (YOE)

• Schedule: Construction complete Dec. 2020

• Commitments to-date: $297mArea Map

OMF East Location and Project Snapshot

4

Page 5: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

2018

Property Acquisition

Design Build proposals

Design Build Contract

Public, Stakeholder & City Council Presentations

Construction Start

TOD Procurement, Development window

Permit process

Rail Operations

OMF East Overall Summary Schedule

5

Page 6: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

6

OMF East Agreements and Milestones

Design-Build Procurement Method Summer 2015

Final EIS Issued September 2015

Sound Transit Board Site Selection October 2015

Federal Record of Decision (ROD) November 5, 2015

Board Authorized Property Acquisition December 2015

Request for Qualifications April 2016

Request for Proposals to 3 teams September 2016

Select Design-Builder & negotiate March – May 2017

Notice to Proceed (NTP) June 19, 2017

Page 7: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Proposal Supriya Kelkar, AIA, Design Oversight Lead

Sound Transit

Page 8: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

• Facility to service, deploy and store

96 LRVs

• Vehicle maintenance shop with 14

service bays

• Mainline track, systems & station

maintenance functions

(Maintenance of Way)

• LRV parts storage and car wash

• Administrative and locker room

facilities to support ~250 full-time

employees

• Equipment and furnishings

• 24/7, 365 day operations

OMF East Program Highlights

8

Page 9: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East The Selected Design Build Team

Notice to Proceed was issued to the

Hensel Phelps team on June 19th.

Contract Value of approximately $219M

Substantial Completion by Q4 2020

9

Page 10: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Project Context & Proposed Site Plan

Spring District/

120th Station

OMF East

Eastside Rail

Corridor Trail

Pine

Forest

Property

ERC

Connection

KC Metro

East Base

Future BPS

School

AutoNation

Dealership

Future

AutoNation

Dealership

Fu

ture

Sp

ring

Blv

d 120th Ave NE

Future 6 story

Garage

Potential ERC/Future

NE 15th Connection

10

Page 11: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Strong OMF Facility Design - This proposal best captured and

resolved the functional and programmatic requirements of

operations facility with direct and achievable construction solution.

Optimized TOD Opportunity - The Hensel Phelps proposal

optimizes the needs of the OMF East facility program while

creating unencumbered, marketable development opportunities.

Provided the most compelling TOD vision, best supporting the

shared goal of the Implementation Agreement to allow for

approximately 1.2m SF of future development.

Best Value - The proposal allows for storage of light rail vehicles

as early as June 2020 based upon the proposed schedule.

OMF East Key Proposal Attributes

11

Page 12: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Design-Build Proposal OverviewBrian Gustine, Hensel Phelps

Matt Roewe, VIA Architecture

Page 13: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Hensel Phelps’ Proposed Overall Site Plan

Operations

Facility

Storage

YardMaintenance

of Way

TOD

Masterplan

13

Page 14: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Highlights of Site Design

Separate OMF and MOW

Buildings

MOW Building moved to

south end of Site

Primary Entrance at North

end of Site

Landscape buffers and 14’

bicycle path at 120th Street

Responds to Bel-Red

Subarea Plan and standards

14

Page 15: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Vehicle Maintenance Facility Main Floor Plan

15

Page 16: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Maintenance of Way (MOW) Floor Plan

16

Page 17: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Aerial View Looking North West

17

Page 18: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Building Details

Conventional steel framed two story

buildings to maximize spans and

clear height

Cast in place concrete base wall with

insulated metal panel exterior with

various colors and textures, along

with glazed storefront systems,

windows and sun shades for

modulation

Clean roofscape with consistent

parapet lines and organized and

screened mechanical equipment18

Page 19: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Arial View Looking Southeast

19

Page 20: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Main Facility Entrance

20

Page 21: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East View south along 120th Ave NE Interim Multi-use Trail

21

Page 22: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East View south along East Side Rail Corridor

22

Page 23: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Upcoming Schedule

23

Master Development Plan & OMF Design Review June – December 2017

Final Design & Permitting June 2017 – June 2018

Interim Trail work September – November 2017

Mobilization on-site September – November 2017

Abatement & Demolition November 2017 – March 2018

Site Grading & Utilities March – September 2018

Start of Building Concrete June 2018

Page 24: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

TOD Masterplan in the OMF East ProposalMatt Roewe, AIA

VIA Architecture

Page 25: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

ZoningBR-OR-2 (125’)

mixed-use

Size 282,715 SF (6.5 acres)

Development

Capacity1.1 – 1.2 million GSF

Development

Parameters

Min 20% Residential

Min. 50,000 SF Retail

Mixed Use Yes

Project

Milestones

2017: MDP submittal

2018-2019: Developer RFP

2021-2023: Potential

Construction

OMF East TOD Summary Metrics

25

Page 26: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

A Village Within The Spring District

Goals:

• Exemplary TOD

• Create Value through

Placemaking

• Embrace Bel-Red Planning

Vision & Principles

• Maximize Utilization Of

Residual Land

26

Page 27: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East TOD Original Concept from MOU

Spring District/

120th Station

OMF East

ERC

Connection

KC Metro

East Base

Future BPS

School

AutoNation

Dealership

120th Ave NE

27

Page 28: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East TOD Overall Context Plan

Spring District/

120th Station

OMF East

Pine

Forest

Property

ERC

Connection

KC Metro

East Base

Future BPS

School

AutoNation

Dealership

120th Ave NE

Potential ERC/Future

NE 15th Connection

28

Page 29: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

A Village Within The Spring District

29

Page 30: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Context Responsive

Spring District/

120th Station

OMF East

Pine

Forest

Property

KC Metro

East BaseAutoNation

Dealership

30

Page 31: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Connected Now & In The Future

Potential Future

120th Ave NE

Realignment &

Widening

Spring

Boulevard

Potential Future

Ichigo Way / 15th

Ave NE

Spring District/

120th Station

Potential ERC

Connection(s)

31

Page 32: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Phase II - Plan with Realigned 120th Ave NE

Spring District/

120th Station

OMF East

Eastside Rail

Corridor Trail

KC Metro

East Base

AutoNation

Dealership

120th Ave NE

32

Page 33: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Site Planning Organization

• Offices Provides Buffering

• Larger “Retail” Street

• Village Square Civic Heart

• Retail & Services Clustered

• Welcoming Gateway To The

Spring District

• Day & Night Mixed Uses

• Solar Orientation

• Affordable Housing Strategy

33

Page 34: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

N-S Section through Future TOD

View to West from

120th Ave NE

Commercial / Office BuildingAffordable Residential

Retail on Plaza

Underground Parking

Retail on Street

75’

125’

34

Page 35: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Buffering

35

Page 36: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Gateway

36

Page 37: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Commercial / Office Building

Retail on Street

Active Ground Floors

37

Page 38: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Retail 60,000 SF

Office 650,000 SF

Residential500 Units(Affordable, Market & Efficiency

Units)

Total Area 1.1 to 1.2 Million SF

Parking2000 Stalls(Below Grade)

Density 3600 People(800 Residents + 2800 Jobs)

FAR Used3.4 (4.0 Possible)

OMF East TOD Summary Metrics – MDP Application

38

Page 39: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Next StepsTracy Reed

Sound Transit

Page 40: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

OMF East Upcoming work

City of Bellevue Permit applications

• Critical Areas

• Master Development Plan / Design Review (Completed by January 2018)

• Early work: o Temporary Bike Trail connections (Fall 2017)

o Building Demolition (Fall 2017)

o KC Sewer Replacement, (Winter/Spring 2018)

• Building and sub-trade permitting (2018)

Property acquisition continues

Three-Party Agreement: 120th Ave NE design and King County bus facilities

East Side Rail Corridor coordination 40

Page 41: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

TOD Procurement Steps - 2018

41

Suitability

for Housing

Method of

Offer

Adjusting

Land Value

Hensel Phelps defines surplus property

boundary as outcome of final design

Issues for Board Consideration:• Approach to determining suitability for housing

on a large development tract

• Surplus property disposition

• Options for offering of surplus property or a joint

development opportunity that satisfies statute

• Strategies for facilitating development goals on

now-unencumbered future TOD property

Page 42: OMF East and TOD Vision - Link light rail...Jun 22, 2017  · OMF East Design-Build Proposal Overview Brian Gustine, Hensel Phelps Matt Roewe, VIA Architecture ... MOW Building moved

Thank You